MOR-23-007 ARC Sliding Block Chain Procurement-SPEC.doc
DOC document 188 KB Posted
- Attached to
- USNS ARCTIC Hydro-serviced Cottered Chain Federal contract opportunity
- Solicitation number
- N3220523Q0065
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N3220523Q0065 Revised_Combined_Synopsis_Solicitation_.docx | DOCX document | |
| Technical Data Non-Disclosure.docx | DOCX document | |
| N3220523Q0065 Combined_Synopsis_Solicitation_.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS SUPPLY
(T-AOE 6)
UNREP Equipment
13 June 2013
MSC /N756/MJP
TITLE; UNREP, SLIDING BLOCK CHAIN LUBRICATE (Enclosure 2.2.1)
1.0 ABSTRACT
1.1. Provide 450 feet of Double Strand Chain that is hydro-service capable and coated with MobilARMA 798.
2.0 REFERENCES/ENCLOSURES:
2.1. References:
2.1.1. NAVSEA Drawing 5363392 Rev D Double Strand Chain
2.2. Enclosures:
2.2.1. Procedure for Hot Dipping Sliding Block Drive Chain
2.2.2. Shipping Box Guidance Information
3.0 ITEM LOCATION/DESCRIPTION:
3.1. Location/Quantity:
3.1.1. Location:
3.1.2. Quantity: Four-Hundred and Fifty (450) Feet of Double Strand Chain
3.2. Item Description/Manufacturer's Data:
3.3. Bill of Materials:
3.3.1. Chain, Double Strand per Reference 2.1, QTY = 450 Feet
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES: NA
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional.
7.0 STATEMENT OF WORK REQUIRED:
7.1. Arrangement/Outfitting:
7.1.1. Contractor shall provide required chain manufactured per reference 2.1. The chain segments shall be hydro-service capable and coated with MobilARMA 798. The chains shall be greased by accomplishing procedures in enclosure 2.2.1. Enclosure 2.2.1 provides amplifying information for General Note 4 of reference 2.1.
7.1.2. Failure to comply with this specification may result in rejection of supplied materials in lieu of rejection contractor may be held responsible for cost of onsite corrective action if supplied materials do not comply with this specification.
7.2. Structural: None
7.3. Mechanical/Fluids: None
7.4. Electrical: None
7.5. Electronics: None
7.6. Preparation of Drawings/Documentation: None
7.7. Inspection/Test:
7.7.1. Contractor shall submit written documentation of compliance with reference 2.1 and enclosure 2.2.1.
7.7.2. Contractors quote shall contain the drawing number and designation of HS to representing Hydroservice capability.
7.8. Painting: None
7.9. Marking:
7.9.1. Upon completion of work fabricate shipping containers for chain using Encl 2.2.2 as guidance. Stencil container and arrange for delivery of material to government per contract.
7.10. Manufacturer’s Representative: None
8.0 GENERAL REQUIREMENTS: None additional
Enclosure 2.2.1 Page 1
File details come from the government source that posted it. Updated .