N00104-18-R-K094_Amendment_1.pdf
PDF 82 KB Posted
- Attached to
- JN25, Power Module Federal contract opportunity
- Solicitation number
- N0010418RK094
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N0010418RK094_J_A_Redacted.pdf | ||
| N0010418RK094_Amendment_4.pdf | ||
| N0010418RK094_Amendment_2.pdf | ||
| ADC_MASTER_Rev_12.pdf | ||
| N00104-18-R-K094.pdf | ||
| REDACTED_18NB090_-_JN25_-_CDRLs.pdf | ||
| CADPAD_Item_Marking_Instruction_-_Ver_1.3__7_April_2017.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0010418NB090
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Section C - The specifications table is revised.
Section E - Paragraph 1 of "CAD/PAD Inspection and Acceptance" is revised.
The closing date has not changed.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 09-Apr-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N0010418RK094
X 9B. DATED (SEE ITEM 11)
29-Mar-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
09-Apr-2018
CODE
NAVSUP WEAPON SYSTEMS SUPPORT
STACEY ROMBERGER, CODE N772.15
5450 CARLISLE PIKE
PO BOX 2020
MECHANICSBURG PA 17055
N00104 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0010418RK094
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
SECTION C
SECTION C – DESCRIPTION AND SPECIFICATIONS (MAY 2005)
NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS
Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon Contractor anticipation of Government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.
NOTE 2: SPECIFICATIONS THAT DO NOT INDICATE SPECIFIC REVISION LEVELS ARE TO BE
MADE TO THE REVISION LEVELS LISTED ON THE DODISS IN EFFECT AT THE TIME OF
SOLICITATION ISSUANCE.
1. DATA LIST / PART NUMBERS / DRAWING NUMBERS:
CLIN DATA LIST / PART OR DRAWING NUMBERS REVISION REVISION DATE
0001 UPCO P/N 1847-066-01
OR
CHEMRING P/N 6254100
OR
EAGLE PICHER P/N EP-4054
2. SPECIFICATIONS:
CLIN SPECIFICATIONS REVISION REVISION DATE
0001 MIL-DTL-82909 A 13 Mar 2003
3. For Contractor part number, Contractor SHALL submit Product Baseline in accordance with DD1423, sequence number A001 .
SECTION C – CONFIGURATION CONTROL: ANSI/EIA-649 (NAVY STOCK CLASS 1377)
(APR 2017)
1. Configuration Control - The Contractor shall maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration shall be provided to the Government in electronic format.
2. Variances – Requests for Variance (RFV) - RFVs shall be designated as Critical, Major, or Minor. RFVs shall be in Contractor format and shall include information outlined in ANSI/EIA-649 section 5.3.4.1 and SAE-EIA-649-1 section 3.3.2. DD Form 1694is the preferred format for RFV submissions.
Note: A copy of the preferred RFV Form DD Form 1694 is available at:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm Additional guidance for completion of RFV can be found at the Attachment “Request for Variance Form 1694 Additional Guidance Rev NA”. This attachment is incorporated by reference with the same force and effect as if contained herein.
The Contractor's assigned RFV number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letter "D", followed by consecutively assigned numeric characters beginning with 001.
Definitions: (See ANSI/EIA 649 and MIL-HDBK-61A for additional guidance on critical, major and minor classifications.)
Critical: Critical variances impact safety, health, environment, or other critical requirement. A departure from a requirement classified as critical in configuration documentation.
Major: Major variances have significant impacts such as performance or operational limits, structural strength, interchangeability, reliability, survivability, maintainability, durability of the item or repair parts, supportability, cost, effective use or operation, weight or size, or appearance. A departure from a requirement classified as major in configuration documentation.
Minor: Minor variances are issued when departure does not involve any of the factors listed for critical or major variance. Minor variances have little or no impact and are generally associated with non-functional factory defects that can be dispositioned locally as: “use as is” or “after suitable repair.” A departure from a requirement classified as minor in configuration documentation.
3. Engineering Change Proposal (ECP) - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. ECPs shall be designated as Major (Class I) or Minor (Class II). ECPs shall be prepared in Contractor format and shall include information outlined in ANSI/EIA-649 section 5.3.1.4. The use of DD Form 1692 is acceptable form for ECP submissions. MIL-HDBK-61 provides additional guidance for preparation of ECPs.
The Contractor's assigned ECP number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.
Definitions: (See ANSI/EIA 649 and MIL-HDBK-61A for additional guidance on Major (Class I) and Minor (Class II) classifications.)
Major (Class I):
a. A change that affects specified and approved requirements for product attributes, including safety, reliability, and supportability.
b. A change, after establishment of the product baseline, that affects compatibility with interfacing products, including such products as test equipment, support equipment, software, and products furnished by a customer or that affects one or more of the following::
- required calibration to the extent that product identification should be changed
- interchangeability or substitutability of replaceable products, assemblies, or components
- change to add a previously non-qualified supplier, where supplier selection is specified
- requires retrofit of delivered products
Minor(Class II): Affects configuration documentation (released design information), product or processes but does not affect Major Change Criteria.
4. ECP changes to Contractor drawings: Minor (Class II) and Major (Class I) ECP changes shall be approved by the Navy Configuration Control Board CCB and technical approval authority prior to implementation. Contractors may use their own numbering format for ECP changes to Contractor drawings. Minor (Class II) ECP changes are defined as changes that do not affect the form, fit, or function. Minor (Class II) affects configuration documentation (released design information), product or processes but does not affect Major Change Criteria. Major (Class I) ECP changes are defined as changes that affect the form, fit, and/or function, and/or requirements, performance, interoperability, supportability, maintainability, cost, safety, addition of a vendor, or a vendor moves facility and the item has not been qualified at that site.
Definitions:
Form: the shape, external size, and marking which uniquely characterizes an item.
Fit: the ability of an item to physically interface or interconnect with and become an integral part of a higher level assembly.
Function: the action[s] that an item is designed to perform including performance, durability and safety.
The following are examples of Major (Class I) changes with regard to function
a. Change to energetic material
b. Change to component material or material properties
c. Change to electrical characteristics.
d. Change in ballistic performance.
If the Navy technical approval authority does not approve the ECP submitted by the Contractor, then the Contractor is required to revert to the Government approved revision of the drawing per the approved product baseline or to the revision used in the prior lot accepted by the Government. The Government reserves the right to invoke First Article Testing (FAT) per paragraph 2 of “Section E-CAD/PAD Inspection and Acceptance”, or require the Contractor to undergo qualification testing.
5. Contractors do not have MRB authority. Authorization to accept or rework any nonconformance is specifically retained by the Contracting Officer. The contractor's MRB shall not make any "use-as-is" or "rework" disposition on any nonconformance, and the MRB recommendations shall be submitted per paragraph six (6) below.
6. The Contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Local DCMA QAR, and the technical activity below:
a. Local DCMA QAR
b. NAVSUP WSS Contracting Officer
c. NSWC IHEODTD CAD/PAD Department Acquisition Management Specialist (AMS)
7. Technical approval authority for RFVs and ECPs is NSWC IHEODTD, Lead CAD/PAD Engineer, Code E2CE.
8. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon
Systems Support.
SECTION C - IDENTIFICATION OF COVERED DEFENSE INFORMATION (252.204-7012) (OCT
2016)
1. In accordance with the DFARS clause at 252.204-7012, Safeguarding Covered Defense Information and Cyber Incident Reporting, the Contractor shall provide adequate security for all government and contractor owned Technical Data Packages (TDPs), drawings and item detail specifications on all covered defense information systems that support the performance of work under this contract.
SECTION E - INSPECTION AND ACCEPTANCE
The following have been modified:
SECTION E
SECTION E – PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING) (APR 2017)
1. Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423 0001AB – 0001AC First Article Testing Contractor Government Contractor Government 0001AD – 0001AE Lot Acceptance Testing
Contractor Government Contractor Government
0001AF – 0001AL Production Units Contractor Government Contractor Government
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House
Address
2. Test samples are required from each production lot and are to be tested in accordance with the approved test plan.
A production lot shall consist of net deliverable quantity, plus additional lot test sample units and any retained sample units for investigative purposes as may be required by Section B.
3. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative (QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The samples shall be selected, at random, from each production lot, by the QAR within 2 workdays for resident QARs, or 7 workdays for non-resident QARs after presentation of the lot.
4. Sample units removed for testing from different lots shall not be commingled.
5. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date. If testing is cancelled within the 20 calendar day period, the contractor shall provide notification to the Contracting Officer, with concurrent notification to the engineering activity. At a minimum, cancellation notification shall be sent no later than two days prior to planned test date
NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A Government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.
6. Disposition of Production Lot Test Samples – The production lot samples are subjected to non-destructive testing. Sample units which meet test and contract requirements may be delivered as part of the total contract quantity.
7. A production lot test report is required and shall be forwarded in accordance with the DD 1423 sequence number A002 requirements to the address shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.
8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved, and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.
9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification shall be made to the Contractor within 20 calendar days after the Contracting Officer receives the production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s) and final approval of the Material Inspection Receiving Report in IRAPT, the Contractor shall ship the production lot(s) as soon as possible and no later than fifteen (15) calendar days after receipt of such notice. Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.
a. Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b. A notice of conditional approval may state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, A003) with all associated costs and expenses to be borne solely by the Contractor.
c. A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing. This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the Contracting Officer may, at his/her discretion, equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).
10. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the Contractor of the responsibility to meet the delivery schedule for production quantities.
SECTION E – INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES (MAR 2005)
1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the Contract Data Requirements List (DD Form 1423, sequence number, A004). The test plan shall be submitted within sixty (60) calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility.
2. Notification of test plan approval, conditional approval, or disapproval shall be provided via IRAPT. This notification may be made within 30 calendar days after receipt of the Production plan/procedure.
3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
4. A notice of conditional approval may state any further action required of the Contractor.
5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.
6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default.
However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.
7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:
Approved by__________________________ Date of approval___________________
Contract number and Contractor under which plan/procedure was approved__________________.
Test Plan number, revision date and NSN for which the item was previously approved_____________.
8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.
SECTION E – CAD/PAD INSPECTION AND ACCEPTANCE (APR 2017)
1. Inspection and acceptance shall be in accordance with MIL-DTL-82909A.
2. The Government reserves the right to invoke the requirement for First Article Testing (FAT) if there is a change in process, facilities, materials, equipment, or production of the item; if two years or more have passed since the item was last manufactured, or if the item has developed a problem. Process is defined as the steps or tasks that are performed to create a product. Facilities is defined as location or buildings where the process(es) are performed to manufacture a product. Materials is defined as all the raw ingredients that are used in the manufacturing of the item.
Equipment is defined as all the tools used to manufacture a product. Production is defined as to make, manufacture, or create a product.
3. The Contractor shall provide and maintain a quality program acceptable to the Government and modeled on ISO 9001:2015or an equivalent quality system. If the quality program is not modeled on ISO 9001:2015 the offeror/prospective Contractor shall indicate the quality system proposed along with how it is equivalent, under separate letter submitted with the offer/proposal.
ISO 9001:2015Other This quality system along with program specific production documentation shall be made available for review by the Government’s representative upon request, at the Contractor’s facility at no cost to the Government.
4. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to ensure the correct identification and nomenclature are assigned for all items and shipping containers prior to shipment including CAGE codes. CAD/PAD Devices are exempt from MIL-STD-129 shelf life markings on packaging; however, they shall have a minimum of 85% of the shelf life remaining at time of delivery. Any delivery from a contractor not having at least 85% shelf-life remaining shall normally be considered non-conforming.
NOTE: The shelf life for CLIN 0001 is: 7 years and 6 months.
5. Radiographic equipment and procedures shall meet the standards stipulated in the latest revisions of the following specifications: ASTM E1742, ASTM E748, and ASTM E545.
6. Radiographers shall be qualified and certified level II or III in accordance with the requirements described in specification NAS 410.
7. In order to fulfill contractual requirements, the Contractor must submit acceptable radiographs. Radiographs should be reviewed by a Level II or Level III certified radiographer in accordance with NAS 410. Radiographs not conforming to the requirements specified herein will not be reviewed by NSWC IHEODTD. Disposition of non-conforming radiographs will be by mutual agreement of the parties.
8. Radiographic Test Technique (RTT) shall include variables which affect the exposure, such as x-ray source, kV or MeV (voltage), mA (current), SFD (Source to Film Distance), or SDD (Source to Detector Distance), exposure time, and film type/detector, and include a diagram or photo of the test setup.
9. Representative Quality Indicators (RQI) should be used on radiographic film or digital images for all CAD/PAD devices. The RQI (also known as a defect standard) contains a known defect (i.e. missing explosive charge, missing O-rings, etc.) placed next to a good unit for comparison, to aid in interpretation. Radiographic test technique shall include RQI to be used and RQI placement. Propellant grains on PAD devices should be radiographed separately from the fully assembled unit. Image Quality Indicators (IQIs) on the radiographic film or digital image must also be used for radiographs of propellant grains for all PAD devices. The penetrameter to be used on the propellant grain radiographs must be made of Magnesium, which is radiographically similar to the propellant. The thickness of the penetrameter must be 2% of the total propellant thickness. The placement of the penetrameter(s) shall be on the part nearest the edge of the film cassette, at the outer edge of the cone of radiation. This allows for the measurement of the image quality or contract sensitivity at the area of maximum geometric sharpness. The penetrameter sensitivity must be 2-2T unless otherwise noted in the drawings or specification for the item being procured.
Radiographic Test Technique for X-rays and N-rays, as applicable, shall be submitted with the First Article Test (FAT) samples to the activity cited below. If there is no FAT requirement, the radiographic test technique for X-rays and N-rays, as applicable, shall be submitted to the activity below as described in paragraphs 9a and 9b herein.
NSWC IHEODTD
ATTN: AMS Per Section H
INDIAN HEAD MD
a. Test technique information for ALL radiographs is specified in section 6 of ASTM E1742, refer to DD 1423 sequence number A005. The radiographic images shall display a number of units representative of a production lot. Units shall be positioned on the radiographic plate at the areas of minimum and maximum geometric distortion.
10. The Contractor shall submit radiographic film as marked (X) below:
X-RAYS ( per applicable spec )
N-RAYS ( per
ASTM E748 )
Sample / LOT Description
X First Article Sample X Lot Acceptance Test Samples X Production Lot Units Explosive Sub-Assemblies (i.e., NON-GFP CTGS, Booster Sleeves, etc.)
a. Radiographs of Production Lot Units shall include Lot Acceptance Testing (LAT) samples.
11. Radiographs may be produced using film (conventional x-ray), or non-film (digital) techniques such as Digital Detector Array (DDA), or Computed Radiography (CR), with the understanding that the Contractor must be qualified and given prior approval to use digital radiography by NSWC IHEODTD. A qualification plan must be submitted to the Level III Radiographer at NSWC Indian Head EODTD for review prior to qualification of the digital x-ray system. Once the qualification plan has been reviewed and approved, the Level III Radiographer at NSWC Indian Head EODTD will conduct a site visit (i.e. audit) to witness the qualification of the digital x-ray system. The results of the tests performed during the digital x-ray system qualification will be documented in a qualification document, which will be submitted to the Level III Radiographer at NSWC Indian Head EODTD. An official approval letter will then be issued by the Commanding Officer, NSWC Indian Head EODTD, which authorizes the use of the digital system. Follow up audits at regular intervals (i.e. annually) may be conducted to assure the long term stability and performance of the digital x-ray system. If digital radiographs are submitted, they shall be in the form of raw data that is Digital Imaging and Communication in Nondestructive Evaluation (DICONDE) compliant. In addition to the raw DICONDE data, 16 bit Tagged Image Format (TIF) images of the digital radiographs must be submitted. The qualification of non-film techniques will be done IAW the latest versions of standards referenced in the latest version of ASTM E1742 (currently ASTM E1742/E1742M-12), such as ASTM E2698 and ASTM E2737 (for the qualification of Digital Detector Array (DDA) detectors), or ASTM E2033 and ASTM E2445 (for the qualification of Computed Radiography (CR) systems).
12. Notification of approval/rejection of the RTT shall be made by the Contracting Officer after receipt at NSWC IHEODTD in iRAPT. Written notification of rejection will be provided by the Contracting Officer. Approval of the RTT must be received prior to performing radiographic inspection of the production lot units. The Contractor shall then follow the approved technique to produce subsequent radiographs in accordance with the approved RTT. Any change in the approved radiographic technique or equipment requires submittal and approval of new RTT at the Contractor's expense.
a. There is hereby created an option for the Government to waive the requirement for submission of a RTT. The Contractor may only request a waiver for the submission of the RTT as long as the Cognizant Engineering Organization (CEO), which is NSWC IHEODTD, has an approved RTT on file from a previous contract, and the x-ray equipment or RTT has not changed since the referenced contract. The following information shall be furnished by the Contractor when submitting the waiver for RTT:
Approved by ____________________________ Date of approval __________________
Contract number under which RTT was approved ________________________________
b. If the submission of the RTT is waived, the previously approved technique shall apply to the contract.
c. If the Contractor requests waiver of submission of the RTT after time of award, an offer of adequate consideration shall accompany the request.
13. An acceptable radiographic sample image is required for each line item on this contract.
14. When submitting the radiographic images, the Contractor shall also submit a report of radiographic inspection.
This report shall clearly indicate the units subjected to radiographic inspection by the following data:
Item Nomenclature and DODIC Government drawing or part number Complete lot number Span of serial numbers displayed Complete contract number Nonconforming units by serial number and reason for rejection Missing units by serial number
Any units found to be nonconforming shall be clearly identified. The specific nature of the non-conformance shall be cited, as well as any assignable cause or analysis related to the occurrence.
15. When undergoing radiographic inspection, each unit in the sample or lot shall be permanently serialized in consecutive numerical order per MIL-STD-1168 before radiographic inspection. Serial numbers shall not be repeated on items with the same part number regardless of changes in the lot number. The numbering shall be from left to right, top to bottom with the first item on the left of each row having the lowest serial number. All annotation must be represented using a method which leaves a permanent image on the film, such as placing lead letters on the film cassette or digital detector prior to each exposure. It is NOT acceptable to use adhesive labels, or to write annotation on the film using a marker or other writing instrument. Units that are missing on a radiograph must be indicated by identifying the serial number of the unit immediately preceding, and immediately following, the missing unit(s).
All units shall be arranged on trays or boards in consecutive numerical order. Radiographs shall reveal internal components. This may require using various techniques which may include multiple exposures, multiple speeds of film being loaded for each exposure, or additional orientation of unit(s) i.e. 0 degree and 90 degree exposures. Any discontinuities in the serial numbers displayed shall be clearly marked on the representative radiographic image.
Specific reasons for the missing serial number(s) and all rejects from the Contractor and QAR inspections prior to radiographic inspection shall be recorded on the radiographic inspection report as described in paragraph 11 and forwarded with the LAT sample. Row-unit-quantities shall be consistent except the ending row of the production lot, which may vary. In addition, serial numbers shall appear at the end of each row when more than 100 units appear on one radiograph image; these serial numbers may appear on tape and be affixed to the radiograph.
16. This radiographic image and report shall be shipped prepaid. The delivery of the radiographic image and report shall be in accordance with Contract Data Requirement List (CDRL) DD Form 1423, sequence number A006. The film shall be placed in film envelopes or sleeves. Radiographic film shall be place into an appropriate shipping container that will not damage the film. The film envelopes shall be placed in either a fiberboard, cardboard, or wooden box. X-rays or N-ray film shall not be placed directly into a shipping container (i.e. FedEx or UPS box). X-ray or N-ray film shall not be rolled up and place in a shipping tube. The film should be flat, and not folded, bent, or otherwise mutilated.
17. All radiographic images shall be retained by the Government. All radiographic images shall display a permanent identification of the following information:
Item Nomenclature and DODIC Government Drawing or Part Number Complete Lot Number Span of Serial Numbers Displayed Complete Contract Number Name of radiographic facility Date of radiograph
18. At a minimum, the radiographic report should include the following information:
Item Nomenclature and DODIC Government Drawing or Contractor’s Part Number Complete Lot Number Span of Serial Numbers Displayed Complete Contract Number
NOTE: For the span of serial numbers, include list of serial numbers for units that have been accepted, and units that have been rejected, along with the reason for rejection.
19. All documentation, i.e., packing slip, invoice, WAWF-RR, etc., accompanying the radiographic images shall clearly indicate, as a minimum, the following information:
Contract Number Item Nomenclature National Stock Number (NSN) Department of Defense Identification Code (DODIC) Lot Number
20. Due to the critical nature and safety application of these items, the Contractor and the QAR are cautioned that it is mandatory to assure the correct identification and nomenclature are assigned for all item and shipping containers prior to shipment.
21. The Contractor shall have the ballistic test fixtures and/or capabilities to assure that the item being procured meets the specification requirements.
22. The Contractor shall provide upon Government request and at Contractor’s own cost, copies of all certificates of compliance for all materials (mechanical properties, alloying) and all quality conformance tests (Hydrostatic, X-ray, Protective Finish, Magnetic Particle, Dye Penetrant).
23. Items containing explosive subassemblies or serialized parts shall be identified on a Marriage Log. The Marriage log shall be in the Contractor’s choice of format and must contain the (a) Contractor name, (b) nomenclature, (c) contract number, (d) major subassembly serial numbers and the matching end item serial number,
(e) lot number of end item and lot number of assembly and subassembly IAW MIL-STD-1168 (Section E – Ammunition Data Cards and Material Inspection and Receiving Report), (f) name of individual completing marriage log, (g) date log completed and (h) name and signature of Quality Assurance Inspector. The Marriage Log shall be submitted for each First Article Test sample (if applicable) and for each lot acceptance test sample, DD1423, sequence number A007
24. In the event the First Article test sample fails to meet the requirements of the specification or drawing, the contractor may be required to submit a Failure Analysis and Corrective Action Report (DD Form 1423, sequence number, A008 ).
25. The contractor shall permanently serialize all First Article components and maintain traceability to inspection/acceptance data and end item serial number.
26. The first article test samples shall not be considered received until all data necessary to evaluate the samples as received, such as: radiographic requirements specified in Section E-Inspection and Acceptance, DD 1650 and DD 250 or WAWF-RR documents.
27. An Incoming Inspection Summary Report shall be submitted under this contract for all production lot and/or first article hardware. The report shall contain all metal parts inspection records such as dimensional verification and all certificate of conformance as required to verify the parts meet the technical drawing package and specification requirements. Copies are to be submitted to the government concurrent with delivery of production lot or first article test samples. Delivery in accordance with Contract Data Requirement List (CDRL) DD Form 1423, sequence number A009.
SECTION E – CAD/PAD ENERGETIC MATERIALS REQUIREMENTS (APR 2017)
1. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed twenty four (24) months based on the original manufacturing date or retest date; unless otherwise noted in the detail specification of the item being procured. Propellant manufactured shall be in accordance with the required specifications of paragraph one. Any government furnished property provided in conjunction with the contract is considered acceptable for meeting the requirement. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).
2. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to:
fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed six months since date of manufacture and comply with original manufacture's specification or military standard. This requirement must be met prior to loading of any of the energetic materials into the item or sub-components.
3. The Government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the Government) provided the Contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. Waivers shall be requested in only one of the following formats:
a. Request for Variance: RFVs shall be submitted in accordance with Section C. The RFV may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer analysis and/or dehumidification at Contractor's cost. RFVs may be submitted with a recertification plan (if available). The recertification plan will be kept on record once approved by the cognizant engineering activity.
b. Energetics Test Matrix: The contractor may request waiver of the energetic and constituent material requirements as long as the Cognizant Engineering Organization (CEO), which is NSWC IHEODTD, has an approved Energetic Test Matrix available for incorporation into Section C at time of award. The following information shall be furnished by the Contractor when submitting the waiver from the energetic and constituent material requirements based on an approved test matrix:
Date of approval
Document Number Revision:
SECTION E – AMMUNITION DATA CARDS AND MATERIAL INSPECTION AND RECEIVING
REPORT (JAN 2005)
1. Under the direction of MIL-STD-1168, the Contractor shall furnish Ammunition Data Cards (ADC) for each shipment (test and production) as generated using the Worldwide Ammunition-data Repository Program (WARP).
Preparation instructions are found in DI-MISC-80043B and on the WARP website in the WARP User's Manual.
Additional guidance for completion of ADC can be found at the Attachment “Ammunition Data Card Master Revision 12.” This attachment is incorporated by reference with the same force and effect as if contained herein.
All components and subassemblies shall be listed on the ADC per DI-MISC-80043B, paragraph 3, in accordance with DD 1423 sequence number A010. A printed copy of the ADC from WARP shall be included with each Shipment.
NOTE: The WARP system for Ammo Data Cards requires Contractors to hold a certificate to access the system and communicate with the secure DoD server.
The site to obtain ECA Access Certificate is: http://www.identrust.com/warp/index.html
The WARP login website is: https://mhpwarp.redstone.army.mil
2. Lot numbers for all explosive components and explosive subassemblies shall be in accordance with MIL-STD- 1168 (Ammunition Lot Numbering and Ammunition Data Card), and shall be included in the components section of the Ammunition Data Card.
3. In accordance with the DFARS clause at 252.246-7000, Material Inspection and Receiving Report, the Contractor shall complete an IRAPT Receiving Report (WAWF-RR) at the time of each delivery (Lot Acceptance or First Article test samples and production lot). Preparation instructions are found in the DFAR Supplement Appendix F.
If the date cited in WAWF-RR is an estimated "ship date", the Contractor shall make distribution of a corrected WAWF-RR indicating the "actual ship date" within 24 hours after actual shipment. The following additional data shall be furnished on the WAWF-RR:
a. Complete lot number, lot expiration date (month and year)
b. Total lot size (consists of net, test, and investigative).
c. Serial numbers of units shipped to consignee.
d. Net quantity shipped to destination.
1. Item quantity shipped to consignee
2. Total item quantity shipped to consignee
3. Item quantity due consignee
4. The Contractor shall make distribution of the ADC and WAWF-RR in accordance with the information provided in Section H no later than 24 hours after shipment. When Item 0001, 0002, etc. is indicated under the designator, the Contractor shall furnish all shipping documents for all SUBCLINs under that line item.
(End of Summary of Changes)