MCC IT Strategic Plan
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| MCC-11-0018-RFQ A01.pdf | ||
| MCC-11-0018-RFQ.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MCC IT Strategic Plan
FY08-FY10
1. IT Vision Statement
To deliver a secure information technology platform and high performing corporate systems that will enable the MCC to reduce poverty through growth.
2. Overview
MCC has evolved over the last three years in the development of its business processes and will continue to change as we adjust to our new organizational structure that consolidates resources focused on compact implementation. Until the present time, the Office of the Chief Information Officer (OCIO) has provided basic
IT infrastructure and customer support as a utility service to our mission. The development of MCC’s Enterprise Architecture marked the beginning of a more strategic approach to align IT investments with MCC business needs. However much more needs to be done to ensure that these investments are properly managed. Our challenges going forward include redefining our business processes in light of our new organization and filling gaps in understanding of our needs. For example, there is a critical need to define MCC requirements for reporting the progress and success of our compacts to Congress and other stakeholders.
The OCIO will evolve a much more strategic approach in support to the agency through this period of transformation and realignment of the Agency by establishing a
Governance Structure (EA) Steering Committee. This approach will help ensure successful implementation of our EA and stabilize, secure and optimize our IT infrastructure. As part of this process, the OCIO will work with MCC managers in
DC and our mission offices as a strategic partner in defining solutions to the implementation of our business processes and the configuration of our major systems
(BIDS, IFMS, and MS Enterprise Platform) to address the needs of our HQ staff, field missions and the MCAs. The OCIO will participate in interactions with external customers, particularly the MCAs, in understanding their technology capability and needs and address gaps in our business systems. A key objective is to leverage our existing Microsoft investments to achieve our vision of “empowering the organization with the tools and information it needs” to ensure accountability for results and lead to transformational development.
This strategic approach represents a fundamental change in values and behavior for the OCIO as it realigns its functions to move from being reactive to being a proactive
“problem solver” that improves the agency’s business processes for delivering development assistance. This Information Technology (IT) Strategic Plan is focused on realigning its performance goals and resources to support a business centric, portfolio management approach that is inclusive, and anchored in corporate business processes and fact-based investment decisions. Further, future IT investments will reflect technical solutions that meet the operational needs defined by MCC managers and staff. As such, the plan will focus on the following goals:
Achieving Stable, Secure and Optimized IT Infrastructure
Aligning Strategic Solutions to Evolving Business Needs
Developing Systems and Services that Empower the Organization
Customer Support that Enables Transformation of the Workforce
Goal (Infrastructure)
Achieving Stable, Secure and Optimized
IT Infrastructure
Goal ( Strategy)
Aligning Strategic
Solutions to Evolving
Business Needs
Goal (Systems)
Develop Systems &
Services that Empower
Organization
Goal (Capacity )
Customer Support &
Enable Transformation of
Workforce
Sub-Goals
Maintain FISMA Compl
Refresh Equipment
Standardize Infrastructure for HQ/ Missions & Guide./
Standards for MCAs
Maintain Change/
Configuration Control
Achieve High Customer
Satisfaction
Sub-Goals
Manage Portfolio
Maintain Governance
Develop and Maintain EA
Strategy for Mission
Infrastructure Develop.
Develop Acquisition
Strategy
Achieve High Customer
Satisfaction
Sub-Goals
Integrated Plan/Schedule for Sys. Development
Integrated Plan/Schedule for Missions Sys.Devel.
Systems and Data integration
Projects On-Schedule &
On-Budget
Achieve High Customer
Satisfaction
Sub-Goals
Systems Training Program
In-Place Enables Business
Training through Broader
HR Initiative
MCC Mission Training &
Guides/Standards for MCAs
Integrated Training Plan includes EA Contractors
Achieve High Customer
Satisfaction
Performance
Objectives
Close Audit & Establish
Quarterly Risk Assess.
Establish Refresh Policy
& Plan
Develop Infra Standards for HQ/Missions/MCAs
Establish CCB
Meet Service Levels
Performance
Objectives
PM Process Defined and
Repeatable
Establish EA Steering Bd
Develop Conceptual
Framework of Solutions
Strategy for Missions Infra.
Acquisition Strat. In-Place
Positive Feedback on EA
Progress
Performance
Objectives
Requirements & Data
Architecture Defined
Mission Require/Data
Architecture Defined
Establish IPTs to Guide
Development
Manage 90 Day
Increments/Milestones
Pos. Feed. on Progress
Performance
Objectives
Training Program Approved by HR and Businesses
EA Contractors Support the
Training Program
Mission Training Plan/
Guides & Stds for MCAs
Provide Continued Staff
Support with assistance of
Infrastructure Help Desk
IT Enterprise Planning/
Action Lifecycle
IT Vision
(2)Enterprise
Architecture (1)
IT
Strategic
Plan (3)
IT Action Plan (4)
IT Performance
Plan and
Reporting (5)
IT Strategic Plan
Risk Assessment
R is k A s s e s s m e n t
MCC Strategic
Plan
Risk Assessment
Guides the Process
There are two sub-goals that are common to each of these goals that the OCIO considers critical to success. They include (1) achieving high customer satisfaction, a key indicator that IT investments and their implementation are aligned with our business needs, and (2) the development and implementation of solutions to specific needs of our field missions that where the development of their IT Infrastructure has lagged that of MCC HQ. The latter includes providing guidance and standards to the MCA to reduce the burden on them in their interface with MCC.
3. Strategic Goals
3.1 Achieving Stable, Secure and Optimized IT Infrastructure
(Infrastructure)
The OCIO number one priority is to stabilize, secure and optimize the current IT infrastructure and support services. The OCIO has resolved many of the issues regarding the staff’s ability to rely on our current infrastructure and will procure new
IT and Telecom services that will standardize our infrastructure and refresh equipment on a regular basis to significantly improve both the security and reliability of our network, systems and customer support services. Once implemented, our new outsourced acquisition approach will free up staff resources to focus on our business and other customer needs as we implement our new business systems and its supporting network infrastructure.
Our new outsourced services model will address the needs of our new organization and our mission offices to support the MCC RCDs in implementing their new roles and responsibilities. Requirements for external users including MCAs and other stakeholders will also be addressed as additional requirements for network support are defined, for example, as part of the BIDS development process. The OCIO will be responsible for monitoring contractor performance, the development of task orders for additional services, and the administration of our service contracts.
A priority in implementing our new services contracts is to ensure change control i.e.
changes to the service defined by our contracts. A Change Control Board (CCB) will be established that includes representation of our business unit stakeholders as part of our partnership efforts going forward.
Another priority is ensuring compliance with FISMA, OMB and other federal requirements. The Agency has lagged in compliance and it is our priority to establish a process to get ahead of the curve and to maintain compliance going forward.
Although our service providers will maintain our systems in compliance with federal requirements, MCC will still need to validate and certify that we are in compliance.
ACTION PLAN for GOAL - Stabilize, Secure and Optimize Infrastructure
S u b -G o a ls a n d
A c ti o s
SUB-GOAl & ACTION ITEM
ASSIGNED
TO
MILESTONE
DUE
DATE
SUCCESS
CRITERIA
Maintain FISMA Compliance
Dev. FISMA Comp Monitoring Plan Close Existing Audit
Establish Quarterly Risk Assess
Establish Contractor Reporting Require. Verify Contractor Compliance
Implement Plan for MCC Systems No Deficiencies Identified by IG
Develop Quarterly Risk Assess Plan
Quarterly Risk Assessment Comp.
Take Actions to Address Risks IG Agrees Plan to Address Risks
Refresh Infrastrucure Infra. Inventory/Metadata Baseline
Inventory/Ownership/Age/Cond Complete
Establish Refresh Plan
Workstations Identify Equipment for refresh
Desktops Printers Approve Replacement Models
Network Infrastructure Replacement Complete
Phones and Mobile Phones Replacement Complete
Standardize Infrastructure Standarize Network Access/ Control
Define what needs to be standardize
Develop Standards
Standardize Computer Image Establish Desired Admin Control
Standardize Business Applications Develop &Implement Com. Plan
Standardize SOPs for Systems Use Implement Standards
Maintain Change/Config Control
Develop CCB Charter Establish CCB Membership Establish Change Control Board
Develop SOPs SOPs In-Place
Conduct Weekly Meetings Record Minutes of Meetings
Communicate Approved Changes E-mail Notifications
Implement Approved Changes Notification Changes Complete
Achieve High Customer Satisfaction
Develop Surveillance Plan Approve Contractor QA/QC Plan Meet Service Levels Assess Customer Satisfaction Review Contractor Perf. Rep.
Develop Task Orders for Add Services
Regularly Survey Customer Satisf
Oversee Delivery of Add Service Develop Task Orders to Add/Change Services
Provide Input to Award Fee Determinations
3.2 Aligning Strategic Solutions to Evolving Business Needs
(Strategic Planning)
MCC business processes are evolving rapidly as the agency moves forward under its new organization to address its needs in compact implementation. Therefore, for the next few years, it will be imperative that the OCIO work in partnership with the senior management team to anticipate its future needs. A key role of the OCIO will be to work with the business units in the application of our new technology and the design and automation of our new evolving business processes and enhancements to our network infrastructure to support them.
There is a significant amount of capability within the current MCC Enterprise
Architecture (EA) framework that can be configured to meet those needs. New systems coming on line such as Business Intelligence and Data Store (BIDS) will be implemented in phases to address many of those evolving needs as they can be defined. In some cases new and additional systems may be required. The OCIO will be proactive in anticipating those future needs so that integrated solutions may be developed that fit within our EA framework. This includes conducting regular surveys of customer needs not currently serviced that may be addressed strategically as part of our EA.
There are a number of alternative strategies for improving our business model that will need to be evaluated. For example, the agency could implement a bottom-up approach to developing an interface with the MCAs where MCC can access and view
MCA performance data real time or MCC could implement a top down approach where the MCA’s simply input data to MCC’s system.
The IT Strategic Plan will include establishing governance to prioritize investments, manage change, and communicate to the business units and other stakeholders the progress of implementation of our EA and enhancements based on collaborative efforts with the business units and input from the EA Steering Group.
As part of our strategic approach, the OCIO will strengthen MCC’s ability to manage our IT investment portfolio. This includes capturing key investment candidates and providing a means to identify, categorizes, and prioritize needs identified by staff, presenting them to the governing Board, and then budgeting and executing projects that are approved. The process that will be used to capture, evaluate, and prioritize investments opportunities is described below in Section 4.0 Portfolio Management.
ACTION PLAN for GOAL- Align Strategic Solutions to Evolving Business Needs
S u b -G o a ls a n d A c ti o
SUB-GOALS & ACTION
ITEMS
ASSIGNED
TO
MILESTONE
DUE
DATE
Manage Portfolio
Develop Process Process Flow and Description Porfolio Mgm't Process
Capture/Track IT Invest Needs Develop System to Capture Input
Defined/Repeatable
Categorize IT Investment Needs Categorizatio/ Ranking of Invest.
Assess Value and Costs Rank Alt by Value and Costs
Evaluate Risks vs Value Develop Risk vs Value Chart
Develop Budget for Invest. Governance Board Approves
Manage Implementation Procure System or Services
Maintain Governance
Establish EA Steering Board Reg Meeting with EA Steering BD
Establish EA Steering Board
Map New Businesses Processes Visio Diagrams Key Processes
Identify Strategic Issues and Options White Papers Issues & Options
Review with EA Steering Board EA Board Approval
Develop & Maintain EA
Define EA and System Baselines EA Reference Dwgss & Descript
Develop Conceptual Framework
New Requirements Defined Identify Technology/Application Requirements of Solutions
Develop Conceptual Solutions Visio Diag Detailing Concept Solns
Update Enterprise Architecture Describe System Integration w/EA
Develop Deployment Plan Strategy for Implementation
Develop Acquistion Strategy
Define Approach to Implement. Develop Statements of Work Acquistion Strategy In-Place
Define Procurement Plan Identify Candidate Vendors
Procure Systems and/or Services RFP Review Complete
Select Vendor Proposal Review Complete
Develop Workplans MCC/Vendor Workplan Complete
Review Conceptual Solutions w/EA SC Presentations to EA Steering BD
Positive Feedback on EA Progress
Review Updates to EA w/ EA SC Presentations to EA Steering BD
Review Acquistion Plans w/ EA SC Presentations to EA Steering BD
3.3 Develop Systems and Services that Empower the Organization (Systems Development)
Our most significant challenge is to successfully implement all business systems and network services required to provide staff with the tools and information they need to achieve the agency’s mission. This will be accomplished incrementally over the next three years and our current EA provides the foundation to begin this process.
Our strategy is to demonstrate early successes to gain the confidence on MCC management and staff. The implementation of each of the systems that make up our
EA will be managed as projects. Although major integrating contractors will manage the day to day work, it is incumbent on the OCIO to ensure the contractors receive the input it requires from our business units so that these systems meet MCC needs. This may be difficult as many of our requirements are still undefined and evolving. In order to manage risks given these uncertainties, projects will be divided into manageable segments where the achievements of key milestones are monitored, for example in 90 day increments, to ensure projects remain on track. Included in Section
4.0 is a chart detailing quarterly goals for each of the major systems that comprise our current EA. Performance will be evaluated against these goals and adjustments will made based on priorities and available resources.
An EA Steering Board and Integrated Project Teams are being established to define our business requirements and provide input to the conceptual framework of our technology solutions. They also help fill gaps in understanding of our requirements and address policy and strategic issues to ensure systems that make up our EA are aligned with MCC business needs as they are developed and implemented.
A key responsibility of the OCIO is to provide the enterprise view of our EA that shows how all systems and data are integrated to provide the capability and functions required. A key objective of the OCIO is the development of our enterprise data architecture that maps how data is stored and retrieved to support the multiple applications that make up our EA. This has not been done to date and will be critical in guiding the development and integration of systems that make up our EA including new systems to support future needs. The OCIO will communicate information gaps that affect our EA and data structure and work with senior managers to resolve them where possible. It will also provide flexibility to address others at a later time when we better understand specific requirements.
Results of project development efforts will be communicated to the EA Steering
Board who will provide feedback to project managers based on input from their staff.
The OCIO will calibrate and communicate expectations for the achievement of key milestones such as the completion of Phase I of BIDS and having the ability to measure and report on compact results and financial performance in FY08 and beyond
ACTION PLAN for GOAL - Develop Systems & Services that Empower the Organization
A c ti o n s a n d
A c ti v it ie
ACTION ITEM
ASSIGNED
TO
MILESTONE
DUE
DATE
Integrated Plan for Systems Develop
Define Interface/Integration Require.
Assess/ Report Based on Current Projects
Define Requirements & Data
Develop Integrated Program Plan Flow Chart Illustrating Project Integration
Architecture
Define Integrated Data Architecture Data Logic Diagrams Complete
Develop Project Plans w Integ Require.
Define Performance Metrics for Project Integ.
Systems & Data Integration
Establish Integrated Project Teams(IPT)
Define Charter/ Members for Each Project IPT
Establish Integrated Project Teams to Guide Development
IPT Review and Approve Workplans
Team Input to Project Workplan Complete
DefineSystem Data Inputs and Outputs
Data Model for Systems Development Compl.
Define & Resolve Development Issues
White Paper on Issues & Recommendations
EA Steering Committee Review EA Steering Committee Appoval of Plans
Projects On-Shedule/On- Budget
(see attached)
Regular Reports on Project Status
IPT and PM Weekly Project Reports
Positive Feedback in Progress of Projects
Develop Communications Plan EA Steering Committee Feedback
Implement Actions to Maintain Plan
Actions Identified, Assigned, and Completed
3.4 Customer Support and Enabling Transformation of the Workforce (Capacity Building)
Providing superior customer support services will be critical to both stabilizing our current infrastructure and supporting staff in the use of the new tools that will make up our new technology platforms. Our new service contracts will significantly improve our current help desk capabilities to build staff confidence and provide the foundation for supporting staff in the use of our new enterprise tools. As new systems come on-line support personnel must be capable of assisting staff in the use of new tools as a complement to the roll-out and training programs. The OCIO will conduct regular surveys to assess customer satisfaction and needs for training and customer support.
ACTION PLAN for GOAL- Develop Systems & Services that Empower the Organization
SUB-GOAL-Projects On- Schedule & On Budget
P ro je c ts
PROJECTS & ACTION
ITEM
ASSIGNED
TO
MILESTONE
DUE
DATE
Business Intelligence/DataStore
Define,Maintain Scope Phase 1 Complete Workplan for Phase 1
Manage 90 Day Increments
Develop Scope/Plan for Next 8 Quarters
Prep Annual Workplan/Update on Rolling Qtr.
Define Data Architecture BIDS Develop Data Logic Diagram
Develop Interface with Existing Fin.MS Establish Interface with NBC
Develop Interface with MCC SharePoint
Define Migration Plan to Production Environ.
Compliance with OMB & FISMA Risk Assess & OMB 300 Approved
Implement Phase 1 Services Complete BIDS Initial Service Agreement
Integrated Financial Mgm't System
Compliance with OMB & FISMA OMB 300s Complete and Approved
Manage 90 Day Increments
Define Scope of Work Performance Work Statement Complete
Develop Procurement Strategy &Plan
Issue RFP for Competive Sourcing
Implement IFMS Vendor Selected and Kickoff Complete
MS Enterprise Platform/ SharePoint
Upgrade to MS SharePoint 2007 SharePoint 2007Tested and Moved to Prod
Manage 90 Day Increments Implement K2 Technology for
Workflow Workplan & testing complete
Implement Digital Asset Management Workplan & testing complete
Implement Team Collaboration Tools Workplan & testing complete
Upgrade to MS Office 2007 Training Plan Complete
Supporting Technology
Stabilize, Secure &Optimize Infrastr. Procure New Services Contracts
Manage 90 Day Increments Impl MS Software Inven &
Distribution Implement - IT Services Contract
Impl Digital Signatures Implement - IT Services Contract
Web Content Filtering Implement - IT Services Contract
Internet Protocal v6 Implement t- IT Services Contract
Our goal is to transform the workforce so that they can effectively use their new capabilities. Our strategy is to implement new systems in a way that supports staff in its transition to MCC’s new organization. This will enhance the staff’s capacity to absorb changes they already need to deal with as part our restructuring. By automating business processes they can concentrate on their new roles and responsibilities. However the rollout of our new systems and the training of staff to use them must be scheduled and planned in an integrated and coordinated effort to ensure we do not overburden staff. The rollout and training plan must also be agreed to by all senior managers who will oversee and guide implementation of our new systems.
Part of the process of developing our staff skills will be to institutionalize and train staff on our policies and procedures for information security, and our plan for disaster recovery and Continuity of Operations (COOP) in response to a man-made or natural disaster.
ACTION PLAN for GOAL- Customer Support &Transforming the Workforce
S u b -G o a ls a n d A c ti o
SUB-GOALS & ACTION
ITEMs
ASSIGNED
TO
MILESTONE
DUE
DATE
SUCCESS
Systems Training Program In- Place
Business Training Needs Defined EA Steering Committee Define Training Needs
Training Program Approved by
HR
IT Training to Enable Sys Define Training Plan Mapped to Proj Sched and Businesses
Develop Training Plan HR and EA Steering Committ.ee Approve Plan
Implement Training HR and Businesses Support Implementation
Regional Training
Define MCC Mission Training Needs
EA Steering Committee Define Special Needs
Regional Training Plan
Develop Training Plan Training Plan Mapped to Projects Schedule
Implement Training HR and EA Steering Committee Approve Plan
Business/Field Office Support Implementation
Contractor Training Support
EA Contract. Define Syst.Train.Require.
Train Requirements Defined for Each System
EA
Contractors Clearly Defined Role
Training Mapped to Rollout Schedule
Train Plan Defined for Specific Systems
Plan Integrated Into Overall MCC Plan
Contractor Support for Training Clearly Defined and Responsibiliy in Training Program
Regular Surveys of Customer Needs Survey of Results of Training
Continued Staff Support with Assistance of Help Desk
Measure Enhanced Customer Capabil
Help Desk Support w Contractor SME's
Review Results with EA Steering Com.
EA Steering Committee Feedback/ Actions
4.0 Portfolio Management
4.1 Portfolio Management Process
The OCIO will develop a system to manage the portfolio of applications and other IT initiatives. The IT portfolio includes large strategic projects such as BIDS and IFS as well as small local applications such as Access databases. Each project is assigned values for Risk, Priority, Scope, Value, Return on Investment, and Life Cycle status.
Inclusion in the IT Porfolio does not imply that approval has been given to proceed.
The IT Portfolio is intended to capture and organize all IT initiatives and provide a snapshot of their status.
Our strategic plan is based on projections for the next three years to view the complete life cycle in the development and implementation of our major systems such as BIDS.
This allows IT to address the timing for the implementation of aspects of the MCC EA.
For example, MS Office 2007 is not required to implement Phase 1 of BIDS but will be critical in the development of our team collaboration capability in addressing compact development in Phase II.
The OCIO will develop a process to collect input on these investment opportunities.
We will then categorize and rank them as to their potential value to the organization, and assess the risk vs. cost to implement them. The EA Advisory Board will decide on priorities as representatives of MCC lines of business. This will ensure all IT investments are aligned with our business needs.
Portfolio Management (IT)
Inbound
Requests Tracking
(EASC – Decision)
High
Value
Low Risk
Low
Value
High
Risk
Output
Prioritization
BIDS
GSS IFMS
Future
HR
CUFF Records x xx xxx
Portfolio Tracking
S
C
O
P
E
R
O
M
V
A
L
U
E
R
I
S
K
P
R
I
O
R
I
T
Y
Resouce/
Budget
Project $$$ DD/MM/YY Status
BIDS
IFMS
GSS
Steering
Committee Senior Staff
Helpdesk
Mouse Elephant Elephant
Heard
Action
Memo
1 paragraph to 1 page
Scope
PID
3 page
Project Task
Identification and
Document
Need
OMB 300
Threshold $0 to $50K $51 to $499K Over $500K
CIO VP EASCDecision Maker
Our Portfolio Management System contains the following essential elements:
Process for the Collection of Requests o Requests can take the form of forms, emails, or verbal instructions from
Management.
o They are entry into our Portfolio Tracking system.
o Each request is given values for Risk, Priority, Scope, Value, Return on
Investment, and Life Cycle status by IT in consultation with the requestor.
Documentation and Evaluation o Each request must be supported by the appropriate supporting documentation.
o $0 to $150k : 1 paragraph to 1 page scope statement (Action Memo), decision to proceed made by CIO o $51k to $499k : 3 page project description, decision to to proceed made by VP o Over $499k : OMB 300 required, decision to proceed made by Steering
Committee
Prioritization o Project are evaluated according to value and risk as shown below.
Projects have the greatest value and least risk higher priority as shown in quadrant 1 may be ranked higher priority. However there may be project of high value but which are high risk that are important to the agency achieving its mission such as shown in quadrant II. They may also be high priority.
Budget o Each project is mapped to and supported by an IT budget line item.
Section 5 details budget elements for the next three years.
Decision Process o Some projects are a component of a larger enterprise effort. If so, the project is aligned and identified as such. For example the implementation of K2 technology to support workflow management is an add-on to our MS Enterprise platform. The EA Steering Board approves moving forward with any new component to our current EA
Projects o All other projects are also reviewed with the EA Steering Board.
Results of analyses are ranking are presented and a decision is made on their priority and to move forward based on funding available.
4.2 Project Management
The OCIO will manage our IT investment portfolio in 90 day or quarterly increments or milestones to ensure we stay of schedule and on budget and to ensure projects remained aligned with our business needs. The latter is especially important because many of MCC requirements are still not well defined and will be fleshed out during the development of our systems.
The figure below identifies quarterly milestones for each of our major EA projects for the next three years. This will be updated quarterly as we refine understanding of our needs.
Gantt charts that show the critical path activities and their relationship to other projects will be developed to manage the day to day project activities and input to MS Project.
Project Managers will report weekly to the CIO on the progress of their projects.
Integrated Project Teams (IPT) that include representation of the business owners and sponsors that will use the IT tools under development will be established for each major project to guide development efforts.
Complete Rebid of
Dyonyx Contract
Establish New Telecom
Contract
Establish Change
Control Board
Establish Refresh
Policy
Initial Refresh of
Equipment
FISMA Risk Assess
Managing Quarterly Progress of IT Portfolio Development
Provide Network/
Infra Support for
BIDS Phase 1
Implementation
Conduct Customer
Satisfaction Survey
Review Contractor
Performance
FISMA Audit and
Risk Assessment
Refresh Equipment
Transition to New
Contracts
Develop
Infrastructure Stds.
for HQ & Missions
Develop Plan for
Infra Support to MCC
Missions
Complete Phase 1
Refresh
FISMA Risk
Assessment
Execute 1 st option year of IT/Telecom
Services Contracts
Add Services
Required to Support
Implement. of BIDS/
IFMS/MS Enterprise
FISMA Risk
Assessment
FISMA Risk
Assessment
FISMA Risk
Assessment
Conduct Customer
Satisfaction Survey
Review Contractor
Performance
FISMA Audit and
Risk Assessment
Refresh Equipment
FISMA Audit and Risk
Assessment
Complete OMB 300s
Prepare Draft SOW/
RFP for Sourcing
Support Establish. Of
NBC Interface for
BIDS Phase 1
G e n e ra l S u p p o rt S e rv ic e s
IF
M S
Quarter
Jan-March
FISMA Audit and Risk
Assessment
Quarter
April-June
Quarter
July-Sept
Quarter
Oct-December
FY 2008
Issue RFP for
Competitive
Sourcing
Review Proposals
Demonstrations by
Shortlisted Vendors
Quarter
Jan-March
FY 2009
Quarter
April-June
Quarter
July-Sept
FISMA Audit and Risk
Assessment
FISMA Audit and Risk
Assessment
Quarter
July-Sept
Quarter
July-Sept
Quarter
July-Sept
Quarter
July-Sept
FY 2010
Make Award Based on Available Funding
Review and Approve
Workplan and
Schedule for IFMS
Implementation
Develop Transition
Plan
Establish IFMS
Development Test
Site
Develop Data
Structure
Test Functionality
Transition to IFMS
Production -Operate
& Test System in
Parallel to Current
Operation for Two
Consecutive
Quarters
(Quarter 1)
Transition to IFMS
Production-Operate
& Test System in
Parallel to Current
Operation for Two
Consecutive
Quarters
(Quarter 2)
Full Production with
New IFMS
Complete Service
Agreement for
Outsourced Services
Expand System for
Reporting on All
Countries in Comp.
Implement.
Complete Interface with NBC for Integ.
Financial & Compact
Perform. Report. &
Cost Acc’t
Define Project/ Plans for BIDS Develop.
Complete Initial Data
Capture Interface with MCAs
Demonstrate Phase 1
System for Report.
on the Progress of
Three Representative
Compacts
Develop Data
Architecture for
Complete BIDS Impl.
Develop Capability to
Conduct Std.
Analyses & Prepare
Std Reports to
Support All MCC
Reporting Require.
Phase 1 BIDS
Complete
Finalize Plan for
BIDS to Support
Compact Develop.
Develop Interface for
Integration with New
IFMS
Establish Budget
Planning and
Management System
Demonstrate BIDS for Three Rep.
Compact Develop.
Efforts.
Upgrade to MS
SharePoint 2007 in
Production
Environment
Train Staff in
Transition to New
Platform
Develop Plan to
Implement Workflow and Digital Asset
Management Cap.
Develop Structure for
Digital Asset
Management System
Test Workflow and
Digital Asset
Management System
Capability
Integrate MS
Enterprise Platform with BIDS to Support
Workflow and Digital
Asset Management in Phase 1 Reporting on Compact
Implementation
B
ID
S M
S E n te rp ri s e
P la tf o rm
Digital Signatures
Complete
SMS System
Implemented Under
New Contract
Develop Task Orders for Service Contract
Support for
Implementation of
New MS Enterprise
Platform, BIDS and
IFMS.
E n a b li n g T e c h n o lo g y
Integrate MS
Enterprise Platform with BIDS to Support
Workflow and Digital
Asset Management in Phase 2 Reporting on Compact
Development Efforts
Develop Plan to
Implement BIDS
Across All Compact
Development Efforts
Integrate BIDS with
MS SharePoint to
Support Team
Collab., Workflow and Document
Management.
5. Budget
Our IT Portfolio is included in our IT Budget and Projections over the next three years. This is reviewed quarterly to ensue commitments are in line with budget line items. Adjustments may be made to reallocate with the current budget year based on the progress of projects and to maintain agency priorities. Out years are used to support the budget planning process.
IT Goals FY08 FY09 FY10
1. Infrastructure
Maintain FISMA Compliance------- $0.3M $0.3M $0.1M
Base IT & Telecom Services $3.8M $3.8M $3.8M
$4.1M $4.1M $3.9M
2. Strategic Planning
Consulting Support in Refining $0.2M
Business Processes and Reporting
Requirements via BIDS /Interface with NBC
Consulting Support in Refining $0.4M $0.3M
Business Processes, Reporting
Requirements and Interface with MCAs ______ _____ _____
$0.2M $0.4M $0.3M
3. Develop Systems
IFMS--------------------------------- $3.4M $3.0M $1.0M
BIDS Phase 1------------------------ $2.0M $2.0M $1.0M
MS Enterprise Platform------------ $0.8M $0.3M
Enabling/Supporting Technology-- $0.4M $0.1M
BIDS Phase 2 $3.0M
$6.6M $5.5M $5.0M
4. Customer Support
Rollout of SharePoint, Workflow, -- $0.6M $0.4M $0.2M
Digital Asset Management, and Team Collaboration
Contractor Support/Training-------- $0.4M $0.4M $0.4M
BIDS, IFMS, MS Enterprise Plat. $1.0M $0.8M $0.6M
Total $11.8M $10.9M $9.8M
5. Acquisition Strategy
The OCIO Acquisition Strategy is driven by our understanding of our business needs and EA.
MCC’s EA defines the capabilities required to support both the operation and management of our business enterprise.
General IT Support
Services BIDSMS Enterprise Platform IFMS
Enabling/Supporting
Technology
MCC Enterprise Architecture
MCCnet, MS Office
MCC Business Needs
Capability to Support Operations
Team Collaboration, Workflow Management, Digital Asset
Management
Capability to Support Management Reporting
Performance Reporting, Financial Management, and Project
Management
MS Live
Communications
MS Office 2007
SharePoint Service
K2 Technology
NBC/New Outsource Service
Provider
Acquisition Strategy
Our approach is to package support services that provide those capabilities so as to ensure proper integration of services and to minimize the number of vendors making it easier to manage.
The OCIO has two integrating contractors supporting the development and implementation of
BIDS and IFMS and will two more contracts in place in March 2008 providing general
IT/Telecom services. These contracts provide the base of support for General IT Services, Enabling Supporting Technology, MS Enterprise Platform, BIDS and IFMS.
The implementation of specific features or technologies that make up the EA under each of these major service areas such the implementation of MS SharePoint 2007 and K2 Technology to provide workflow management capability support to both Operations and BIDS development will be implemented via task orders and contract modifications to one or more of these existing contracts. Vendors such as K2 Technologies will be included in specific task orders.
Our contracts include considerable flexibility to add tasks and to modify scopes of work to accommodate implementation of additional requirements as they are defined through our
Portfolio Management Process. Given that many of our detailed requirements are not yet well defined it will be important that we manage enhancements and changes to our EA through our
CCB.