This document outlines the requirements for a federal solicitation requesting the manufacture of a Cable Assembly Launcher. Key details include:
-
The solicitation is for the manufacture and quality requirements of the Cable Assembly Launcher in accordance with applicable drawings and specifications. Technical requirements include cage codes, source control, first article testing, quality assurance procedures, packaging and preservation requirements, and testing plans.
-
Offerors must meet delivery dates and technical specifications for the Cable Assembly Launcher as defined in drawings 6292767, 7454380, and 7552008. Quality conformance testing, material certifications, and test plans are required and must be approved and submitted according to the DD Form 1423.
-
The award will be bilateral, requiring the contractor's written acceptance. The Department of the Navy Naval Supply Systems Command is the issuing agency. The solicitation includes standard clauses around inspection, changes, packaging, and mercury restrictions. Documentation and reporting must follow the DD Form 1423 Contract Data Requirements List.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE Prescribed by GSA
FAR (48 CFR) 53.243
STANDARD FORM 30 (REV. 10-83)
(a) By completing Items 8 and 15, and returning ____ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
30-105
(If required)
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
tended.
is not ex-is extended,
12. ACCOUNTING AND APPROPRIATION DATA
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)14. DESCRIPTION OF AMENDMENT/MODIFICATION appropriation date, etc.)
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(Signature of Contracting Officer)
(Specify authority)
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
10A. MODIFICATION OF CONTRACT/ORDER NO.
(SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.(No., street, county, State and Zip Code)8. NAME AND ADDRESS OF CONTRACTOR
6. ISSUED BY
PAGE OF PAGES1. CONTRACT ID CODE
3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO.
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
IN ITEM 10A.
THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
(such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
(Specify type of modification and authority)D. OTHER
BY(Signature of person authorized to sign)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
CODE FACILITY CODE
CODECODE
(Type or print)16A. NAME AND TITLE OF CONTRACTING OFFICER
16B. UNITED STATES OF AMERICA
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
15B. CONTRACTOR/OFFEROR
15A. NAME AND TITLE OF SIGNER (Type or print)
(SEE ITEM 13)
(If applicable)5. PROJECT NO.4. REQUISITION/PURCHASE REQ. NO.
7. ADMINISTERED BY (If other than Item 6)
16C. DATE SIGNED15C. DATE SIGNED
Contractor is not, is required to sign this document and return ____ copies to the issuing office.
10B. DATED
9B. DATED
E. IMPORTANT:
1 10
0001 2022 APR 21 21027-0022 (HIPRSY )
N00104
NAVSUP WEAPON SYSTEMS SUPPORT MECH
5450 CARLISLE PIKE
MECHANICSBURG, PA 17050-2411
CREATOR OFC CD: N744.16
N00104-22-Q-NC89
X
2022 MAR 02
X X
THE HOUR AND DATE SPECIFIED FOR RECEIPT OF OFFERS IS EXTENDED TO 4:30 PM LOCAL TIME ON 2022 APR 22.
SEE NEXT PAGE
N00104-22-Q-NC89 AMEND: 0001 PAGE 2 OF 10
NOTE:
The TDP has been updated from version 027 to 028.
The due date of offers has been extended to 22 APR 2022.
First Article Testing clauses have been added.
All other terms and conditions remain unchanged.
PAGES
OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED
NAME OF OFFEROR OR CONTRACTOR
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
N00104-22-Q-NC89 AMEND: 0001 3 10
0001 TDP VERSION NUMBER IS CHANGED FROM 027 TO 028
SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E AND ATTACHMENTS
ALL REFERENCES TO WAIVERS ON PRIOR TDPS ARE NO LONGER APPLICABLE
REFERENCE NUMBERS STILL APPLY
N00104-22-Q-NC89 AMEND: 0001 PAGE 4 OF 10
PART I - THE SCHEDULE
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
CLIN: 0001
NIIN: 015688540 ACTIVITY USE ONLY: TDP VERSION NO.: 028
ITEM NAME: CABLE ASSY LAUNCHER
1. SCOPE
1.1 This contract/purchase order contains the requirements for manufacture and the contract quality requirements for the CABLE ASSY LAUNCHER .
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order shall take precedence. Nothing in this contract/purchase order, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.3
DRAWING NO. CAGE REV DOC TYPE DISTR CD SHEET NR REV TYPE SIZE
6292767 53711 B FN D3 0001 B 49998 0009641
6292767 53711 B FN D3 0002 B 49998 0005626
6292767 53711 B FN D3 0003 B 49998 0005167
7454380 53711 B VD D3 0001 49998 0862515
7552008 53711 B FN D3 0001 49998 0034183
DOCUMENT REFERENCES
SPEC NO. SLASH NO. PART NO REV DATE DISTR CD AMEND CHG NTC SUPP
MIL-STD-129 R 24 MAY 18 A
MIL-STD-130 N 16 NOV 12 A
ISO_9001 - 15 NOV 08 A
ISO 9002 - 01 JUL 94 A
MIL-I-45208 A 03 NOV 95 A 2
ISO9001 - 15 DEC 00 A
S9320-AM-PRO-020/MLDG 2 01 AUG 99 A
3. REQUIREMENTS
3.1 Cage Code/Reference Number Items - The CABLE ASSY LAUNCHER furnished under this contract/purchase order shall be the design represented by Cage Code(s) reference number(s). Cage _______ ref. no.
<53711 7454380-3 15789 7454380-3 17476 7454380-3>
3.1.1 NAVSEA S9320-AM-PRO-020/MLDG - Manufacture of this item requires vendor certification in accordance with
NAVSEA S9320-AM-PRO-020/MLDG.
3.1.2 <Per the NAVSEA molding manual (S9320-AM-PRO-020/MLDG REV 2), in process step number 4-9 (PRESHIPMENT INSPECTION), the manual states: "ensure test inspection report (DS9: appendix II-F),is properly completed and is packaged with cable assembly".>
3.2 Source Control Item - Previous delivery of the specified National Stock Number or similar item manufactured to technical procurement specifications and/or drawings supplied by a Government activity or Price Contractor does not in itself qualify a supplier as a Government approved source. Only those sources for this item previously approved by the Government have been solicited. The time required for approval of a new supplier is normally such that award
N00104-22-Q-NC89 AMEND: 0001 PAGE 5 OF 10
cannot be delayed pending approval of the new source.
If you have not been solicited and you can furnish either (a) proof of your prior approval as a supplier of this item, or (b) data showing you have produced the same or similar items satisfactorily for the Government or a commercial source, or (c) test data indicating your product can meet service operating requirements, or (d) other pertinent data concerning your qualificatin to produce the required item, notify the Procurement Contracting Officer in writing, furnishing said proof of data for evaluation possibly leading to your firm being authorized as an approved source for this procurement or subsequent procurements.
3.3 <A Quality Conformance Test Plan (QCTP) shall be submitted for government approval. Approval of this plan is required prior to scheduling First Article testing. The In-Service Engineering Agent (ISEA), Naval Undersea Warfare Center Division Keyport Code 435, will witness First Article Testing (see dwg 7454380 Note 22). If First Article testing is waived, approval of the QCTP is required prior to testing the first production lot unit. The Defense Contract Management Agency will act as the ISEA's designated representative (per note 18) and will witness quality conformance testing on the first production lot unit.>
3.4 First Article Test Procedures are required and must be approved prior to any First Article Testing.
3.5 First Article Approval (Contractor Testing) - First Article Test (FAT) and approval is required.
3.6 Hydrostatic Test - Hydrostatic Testing of the CABLE ASSY LAUNCHER shall be in accordance with <Note 18 (F) on Dwg 7454380> .
3.7 Marking - This item shall be physically identified in accordance with MIL-STD-130.
3.8 Serialization - The supplier shall mark a serial number on each CABLE ASSY LAUNCHER in accordance with <DWG 7454380 NOTE 15> . Actual serial numbers will be assigned <by the ISEA, NUWC Divsion, Keyport, 610 Dowell St., Keyport WA 98345, Code 435> .
3.9 Changes in Design, Material Servicing, or Part Number - Except for a Code 1 change, which shall be processed as provided in the code statement shown below, no substitution of items shall be made until the SPCC Contracting Officer has been notified and approval has been given by issuance of a written change order. When any change in design, material, servicing or part number is made to replace or substitute any item to be furnished on this contract/purchase order, the Contractor shall furnish, for the substituting/replacement item, a drawing and an explanation of the reason for the change, or a detailed description of the change, explaining the reason therefore.
If finished detail drawings are not available, shop drawings inthe form used by the manufacturer will be acceptable for Government evaluation. When notifying the Contracting Officer of the reasons for making substitutions, the type of change shall be indicated by code number in accordance with one of the following statements:
Code 1: PART NUMBER CHANGE/MINOR DESIGN CHANGE - If the Manufacturer's Part Number or item design indicated thereon has changed, but form, fit and function of the item is not affected thereby, and the design change meets the criteria for minor, by not effecting form, fit, function, reliability or safety , supply the item and advise SPCC immediately of the new part number, furnishing a detail drawing and/or a detailed description of the change, as applicable.
Code 2: Assembly (or set or kit) not furnished - Used following detail parts.
Code 3: Part not furnished separately - Use assembly.
Code 4: Part redesigned - Old and new parts are completely interchangeable.
Code 5: Part redesigned - New part replaces old. Old part cannot replace new.
Code 6: Part redesigned - Parts not interchangeable.
3.10 Mercury Free - The material supplied under this contract/purchase order is intended for use on submarines/surface ships and therefore shall contain no metallic mercury and shall be free from mercury contamination. Mercury contamination of the material will be cause for rejection.
If the inclusion of metallic mercury is required as a functional part of the material furnished under this contract, the Contractor shall obtain written approval from the Procurement Contracting Officer before proceeding with manufacture. The contractor's request shall explain in detail the requirements for mercury, identify specifically the parts to contain mercury, and explain the method of protection against mercury escape. Such a request will be forwarded directly to the Procurement Contracting Officer with a copy to the applicable Government Inspector. Upon approval by the Contracting Officer, the vendor will provide a "Warning Plate" stating that metallic mercury is a functional part of the item and will include name and location of that part.
The use of mercury, mercury compounds, or mercury-bearing instruments and/or equipment in a manner which might cause contamination in the manufacture, assembly, or test of material on this contract is prohibited. The most probable causes of contamination are direct-connected manometers, mercury vacuum pumps, mercury seals, or the handling of mercury in the immediate vicinity. Mercury switches, mercury in glass thermometers, standard cells and other items containing mercury may be used if they are located so as not to constitute a contamination hazard.
N00104-22-Q-NC89 AMEND: 0001 PAGE 6 OF 10
If external contamination by metallic mercury occurs or is suspected, the following test may be used to determine whether contamination by metallic mercury exists or whether corrective cleaning measures have been effective. Enclose the equipment in a polyethylene bag or close-fitting airtight container for eight hours at room temperature (70 degrees F minimum).Sample the trapped air and if mercury vapor concentration is 0.01 mg/cu meter or more, the material is mercury contaminated insofar as the requirements of this contract are concerned.
These requirements shall be included in any subcontract or purchase order hereunder and the Contractor shall insure SubContractor compliance with these requirements.
Technical questions pertaining to these requirements shall be referred to the Procurement Contracting Officer via the cognizant Administrative Contracting Officer. For background, the following information is provided:
Mercury is corrosive to gold, silver, nickel, stainless steels, aluminum and copper alloys. Stainless steels, nickel, and copper alloys are widely used in reactor plants and other submarine/surface ship systems. Accidental trapping of mercury in a component could cause serious damage to vital parts. Mercury is also toxic if inhaled, ingested, or absorbed through the skin. It is evident that grave consequences could result from small amounts of mercury vapor present in an unreplenished submarine/surface ship atmosphere.
3.11 Vendor Waivers/Deviations - Compliance with the delivery date and technical requirements of NAVICP-MECH Repair Part Material contracts is expected.
As a cautionary note, seller intended use of any material which is not in full compliance with the specified contract technical requirements shall be identified as an exception in response to this solicitation.
Request for delivery date extensions and waivers/deviations shall be accompanied by an explanation of the cause for the delay, or the reason for the requested nonconformance to this solicitation in the event the Procurement Contracting Officer (PCO) concurs with your request.
Request for waivers/deviations shall provide justification for the requested change including an evaluation which demonstrates that proposed nonconformance will not affect the quality, form, fit, or function of the part.
Requests for Waiver/Deviations shall be presented to the Government Quality Assurance Representative (QAR) for comment. (The QAR shall forward the request, with their comments, directly to the post award PCO within five working days after receipt.)
3.12 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number <CSD023> in ECDS at https://register.nslc.navy.mil/
3.13 <CABLE JACKET ADHESION TESTING:
Testing shall be required to verify the adhesion strength of the bondbetween arctic neoprene jacketed cables and cured polyurethane. A sampleof the cable jacket material or a portion of the arctic neoprene cablejacket can be removed and used to perform adhesion testing per therequirements of ASTM D1876, Standard Test Method for Peel Resistance ofAdhesives, (T-Peel Test). The arctic neoprene material must be aged atambient temperature for a minimum of three months; cable which has beenstored on a reel at ambient temperature in a temperature controlled roomis acceptable. Test apparatus, procedure and reporting is defined inASTM D1876, except that the Aluminum and or Aluminum-Alloy Sheet or Plateshall be a cured polyurethane block, rather than a metal strip. Anyalternate adhesion tests must be approved by NAVSEA. The required adhesionvalue shall be:Adhesion Value - lbf/in of width, minimum: 15 Polyurethane shall be selected from NAVSEA S9320-AM-PRO-020 allowablemolding systems. To every extent possible, the molding procedure shallbe performed in accordance with NAVSEA S9320-AM-PRO-020.>
3.14 <FAT is required IAW DWG 7454380 Rev B note 22. FA testing shall be conducted if suggested source of supply identified in note 21 has not been qualified per previous LAC manufacturing efforts or similar cable manufacturing effortsas approved by NAVSEA.FA testing / Qaulity Comformance Testing shall beconducted IAW requirements denoted in note 18 and the PRO-20 Manual, VOL II.>
PART I - THE SCHEDULE
SECTION D
PACKAGING AND MARKING
CLIN: 0001
NIIN: 015688540 ACTIVITY USE ONLY: TDP VERSION NO.: 028
ITEM NAME: CABLE ASSY LAUNCHER
5. PACKAGING
5.1 Preservation, Packaging, Packing and Marking - Preservation, Packaging, Packing and Marking shall be in accordance with the Contract/Purchase Order Schedule and as specified below.
N00104-22-Q-NC89 AMEND: 0001 PAGE 7 OF 10
Unique Item Identification (UID) per requiremetns of MIL-STD-130N shall be procured/manufactured by vendor and affixed in approximate location shown on DWG 7454380.
MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
CLIN: 0001
NIIN: 015688540 ACTIVITY USE ONLY: TDP VERSION NO.: 028
ITEM NAME: CABLE ASSY LAUNCHER
4. QUALITY ASSURANCE
4.1 <MIL-I-45208A IS AUTHORIZED BY NAVSUP WSS TO BE UTILIZED IN LIEU OF ISO 9001.>
4.2 Responsibility for Inspection - Unless otherwise specified in the contract/purchase order, the Contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract/purchase order, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements.
4.3 Inspection System Requirements - The supplier shall provide and maintain an inspection/quality system acceptable to the Government. The inspection system requirements for this contract/purchase order shall be in accordance with MIL-I-45208. Suppliers certified to perform under ISO 9001 or ISO 9002 are granted permission to utilize the one desired in lieu of MIL-I-45208.
4.4 Responsibility for Compliance - All items must meet all requirements of this contract/purchase order. The inspection set forth in this specification shall become a part of the Contractor's overall inspection system or quality program. The absence of any inspection requirements shall not relieve the Contractor of the responsibility of assuring that all products or supplies submitted to the Government for acceptance comply with all requirements of the contract/purchase order. Sampling in quality conformance does not authorize submission of known defective material, either indicated or actual, not does it commit the Government to acceptance of defective material.
4.5 Records of Inspection - (This requirement is not applicable to Government Purchase Orders) Records of all inspection work performed by the Contractor, as referenced elsewhere in this contract, shall be kept complete and available to the Government during the performance of the contract and for a period of four years after final delivery of supplies.
4.6 First Article Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423). The test procedures shall be approved prior to production.
There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure previously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved.
In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order.
4.7 First Article Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423). The report shall be approved prior to production.
4.8 Production Lot Test Procedures - (Government Approval) - The Contractor shall prepare and submit test procedures in accordance with the Contract Data Requirements List (DD Form 1423).
There is hereby created an option for the Government to waive the requirement for submission of a test procedure. If the Offeror has had its test procedure proviously approved by the Government, furnish the name of the approval activity, date of approval, and contract number under which the test procedure was approved.
In the event the Government exercises the option to waive submission of a test procedure, the previously approved procedure shall apply to the contract/purchase order.
4.9 Production Lot Test/Inspection Report - The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423).
4.10 Production Lot Test (Contractor) - The Contractor shall perform 100% production testing in accordance with
N00104-22-Q-NC89 AMEND: 0001 PAGE 8 OF 10
<Note 18 of Dwg 7454380 Quality Conformance Testing of all manufactured cable assemblies.> .
4.11 Material Certification - The material composition inspection shall consist of a certification that material requirements have been met. The Contractor shall prepare and submit a report in accordance with the Contract Data Requirements List (DD Form 1423).
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
CLAUSE 52.209-3 IS INCORPORATED
52.209-3
FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(a) The Contractor shall test < > unit(s) of Lot/Item < > as specified in this contract. At least < > calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within < > calendar days from the date of this contract to < > (insert address of the Government activity to receive the report) marked "First Article Test Report: Contract No. < > , Lot/Item No. < > " Within < > calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following a disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule,or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may delivcer the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) above, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
< > Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
N00104-22-Q-NC89 AMEND: 0001 PAGE 9 OF 10
52.209-3 (CONT)
FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
< > Alternate II (Sep 1989). As prescribed in 9.308-1(a)(3) and (b)(3), substitute the following paragraph (g) for paragraph (g) of the basic clause:
(g) Before first article approval, the Contracting Officer may, by written authorization, authorize the Contractor to acquire specific materials or components or to commence production to the extent essential to meet the delivery schedules. Until first article approval is granted, only costs for the first article and costs incurred under this authorization are allocable to this contract for
(1) progress payments, or
(2) termination settlements if the contract is terminated for the convenience of the Government. If first article tests reveal deviations from contract requirements, the Contractor shall, at the location designated by the Government, make the required changes or replace all items produced under this contract at no change in the contract price.
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
CLIN: 0001
NIIN: 015688540 ACTIVITY USE ONLY: TDP VERSION NO.: 028
ITEM NAME: CABLE ASSY LAUNCHER
DOCUMENT NAME EXHBT/ATTCHMNT
NOTES ATTACHMENT 1
DD1423 EXHIBIT
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION M
EVALUATION FACTORS FOR AWARD
CLAUSE SUPTXT215-9401(6-03) IS INCORPORATED
SUPTXT215-9401(6-03)
EVALUATION OF FIRST ARTICLE TESTING
(a) Offerors are advised that the contract awarded as a result of this solicitation will require first article testing. This requirement may be waived by the Contracting Officer when supplies identical or similar to those called for have previously been delivered by the offeror and accepted by the Government. Therefore, offerors can submit alternative offers, one including testing and approval and the other excluding testing and approval. If the Government waives the requirement for first article unit(s), test plans, testing and test reports(s) for eligible offerors, the prices set forth in paragraph (g) will be used in evaluating offers. In addition, all provisions relating to first article testing will be deleted from the resulting contract.
(b) Offerors shall identify these identical or similar supplies by the contract number, agency, national stock number, contract award date, and contract delivery date.
CONTRACT NSN CONTRACT AWARD DELIVERY
AGENCY NUMBER DATE DATE
(c) ( < > ) The Government is responsible for first article testing under this contract. The cost to the Government of this testing will be a factor in the evaluation of offers, as it will be added to the offers requiring first article testing. The estimated cost of this testing is $( < > )__________.
( < > ) The contractor is responsible for first article testing under this contract.
(d) The approved first article serves as a manufacturing standard.
(e) Earlier delivery, if required in case of waiver of first article, shall not be a factor in the evaluation for award.
(f) The prices for first articles and first article tests in relation to production quantities shall not be materially unbalanced, if first article test items or tests are to be separately priced.
N00104-22-Q-NC89 AMEND: 0001 PAGE 10 OF 10
SUPTXT215-9401(6-03) (CONT)
EVALUATION OF FIRST ARTICLE TESTING
(g) Unit price offered if First Article is waived: $__________.
N00104-22-Q-NC89 AMEND: 0001
ATTACHMENT 1 PAGE: 1
CLIN: 0001
NIIN: 015688540 ACTIVITY USE ONLY: TDP VERSION NO.: 028
ITEM NAME: CABLE ASSY LAUNCHER
6. NOTES
6.1 Ordering Information for Document References - The Department of Defense Single Stock Point (DODSSP), Website http://www.dsp.dla.mil/, provides product information for the Department Of Defense Index Of Specifications and Standards (DODISS) (i.e.Military/Federal Specifications and Standards), Data Item Descriptions (DIDs), and other DODSSP Products.
A. Availability of Cancelled Documents - The DODSSP offers cancelled documents that are required by private industry in fulfillment of contractual obligations in paper format. Documents can be requested by phoning the Subscription Services Desk.
B. Commercial Specifications, Standards, and Descriptions - These specifications, standards and descriptions are not available from Government sources. They may be obtained from the publishers of the applicable societies.
C. Ordnance Standards (OS), Weapons Specifications (WS), and NAVORD OSTD 600 Pages - These type publications may be obtained by submitting a request to:
Commander, Indian Head Division, Naval Surface Warfare Center Code 8410P, 101 Strauss Avenue Indian Head, MD 20640-5035
D. On post-award actions, requests for "Official Use Only" and "NOFORN" (Not Releasable To Foreign Nationals) documents must identify the Government Contract Number, and must be submitted via the cognizant Defense Contract Management Command (DCMC) for certification of need for the document. On pre-award actions such requests must be submitted to the PCO for certification of need for the document.
E. NOFORN Military Specifications and Standards (including Amendments, Change Notices and Supplements, but NOT interim Changes) to be ordered from:
Contracting Officer
NAVICP-MECH
Code 87321 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788
F. Nuclear Reactor Publications Assigned NAVSEA Documents and Identification Numbers (i.e. NAVSEA Welding Standard, NAVSEA 250-1500-1) are to be ordered from:
Commanding Officer
NAVICP-MECH
Code 009 5450 Carlisle Pike P.O. Box 2020 Mechanicsburg, Pa. 17055-0788
G. Technical Manuals Assigned NAVSEA Identification Numbers (i.e. NAVSEA Welding And Brazing Procedure, NAVSEA S9074-AQ-GIB-010/248) are to be ordered from:
Naval Inventory Control Point Code 1 Support Branch 700 Robbins Avenue Phildelphia, Pa. 19111-5094
H. Interim Changes and Classified Specifications shall be obtained by submitting a request on DD Form 1425 to
NAVICP-MECH.
Engineering source of supply approval is Steven Sheridan. Phone contact number is 360.315.3388. Email address is steven.sheridan@navy.mil
6.2 <Cable jacket adhesion testing only applies when bonding polyurethaneto arctic neoprene. This test does not apply when bonding polyurethaneto non-arctic neoprene.>
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, Previous editions are obsolete searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
1. DATA ITEM NO.
1. DATA ITEM NO.
(2 Data Items) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM ________ OTHER ______________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DD Form 1423-2, JUN 90
S/N 0102-LF-010-5600
Page ______ of ______ Pages
2. TITLE OF DATA ITEM
2. TITLE OF DATA ITEM
18. ESTIMATED
TOTAL PRICE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
I
I
17. PRICE GROUP
17. PRICE GROUP 3. SUBTITLE
3. SUBTITLE
7. DD 250 REQ
7. DD 250 REQ
8. APP CODE
8. APP CODE
DIST STATEMENT
DIST STATEMENT
REQUIRED
REQUIRED
9.
9.
10. FREQUENCY
10. FREQUENCY
11. AS OF DATE
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
12. DATE OF FIRST SUBMISSION
DATE OF SUBSEQUENT
DATE OF SUBSEQUENT
SUBMISSION
SUBMISSION
13.
13.
14. DISTRIBUTION
14. DISTRIBUTION
b. COPIES
b. COPIES
4. AUTHORITY
4. AUTHORITY
(Data Acquisition Document No.)
(Data Acquisition Document No.)
5. CONTRACT REFERENCE
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
6. REQUIRING OFFICE
16. REMARKS
16. REMARKS
a. ADDRESSEE
a. ADDRESSEE
Draft
Draft
Repro
Repro
Reg
Reg
Final
Final
15. TOTAL
15. TOTAL
J. DATE G. PREPARED BY H. DATE I. APPROVED BY
X
CABLE ASSY LAUNCHER N0010420XA064
FAT REQUIREMENTS
001 FIRST ARTICLE QUALIFICATION TEST PLAN
DI-NDTI-81307A NOTE 22 DWG 7454380 NAVSUP WSS
SD ASREQ 30 DAC
NA D NA NA
DCMC-QAR 00 01 00
<IN ADDTION TO FA REQUIREMENTS:
(CABLE JACKET ADHESION TESTING)Testing shall be required DLA 00 01 00 to verify the ad hesionstrength of the bond between arctic neoprene jacketed cables and cured polyurethane. NUWC CODE 435 00 01 00 A sample of the cable jacket material or a portion of thecured polyurethane. A sample of the cable jacket material or a portion of the arctic neoprene cable of the cable jacket material or a portion of the arctic neoprene cablejacket can be removed and used to perform adhesion testing per the requirements of ASTM D1876, Standard Test Method for Peel Resistance ofAdhesives, (T-Peel Test). The arctic neoprene material must be aged atambient temperature for a minimum of three months; cablewhich has been stored on a reel at ambient temperature in a temperature controlled roomis acceptable. Test apparatus, procedure and reporting is defined in ASTM D1876, except that the Aluminum and or Aluminum-Alloy Sheet or Plateshall be a cured polyurethane block, rather than a metal strip. Anyalternate adhesion tests must be approved by NAVSEA. The required adhesion value shall be: Adhesion Value - lbf/in of width, minimum: 15 Polyurethane shall be selected from NAVSEAS9320-AM-PRO-020 allowable molding systems. To every extent possible,>
00 03 00
FIRST ARTICLE TEST PROCEDURE
002 QUALITY CONFORMANCE INSPECTION AND TEST PROCEDURE
DI-RELI-80322 NOTE 18 DWG 7454380 NAVSUP WSS
SS ASREQ 30 DAC
NA D NA NA
DCMC-QAR 00 01 00
<A FAT PLAN SHALL BE DEVELOPED AND SUBMITTED FOR
APPROVAL/DISAPPROVAL IAW REQUIREMETNS DENOTED IN NOTE 18 DLA 00 01 00
OF DWG 7454380. >
NUWC CODE 435 00 01 00
00 03 00
KLMNOPQRST
NAVSUP WSS N97131.3 2021 DEC 16 RICHARD FLEMISTER 2021 DEC 16
1 4
DD FORMo1423-2 REVERSE, JUN 90
5010.12-L (AMSDL), or one-time DID number, that defines data
Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management", etc.
(See DoD 5010. 12-M for detailed instructions.)
Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4;
Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14,; Desired medium for delivery of the data item.
Enter total number of draft/final copies to be delivered.
Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Specify when subsequent submittals are required, when applicable.
Specify when first submittal is required.
Specify as-of date of data item, when applicable.
Specify number of times data items are to be delivered.
For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).
Specify requirement for approval of a draft before preparation of the final data item.
Specify requirement for inspection/acceptance of the data item by the Government.
Enter technical office responsible for ensuring adequacy of the data item.
Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD content and format requirements.
Enter subtitle of data item for further definition of data item (optional entry).
Enter title as it appears on data acquisition document cited in Item 4.
Date CDRL was approved.
Signature of CDRL approval authority.
Date CDRL was prepared.
Signature of preparer of CDRL.
Enter name of system/item being acquired that data will support
Self-explanatory
INSTRUCTIONS FOR COMPLETING DD FORM 1423
FOR GOVERNMENT PERSONNEL
Item A.
Item B.
Item C.
Self-explanatory
Mark (X) appropriate category: TDP - Technical Data
Item D.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G.
Item H.
Item I.
Item J.
Item 1.
Item 2.
See Dod FAR Supplement Subpart 4.71 for proper numbering.
Item 3.
Item 4.
Item 5.
Item 6.
Item 7.
Item 8.
Item 9.
Item 10.
Item 11.
Item 12.
Item 13.
Item 14.
Item 15.
Item 16.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
b. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to theperformance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirements to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.
The Government's right to use the data shall be governed by the pertinent provisions of the contract.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essentialdata item without conforming to Government requirements,and the administrative and other expenses related toreproducing and delivering such data item to the Government.
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, Previous editions are obsolete searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
1. DATA ITEM NO.
1. DATA ITEM NO.
(2 Data Items) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM ________ OTHER ______________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DD Form 1423-2, JUN 90
S/N 0102-LF-010-5600
Page ______ of ______ Pages
2. TITLE OF DATA ITEM
2. TITLE OF DATA ITEM
18. ESTIMATED
TOTAL PRICE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
I
I
17. PRICE GROUP
17. PRICE GROUP 3. SUBTITLE
3. SUBTITLE
7. DD 250 REQ
7. DD 250 REQ
8. APP CODE
8. APP CODE
DIST STATEMENT
DIST STATEMENT
REQUIRED
REQUIRED
9.
9.
10. FREQUENCY
10. FREQUENCY
11. AS OF DATE
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
12. DATE OF FIRST SUBMISSION
DATE OF SUBSEQUENT
DATE OF SUBSEQUENT
SUBMISSION
SUBMISSION
13.
13.
14. DISTRIBUTION
14. DISTRIBUTION
b. COPIES
b. COPIES
4. AUTHORITY
4. AUTHORITY
(Data Acquisition Document No.)
(Data Acquisition Document No.)
5. CONTRACT REFERENCE
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
6. REQUIRING OFFICE
16. REMARKS
16. REMARKS
a. ADDRESSEE
a. ADDRESSEE
Draft
Draft
Repro
Repro
Reg
Reg
Final
Final
15. TOTAL
FIRST ARTICLE TEST PLAN
003 TEST REPORT
DI-NDTI-80809B FAR52,SUBPR 52.209-3 NAVSUP WSS
SS ASREQ 30 DAC
NA D NA NA
DCMC-QAR 00 01 00
<TEST RESULTS AND COCS SHALL BE DELIVERED TO THE ISEA VIA
ADDRESS IN NOTE 3 OR VIA ALTERNATE METHOD AS SPECIFIED BY DLA 00 01 00
ISEA. REQUIREMETNS DENOTED IN NOTE 18 OF DWG 7454380. >
NUWC CODE 435 00 01 00
00 03 00
MATERIAL (MOLDS)
004 CERTIFICATE OF COMPLIANCE
DI-MISC-81356 NOTE 9 DWG 7454380 NAVSUP WSS
SS ASREQ 30 DAC
NA D NA NA
DCMC-QAR 00 01 00
Submit before material delivery a Certificate of Compliance per DI-MISC-81356 to Block 14 addresses. A DLA 00 01 00 separate Certificate of Compliance shall be prepared and submitted for each unique combination of Contract/Purchase NUWC CODE 435 00 01 00 Order Number, National Stock Number and Item Nomenclature specified in the schedule of Supply/Services.
<MOLD, FABRICATE, AND INSPECT PER NAVSEA
S9320-AM-PRO-020/MLDG. IAW NOTE 9 DWG 7454380.>
00 03 00
KLMNOPQRST
NAVSUP WSS N97131.3 2021 DEC 16 RICHARD FLEMISTER 2021 DEC 16
2 4
Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management", etc.
(See DoD 5010. 12-M for detailed instructions.)
Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4;
Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14,; Desired medium for delivery of the data item.
Enter total number of draft/final copies to be delivered.
Enter addresses and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Specify when subsequent submittals are required, when applicable.
Specify when first submittal is required.
Specify as-of date of data item, when applicable.
Specify number of times data items are to be delivered.
For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoD 5230.24).
Specify requirement for approval of a draft before preparation of the final data item.
Specify requirement for inspection/acceptance of the data item by the Government.
Enter technical office responsible for ensuring adequacy of the data item.
Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD content and format requirements.
Enter subtitle of data item for further definition of data item (optional entry).
Enter title as it appears on data acquisition document cited in Item 4.
Date CDRL was approved.
Signature of CDRL approval authority.
Date CDRL was prepared.
Signature of preparer of CDRL.
Enter name of system/item being acquired that data will
Item A.
Item B.
Item C.
Self-explanatory
Mark (X) appropriate category: TDP - Technical Data
Item D.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G.
Item H.
Item I.
Item J.
Item 1.
Item 2.
See Dod FAR Supplement Subpart 4.71 for proper numbering.
Item 3.
Item 4.
Item 5.
Item 6.
Item 7.
Item 8.
Item 9.
Item 10.
Item 11.
Item 12.
Item 13.
Item 14.
Item 15.
Item 16.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
b. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to theperformance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirements to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data.
The Government's right to use the data shall be governed by the pertinent provisions of the contract.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essentialdata item without conforming to Government requirements,and the administrative
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B
B regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, Previous editions are obsolete searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
1. DATA ITEM NO.
1. DATA ITEM NO.
(2 Data Items) Form Approved OMB No. 0704-0188
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM ________ OTHER ______________________________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
DD Form 1423-2, JUN 90
S/N 0102-LF-010-5600
Page ______ of ______ Pages
2. TITLE OF DATA ITEM
2. TITLE OF DATA ITEM
18. ESTIMATED
TOTAL PRICE
18. ESTIMATED
TOTAL PRICE
CONTRACT DATA REQUIREMENTS LIST
I
I
17. PRICE GROUP
17. PRICE GROUP 3. SUBTITLE
3. SUBTITLE
7. DD 250 REQ
7. DD 250 REQ
8. APP CODE
8. APP CODE
DIST STATEMENT
DIST STATEMENT
REQUIRED
REQUIRED
9.
9.
10. FREQUENCY
10…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .