Solicitation_N0010418RK013.pdf
PDF 547 KB Posted
- Attached to
- CWRJ - Propeller Baffle Federal contract opportunity
- Solicitation number
- N0010418RK013
About this file
Solicitation N0010418RK013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 17NA032_Amend0008.pdf | ||
| 17NA032_Amend_0007.pdf | ||
| 17NA032_Amend_0006.pdf | ||
| 17NA032_Amend_0005.pdf | ||
| SOLAMEND0004.pdf | ||
| SOLAMEND0003.pdf | ||
| Amendment_0002_to_Solicit_N0010418RK013.pdf | ||
| Amendment_0001_to_Solicit_N0010418RK013.pdf | ||
| ---_GFP_ConsolidatedGovernmentFurnishedProperty-VERSION-1_20160815_CWRJ_FY18_B_---.pdf | ||
| CWRJ_-_CDRL's.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 02:00 PM local time 28 Feb 2018
X
A
X B
X C X D
EX
X
G
F 51 - 56
57 - 61
X H 62 - 63 kirsten.barnes@navy .mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
DO-A5 1 63
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
N00104 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and electronically conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
KIRSTEN I. BARNES 717-605-5937
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 9
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
10 - 13
14 - 15
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
16 - 20
21 - 24 X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 25 - 26 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 27 - 29 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
30 - 49
PART II - CO NTRACT CLAUSES
NAVSUP WEAPON SYSTEMS SUPPORT
KIRSTEN BARNES, CODE N742.13
5450 CARLISLE PIKE
P.O. BOX 2020
MECHANICSBURG PA 17055
7176055937
7176052807FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.
N5006317NA032
5. DATE ISSUED
22 Jan 2018
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
N0010418RK013
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit
IAW DWG: Drawing Number 8290293 and all other Associated Drawings &
Specifications
NSN: 4T-1355-01-603-7731
PURCHASE REQUEST NUMBER: N5006317NA032
NET AMT
0001AA 1 Set NSP Contract Data Requirements List
FFP
Technical Data, See DD Form 1423
Data items A001 through A004
FOB: Destination
0001AB 1 Each NSP First Article (Preproduction) Test
FFP
Samples (See FAR 52.209-3). Testing is destructive
0001AC 47 Each NSP Production Lot (Periodic) Test Samples.
FFP
Consists of: Lot 1 is 400 EA net, plus an additional 29 EA per lot for test. Lot 2 is
260 EA net, plus an additional 18 EA per lot for test. Testing is destructive.
0001AD 100 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit
TAC: NSTS
FOB: ORIGIN
NOTE: The requirements in DFARS 252.211-7003, Item Identification and
Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AE 96 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AF 75 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AG 100 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AH 79 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AJ 36 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit
TAC: IN-P-AAR MAPAC: PIN008
unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AK 175 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit
TAC: CA-P-BDG MAPAC: PCNOPS
unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
0001AL 29 Each
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit
TAC: UK-P-AHU MAPAC: PUK008
unique identification or a DoD recognized unique identification equivalent.
FOB: Origin (Shipping Point)
DODIC: CWRJ
FFP
Nomenclature:
Propeller Baffle Kit
One year option up to 75%.
PURCHASE REQUEST NUMBER: TBD
Stepladder:
75 – 200
201 – 400
401 – 518
CLAUSES INCORPORATED BY REFERENCE
52.232-16 Progress Payments APR 2012
52.247-55 F.O.B. Point For Delivery Of Government-Furnished
Property
JUN 2003
SECTION B NOTES
SOLICITATION NOTES:
1. Faxed offers will NOT be accepted.
2. Since the Government intends to award without discussion, any exceptions to the requirements of this solicitation should be raised prior to submission of an offer.
3. This item is a CSI – Critical Safety Item.
4. Electronic submission of an offer may be accomplished by attaching your offer to an email directed to kirsten.barnes@navy.mil. The size limitation of an email through the NAVSUP
WSS mail server is 10 MB. All files designated as .zip files will be stripped from any email sent.
Files larger than the server limitation may be segregated and sent via several emails as long as they are clearly identified as such. It is highly recommended that the Offeror request email mailto:x.x@navy.mil delivery confirmation or other form of acknowledgement to verify that the proposal submission was received.
5. This solicitation is 100% set-aside for WOSB.
6. If no unit prices are submitted for CLIN 0002, the unit prices submitted for CLIN 0001 will be considered the unit price for CLIN 0002 and the respective step ladders.
7. Offerors are encouraged to supply a unit price for each stepladder quantity shown above. Failure to do so could result in an option exercised for a relatively small quantity at the basic contract unit price.
8. Any exception to the option may render your offer non- responsive.
9. Pres-award survery will be performed.
10. FAT, LAT and CDRLs are Not Separately Priced (NSP).
Section C - Descriptions and Specifications
SECTION C
PROCUREMENT SPECIFICATION
I. NSN: 4T-1355-01-603-7731-CWRJ
PROPELLER BAFFLE KIT
Assembly Level Baseline – Sequential
Drawing Revision Nomenclature
1330750 C WASHER, FLAT
2048395-6 AR SCREW, SELF-LOCKING
6097560 E SLEEVE
6207634-4 A WIRE ASSEMBLY, RELEASE
6207635 D WIRE, RELEASE
7609374 - SHELL, PROPELLER BAFFLE HALF
7609375 - FOAM INSERT, PROPELLER BAFFLE
7609376 A PROPELLER BAFFLE ASSEMBLY
8290293 -
PROPELLER BAFFLE KIT + NOR: 54/NUWC-K/15047-01 AND REDLINE
DRAWING 8290293
8601830 - TRACEABLE SEAL, WEATHERPROOF
Reference Documents for Assembly (References with Approved Replacements in Parentheses)
DOCUMENT NUMBER
AMS 5678
ANSI 14.5M-1982
ANSI B46.1 (ASME B46.1)
ANSI Y14.5-1973
ASME B46.1
ASME Y14.100-2000
ASME Y14.24
ASME Y14.34
ASME Y14.35M
ASME Y14.5M-2009
ASME Y14.5M-94
ASTM D1974
ASTM D5118
ASTM D5486
DOD-D-1000 (DOD-STD-100C NOTICE 4)
DOD-STD-100 (MIL-STD-100E NOTICE 1)
DOD-STD-2101
MIL-A-8625
MIL-D-1000 (MIL-STD-100A)
MIL-DTL-117
MIL-F-18240 (MIL-DTL-18240)
MIL-H-6875 (SAE AMS-H-6875)
MIL-PRF-61002
MIL-S-5002 (MIL-DTL-5002)
MIL-S-5059 (SEE CANCELLATION SHEET FOR REPLACEMENT)
MIL-S-6721 (SAE AMS 5510 AND 5512)
MIL-STD-100E NOTICE 1
MIL-STD-105 (MIL-STD-1916, ASQ Z1.4)
MIL-STD-129
MIL-STD-130
MIL-STD-6868 (ASTM E1417)
MIL-STD-8 (ASME Y14.5)
MIL-T-8504 (INACTIVE FOR NEW DESIGN, USED FOR REPLACMENT ONLY)
MS16997-31 (NAS 1352)
MS21262-15 (NASM 21262)
MS24665 (NASM 24665)
NAS1149
NAS1352
NASM 45938
QQ-P-35 (ASTM A967, SAE AMS 2700)
SAE AMS-QQ-A-250/8
TR5624413 REV. F
2132301 REV. C Reference Only. Will be provided as GFE. Weldment (GFP Test Aid)
6207627 REV. E (REFERENCE ONLY. NOT NEEDED TO MANUFACTURE)
DESCRIPTION AND SPECIFICATIONS
NOTE 1: NON-ANTICIPATION OF INITIAL DEVIATIONS ON AWARDS
Offerors are reminded that any resultant contract will require performance in strict compliance with the specifications set forth therein, and that prices offered should not be predicated upon contractor anticipation of government authorization of deviations, even though such deviations may have been granted previously under other contracts for the same item.
CONFIGURATION CONTROL – ANSI/EIA–649
1. Any Engineering Change Proposal (ECP) or Request for Variance (RFV) affecting an item being procured under this contract shall be in accordance with ANSI/EIA-649. Final approval of any ECP and/or RFV shall be in writing, by the Contracting Officer, NAVSUP Weapon Systems Support. If any such approval affects the cost of
Performance of this contract, an equitable adjustment shall be made in the contract price in accordance with the provisions of the "Changes" clause of this contract.
2. RFVs shall be issued using information outlined in ANSI/EIA-649 section 5.3.4.1. The use of DD Form 1694 is a required form for RFV submissions. MIL-HDBK-61 provides additional guidance for preparation of RFVs.
3. ECPs shall be issued using information outlined in ANSI/EIA-649 section 5.3.1.4. The use of DD Form 1692 is a required form for ECP submissions. MIL-HDBK-61 provides additional guidance for preparation of ECPs.
4. The contractor's assigned RFV number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letter "V", followed by consecutively assigned numeric characters beginning with 001.
5. The contractor's assigned ECP number shall use the following numbering format:
a. The last four alpha-numeric characters of the contract number followed by a dash (-).
b. The letters "ECP", followed by consecutively assigned numeric characters beginning with 001.
6. The contractor shall submit an electronic copy of any ECP or RFV to the Contracting Officer, Administrating
Contracting Officer, and the activity below:
A. Contract Administration Office (CAO), (for review and comment to PCO)
B. NAVSUP WSS Contracting Officer N742.13, Email: kirsten.barnes@navy.mil
C. NAVSUP GLS, Code 45113, Email: margaret.bowerman@navy.mil
7. Technical approval authority for RFDs and ECPs is NUWC Keyport (nicole.lerner@navy.mil).
8. Authorization to accept non-conforming supplies is specifically retained by the Contracting Officer.
252.211-7005 Substitutions for Military or Federal Specifications and
Standards
NOV 2005
mailto:kirsten.barnes@navy.mil mailto:margaret.bowerman@navy.mil mailto:nicole.lerner@navy.mil
Section D - Packaging and Marking
SECTION D
Packaging, Packing, Preservation and Transportation
PR: N5006317NA032
1. Preservation, Packaging, and Packing shall be in accordance with all associated drawings and specification listed herein.
2. Transportation Data:
a. NSN/NALC: 4T-1355-01-603-7731-CWRJ
b. Nomenclature: Propeller Baffle Kit
c. GBL Freight Description: N/A
d. NMFC Number: 186620
e. UFCC Number: 91810
f. Hazard Classification (Class, Division and Storage Compatibility): N/A
g. UN Number: N/A
Competent Authority Approval (CAA): N/A
Exemption number: N/A
h. Container Markings: IAW all associated drawings and specifications as listed herein.
i. Performance Oriented Packaging Certification Marking: N/A
j. Label: IAW all associated drawings and specifications as listed herein.
k. CIIC (Controlled Inventory Item Code): 7
l. Hazardous materials shall be offered for transportation in full compliance with Title 49 Code of Federal
Regulations (49 CFR).
m. GFM is not hazardous: GFM PROVIDED
Remarks: For hazardous and explosive material the above transportation data must be updated within 30 days prior to marking and labeling because of the lead-time between the initiation of the procurement and the actual shipping timeframe. Please contact the contracting officer (kirsten.barnes@navy.mil) at the NAVSUP Weapon Systems
Support, Mechanicsburg, PA for updated data.
MIL-STD-1168C – AMMUNITION LOT NUMBERING & AMMUNITION DATA CARD
Ammunition lot numbers shall be formatted in accordance with the current version of MIL-STD 1168 and include all lot number elements as reflected in the standard. The lot number shall be documented on the Ammunition Data
Card and include associated data in accordance with the current version of MIL-STD 1168:
(1) Manufacturer’s Identification symbol: Only the approved Manufacturer’s Identification symbol for the contractor or manufacturer is to be used in the lot number. Requests for approval of a Manufacturer’s
Identification symbol are to be submitted via the Government Inspector. Refer to MIL-HDBK-1461 for guidance, which is available on the WARP Website (https://mhpwarp.redstone.army.mil).
https://mhpwarp.redstone.army.mil/
Section E - Inspection and Acceptance
SECTION E
PRODUCTION LOT TEST SAMPLES (CONTRACTOR TESTING)
1. Test samples are required from each production lot and are to be tested in accordance with the approved test plan.
A production lot shall consist of net deliverable quantity, LOT test sample units, and any retained sample units for investigative purposes as may be required by Section B.
2. The production lot(s) must be manufactured and presented to the Government Quality Assurance Representative
(QAR) with all documentation required by section B. The documentation (WAWF-RRs and Ammunition Data Card printed from WARP) accompanying the production lot test samples shall contain the contract number, item, lot number identification, DODIC, NSN, and serial numbers. The presentation of the lot shall be made to the QAR 180 calendar days after date of contract to select the production test samples. If FAT is required then presentation of lot samples shall be made IAW timetable in Section F. The samples shall be selected, at random, from each production lot, by the QAR within 48 hours for resident QARs, or 7 calendar days for non-resident QARs after presentation of the lot.
3. Sample units removed for testing from different lots shall not be commingled.
4. Production lot testing shall be performed by the Contractor within 30 calendar days of production lot sample selection. Production lot testing shall be witnessed by a representative of the engineering activity and/or the cognizant QAR. The Contractor shall provide written notification to the Contracting Officer, with concurrent notification to the engineering activity, and the QAR, at least 20 calendar days prior to the planned testing date.
NOTE: If a failure occurs during testing and an engineering activity representative is not present, all testing shall be halted and the engineering activity and contracting officer shall be notified within 24 hours. A government representative shall be allowed to participate in the failure investigation in accordance with applicable CDRLs. Contractor testing shall resume upon notification by the Contracting Officer.
5. Disposition of Production Lot Test Samples –
Production Lot Testing Samples are subject to destructive testing. These units cannot be used to meet the total contract quantity.
6. Retained samples, if applicable, shall be sent to the address shown in Section F after lot release.
7. A production lot test report is required and shall be forwarded in accordance with the DD 1423 sequence number
A002 requirements to the address shown in Block 14. The test report shall include all results of testing conducted in accordance with the approved test plan.
8. Acceptance, shipment, and payment shall not be accomplished until the production lot test samples have been tested, the required report approved, and the lot has been released for service use. The retained samples, if applicable, shall be shipped to the address provided in Section F of the contract after the lot has been released for service use.
9. The only valid and contractually binding notification of production lot approval, conditional approval, or disapproval shall be in writing and issued by the Contracting Officer. This notification may be made to the
Contractor within 45 calendar days after the Contracting Officer receives the production lot test report(s) and all applicable CDRL requirements. Upon receipt of the written approval accepting a production lot(s), the Contractor shall ship the production lot(s) as soon as possible and no later than 15 calendar days after receipt of such notice.
Final acceptance of the production lot(s) shall be the responsibility of the cognizant DCMA QAR, but shall not occur unless and until the production lot approval has been issued in writing by the Contracting Officer.
a) Any notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
b) A notice of conditional approval shall state any further action required of the Contractor. In the event the test sample fails to meet the requirements of the specification or drawing, the Contractor shall submit a Failure
Analysis and Corrective Action Report (DD Form 1423, sequence number, A003) with all associated costs and expenses to be borne solely by the Contractor.
c) A notice of disapproval may cite reasons for such. If the production lot test report(s) is disapproved by the Contracting Officer, the QAR may be required to select an additional production lot test sample(s) for testing.
This direction may be given by the Contracting Officer in the notice of disapproval. The Contractor shall furnish such additional test sample(s) under the terms and conditions and within the time specified in the notification. The cost of each additional approval test, and all costs related to such test(s), shall be borne by the Contractor. Upon approval of the production lot test sample(s) and report(s), the Contracting Officer may equitably adjust the delivery schedule of the contract for only the lot represented by such sample(s). The Government reserves the right to require an equitable decrease of the contract price for any extension of the delivery schedule necessitated by additional test(s) or for any additional costs incurred by the Government due to the need for additional approval test(s).
10. If the Contractor fails to deliver any production lot test sample(s) within the time or times specified, or if the
Contracting Officer disapproves any production lot test report(s), the contract may be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract may be subject to termination for default. In such an event, failure of the Government to terminate this contract for default shall not relieve the
Contractor of the responsibility to meet the delivery schedule for production quantities.
1. Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001AA Technical Data See DD1423 See DD1423 See DD1423 See DD1423
0001AB First Article Testing Contractor Government Contractor Government
0001AC Lot Acceptance Testing Contractor Government Contractor Government
0001AD – 0001XX Production Units Contractor Government Contractor Government
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House
Address
INSPECTION AND ACCEPTANCE OF TEST PLANS / PROCEDURES
1. The Contractor shall submit a test plan/procedure for Government approval/disapproval as specified in the
Contract Data Requirements List (DD Form 1423, sequence number, A001). The test plan shall be submitted within
60 calendar days after contract award date. The Acceptance Test Plan shall identify that test fixtures are available for use at the Contractor’s Facility.
2. Notification of test plan approval, conditional approval, or disapproval shall be be provided via IRAPT. This notification may be made within 30 calendar days after receipt of the Production plan/procedure.
3. The notice of approval or conditional approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract.
4. A notice of conditional approval shall state any further action required of the Contractor.
5. A notice of disapproval shall cite the reasons for such. If the plan or procedure is disapproved by the
Government, the Contractor may be required, at the option of the Government, to submit a revised plan or procedure for evaluation. After each notification by the Government to submit a revised plan or procedure, the Contractor shall, at no additional cost to the Government, make any necessary revisions or modifications to the plan or procedure. Such revisions shall be furnished in accordance with terms and conditions and within the time specified in the notification. The Government may take action on the resubmitted plan or procedure within the time specified above. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule necessitated by resubmission of the plan or procedure.
6. If the Contractor fails to deliver the plan or procedure within the time specified, or if the Contracting Officer disapproves any plan or procedure, the Contractor shall be deemed to have failed to make delivery within the meaning of the "Default" clause of this contract, and this contract shall be subject to termination for default.
However, failure of the Government in such an event to terminate the contract shall not relieve the Contractor of the responsibility to meet all requirements of the contract including delivery of any first article sample(s), data requirements, and/or production quantities.
7. There is hereby created an option for the Government to waive the requirement for submission of a plan or procedure. If the offeror has had its plan previously approved by the Government, the following information shall be furnished:
Approved by__________________________ Date of approval___________________
Contract number and contractor under which plan/procedure was approved__________________.
Test Plan number, revision date and NSN for which the item was previously approved_____________.
8. If the submission of the plan or procedure is waived, the previously approved plan or procedure shall apply to the contract.
INSPECTION AND ACCEPTANCE
Production Quality Assurance of all items to be furnished hereunder shall be made by the cognizant Government
Inspector at the contractor's or sub-contractor's plant. Quality Assurance Inspection System to be in accordance with
ISO-9001, ANSI/ASQC or
MIL-I- 45208.
NOTE:
Acceptance or rejection shall be accomplished by the cognizant GQAR based upon his own inspection(s) and the results of the First Articles or Periodic Production and/or Acceptance Samples from the testing activity to the GQAR via
Procurement Contracting Officer (PCO).
QUALITY ASSURANCE REQUIREMENTS
An inspection lot shall consist of items manufactured under essentially the same conditions and at essentially the same time. Prior to submittal of each inspection lot to the Government Representative, the contractor shall provide inspection/or test records that assure the units presented have passed all inspections and tests required by the applicable drawings, specifications and quality assurance documentation. Unless specified otherwise, as a minimum this inspection and testing shall be in accordance with MIL-STD-105 (MIL-STD-1916), latest revision at issue date of solicitation, inspection Level II, with 100% inspection for critical characteristics, 1.0 AQL (Acceptance Quality Level), for major characteristics and 2.5 AQL for all other characteristics. All defects of the same class will be considered collectively when determined compliance with applicable AQL.
52.246-2 Inspection Of Supplies--Fixed Price AUG 1996
52.246-16 Responsibility For Supplies APR 1984
CLAUSES INCORPORATED BY FULL TEXT
52.246-11 HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (DEC 2014)
(a) The Contractor shall comply with the higher-level quality standard(s) listed below.
ISO-9001:2015
(b) The Contractor shall include applicable requirements of the higher-level quality standard(s) listed in paragraph
(a) of this clause and the requirement to flow down such standards, as applicable, to lower-tier subcontracts, in--
(1) Any subcontract for critical and complex items (see 46.203(b) and (c)); or
(2) When the technical requirements of a subcontract require--
(i) Control of such things as design, work operations, in-process control, testing, and inspection; or
(ii) Attention to such factors as organization, planning, work instructions, documentation control, and advanced metrology.
(End of clause)
ICP EA04 EDITABLE
INSPECTION, ACCEPTANCE, AND PLACE OF PACKAGING
Supplies furnished hereunder Shall be: Inspected at (X) Contractor's and/or Subcontractor's plant or ( )
Destination.
Acceptance Shall be: at (X) Contractor's and/or Subcontractor's plant or ( ) Destination.
If supplies will be packaged at a location different from the offeror address indicated on the solicitation, the offeror shall provide the name and street address of the packaging location:
Packaging House
Address
Section F - Deliveries or Performance
SECTION F
SECTION F
DELIVERIES OR PERFORMANCE
Unless otherwise indicated in this contract, accelerated deliveries are desirable and acceptable at no additional cost to the Government. The addresses for the activities designated to receive supplies are listed below:
LINE / SUBLINE ITEM and QTY SHIP TO:
0001AB 1 KT Contractor Testing Site (Contractor Facility)
0001AC 47 KT Contractor Testing Site (Contractor Facility)
0001AD 100 KT
NMC CED DET JACKSONVILLE
UIC: N61166
Naval Air Station Jacksonville
Bldg. 374 Akron Road
Jacksonville, FL 32212-0073
0001AE 96 KT
NMC DET NORTH ISLAND
UIC: N61047
Naval Air Station North Island
Building 872 Rogers Road
San Diego, CA 92135-7033
0001AF 75 KT
NMC EAD DET PEARL HARBOR
UIC: N68297
COMM 808-471-1111 EXT 225
BLDG 562, G Avenue
Ewa Beach, HI 96706-3381
0001AG 100 KT
NMC EAD DET YOKOSUKA
UIC: N61581
1-54 URAGO-CHO
YOKOSUKA-SHI
JAPAN, 237-0062
0001AH 79 KT
NUWC Keyport
UIC: N00253
ATTN: Receiving Office Bldg 893/144
610 Dowell Street
Keyport, WA 98345-7610
0001AJ 36 KT FMS Case IN-P-AAR
0001AK 175 KT FMS Case CA-P-BDG
0001AL 29 KT FMS Case UK-P-AHU
NOTES:
Please contact NAVSUP WSS Contracting Officer (Code N742.13) 60 days prior to shipment to confirm delivery destination. QAR is not authorized to approve items for shipment; approval for shipment is only authorized after the test validation reports have been reviewed and approved by the NAVSUP WSS PCO.
Shipment/Performance Notice Distribution - The cognizant DCMA office shall provide automated
Shipment/Performance Notice (PJJ card) to the Commanding Officer, Attn: Code 4511, NAVSUP
Logistics Operations Center, Mechanicsburg, PA 17055-0735 DOD Address Code N49935
(Routing ID Code NCB), (Communications ID RUSAACM), in support of the Ordnance Information
System-Wholesale (OIS-W, formerly CAIMS).
52.242-15 Stop-Work Order AUG 1989
52.242-17 Government Delay Of Work APR 1984
52.247-29 F.O.B. Origin FEB 2006
52.247-30 F.O.B. Origin, Contractor's Facility FEB 2006
52.247-34 F.O.B. Destination NOV 1991
52.247-52 Clearance and Documentation Requirements-Shipments to
DOD Air or Water Terminal Transshipment Points
FEB 2006
52.247-55 F.O.B. Point For Delivery Of Government-Furnished
Property
JUN 2003
52.247-65 F.O.B. Origin, Prepaid Freight--Small Package Shipments JAN 1991
252.247-7023 Transportation of Supplies by Sea APR 2014
252.247-7028 Application for U.S. Government Shipping
Documentation/Instructions
JUN 2012
52.211-8 TIME OF DELIVERY (JUN 1997)
(FAR 52.211-8 TIME OF DELIVERY
(a) The Government requires delivery to be made according to the following schedule:
FIRST ARTICLE REQUIRED DELIVERY SCHEDULE
Item Quantity Days Item Quantity Days
0001AB 1 KT (FAT) 180 DADC 0001AK 175 KT FMS 330 DAFATA
0001AC 29 KT (LAT) 210 DAFATA 0001AL 29 KT FMS 330 DAFATA
0001AD 100 KT 270 DAFATA 0002 200 KT FY19 OPTION
0001AE 96 KT 270 DAFATA
0001AF 75 KT 270 DAFATA A001 (Test Procedure) 1 Set 60 DADC
0001AG 100 KT 270 DAFATA A002 (Test Report) 2 Sets 210 DADC
0001AH 29 KT 270 DAFATA A003 (Failure Analysis) 1 Set A/R
0001AC 18 KT (LAT) 270 DAFATA A004 (Production
Progress
Report)
1 Set Monthly
0001AH 50 KT 330 DAFATA
0001AJ 36 KT FMS 330 DAFATA
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval
FIRST ARTICLE WAIVED DELIVERY SCHEDULE
0001AC 29 KT (LAT) 210 DADC 0001AK 175 KT FMS 330 DADC
0001AD 100 KT 270 DADC 0001AL 29 KT FMS 330 DADC
0001AE 96 KT 270 DADC 0002 200 KT FY19 OPTION
0001AF 75 KT 270 DADC
0001AG 100 KT 270 DADC A001(Test Procedure) 1 Set 60 DADC
0001AH 29 KT 270 DADC A002 (Test Report) 2 Sets 30 DAFATA
0001AC 18 KT (LAT) 270 DADC A003 (Failure Analysis) 1 Set A/R
0001AH 50 KT 330 DADC A004 (Production
Progress
Report)
1 Set Monthly
0001AJ 36 KT FMS 330 DADC
The Government will evaluate equally, as regards time of delivery, offers that propose delivery of each quantity within the applicable delivery period specified above. Offers that propose delivery that will not clearly fall within the applicable required delivery period specified above will be considered non-responsive and rejected. The
Government reserves the right to award under either the required delivery schedule or the proposed delivery schedule, when an offeror offers an earlier delivery schedule than required above. If the offeror proposes no other delivery schedule, the required delivery schedule above will apply.
OFFERORS PROPOSED DELIVERY SCHEDULE – First Article Required Delivery Schedule
OFFERORS PROPOSED DELIVERY SCHEDULE – First Article Waived Delivery Schedule
KEY: DADC = Days After Date of Contract DAFATA = Days After First Article Test Approval DANLATA = Days
After Notification of LAT Approval
(b) Attention is directed to the Contract Award provision of the solicitation that provides that a written award or acceptance of offer mailed, or otherwise furnished to the successful offeror, results in a binding contract.
The Government will mail or otherwise furnish to the offeror an award or notice of award not later than the day award is dated. Therefore, the offeror should compute the time available for performance beginning with the actual date of award, rather than the date the written notice of award is received from the
Contracting Officer through the ordinary mails. However, the Government will evaluate an offer that proposes delivery based on the Contractor's date of receipt of the contract or notice of award by adding (1) five calendar days for delivery of the award through the ordinary mails, or (2) one working day if the solicitation states that the contract or notice of award will be transmitted electronically. (The term "working day" excludes weekends and U.S. Federal holidays.) If, as so computed, the offered delivery date is later than the required delivery date, the offer will be considered non-responsive and rejected.
Section G - Contract Administration Data
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause—
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo unless Contractor’s business systems do not allow. In that event an “Invoice” (stand-alone) and “Receiving
Report” (stand-alone) may be used.
http://www.acq.osd.mil/dpap/dars/dfars/html/current/252232.htm https://www.acquisition.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/
(Contracting Officer: Insert applicable document type(s). Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
See Section E Inspection and Acceptance
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in iRAPT (WAWF) Data to be entered in iRAPT (WAWF)
Pay Official DoDAAC See Block 12 of Award
Issue By DoDAAC See Block 5 of Award
Admin DoDAAC See Block 6 of Award
Inspect By DoDAAC See Block 6 of Award
Ship To Code See Section F
Ship From Code See Section F
Mark For Code See Section F
Service Approver (DoDAAC) See Block 6 of Award
Service Acceptor (DoDAAC) See Block 6 of Award
Accept at Other DoDAAC See Block 6 of Award
LPO DoDAAC Data to be entered in iRAPT (WAWF)
DCAA Auditor DoDAAC See Block 12 of Award
Other DoDAAC(s) See Block 5 of Award
(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
See Section H – Special Distribution
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s
WAWF point of contact. navsupwawf.wss.fct@navy.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
mailto:navsupwawf.wss.fct@navy.mil
Section H - Special Contract Requirements
SECTION H
SECTION H – ADMINISTRATIVE POINTS OF CONTACT (MARCH 2016)
1) Inquiries and correspondence directed to the Administrative Point of Contact at NAVSUP should be addressed as follows:
Name: Kirsten Barnes Code: N742.13
Phone: 717-605-5937 Email: kirsten.barnes@navy.mil
2) Inquiries and correspondence directed to the Acquisition Management Specialist (AMS) should be addressed as follows:
Name: Margaret Bowerman Code: N45113
Phone: 717-605-5377 Email: Margaret.bowerman@navy.mil
3) If the inquiry involves technical questions, (drawing, specifications, etc.) inquiry should be submitted in accordance with the procurement specification. All telephone inquiries pertaining to technical questions must be confirmed in writing with the above AMS and PCO within 48 hours.
SECTION H – GOVERNMENT FURNISHED PROPERTY (APR 2017)
1. The Government will furnish the following property to the Contractor for use in performance of this contract:
2. Attachment 1, Consolidated Listing of Government Furnished Property, shall be completed by the Contracting
Officer and uploaded to Electronic Document Access (EDA) as an attachment. Additional information can be found at DFARS PGI (245.103 & 245.201-70).
PROPERTY QUANTITY COST DATE
Forward Closure Weldment - DWG 2132301 1 EA $500.00 30 Days prior to test
Delivery of such property will be made by NUWC, KEYPORT, GFP will be available for delivery no earlier than 30 DAYS PRIOR TO TEST.
The property will be provided by the government to the contractor as Government Furnished Equipment for
100%
FITMENT CHECKS.
3. The property will be delivered, at the Government's expense, at or near (determined at time of award):
POC:
Address:
4. The Contractor shall notify the Contracting Officer, in writing, with a concurrent copy to the cognizant DCMA office and NUWC KEYPORT, 610 Dowell Street Keyport WA 98345-7610, at least ninety (90) days prior to the need for the Government Furnished Property (GFP).
The GFP request shall clearly indicate the following information:
a. Contract Number
b. End Item Nomenclature and DODIC
c. Quantity of GFP required
d. Complete address to which GFP is to be delivered
e. Date GFP is required
5. Only the property listed above, in the quantity shown, will be furnished by the Government. The total quantity of
GFP provided will include First Article/Preproduction Testing, if required, lot acceptance, and normal attrition.
6. The Contractor shall notify the Contracting Officer, in writing, within thirty (30) days after GFP is determined to be lost, damaged, destroyed, no longer usable, or no longer needed for the performance of the contract.
7. All other property required for performance of this contract shall be furnished by the Contractor.
8. The contractor shall use a DD Form 1149, Requisition and Invoice Shipping Document for transfer of GFP.
mailto:Margaret.bowerman@navy.mil
9. DISPOSITIONING - The Contractor shall request disposition instructions from the Contracting Officer for any residual GFP. Any residual GFP must be in a container clearly marked with the NSN and lot number. It must also be free from any hazardous waste. Contents and marking shall be verified by the Government QAR.
Residual GFP shall be dispositioned within thirty (30) days after acceptance of the final production lot.
Additionally, the Contractor shall notify the receiving activity, in writing, at least thirty (30) days prior to shipment. A detailed list of material being returned shall be provided. Failure to comply may result in rejection of the material at the destination. Any costs associated with return of unauthorized shipments shall be borne by the Contractor.
SECTION H
SPECIAL DISTRIBUTION
NOTE 1: Use of the Wide Area Work Flow Receipt and Acceptance (WAWF-RR) electronic form is required. See clause 252.246-7000 Material Inspection and Receiving Report (MAR 2008) and 252.232-7003 Electronics
Submission of Payment Requests and Receiving Reports (JUN 2012).
NOTE 2: When using WAWF-RR to submit Contract Data Requirements List (CDRL) data and “Not Separately
Priced” items, the following information shall be listed in the “Comments” field of the WAWF electronic form:
Shipping company, shipment tracking number, and date shipped.
WAWF-RR documents accompanying the shipment are to be attached as follows (Type of Shipment - Location):
1. Carload or truckload - Affix to the shipment where it will be readily visible and available upon request.
2. Less than carload or truckload - Affix to container number one or container bearing lowest number.
3. Mail, including parcel post - Attach to outside or include in the package. Include a copy in each additional package of multi-package shipments.
Activity Number of Copies
Commanding Officer 1
NAVSUP Weapon Systems Support
Attn: Code N742.13
P.O. Box 2020
Mechanicsburg, PA 17055-0788 kirsten.barnes@navy.mil
NAVSUP Global Logistics Support
Attn: Code 45113
Bldg. 407N
Mechanicsburg, Pa 17055-0735 margaret.bowerman@navy.mil
MECH_NOLSC_PRP@navy.mil
Administrative Contracting Officer (ACO) 1
(Indicated in block 6 of SF 26)
NUWC Keyport Division
Attn: Code N421 mailto:kirsten.barnes@navy.mil mailto:margaret.bowerman@navy.mil mailto:MECH_NOLSC_PRP@navy.mil
610 Dowell Street
Keyport, WA 98325 nicole.lerner@navy.mil
PRODUCTION PROGRESS REPORTS DD Form 375 OR EQUIVALENT
(a) The contractor shall prepare and submit a Production Progress Report for the following contract items:
"ALL CONTRACT LINE ITEMS"
(b) The report shall be submitted via mailed or emailed on or before the 5th day of each month. The report shall be distributed as set forth in paragraph (c).
(c) The Production Progress Report shall be distributed as follows:
Addressee No. of Copies
NAVSUP Weapon Systems Support
Attn: Code N742.13
5450 Carlisle Pike
P.O. Box 2020
Mechanicsburg, PA 17055-0788 kirsten.barnes@navy.mil
Administrative Contracting Officer 1
Block 6 of Standard Form 26
NAVSUP Global Logistics Support
Attn: Code 45113
5450 Carlisle Pike
Bldg. 407N
Mechanicsburg, PA 17055-0735 margaret.bowerman@navy.mil
MECH_NOLSC_PRP@navy.mil
NUWC Keyport Division
Attn: Code N421
610 Dowell Street
Keyport, WA 98325 nicole.lerner@navy.mil
(d) The report shall contain the following information:
(1) The problem, actual or potential and its cause;
(2) Items and quantities affected;
(3) When the delinquency started or will start;
(4) Action taken to overcome the delinquency;
(5) Estimated recovery date; and/or
(6) Proposed schedule revision.
mailto:nicole.lerner@navy.mil
Section I - Contract Clauses
SECTION I
SECTION I
FAR 52.209-3 FIRST ARTICLE APPROVAL - CONTRACTOR TESTING (Sep 1989)
(a) The Contractor shall test 1 EA unit(s) of Lot/Item 0001AB as specified in this contract. At least 30 calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
(b) The Contractor shall submit the first article test report within 180 calendar days from the date of this contract to
NAVSUP WSS Code N742.13 marked “First Article Test Report: Contract No. _______, Lot/Item No. _______”
Within 45 calendar days after the Government receives the test report, the Contracting Officer shall notify the
Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
(c) If the first article is disapproved, the Contractor, upon Government request, shall repeat any or all first article tests. After each request for additional tests, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall then conduct the tests and deliver another report to the Government under the terms and conditions and within the time specified by the Government. The Government shall take action on this report within the time specified in paragraph (b) of this subsection. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule, or for any additional costs to the Government related to these tests.
(d) If the Contractor fails to deliver any first article report on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.
(e) Unless otherwise provided in the contract, and if the approved first article is not consumed or destroyed in testing, the Contractor may deliver the approved first article as part of the contract quantity if it meets all contract requirements for acceptance.
(f) If the Government does not act within the time specified in paragraph (b) or (c) of this subsection, the
Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.
(g) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for (1) progress payments, or (2) termination settlements if the contract is terminated for the convenience of the Government.
(h) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the offeror/contractor and have been accepted by the Government. The offeror/contractor may request a waiver.
Alternate I (Jan 1997). As prescribed in 9.308-1(a)(2) and (b)(2), add the following paragraph (i) to the basic clause:
(i) The Contractor shall produce both the first article and the production quantity at the same facility.
https://acquisition.gov/far/current/html/Subpart%209_3.html#wp1078466
52.202-1 Definitions NOV 2013
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006
52.203-7 Anti-Kickback Procedures MAY 2014
52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or
Improper Activity
MAY 2014
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity MAY 2014
52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.203-17 Contractor Employee Whistleblower Rights and Requirement
To Inform Employees of Whistleblower Rights
APR 2014
52.204-2 Security Requirements AUG 1996
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
52.204-10 Reporting Executive Compensation and First-Tier
Subcontract Awards
OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for
Debarment
OCT 2015
52.209-10 Prohibition on Contracting With Inverted Domestic
Corporations
NOV 2015
52.211-5 Material Requirements AUG 2000
52.211-15 Defense Priority And Allocation Requirements APR 2008
52.215-2 Audit and Records--Negotiation OCT 2010
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997
52.215-14 Integrity of Unit Prices OCT 2010
52.215-22 Limitations on Pass-Through Charges--Identification of
Subcontract Effort
OCT 2009
52.215-23 Limitations on Pass-Through Charges OCT 2009
52.219-6 Notice Of Total Small Business Set-Aside NOV 2011
52.219-8 Utilization of Small Business Concerns NOV 2016
52.219-13 Notice of Set-Aside of Orders NOV 2011
52.219-14 Limitations On Subcontracting JAN 2017
52.219-28 Post-Award Small Business Program Rerepresentation JUL 2013
52.222-1 Notice To The Government Of Labor Disputes FEB 1997
52.222-3 Convict Labor JUN 2003
52.222-4 Contract Work Hours and Safety Standards- Overtime
Compensation
MAY 2014
52.222-19 Child Labor -- Cooperation with Authorities and Remedies OCT 2016
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment
Exceeding $15,000
MAY 2014
52.222-21 Prohibition Of Segregated Facilities APR 2015
52.222-26 Equal Opportunity SEP 2016
52.222-29 Notification Of Visa Denial APR 2015
52.222-37 Employment Reports on Veterans FEB 2016
52.222-40 Notification of Employee Rights Under the National Labor
Relations Act
DEC 2010
52.222-50 Combating Trafficking in Persons MAR 2015
52.222-54 Employment Eligibility Verification OCT 2015
52.223-6 Drug-Free Workplace MAY 2001
52.223-18 Encouraging Contractor…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.