PDF 166 KB Posted

Attached to
SPRAY COAT SYSTEM Federal contract opportunity
Solicitation number
N0016416T0154
Issued by
Department of the Navy Naval Sea Systems Command

About this file

16T0154_0002

View the file

Other files for this federal contract opportunity

Other files attached to SPRAY COAT SYSTEM, newest first.
File Type Posted
16T0154_0001.pdf PDF
16T0154_sol.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is to remove language from the Evaluation Criteria.

All other terms and condition remain the same.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-16-T-0154

X 9B. DATED (SEE ITEM 11)

04-Aug-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

24-Aug-2016

CODE

NAVAL SURFACE WARFARE CENTER CRANE DIV

ANDREW B. FICKLIN

BLDG. 3373

300 HWY 361

CRANE IN 47522-5001

N00164 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N00164-16-T-0154

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SAP PROV - SAP PROVISIONS

The following have been modified:

CNIN-SAP-022 EVALUATION CRITERIA (MAY 2005)

THE FOLLOWING BEST VALUE DETERMINATION IAW FAR 13.106 WILL BE USED

TO EVALUATE THE QUOTES USING LOW PRICE TECHNICALLY ACCEPTABLE

EVALUATION CRITERIA:

QUOTERS – PLEASE SEE THE FOLLOWING FOR EVALUATION CRITERIA

The following Best Value Factors listed will be used to evaluate the Quotes using Low Price

Technically Acceptable Evaluation Criteria – GO – NO GO Criteria:

TECHNICAL APPROACH

DELIVERY

PAST PERFORMANCE

CONSTRUCTIVE ACCEPTANCE

PRICE

Technical Acceptance Factor #1: Technical Approach

Quoters will need to provide product literature or a capabilities document which outlines how the vendor will provide the system IAW the specification. The product literature or capabilities document will be evaluated by the Requiring Technical Activity (RTA) to ensure technical acceptance.

Technical Acceptance Factor #2: Delivery

Quoters will need to fill out the clause 52.211-8 for evaluation by the Government. All vendors who can meet the Governments required delivery date will be deemed technically acceptable.

Technical Acceptance Factor #3: Past Performance

Past performance will be evaluated based on the below questionnaire. The contractor will need to complete the questionnaire in its entirety and provide all information.

Projects listed will need to be work that had been completed by the contractor for same/similar supplies within the past three years and can be either Government or

Commercial contractors.

Past performance will be based on GO / NO GO basis, evaluated strictly on the information provided on the questionnaire and Past Performance Information Retrieval System

(PPIRS), see provision 252.213-7000 . An unacceptable (NO GO) equals the inability to have met any work listed on the questionnaire or PPIRS. A quoter with no past performance will be evaluated as neutral.

Technical Acceptance Factor #4: Constructive Acceptance

Acceptance period is 30 days once the system is delivered and installed.

SEE TECHNICAL ACCEPTANCE EVALUATION MATRIX BELOW:

Quoter’s by checking a “GO” column you are certifying that your company meets technical acceptance evaluation factors. Matrix must be filled out for consideration of award.

TECHNICAL ACCEPTANCE

EVALUATION FACTOR

GO NO

GO

IF YOU CAN EXCEED ANY TECHNICAL ACCEPTANCE

EVALUATION CRITERIA PLEASE INDICATE HOW

BELOW

CONFORMANCE TO

SPECIFICATIONS

By checking GO in this box you are certifying you can provide the system required that meets all aspects outlined in the specifications.

CONFORMANCE TO DELIVERY

By checking GO in this box you are certifying that your company meets the Governments required delivery schedule outline in 52.211-8.

CONFORMANCE TO PAST

HISTORY

By checking GO in this box you are certifying that your company meets all of the requirements.

CONFORMANCE TO

CONSTRUCTIVE ACCPETANCE

By checking GO in this box you are certifying that your company agrees to the constructive acceptance of 30 days.

A RESPONSIVE QUOTE CONSISTS OF THE FOLLOWING

Signed SF 1449 (ALL PAGES RETRURNED)

52.211-8 Time Of Delivery SF 1449 Delivery schedule filled out with Quoters delivery dates

All pricing must be entered on each CLIN of solicitation.

Technical Evaluation Matrix completely filled out

Past Performance Questionnaire completely filled out

ADDITIONAL DOCUMENTATION WILL BE ACCEPTED HOWEVER NO

QUOTER WILL BE CONSIDERED TECHNICALLY ACCEPTABLE WITHOUT

THE ABOVE MENTIONED DOCUMENTATION.

TO BE CONSIDERED TECHNICALLY ACCEPTABLE ALL QUOTERS MUST MEET

THE ABOVE CRITERIA. ONCE QUOTERS HAVE BEEN DEEMED TECHNICALLY

ACCEPTABLE, THEN AND ONLY THEN WILL PRICE BE EVALUATED.

Quotes that are non-compliant with any material requirement of this solicitation may be rejected without further consideration for award. This will be a firm fixed price contract and will be awarded utilizing Simplified Acquisition

Procedures.

ATTACHMENT I EXPERIENCE QUESTIONNAIRE

EXPERIENCE QUESTIONNAIRE

Instructions: Complete by inserting information or Xing box, as indicated. If extra space is needed to complete an item, use the remarks block (indicate item number in remarks block).

1. Contractor Name, Address, and Telephone

Number

DUNS Number:

CAGE Code:

2. Submitted to (Office Name & Address)

– Attn: Casandra O’Neall

NSWC Crane

RE: Solicitation #N00164-16-T-0154

3. Business

Non-

4. How many years do you or your firm have in the line of work contemplated by this solicitation? ________ Years

5. How many years experience in contracting have you or your business had as a (a) prime contractor ________ and/or (b) sub-contractor ______ for same/similar services.

6. List below the projects your business has completed within the last three years (continue on separate sheet if necessary):

Contract

Amount

Type of Project

Date Completed Name, Address, and Telephone No. of

Owner/Person to Contract for Project

Information

7. List below all of your firm’s contractual commitments running concurrently with the work contemplated by this solicitation (continue on separate sheet if necessary):

Contract

Amount

Dollar Amt

Of Award

Name, Address, and Telephone No. of

Business/Government Agency Involved

Awarded

(Units)

Percent

Completed

Date

Contract

Completed

8a. Have you ever failed to complete any work awarded to you? _____ Yes _____ No

8b. Has work ever been completed by performance bond? _____ Yes _____ No

8c. If “Yes” to either item 8a or 8b specify location(s) and reason(s) why (continue on separate sheet if necessary):

CERTIFICATION

I certify that all of the statements made by me are complete and correct to the best of my knowledge and that any persons named as references are authorized to furnish NSWC Crane with any information needed to verify my capability to perform this project.

9a.Certifying Official’s Name and Title

9b. Signature (Sign in Ink) 10. Date

(End of Summary of Changes)