Enclosure_1_-_SOW_03-19-15_-_SSN.pdf

PDF 35 KB Posted

Attached to
SP22 Engineering Services Federal contract opportunity
Solicitation number
N00030-16-R-0018
Issued by
Department of the Navy Strategic Systems Programs

About this file

SOW 03-19-15

View the file

Other files for this federal contract opportunity

Other files attached to SP22 Engineering Services, newest first.
File Type Posted
Enclosure_3_-_DD254_-_SSN.pdf PDF
Enclosure_2_-__CDRL_-_SSN.pdf PDF
Enclosure_4_-_FTE_-_SSN.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION C – DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

Item 0001 –Launcher Systems Engineering (SP22) (CPFF-LOE) (O&MN)

(U.S.)(FY16)

During the period from 31 December 2015 through 30 December 2016, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to perform the following on-site services for TRIDENT II (D5) Submarine Launched Ballistic Missile (SLBM) Strategic Weapon System (SWS) equipment, components, technical documentation, plans and programs.

A. SWS Integration Support - The Contractor shall support Launcher Branch (SP22), Strategic Systems Programs (SSP) field activities, Naval Surface Warfare Center (NSWC) Crane and other Contractors to ensure system integration of all elements of the SWS subsystems are being considered in performing technical, operational, and programmatic tradeoffs. The Contractor’s efforts shall include systems analyses, independent studies, technology and engineering evaluations, document development, trade analysis and participation in working groups and integrated product teams.

B. New START Support - The Contractor shall assist the SP22 Launcher Branch in the implementation and execution of New START and technical requirements to support the preparation of equipment and system designs. The Contractor shall support in-service engineering of equipment and system. The Contractor shall support integration and planning efforts to include working with SSP field activities, Naval Surface Warfare Center (NWSC) Crane and other Contractors in programmatic documentation efforts, technology and engineering evaluations, provide planning support for and participation in working groups and ensure implementation of action items.

C. Information Assurance - The Contractor shall provide engineering services in support of SP22 Launcher Branch information assurance (IA) implementation. The Contractor shall provide technical reviews on IA packages in accordance with the certification and accreditation (C&A) processes for TRIDENT Strategic Weapon System (SWS) and associated testing equipment, trainers and support systems. The Contractor shall provide technical assistance on interpreting SSP IA policies, requirements and C&A processes to Technical Division’s personnel. Participate in System Requirements Reviews (SRRs), Preliminary Design Reviews (PDRs), Critical Design Reviews (CDRs), Development and Deployment Teams (DDTs), Concept Development Teams (CDTs), focus teams and working groups. The Contractor shall assist in the generating of IA related presentations, letters, memorandums, white papers.

D. Technical Branch/Project Management Office Documentation Management Support - The Contractor shall provide support to SSP in Documentation Management, Receipt, Review and Storage. The Contractor shall generate strategies and planning to maintain and coordinate documentation controls and processing between SP22, SPF70 Project Management Office and entities that provide documentation to SSP for review, processing and approval. The Contractor shall support the on-going initiatives by the SP22 and SPF70 Project Management Office to update, integrate and/or consolidate documentation and documentation management infrastructure. The Contractor shall receive, review, record, disseminate, track and report documentation within SP22 and SPF70 Project Management Office and maintain configuration control of the latest approved documents. The Contractor shall provide recommendations for streamlining, optimizing, or improving upon current policies, processes, and standards for data, documentation, and information management infrastructure.

E. Travel: The Contractor shall travel in performance of this contract. Travel shall be for the purpose of supporting tasks listed in this Item. All travel shall be in accordance with the Government’s Joint Travel Regulations (JTR) or Joint Federal Travel Regulation (JFTR).

Item 0002 – Advance Launcher Development Program Systems Engineering (SP22)

(CPFF-LOE) (R&D) (U.S.)(FY16)

A. The Contractor shall support SP22 Launcher Branch in the design and development, site activation, test and evaluation, and maintenance phases of the Advance Launcher Development Program(ALDP) based upon specific weapon systems experience for: strategic nuclear weapons, Ballistic Missile Submarine (SSBN), weapons facility operations, nuclear safety and security, TRIDENT testing requirements, test facility operations and integration, hardware logistics and delivery, strategic missile and ordnance handling, Information Assurance, and other government organizational procedures and instructions that support the Launcher Subsystem and LTC.

1. Concept of Operations (CONOPS) Support: The Contractor shall develop and maintain the Launcher portion of the CONOPS for the Launcher Test Capabilities (LTC) project site activation, test & evaluation, and post operations & maintenance phases.

2. Safety and Risk Mitigation: The Contractor shall conduct and provide safety risk mitigation analysis for the ALDP and LTC project. The Contractor shall analyze launcher subsystem and support equipment plans to assess technical risk and programmatic risk based on new and emergent design activities, material restrictions, environmental impact, and regulatory constraints to manage engineering activities to optimize design, testing, and acquisition efforts.

3. Modeling, Simulation, and Analysis Support: The Contractor shall perform launcher subsystem simulations for the ALDP and LTC project and shall document and report the data based on the outcome of the simulations. The Contractor shall apply a structured a nd rigorous methodology to create and validate models and 3-D representations of designs and arrangements for launcher systems and subsystems. This includes, but is not limited to, the use of models, emulators, prototypes, simulators, and stimulators to develop data for making management, technical and engineering decisions.

4. Verification and Validation Requirements: The Contractor shall verify and validate engineering performance requirements for launcher subsystem components, interfaces, and related support equipment to ensure compliance with the Interface Control Documents (lCD) for the Launcher Subsystem. The Contractor shall provide advanced systems engineering analysis and management support to analyze and manage components and coordinated interfaces between Launcher, Fire Control, Navigation, and Missile Control Center Module (MCCM). The Contractor shall provide advanced Launcher, Missile and Fire Control analysis support to develop, operate, and maintain test sites.

5. Integration: The Contractor shall support systems integration of subsystems with project planning to include studies and analysis as well as, technical assessment of the weapons systems, subsystems and components. This includes concept design development and definition, demonstration, validation and testing, technical documentation, information assurance, Government Furnished Items logistics and delivery, engineering and analysis processes, and life cycle assessment and scheduling for the integration of subsystems with facility planning processes.

B. Maintenance and Sustainment: The Contractor shall support develop m e n t o f the test site maintenance and sustainment plans for the ALDP and LTC project.

The Contractor shall perform life cycle assessments o f a l l subsystems to develop test site maintenance and sustainment plans. The Contractor shall perform the necessary studies and analyses to provide a technical assessment of the system interfaces, subsystems and components and provide their recommendations and findings to SSP for review and concurrence.

C. Project General Support: T h e Contractor shall provide general support , written engineering assessments , critiques on project procedures and processes developed fo r the ALDP. The Contractor shall analyze, make recommendations, provide rationale for the recommendations, and provide technical administrative support in preparing assigned project plans, schedules, cost estimates and risk analyses required to support each Design Review.

Item 0003 – Information Management Strategy Support (SP201) (CPFF-LOE) (O&MN) (U.S.)(FY16)(Option) During the period from 31 December 2015 through 30 December 2016, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to perform the following on-site services for TRIDENT II (D5) Submarine Launched Ballistic Missile (SLBM) Strategic Weapon System (SWS) equipment, components, technical documentation, plans and programs.

A. The Contractor shall support the generation of strategies and planning to maintain and coordinate documentation controls and processing within the SSP enterprise.

The Contractor shall support the long-term strategy and vision for the integration of government-owned documentation and information across the SSP enterprise, and recommend SSP policy changes to capture this vision.

B. The Contractor shall support the on-going initiatives by the SSP to update, integrate and consolidate documentation and information infrastructure. The Contractor shall recommend strategies to integrate these disparate initiatives and systems.

Item 0004 – Launcher Systems Engineering (SP22) (CPFF-LOE) (O&MN) (U.S.)(FY17)(Option) During the period from 31 December 2016 through 30 December 2017, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to perform efforts described in Item 0001 if Option Item 0004 is exercised in accordance with the Option Exercise clause.

Item 0005 – Advance Launcher Development Program Systems Engineering (SP22) (CPFF-LOE) (R&D) (U.S.)(FY17)(Option) During the period from 31 December 2016 through 30 December 2017, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to perform efforts described in Item 0002 if Option Item 0005 is exercised in accordance with the Option Exercise clause.

Item 0006 – Information Management Strategy Support (SP201) (CPFF-LOE) (O&MN) (U.S.)(FY17)(Option) During the period from 31 December 2016 through 30 December 2017, the Contractor shall make available and employ its facilities, personnel at the level of effort set forth in Section F, services of others, and materials, and shall use its best efforts to perform efforts described in Item 0003 if Option Item 0006 is exercised in accordance with the Option Exercise clause.

Item 0007 – Contract Data Requirements List The Contractor shall deliver data in accordance with the Contract Data Requirements List (CDRL), Exhibit A, and the following:

The Contractor shall report contract performance status. See CDRL A001, Contract Status Report.

The Contractor shall report progress, highlights, and problem areas along with resolution plans. These reports are concise engineering documents that outline an issue, approach, resolution, and recommended action. These reports include technical analysis and briefs to provide system engineering positions, analytical results and information on issues related to the operations and maintenance of the TRIDENT II Launcher subsystem. See CDRL A002, Technical Report.

The Contractor shall report the financial status of the contract and the post-completion status. See CDRL A003, Monthly/Quarterly Contractor Financial Management Report (CFMR-M/CFMR-Q), and CDRL A004, Post Completion Report/Man-Hour & Cost Expenditure.