AMENDMENT 00001 - SOLICITATION
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 16RWS05_sol.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Correct and clarify the Salient Characteristics. Change the offer due date from 10 July 2016 to 11 July 2016.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 05-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N00164-16-R-WS05
X 9B. DATED (SEE ITEM 11)
09-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
05-Jul-2016
CODE
NAVAL SURFACE WARFARE CENTER CRANE DIV
D.HARRELL (812-854-8291)
BLDG 121
300 HWY 361
CRANE IN 47522-5001
N00164 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N00164-16-R-WS05
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 4.0 - CLAUSES & OTHER FULL TEXT INFORMATION
SUMMARY OF CHANGES
SECTION 1.0 - SCHEDULE/INSPECTION & ACCEPTANCE/DELIVERY
The required response date/time has changed from 10-Jul-2016 02:00 PM to 11-Jul-2016 02:00 PM.
The following have been modified:
SALIENT CHARACTERISTICS
Brand Name or Equivalent Specification
The government requests a new, not remanufactured commercial 3D printing system brand name or equivalent to the Fortus 900mc manufactured by Stratasys and as specified within this document.
1. 3D Printing Type
1.1 The printer should be a Material Extrusion (ASTM F2792) type. This is commonly known as Fused
Deposition Modeling (FDM).
2. 3D Printing Materials:
2.1 The printer shall be capable of printing a mold material that can be withstand multiple autoclave cure cycles with a worst-case section at 2-hours, 50psig, and at 410°F. ULTEM 1010 has been identified as an acceptable material that meets this requirement and will be the baseline for evaluating potential equivalent materials.
2.2 The printer shall be capable of printing the following materials with a compatible secondary support material type. Equivalent material types (with corresponding equivalent mechanical, chemical, UV, thermal, and electrical properties) would be acceptable.
Material Type Support Material ULTEM 1010 Breakaway
ASA Soluble Nylon 12 Soluble
Polycarbonate (PC) Soluble ULTEM 9085 Breakaway
2.3 The Fortus printer shall include the Fortus Plus cartridge upgrade to retain material cartridge compatibility with the Fortus 450mc system. This requirement only applies to the Fortus printer.
2.4 The printer shall be capable of printing the below layer heights with the materials noted (or their equivalents).
Layer Height Intended Material Use .007 ASA, Nylon 12, PC .010 ASA, Nylon 12, PC, ULTEM 9085, ULTEM 1010 .013 ASA, Nylon 12, PC, ULTEM 9085, ULTEM 1010
.020 ASA, ULTEM 1010
2.5 The printer shall include the materials and consumables in the below table. Fortus starter packs with the material of the quantity noted shall be included. Equivalent printers shall include vendor-specific materials and consumables equivalent to the Fortus material type and properties in quantities noted.
Starter Packs (Fortus Plus Cartridges) Quantity
ASA Starter Pack 3 Nylon 12 Starter Pack 3
Polycarbonate (PC) Starter Pack 3 ULTEM 9085 Starter Pack 2 ULTEM 1010 Starter Pack 2
Material Cartridges (Fortus Plus) Quantity
ULTEM 1010 Model (ea) 8 ASA Model Light Gray (ea) 4
Extrusion Tips Quantity T14 Tips (ea) 4 T20 Tips (ea) 4 T40 Tips (ea) 4
Consumables Quantity
Tip Wipe Brush (ea) 4 Tip Wipe Flicker Plates (ea) 16
ULTEM 1010 Large Build Sheets (Pkg 10) 2
3. 3D Printing Machine/Build Properties
3.1 The printer shall have, at minimum, a build envelop size of 36” x 24” x 36” (XYZ).
3.2 The printer shall include dual extruders for both model and support material deposition.
3.3 The printer shall have two material bays and two support material bays with auto changeover or shall be able to support the loading of equivalent amounts of both at one time.
3.4 The printer shall have a heated build chamber capable of producing and maintaining temperatures required for the optimum printing of the ULTEM 1010 or equivalent material.
4. Soluble Support Removal
4.1 The printer shall include a standalone support material removal appliance with a removal volume that equals or exceeds the required build envelop volume.
5. Facilities Restrictions
5.1 The printer shall have a maximum size of 165” x 145” x 120” (Width x Depth x Height).
5.2 The standalone support material removal appliance shall have a maximum size of 75” x 55” x 120” (Width x Depth x Height).
5.3 The standalone support material removal appliance shall not generate noise at or exceeding 85 dBA while operating as measured at a normal operator’s position.
6. 3D Printing Software
6.1 Printing software shall be included and shall interface with the printer natively and include both processing and print-job management functions.
6.2 Processing software shall accept import of .STL files for geometry data.
6.3 Processing software shall have full toolpath control of both the material and support material.
6.4 Software shall include the ability to print all specified materials.
7. Installation & Training
7.1 The vendor shall provide onsite installation of the 3D printer.
7.2 The vendor shall provide a minimum 2 day training course at the OEM location on the use of the 3D printer, advanced features of the software, and applications support for ULTEM 1010 or equivalent material.
8. Warranty
8.1 Standard commercial warranty (SCW) included at no additional cost seen as acceptable and equivalent regardless of warranty length or terms.
(End of Summary of Changes)