About this file

This document is a Market Research Questionnaire issued by the U.S. Department of Justice Federal Bureau of Prisons (FBOP) for the replacement of the cooling tower at the Federal Correctional Institution (FCI) Phoenix in Arizona. The FBOP is conducting market research to gather information from interested small business contractors to potentially issue a single firm-fixed-price construction contract for the project. The key details are:

The contractor will be required to completely remove the existing EVAPCO cooling tower and install a new closed-circuit cooling tower to match the existing system. The work includes reconnecting water supply and return piping, electrical connections, installing new pumps, and commissioning the new equipment. The estimated performance period is 365 calendar days, and the estimated magnitude of the project is between $250,000 and $500,000. The NAICS code is 238220 (Plumbing, Heating, and Air Conditioning Contractors) with a $19 million small business size standard. Interested small business contractors are requested to respond to the questionnaire by April 24, 2024 and add their business names to the Interested Vendors List in SAM.gov.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of Justice Federal Bureau of Prisons Field Acquisition Office

U.S. Armed Forces Reserve Complex Grand Prairie, Texas 75051

April 12, 2024

Market Research Questionnaire Field Acquisition Office Building and Facilities Section (B&F) Federal Correctional Institution Phoenix, Arizona Sources Sought 15B60824PR000094

The Federal Bureau of Prisons (FBOP) is conducting market research in accordance with Federal Acquisition Regulation, Part 10. A single solicitation will be issued for Replace FPC Cooling Tower. The FBOP, Federal Correctional Institution Phoenix (FCI Phoenix) located at 37900 N. 45th Avenue in Phoenix, Arizona, intends to make a single award to a responsible entity that will provide all necessary equipment, labor, materials, incidentals, programming, and commissioning to replace the cooling tower at the Federal Prison Camp (FPC). It is the contractor’s responsibility to obtain permitting, should it be required. All manufacturers’ recommendations will be required to be implemented. All equipment specified must be brand name or an equal product.

This market research questionnaire is for information purposes only. The described requirement may or may not be included in the subsequent solicitation.

A summary of the requirements is as follows:

The Contractor will completely disconnect, remove, and properly dispose of the existing EVAPCO Cooling Tower Model LSWE, to include two taco system pumps. The Contractor to provide a new closed circuit cooling tower to match the existing cooling tower. Replacement includes reconnect of existing water supply and return piping (inlet, outlet, drains, and overflow), make-up water piping, re-connection of VFD’s, tie into existing electrical (high and low voltage), install new electrical whips, install two taco system pumps to match existing performance, install new access ladder handrail and platform on the new tower. The new tower basin shall be a 304 SS water touch basin. The demo and installation shall meet all federal, state, and local codes. All recommendations suggested by the manufacturer will be included in the installation. The Contractor will clean-up work area, start-up/test, and commission the equipment upon completion of installation and train FBOP staff.

Specifications:

Fan Motor – Fan motor(s) shall be 18.5 kW suitable for outdoor installation on 480 volts, 60 hertz, and 3 phase, 30-amp electrical service, 25 hp. Motor(s) shall be mounted on an adjustable base.

Fan and Drive System - Fans shall be forwardly curved centrifugal type of hot-dip galvanized construction.

The fans shall be factory installed into the pan-fan section, and statically and dynamically balanced for vibration free operation. Fans shall be mounted on either a solid steel shaft or a hollow steel shaft with forged bearing journals. The fan shaft shall be supported by heavy-duty, self-aligning bearings with cast-iron housings and lubrication provided fittings for maintenance. The fan drive shall be V-belt type with taper lock pulleys designed for 150% of the motor nameplate kW. Drives are to be mounted and aligned at the factory.

Water Recirculation Pump - The two pumps shall be a close-coupled, centrifugal type with a mechanical seal. Pump motor shall be 2.2 kW design suitable for outdoor installation on 480 volts, 60 hertz, and 3 phase, 24-amp electrical service, 20 hp.

Water Distribution System - The system shall provide a water flow rate of not less than 1 gal./sec. over each square meter of unit face area to ensure proper flooding of the coil. The spray header shall be constructed of polyvinyl chloride pipe for corrosion resistance. All spray branches shall be removable and include a threaded end plug for cleaning. The water shall be distributed over the entire coil surface by precision molded from heavy-duty, glass reinforced nylon spray nozzles for long life and 100% corrosion resistance (34 mm diameter orifice and 38 mm clearance between the nozzle bottom and water diverter plate) with an internal sludge ring to eliminate clogging. Nozzles shall be threaded into the spray header to provide easy removal for maintenance.

Casing and Fan Section - The casing and fan section shall be constructed of Z-725 heavy gauge mill hot-dip galvanized steel. During fabrication, all panel edges shall be coated with a 95% pure zinc compound.

Eliminators - The eliminators shall be constructed of inert polyvinyl chloride that has been specially treated to resist UV degradation. Assembled in easily handled sections, the eliminators shall incorporate three changes in air direction to assure removal of entrained moisture from the discharge airstream. The maximum drift rate shall not exceed 0.001 % of the recirculated water rate.

Water Inlet(s) - Grooved pipe with mechanical coupling or welded fittings will be acceptable.

Water Outlet(s) - Grooved pipe with mechanical coupling or welded fittings will be acceptable.

Fill - Fill and integral drift eliminators formed from self-extinguishing (per ASTM D-568) polyvinyl chloride (PVC) having a flame spread rating of 5 per ASTM Standard E84-77a. Suitable for a maximum enter water temperature of 130° F (54.44° C). Eliminators should be designed to effectively strip entrained moisture from the leaving airstream with a minimum of air resistance.

Basin Water Level Control - Make-up valve with unsinkable polystyrene filled plastic float arranged for easy adjustment. Make-up valve should be corrosion resistant and suitable for water supply pressures between 15 psig (103 kPa and 50 psig (345 kPa).

Basin Sweeper Piping - Cold water basin should include Polyvinyl chloride (PVC) sump sweeper. Influent and effluent connections for connecting to a user supplied filtration system. 20 psig (135 kPa) pressure is required at the water inlet.

Access Door Platform - An external service platform(s), with aluminum ladder(s), galvanized safety gate and 1-1/4" (32mm) galvanized steel pipe safety railing complying with OSHA standards and regulations.

Access to the Statement of Work is located on SAM.gov under Notice ID 15B60824PR000094 and will require an active https://sam.gov vendor registration (login). If you encounter problems accessing these documents, please contact the Federal Service Desk at 866-606-8220.

Please answer the following questions:

1. Can your firm provide Replace FPC Cooling Tower at the institution specified above?

__________ Yes ___________ No

2. If you answered “No” in Question 1 above, what construction requirements can your firm provide?

3. The North American Industrial Classification System (NAICS) code for Electrical Contractors and Other Wiring Installation Contractors is 238220, which sets the small business standard at $19 million.

Based on this standard, what is your business size, small or large?

__________ Small ___________ Large

4. What level of subcontracting, if any, would your firm utilized to provide the listed requirement?

5. Are you eligible for participation in one of the following small business programs? If so, please indicate the program.

__________ “8(a)” Program __________ Women-Owned Small Business concern __________ Economically Disadvantaged Women-Owned Small Business concern __________ HUBZone Small Business concern __________ Veteran-Owned Small Business concern __________ Service-Disabled Veteran-Owned Small Business concern

6. The Performance Period estimated for this project is 365 calendar days working 7-hour days. Does this time frame appear to be suitable for your firm to complete the requirement?

________Yes ________No

If not, what time frame in calendar days would it take your firm to complete?

___________Calendar Days

7. How many calendar days does your firm need to prepare a proposal resulting from this solicitation?

_____________ 45 days _____________ 60 days

8. After reviewing the proposed work, are there any industry recommendations you would suggest other than what we provided in our description?

________Yes ________No

If yes, what suggestion? ___________________________________________________________

9. If you were to complete this work, where do you estimate your pricing range?

_______ Between $100,000 and $250,000

_______ Between $250,000 and $500,000

_______ Between $500,000 and $1,000,000

_______ Between $1,000,000 and $5,000,000

_______ Between $5,000,000 and $10,000,000

_______ More than $10,000,000

10. If awarded a contract, how many calendar days after the award could you begin construction? Please note that all individuals working on site at the institutions must undergo a security clearance investigation. This investigation may take 30 calendar days or longer to complete.

________ Calendar days after Contract Award

11. Please furnish the following information in reference to your firm:

Name:

Address:

Point of Contact:

Telephone Number:

E-mail Address:

Unique Entity ID (UEI):

Please e-mail your responses to jbergami@bop.gov. Responses must be received no later than April 24, 2024.

A few notes regarding all FBOP requirements:

1. The resulting solicitation will be distributed solely through the General Services Administration Federal Business Opportunities website at sam.gov. Hard copies of the solicitation are not available.

The website provides download instructions to obtain all documents relating to the solicitation. All future information concerning this acquisition, including the pre-solicitation notices, solicitation, and any subsequent amendments, will be distributed solely through the website. Interested parties are responsible for monitoring the website to ensure they have the most current information about the acquisition.

2. Any contractor interested in obtaining a contract award with the Federal Bureau of Prisons must be registered in the System for Award Management (SAM) at www.sam.gov. In order to qualify for award, your business size metrics information entered in your SAM registration must be less than or equal to the size standard specified above. You must also have the NAICS code stated. Each bidder's SAM registration will be reviewed by the Government to confirm that your business size meets the small business size standard requirement and the stated NAICS code is listed.

All bidders are urged to double check their SAM registration and update as necessary, including the size metrics information and NAICS code.

mailto:jbergami@bop.gov https://beta.sam.gov/

Check Box2: Off
Check Box3: Off
Text4:
Text5:
Check Box6: Off
Check Box7: Off
Text8:
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Text17:
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Text22:
Text23:
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Text30:
Text31:
Text32:
Text33:
Text34:
Text35:
Text36:

File details come from the government source that posted it. Updated .