MQR_8215.pdf

PDF 157 KB Posted

Attached to
AN-TSQ-T 10 Transmitters Federal contract opportunity
Solicitation number
SPRHA523R0237
Issued by
Defense Logistics Agency Aviation

About this file

This document outlines manufacturing qualification requirements for the repair of AN/TSQ-T10 transmitter units. Potential sources must verify facilities, testing equipment, repair processes, and complete data packages to qualify for repair work. Qualification involves preparing a test plan and conducting evaluations at the offeror's expense to demonstrate meeting performance, quality, and other standards. The estimated qualification time is 90 days. Waivers of some requirements are possible for sources with prior government or OEM repair experience or qualifications on similar items.

The related solicitation is open only to Applied Systems Engineering as an approved repair source. Interested parties must review the attached qualification requirements and technical data package to pursue approval for future opportunities. The Defense Logistics Agency Aviation is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to AN-TSQ-T 10 Transmitters, newest first.
File Type Posted
SPRHA523R0237_______0002.pdf PDF
SPRHA523R0237_______0001.pdf PDF
SPRHA523R0237.pdf PDF
EDL_1848.pdf PDF
SPI_3790.pdf PDF
EDL_8215.pdf PDF
SPI_3787.pdf PDF
CPP.pdf PDF
Pkg_SOW.pdf PDF
MQR_1848.pdf PDF
MQR_1845.pdf PDF
EDL_1845.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPAIR QUALIFICATION REQUIREMENTS

NIIN: 0016448215FD

P/N: 105103-1 Noun: Transmitter, Radar Application: AN/TSQ-T10, Joint Threat Emitter (JTE)

5 Dec 2019 Section C 1/3

SECTION C:

1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE

a. Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this Transmitter, Radar.

b. Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. This includes, but not limited too, the ability to obtain repair of the magnetron as well as the ability to replace and test associated components within the transmitter. Ability to test assembly interface and RF signal characteristics including appropriate equipment to measure the output power. The peak transmitter RF output power shall be 160 [kW] minimum over the operating frequency range of 8.5 [GHz] to 9.6 [GHz] inclusive. The maximum output power shall be no more than 1.0 dB above the specified peak transmit power.

The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.

c. Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror’s possession including, at a minimum Northrop Grumman Amherst Systems (1L4J7) drawing A9070-091002 and any documents referenced herein. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications.

d. Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by AFMC 415 SCMS/GUEA. The offeror shall also identify its sources for materials and its standards for internally used processes

e. Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to AFMC 415 SCMS/GUEA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawing A9070-091002.

f. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $0.00.

P/N: 105103-1

5 Dec 2019 Section C 2/3

g. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 90 days. This is based on complexity of the Transmitter, Radar and other factors.

h. Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement.

i. Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item. Approval, however, does not guarantee subsequent contract award.

P/N: 105103-1

5 Dec 2019 Section C 3/3

2. SOURCE QUALIFICATION WAIVER REQUIREMENTS

Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements. If a waiver is granted and the offeror is awarded a contract, the offeror may still be required to provide a post-contract award first article exhibit to verify production capability:

a. QWC1: The potential source submits written certification that the articles have been repaired for the government or original equipment manufacturer (e.g., DD Form 250, Material Inspection and Receiving Report, Purchase Order invoice, etc).

b. QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.

c. QWC3: A source qualified to repair an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.

d. QWC4: A source qualified to repair earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.

e. QWC5: A source qualified to repair a similar or like item can be qualified to provide the required item. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. At a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.

f. QWC6: A source previously qualified to repair an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the repair process.