mety075 od.pdf

PDF 17 KB Posted

Attached to
open inspect and report POSITIONER PITCH PRO Federal contract opportunity
Solicitation number
70Z08025QMETY075
Issued by
Department of Homeland Security US Coast Guard

About this file

This document is an Overhaul Description for a valve positioner (Stock Number 4820-01-211-8359, Part Number PA11-06865) used on WMEC 210 B Class Cutters, issued by the U.S. Coast Guard Surface Force Logistics Center. The overhaul requires a contractor to perform a comprehensive inspection, testing, and restoration of the valve positioner to meet original manufacturer specifications, with a cost estimate not to exceed $6,831.

Key requirements include conducting a preliminary inspection, submitting a detailed material and cost estimate, overhauling the valve positioner according to Northway Products' standard procedures, performing an operational test to ensure no leakage, and creating a comprehensive test report. The contractor must preserve and package the valve positioner in a wooden box, apply specific markings, use bar coding, and provide a standard manufacturer's warranty. Delivery will be to the Coast Guard SFLC Receiving Room in Baltimore, MD, with acceptance contingent on verification of packaging, marking, and transit condition.

View the file

Other files for this federal contract opportunity

Other files attached to open inspect and report POSITIONER PITCH PRO, newest first.
File Type Posted
52.212-3.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OVERHAUL DESCRIPTION

FOR OFFICIAL USE ONLY

ITEM NAME POSITIONER,VALVE

STOCK NUMBER 4820-01-211-8359

PART NUMBER PA11-06865

USED ON WMEC 210 B CLASS CUTTERS

Items as received by the contractor must be complete and of the proper cited part number. Discrepancies shall be reported to the Coast Guard Contracting Officer.

OVERHAUL REQUIREMENTS:

1. SCOPE

1.1 This description initiates the inspection and overhaul of the item described below for ELC stock replenishment.

Stock No: 4820-01-211-8359 Name: POSITIONER VALVE Part Number: PA11-06865 OEM: Northway Products Inc.

1.2 Valve assembly received by the contractor must be complete and of the proper Northway Products cited part number PA-11-06865. Any discrepancies shall be reported to the Coast Guard Contracting Officer.

1.3 The overhaul requirements described herein are not intended to replace any procedures, controls, examinations or tests normally employed by the contractor to assure the quality of the product. Overhaul is intended to restore the valve positioner to a condition equal to that of an identical new positioner valve.

2. Referenced Documents:

a) OEM Drawing No: 6907-F, Sheets 1-4 (not included)

b) TP-3231B-252-A, Technical Publication for Propulsion Control System.

c) ANSI/NCSL Z540-3-2006 (R 2013) Calibration laboratories and Measuring and Test Equipment General Requirements

d) ANSI/ASQC Q9001- 2008, Quality Management Systems - Requirements.

e) U.S. COAST GUARD SPECIFICATION D-000-0100 REV G. (dated 06/2006) Bar coding For U.S.C.G. SFLC Material.

2.1 Precedence: In the event of a conflict between this statement of work and the referenced documents cited herein, this statement of work shall take precedence.

3. Requirements:

3.1 Preliminary Inspection. Preliminary disassembly and inspection shall be conducted to determine estimated cost of overhaul. A written estimate to include material, labor, testing, preservation, packing and marking cost shall be submitted to the Coast Guard Contracting Officer. The written estimate shall include the cost of a new positioner valve. Only upon approval of the estimate and approval to proceed should start of overhaul work or orderig of parts comence..

3.1.1 The material list shall include all recommend replacement parts. Parts shall be listed by Item name, manufacturer part number and cost.

3.2 The valve positioner shall be overhauled and tested in accordance with current Northway Products standard overhaul procedures.

3.3 Upon completion of the overhaul, the contractor shall conduct an operational test of the valve positioner on a test stand to assure satisfactory operation and that no leakage occurs during operation.

3.4 Test Report: The results for the test shall be documented on a service and repair report. A copy of the test report shall be packed with the unit and a copy shall be turned over to the Coast Guard quality assurance representative. Report shall contain the following information as a minimum:

a) Contractor name.

b) Contract number.

c) work order number.

d) Date of test.

e) Description of the test and test results.

f) Name of the person conducting the testing.

3.5 Final Assembly: Overhauled valve positioner shall be delivered to the Coast Guard completely assembled and ready for installation. Contractor shall preserve, package and mark each positioner valve in accordance with requirements herein.

3.6 Warranty: Contractors standard warranty applies.

3.7 Notifications & Inspections: The contractor shall be responsible for notifying the Contracting Officer at least seven (7) calendar days prior to the contractor being ready for any Quality Assurance (Q.A.) inspections or testing as required herein.

4.0 Inspection General: The Contractor shall maintain an inspection system which shall ensure that each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system shall be in accordance with Federal Acquisition Regulation (FAR) Clause 52.246-2. The system shall be documented and available for review by the Coast Guard Quality Assurance Representative.

4.1 Responsibility for Inspection: The Contractor shall be responsible for the performance of all inspection requirements specified herein. The Contractor shall provide space, personnel and test equipment for the conduct of all inspection requirements. All inspection and testing shall be performed at the Contractors plant or at other facilities acceptable to the Coast Guard. The Coast Guard reserves the right to verify or have performed any of the inspections set forth herein where such inspections are deemed necessary to assure that supplies and services conform to the prescribed requirements. The manufacturer's quality system shall comply with the requirements of ANSI/ASQC 9001Quality Management Systems - Requirements.

4.2 Records: The contractor shall maintain records of all conducted inspections and tests. The records shall indicate the nature and number of performed observations, the number and type of deficiencies found and the corrective action taken.

4.3 Contractors Calibration System: The test facility shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540-3. The program shall be documented and traceable to the National Institute of Standards (NIST).

SHELF LIFE CD 0

1. SCOPE

1.1 This description initiates the inspection and overhaul of the item described below for ELC stock replenishment.

Stock No: 4820-01-211-8359 Name: POSITIONER VALVE Part Number: PA11-06865 OEM: Northway Products Inc.

1.2 Valve assembly received by the contractor must be complete and of the proper Northway Products cited part number PA-11-06865. Any discrepancies shall be reported to the Coast Guard Contracting Officer.

1.3 The overhaul requirements described herein are not intended to replace any procedures, controls, examinations or tests normally employed by the contractor to assure the quality of the product. Overhaul is intended to restore the valve positioner to a condition equal to that of an identical new positioner valve.

2. Referenced Documents:

a) OEM Drawing No: 6907-F, Sheets 1-4 (not included)

b) TP-3231B-252-A, Technical Publication for Propulsion Control System.

c) ANSI/NCSL Z540-3-2006 (R 2013) Calibration laboratories and Measuring and Test Equipment General Requirements

d) ANSI/ASQC Q9001- 2008, Quality Management Systems - Requirements.

e) U.S. COAST GUARD SPECIFICATION D-000-0100 REV G. (dated 06/2006) Bar coding For U.S.C.G. SFLC Material.

2.1 Precedence: In the event of a conflict between this statement of work and the referenced documents cited herein, this statement of work shall take precedence.

3. Requirements:

3.1 Preliminary Inspection. Preliminary disassembly and inspection shall be conducted to determine estimated cost of overhaul. A written estimate to include material, labor, testing, preservation, packing and marking cost shall be submitted to the Coast Guard Contracting Officer. The written estimate shall include the cost of a new positioner valve. Only upon approval of the estimate and approval to proceed should start of overhaul work or orderig of parts comence..

3.1.1 The material list shall include all recommend replacement parts. Parts shall be listed by Item name, manufacturer part number and cost.

3.2 The valve positioner shall be overhauled and tested in accordance with current Northway Products standard overhaul procedures.

3.3 Upon completion of the overhaul, the contractor shall conduct an operational test of the valve positioner on a test stand to assure satisfactory operation and that no leakage occurs during operation.

3.4 Test Report: The results for the test shall be documented on a service and repair report. A copy of the test report shall be packed with the unit and a copy shall be turned over to the Coast Guard quality assurance representative. Report shall contain the following information as a minimum:

a) Contractor name.

b) Contract number.

c) work order number.

d) Date of test.

e) Description of the test and test results.

f) Name of the person conducting the testing.

3.5 Final Assembly: Overhauled valve positioner shall be delivered to the Coast Guard completely assembled and ready for installation. Contractor shall preserve, package and mark each positioner valve in accordance with requirements herein.

3.6 Warranty: Contractors standard warranty applies.

3.7 Notifications & Inspections: The contractor shall be responsible for notifying the Contracting Officer at least seven (7) calendar days prior to the contractor being ready for any Quality Assurance (Q.A.) inspections or testing as required herein.

4.0 Inspection General: The Contractor shall maintain an inspection system which shall ensure that each item offered to the Coast Guard for acceptance or approval conforms to the contract requirements. The inspection system shall be in accordance with Federal Acquisition Regulation (FAR) Clause 52.246-2. The system shall be documented and available for review by the Coast Guard Quality Assurance Representative.

4.1 Responsibility for Inspection: The Contractor shall be responsible for the performance of all inspection requirements specified herein. The Contractor shall provide space, personnel and test equipment for the conduct of all inspection requirements. All inspection and testing shall be performed at the Contractors plant or at other facilities acceptable to the Coast Guard. The Coast Guard reserves the right to verify or have performed any of the inspections set forth herein where such inspections are deemed necessary to assure that supplies and services conform to the prescribed requirements. The manufacturer's quality system shall comply with the requirements of ANSI/ASQC 9001Quality Management Systems - Requirements.

4.2 Records: The contractor shall maintain records of all conducted inspections and tests. The records shall indicate the nature and number of performed observations, the number and type of deficiencies found and the corrective action taken.

4.3 Contractors Calibration System: The test facility shall be required to maintain a test equipment calibration program in compliance with ANSI/NCSL Z540-3. The program shall be documented and traceable to the National Institute of Standards (NIST).

4.4 Inspections and Tests: The operational test required in part 3.3 and test report required by 3.4 is considered to be the minimum necessary and is not intended to replace any controls, examinations, or tests normally employed by the contractor to assure the quality of the product. Inspection of Preservation, Packaging and Marking requirements is also required.

5. Preservation Packaging and Marking

5.1 Preservation: Drain positioner valve of all test fluid and seal all open ports with plastic caps. Each overhauled valve positioner shall be preserved and wrapped to ensure the protection against the intrusion of moisture and for protection against corrosion during warehouse storage.

5.2 Packaging - Each overhauled and preserved valve positioner shall be individually packaged in its own box. The box shall be constructed of either wood or double walled corrugated paperboard box with wood framing. Box shall have sufficient internal cushioning and be capable of protection to the valve assembly during multiple shipping and handling by commercial carriers.

5.3 Marking: Shipping container shall be stenciled with black enamel paint with the information as laid out below. Stencil shall be applied directly on the container and be 1/2 inch minimum height black characters on a white painted background. NOTE: ANY PREVIOUS MARKINGS SHALL BE COMPLETELY REMOVED

FROM A REUSABLE SHIPPING CONTAINER PRIOR TO THE APPLICATION OF ANY NEW

MARKINGS.

5.4 BAR CODING: The stock number shall also be bar coded in addition to the numerical marking. All bar coded labels shall be in accordance with ELC Bar Coding specification number D-000-100. The actual labels shall be Type "V", Grade "C", Style "2", Composition "a". The Bar Code Label can be applied separately or as part of the marking required in 5.3.

NSN: 4820-01-211-8359

Name: VALVE, POSITIONER

P/N: PA11-06865

Shipping Weight: ______________ Government Contract Number. .

The following statement "Coast Guard SFLC Material Condition A, 1 ea."

6.0 Notes:

Commercial:

American National Standards Institute (ANSI) 1430 Broadway New York, NY 10018 212-642-4900

4.4 Inspections and Tests: The operational test required in part 3.3 and test report required by 3.4 is considered to be the minimum necessary and is not intended to replace any controls, examinations, or tests normally employed by the contractor to assure the quality of the product. Inspection of Preservation, Packaging and Marking requirements is also required.

5. Preservation Packaging and Marking

5.1 Preservation: Drain positioner valve of all test fluid and seal all open ports with plastic caps. Each overhauled valve positioner shall be preserved and wrapped to ensure the protection against the intrusion of moisture and for protection against corrosion during warehouse storage.

5.2 Packaging - Each overhauled and preserved valve positioner shall be individually packaged in its own box. The box shall be constructed of either wood or double walled corrugated paperboard box with wood framing. Box shall have sufficient internal cushioning and be capable of protection to the valve assembly during multiple shipping and handling by commercial carriers.

5.3 Marking: Shipping container shall be stenciled with black enamel paint with the information as laid out below. Stencil shall be applied directly on the container and be 1/2 inch minimum height black characters on a white painted background. NOTE: ANY PREVIOUS MARKINGS SHALL BE COMPLETELY REMOVED

FROM A REUSABLE SHIPPING CONTAINER PRIOR TO THE APPLICATION OF ANY NEW

MARKINGS.

5.4 BAR CODING: The stock number shall also be bar coded in addition to the numerical marking. All bar coded labels shall be in accordance with ELC Bar Coding specification number D-000-100. The actual labels shall be Type "V", Grade "C", Style "2", Composition "a". The Bar Code Label can be applied separately or as part of the marking required in 5.3.

NSN: 4820-01-211-8359

Name: VALVE, POSITIONER

P/N: PA11-06865

Shipping Weight: ______________ Government Contract Number. .

The following statement "Coast Guard SFLC Material Condition A, 1 ea."

6.0 Notes:

Commercial:

American National Standards Institute (ANSI) 1430 Broadway New York, NY 10018 212-642-4900

WARRANTY:

X A. Standard Manufacturer's Warranty

B. Item being repaired as an "onboard repair" or a "system stock" item and will be put into inventory. NOT FOR IMMEDIATE INSTALLATION.

Contractor must guarantee item against defects that lead to failure for days after installation for a period of up to two (2) years after delivery to Coast Guard.

GOVERNMENT ACCEPTANCE:

Acceptance will be made at destination by a Government representative.

Acceptance will be contingent upon the representative's verification of no damage in transit, correctness and completeness of order and contractor's conformance to preservation/packaging, packing and marking requirements.

PACKAGING AND MARKING FOR SHIPMENT:

X

A. Each unit shall be packed individually in it's own wooden box which shall be capable of providing adequate protection to the item during multiple shipments. Mark each box in legible black print lettering with the following information:

NATIONAL STOCK NUMBER

ITEM NAME

PART NUMBER

GOVERNMENT ORDER NUMBER

4820-01-211-8359

POSITIONER,VALVE

PA11-06865

PRESERVATION / PACKAGING:

A. Each unit shall be individually preserved and wrapped for protection against deterioration for a period of two (2) years minimum.

X B. See Attachments

B. See Attachments

And the words: "Coast Guard SFLC Material, Condition "A"

RECOMMENDED SOURCES:

NORTHWAY PRODUCTS INC

11027 47TH AVE W

MUKILTEO, WA 98275-5019

POC: GARY BERG

EMAIL: GARY.BERG@NORTHWAYPRODUCTS.COM

WRITTEN BY:

DATE :

CRAIG FAW

03 JUL 25

Cost Estimate for Overhaul NOT TO EXCEED: $6,831