DBD_CCDR_RFP_Data_Request.xlsx
XLSX spreadsheet 100 KB Posted
- Attached to
- DRAFT Dual Band Decoy (DBD) BAA Federal contract opportunity
- Solicitation number
- N00019-18-R-0086
About this file
DRAFT CCDR Data Request
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DBD_DET_Draft_BAA_QAs__9.pdf | ||
| DBD_DET_Draft_BAA_QAs_5-8.pdf | ||
| DBD_DET_Draft_BAA_QAs_1-4.pdf | ||
| DRAFT_DBD_DET_BAA.docx | DOCX document | |
| N0001918R0086_-_Draft_BAA_RFP_and_Model_Contract.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Guide
COLOR KEY / TABS
Input Expand WBS as necessary and specify Hardware Modules or CSCIs as required for the proposed program
Traceability Matrix Identify BOE # and WBS reporting element mappings
| CCDR Summary | Identify quantities associated with the proposed lot in column D |
| Provide program information to include period of performance, contract type and number, as well as program completion percentage | |
| Bucket the proposed values using the MIL-STD WBS; values should be reported in yellow cells |
SEPM Hours by Month Provide proposed SEPM by month. Make the necessary adjustments to column B to align with the POP timeline.
SLOC Provide the software SLOC and hours for the proposed CSCI's
Module Design Provide the details related to the modules that will change or be re-designed
| Vendor List | Summary of Vendors over TINA and the Suppliers in the BOM |
| BOM Example | Cost build up by Part Number, WBS, and Supplier |
These WBS reporting elements do not align directly with the CSDR format. The reporting elements have been adjusted to collect the necessary information needed to evaluate the proposal.
Input
| KEY: | |
| Contractor Input | Specify reporting elements specific to the proposed approach using the yellow cells below. |
| Expand the table as necessary. | |
| Recommended WBS is based on the MIL-STD 881 (Appendix B). The MIL-STD can be located at the following DCARC site: http://cade.osd.mil. |
| WBS Code | Reporting Element | Dictionary |
| A | Dual Band Decoy (DBD) | Cost roll up of WBS AA, AB, AC, AD, AE, AF, AG, AH, AI, AJ, AK, AL |
| AA | Dual Band Decoy (DBD) Prime Mission Product (PMP) | Cost roll up of WBS AAA, AAB, AAC, AAD, AAE |
| AAA | DBD Module 1 Hardware | Identify Module 1 applicable to the DBD PMP (cost roll up AAAA, AAAB, AAAC) |
| AAAA | Labor Dollars | Accounts for Direct Labor Dollars + Overhead Dollars for all functional labor categories that fall under "Module 1". |
| AAAB | Material Dollars | Accounts for all Direct Materials (Raw, Purchased Parts, Purchased Equipment, and Subcontracts) as well as Material Handling Overhead dollars related to "Module 1". |
| AAAC | Other Costs Not Shown Elsewhere | Any other costs that are tied to "Module 1" which are not previously reported in the Labor or Material reporting elements (i.e. Travel, Other Charges) |
| AAB | DBD Module 2 Hardware | Identify Module 2 applicable to the DBD PMP (cost roll up AABA, AABB, AABC) |
| AABA | Labor Dollars | Accounts for Direct Labor Dollars + Overhead Dollars for all functional labor categories that fall under "Module 2". |
| AABB | Material Dollars | Accounts for all Direct Materials (Raw, Purchased Parts, Purchased Equipment, and Subcontracts) as well as Material Handling Overhead dollars related to "Module 2". |
| AABC | Other Costs Not Shown Elsewhere | Any other costs that are tied to "Module 2" which are not previously reported in the Labor or Material reporting elements (i.e. Travel, Other Charges) |
| AAC | DBD Module 3 Hardware | Identify Module 3 applicable to the DBD PMP (cost roll up AACA, AACB, AACC) |
| AACA | Labor Dollars | Accounts for Direct Labor Dollars + Overhead Dollars for all functional labor categories that fall under "Module 3". |
| AACB | Material Dollars | Accounts for all Direct Materials (Raw, Purchased Parts, Purchased Equipment, and Subcontracts) as well as Material Handling Overhead dollars related to "Module 3". |
| AACC | Other Costs Not Shown Elsewhere | Any other costs that are tied to "Module 3" which are not previously reported in the Labor or Material reporting elements (i.e. Travel, Other Charges) |
| AAD | DBD Software | Cost roll up of AADA, AADB, AADC |
| AADA | CSCI 1 | Identify specific CSCIs applicable to the DBD PMP |
| AADB | CSCI 2 | Identify specific CSCIs applicable to the DBD PMP |
| AADC | CSCI 3 | Identify specific CSCIs applicable to the DBD PMP |
| AAE | DBD Integration, Assembly, Test and Checkout | Accounts for all costs related to the Integration, Assembly, Test and Checkout line item. |
| AB | Platform Integration | Accounts for all costs related to the Platform Integration line item. |
| AC | System Engineering | Accounts for Direct Labor Dollars + Overhead Dollars for all functional labor categories that fall under System Engineering. |
| AD | Program Management | Accounts for Direct Labor Dollars + Overhead Dollars for all functional labor categories that fall under Program Management. |
| AE | System Test and Evaluation | Accounts for all costs related to the System Test and Evaluation line item. |
| AF | Training | Accounts for all costs related to the Training line item. |
| AG | Data | Accounts for all costs related to the Data line item. |
| AH | Peculiar Support Equipment | Accounts for all costs related to the Peculiar Support Equipment line item. |
| AI | Common Support Equipment | Accounts for all costs related to the Common Support Equipment line item. |
| AJ | Operational/Site Activation | Accounts for all costs related to the Operational/Site Activation line item. |
| AK | Industrial Facilities | Accounts for all costs related to the Industrial Facilities line item. |
| AL | Initial Spares and Repair Parts | Accounts for all costs related to the Initial Spares and Repair Parts line item. |
Traceability Matrix BOE # WBS Element
CCDR Summary
| PROPOSED | |
| Contract Type | |
| Contract Number/Solicitation Number | |
| Period of Performance Start Date | |
| Period of Performance End Date | |
| Cumulative Qty Made in Past |
(all customers for this Item)
| Quantity this Contract |
| Target Cost |
| Target Price |
| Target Profit |
| Percent Complete |
| Costs Table | ||
| PROPOSED | ||
| WBS |
ELEMENT
CODE WBS REPORTING ELEMENTS NUMBER OF
UNITS AT
| COMPLETION | COSTS INCURRED AT COMPLETION (U.S. Dollars) | |||
| Non-Recurring | Recurring | TOTAL |
| A | Dual Band Decoy (DBD) | $0.0 | $0.0 | $0.0 |
| AA | Dual Band Decoy (DBD) Prime Mission Product (PMP) | $0.0 | $0.0 | $0.0 |
| AAA | DBD Module 1 Hardware | $0.0 | $0.0 | $0.0 |
| AAAA | Labor Dollars | $0.0 | ||
| AAAB | Material Dollars | $0.0 | $0.0 | |
| AAAC | Other Costs Not Shown Elsewhere | $0.0 | ||
| AAB | DBD Module 2 Hardware | $0.0 | $0.0 | $0.0 |
| AABA | Labor Dollars | $0.0 | ||
| AABB | Material Dollars | $0.0 | $0.0 | |
| AABC | Other Costs Not Shown Elsewhere | $0.0 | ||
| AAC | DBD Module 3 Hardware | $0.0 | $0.0 | $0.0 |
| AACA | Labor Dollars | $0.0 | ||
| AACB | Material Dollars | $0.0 | $0.0 | |
| AACC | Other Costs Not Shown Elsewhere | $0.0 | ||
| AAD | DBD Software | $0.0 | $0.0 | $0.0 |
| AADA | CSCI 1 | $0.0 | ||
| AADB | CSCI 2 | $0.0 | ||
| AADC | CSCI 3 | $0.0 | ||
| AAE | DBD Integration, Assembly, Test and Checkout | $0.0 | ||
| AB | Platform Integration | $0.0 | ||
| AC | System Engineering | $0.0 | $0.0 | |
| AD | Program Management | $0.0 | ||
| AE | System Test and Evaluation | $0.0 | ||
| AF | Training | $0.0 | ||
| AG | Data | $0.0 | ||
| AH | Peculiar Support Equipment | $0.0 | ||
| AI | Common Support Equipment | $0.0 | ||
| AJ | Operational/Site Activation | $0.0 | ||
| AK | Industrial Facilities | $0.0 | ||
| AL | Initial Spares and Repair Parts | $0.0 | ||
| Subtotal Cost | $0.0 | $0.0 | $0.0 |
| G&A | Reporting Contractor G&A | |
| UDB | Reporting Contractor Undistributed Budget | |
| MR | Reporting Contractor Management Reserve | |
| FCCM | Reporting Contractor FCCM | |
| Total Cost | $0.0 |
FEE Reporting Contractor Profit/Loss or Fee
Total Price $0.0
22. REMARKS
Labor Hours Table
WBS
ELEMENT
| CODE | WBS REPORTING ELEMENTS | PROPOSED | |||
| PROPOSED | |||||
| A | B | ||||
| Non-Recurring | Recurring | ||||
| A | Dual Band Decoy (DBD) | - 0 | - 0 | ||
| AA | Dual Band Decoy (DBD) Prime Mission Product (PMP) | - 0 | - 0 | ||
| AAA | DBD Module 1 Hardware | - 0 | |||
| AAB | DBD Module 2 Hardware | - 0 | |||
| AAC | DBD Module 3 Hardware | - 0 | |||
| AAD | DBD Software | - 0 | - 0 | ||
| AADA | CSCI 1 | - 0 | |||
| AADB | CSCI 2 | - 0 | |||
| AADC | CSCI 3 | - 0 | |||
| AB | Platform Integration | ||||
| AC | System Engineering | - 0 | |||
| AD | Program Management | ||||
| AE | System Test and Evaluation | ||||
| AF | Training | ||||
| AG | Data | ||||
| AH | Peculiar Support Equipment | ||||
| AI | Common Support Equipment | ||||
| AJ | Operational/Site Activation | ||||
| AK | Industrial Facilities | ||||
| AL | Initial Spares and Repair Parts | ||||
| Subtotal |
SEPM Hours by Month
Proposed
| % Complete |
| EXAMPLE |
| Feb-2012 |
| Mar-2012 |
| Apr-2012 |
| May-2012 |
| Jun-2012 |
| Jul-2012 |
| Aug-2012 |
| Sep-2012 |
| Oct-2012 |
| Nov-2012 |
| Dec-2012 |
| Jan-2013 |
| Feb-2013 |
| Mar-2013 |
| TOTAL hrs | 0.00 |
| TOTAL Cost | |
| SEPM POP | |
| Specify proposed hours per month | |
| SEPM POP (total months) |
SLOC
In attempt to compare the software hours to NAVAIR datasets we want to ensure we are making comparisons accurately. Please identify any hours associated with NAVAIR software elements (listed below) that are captured elsewhere in the proposal if not included within the Software hours line.
NAVAIR datasets include the following elements:
| - Software Coding and Testing |
| - Software Requirements Analysis |
| - Software Architecture Analysis |
| - Software Detailed Design |
| - Software Integration |
| - Software Qualification Testing |
| - System Integration |
Elements not included in NAVAIR datasets :
| - System Requirements Analysis |
| - System Architectural Analysis |
| - System Qualification Testing |
| - Software Installation |
| - Software Acceptance Support |
| Mod Code effort | Reuse Code effort | ||||||||||
| CSCI | New | Mod | Reuse | Auto | COTS | Language | Mod Design % | Mod | |||
| Code % | Mod Retest % | Reuse Design % | Reuse Code % | Reuse Retest % | |||||||
| Design % | Code % | Test % | Effort Sum Check | ||||||||
| Design % | Code % | Test % | Effort Sum Check | Code Complexity Simple | Code Complexity Routine | Code Complexity Complex | Complexity sum check |
Jennifer.Meredith: Jennifer.Meredith:
| This cell turns red if the sum of simple, routine and complex code does not equal 100% | Total Software Hours Proposed | ||||||||||||||||||||
| Dataset Example | 15% | 15% | 15% | 7% | 7% | 7% | 40% | 30% | 30% | 100% | 40% | 30% | 30% | 100% | 100% | 0% | 0% | 100% | |||
| CSCI 1 (specify) | 0% | 0% | 0% | 0% | 0% | 0% | |||||||||||||||
| CSCI 2 (specify) | 0% | 0% | 0% | 0% | 0% | 0% | |||||||||||||||
| CSCI 3 (specify) | 0% | 0% | 0% | 0% | 0% | 0% | |||||||||||||||
| 0% | 0% | 0% | 0% | 0% | 0% | ||||||||||||||||
| 0% | 0% | 0% | 0% | 0% | 0% | ||||||||||||||||
| 0% | 0% | 0% | 0% | 0% | 0% | ||||||||||||||||
| 0% | 0% | 0% | 0% | 0% | 0% | ||||||||||||||||
| 0 |
Instructions Enter the logical Source Lines of Code (SLOC)
New - This is the amount of new code defined for the CSCI.
Mod – This is the amount of modified code defined for the CSCI.
Reuse – This is the amount of reuse code defined for the CSCI. Reuse code is different from Commercial Off-The-Shelf (COTS) code. Reuse typically comes from a previous weapon system development with limited applicability to a broad spectrum of users. The goal is to use the code without modification, however it must be retested in the new application environment. Frequently there will be some minor redesign and recode required to make the reuse code function in the new environment.
COTS – This is the amount of COTS code defined for the CSCI. COTS is not meant to cover things like the size of an Operating System (like Linux or MS-DOS). Rather it is applications software that meets a functional need of the program. For our purposes this is considered unmodified COTS. Any COTS that requires “tweaking” or modification is not COTS and should be treated as reuse or modified depending on the amount of modification required.
i.e., ADA, Assembly, C, C++, COBOL, Fortran, etc Mod Design % - This factor should reflect the amount of redesign that needs to take place for the code to be modified relative to designing it new. Note that this is effort and not lines of code. The amount of design effort required is often disproportionately higher than the amount of effort to recode the software. This is driven by unfamiliarity with the modified code, quality of the donor code, and how closely the new requirements match the original codes functionality.
Mod Code % - This factor reflects the amount of effort required to code the modified software relative to writing it as new. Frequently the amount of recoding required is higher, sometimes much higher, than the redesign %.
Reuse Design % - This factor reflects the amount of effort the design community will spend familiarizing themselves with the reuse code relative to having designed it new. Even code that will be completely untouched requires design effort to research and validate the code application.
Reuse Code % - This factor reflects the amount of effort required to code the reused software relative to writing it as new. It is rare that code can be truly reused without some minor coding effort.
Design % - This factor should reflect the amount of effort that needs to take place for the code to be designed/redesigned.
Code % - This factor reflects the amount of effort required to code the software.
Test % - This factor reflects the amount of effort required to test/retest the software. Simple - Code that performs easily tested functions, has generally linear inputs and outputs, i.e. linear domain & range relationships, single SW & hardware relationship, and performs simplistic data management functions like look up tables or library functions. The main difference between simple and routine code is the relative degree of testing required to determine code functionality. Simple code can consist of simulation, maintenance, data handling, or human interface components.
Routine - Code that has multiple input and output paths requiring a moderate degree of testing to certify functionality, maybe newly written or adaption of existing code from other DOD programs and generally performs non real time, non algorithm intense functions like simulation, tools, maintenance, Graphical User Interface (GUI) or data handling. Code is rarely constrained by the operating environment.
Complex - Code that has a very high number of input and output paths making it very difficult to test, may perform real time mathematical intense functions, maybe constrained by the operating environment, maybe written in a highly secure environment, or involves new or novel algorithms or applications. Complex code tends to be found in functions that emulate or interface with the physical world, i.e. radar signal processing, missile detection, data links protocol implementation, and electronic warfare. Human interface is infrequent with this type of code. Key to identifying complex code is the difficulty in verifying and validating the code in a laboratory environment. This should be the total Software hours proposed as compared to NAVAIR datasets for an apples to apples comparison.
Module Design
| Module Name (SRA) | Module Type | Module Function | New/Mod/COTS | % Modification Required | Brief Description of Modification | Hours Proposed | * Please provide details related to the modules that will change or be re-designed | |
| Specify Name | Module 1 | |||||||
| Specify Name | Module 2 | |||||||
| Specify Name | Module 3 |
| 0 | Total Hours | |||||
| Instructions | i.e. Power, Analog, Digital, RF | Brief description of module | This would be the percent of the module that needs to be modified as compared to if it was brand new. | What work is being done? What is changing? |
Vendor List Summary
| Supplier Name | Sum of BOM | % of BOM | ||
| $ - 0 | ERROR:#DIV/0! | * Summary roll of all BOM Suppliers; identifies over TINA Suppliers | ||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ERROR:#DIV/0! | |||
| $ - 0 | ||||
| WBS | WBS Description | Total BOM Value | ||
| AAA | DBD Module 1 Hardware | $ - 0 | ||
| AAB | DBD Module 2 Hardware | $ - 0 | ||
| AAC | DBD Module 3 Hardware | $ - 0 |
$ - 0
BOM Example CLIN SOW Paragraph WBS Part Number Description EST Method Bullard, Michelle A CIV NAVAIR 4.2: Estimating Method used -
For example:
- Quote (Q)
- Purchase Order (PO)
- Estimate (E)
- Long Term Agreement (LTA) Validity Date / Expiration Date Bullard, Michelle A CIV NAVAIR 4.2:
When do quotes/LTAs expire?
If Estimating Method was PO history, what was the date the part was procured? Supplier Name Qty Unit Cost Extended Escalation Factor Bullard, Michelle A CIV NAVAIR 4.2:
| If Applicable | Material w/Escalation | Scrap Factor | |||||
| Bullard, Michelle A CIV NAVAIR 4.2: Scrap or Attrition Factors | Material w/ Scrap | Min Buy Qty | Min Buy Charges | Tooling/NRE/Other Charges | Total Extended Cost | CAGE Codes | PO # |