M68909-16-Q-7621..pdf
PDF 1 MB Posted
- Attached to
- AVTB Technical Support Services Federal contract opportunity
- Solicitation number
- M68909-16-Q-7621
- Issued by
- United States Marine Corps
About this file
RFQ and Attachments 1 thru 4
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_ _Answers__M68909-16-Q-7621.docx | DOCX document | |
| Section_SF_1449_Final_May_10_2016.docx | DOCX document | |
| M68909-16-Q-7621_AMD_01_10_MAY_2016.docx | DOCX document | |
| SUMMARY_OF_CHANGES_AVTB_Tech_Supt_10_Apr_2016.docx | DOCX document | |
| CDRLs_AVTB_CSS_04202016_signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
M68909-16-Q-7621 20-Apr-2016
b. TELEPHONE NUMBER
(760) 725-9208
8. OFFER DUE DATE/LOCAL TIME
02:00 PM 20 May 2016
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
M689099. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
ROSEMARIE E. MENDOZA
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
COMMANDING OFFICER
CONTRACTS, MCTSSA
BOX 555171
CAMP PENDLETON CA 92055-5171
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
(760) 725-2514FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
541990
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
X
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF56
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
M68909-16-Q-7621
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months
3.1 Copyediting and Proofreading
FFP
Copyediting and Proofreading IAW PWS. Period of Performance: 03 June 2016 through 02 June 2017
FOB: Destination
NET AMT
0002 12 Months
3.2 Project Management Support
Project Management Support IAW PWS. Period of Performance: 03 June 2016
0003 12 Months
3.3 Test Process Development Support
Test Process Development Support IAW PWS. Period of Performance: 03 June
2016 through 02 June 2017
0004 12 Months
3.4 Operations Support
Operations Support IAW PWS. Period of Performance: 03 June 2016 through 02
June 2017
0005 12 Months
3.5 Meeting Support
Meeting Support IAW PWS. Period of Performance: 03 June 2016 through 02
June 2017
0006 12 Months
3.6 Technical Department Records Mgmt
Technical Department Records Management IAW PWS. Period of Performance:
03 June 2016 through 02 June 2017
0007 12 Months
3.7 Technical Department Training
Technical Department Training Coordination IAW PWS. Period of Performance:
03 June 2016 through 02 June 2017
0008 12 Months
3.8 Lab Technician Support
Lab Technician Support IAW PWS. Period of Performance: 03 June 2016
CDRLS for Base Year
1001 12 Months OPTION 3.1 Copyediting and Proofreading
Copyediting and Proofreading IAW PWS. Period of Performance: 03 June 2017 through 02 Jun 2018
1002 12 Months OPTION 3.2 Project Management Support
Project Management Support IAW PWS. Period of Performance: 03 June 2017
1003 12 Months OPTION 3.3 Test Process Development Support
2017 through 02 Jun 2018
1004 12 Months OPTION 3.4 Operations Support
Operations Support IAW PWS. Period of Performance: 03 June 2017 through 02
Jun 2018
1005 12 Months OPTION 3.5 Meeting Support
Meeting Support IAW PWS. Period of Performance: 03 June 2017 through 02 Jun
1006 12 Months OPTION 3.6 Technical Department Records Mgmt
03 June 2017 through 02 Jun 2018
1007 12 Months OPTION 3.7 Technical Department Training
Technical Department Training Coordination. Period of Performance: 03 June
2017 through 02 Jun 2018
1008 12 Months OPTION 3.8 Lab Technician Support
Lab Technician Support IAW PWS. Period of Performance: 03 June 2017
OPTION CDRLs - Option Year 1
OPTION ODC Estimated
Other Direct Costs (ODC). Travel charges are limited and shall be IAW FAR
31.205-46
2001 12 Months
Copyediting and Proofreading IAW PWS. Period of Performance: 03 June 2018 through 02 June 2019
2002 12 Months
Project Management Support IAW PWS. Period of Performance: 03 June 2018
2003 12 Months
2018 through 02 June 2019
2004 12 Months
Operations Support. Period of Performance: 03 June 2018 through 02 June 2019
2005 12 Months
Meeting Support IAW PWS. Period of Performance: 03 June 2018 through 02
June 2019
2006 12 Months
03 June 2018 through 02 June 2019
2007 12 Months
Technical Department Training Coordination. Period of Performance: 03 June
2018 through 02 June 2019
2008 12 Months
Lab Technician Support IAW PWS. Period of Performance: 03 June 2018
OPTION CDRLs - Option Year 2
OPTION ODC - Estimate
3001 12 Months
Copyediting and Proofreading IAW PWS. Period of Performance: 03 Jun 2019 through 02 June 2020
3002 12 Months
Project Management Support IAW PWS. Period of Performance: 03 Jun 2019
3003 12 Months OPTION 3.3 Test Development Support
Test Development Support IAW PWS. Period of Performance: 03 Jun 2019
3004 12 Months
Operations Support IAW PWS. Period of Performance: 03 Jun 2019 through 02
June 2020
3005 12 Months
Meeting Support IAW PWS. Period of Performance: 03 Jun 2019 through 02 June
3006 12 Months
03 Jun 2019 through 02 June 2020
3007 12 Months
Technical Department Training Coordination IAW PWS. Period of Performance:
03 Jun 2019 through 02 June 2020
3008 12 Months
Lab Technician Support IAW PWS. Period of Performance: 03 Jun 2019 through
02 June 2020
OPTION CDRLS - Option Year 3
OPTION ODC- Estimate
4001 12 Months
Copyediting and Proofreading IAW PWS. Period of Performance: 03 Jun 2020 through 02 June 2021
4002 12 Months
Project Management Support IAW PWS. Period of Performance: 03 Jun 2020 through 02 June 2021
4003 12 Months est Process Development Support IAW PWS. Period of Performance: 03 Jun
2020 through 02 June 2021
4004 12 Months
Operations Support IAW PWS. Period of Performance: 03 Jun 2020 through 02
June 2021
4005 12 Months
Meeting Support IAW PWS. Period of Performance: 03 Jun 2020 through 02 June
4006 12 Months
03 Jun 2020 through 02 June 2021
4007 12 Months
Technical Department Training Coordination. Period of Performance: 03 Jun
2020 through 02 June 2021
OPTION CDRLS - Option Year 4
SECTION C DESCRIPTION
Performance Work Statement
Amphibious Vehicle Test Branch (AVTB)
TECHNICAL SUPPORT SERVICES
1 INTRODUCTION
1.1 Background
The Amphibious Vehicle Test Branch (AVTB) provides Test and Evaluation (T&E) of amphibious and ground combat vehicles to Marine Corps Systems Command (MCSC) and Program Executive Officer
Land Systems (PEO LS). AVTB is responsible for the T&E of combat vehicles throughout the vehicle lifecycle. AVTB applies deliberate, documented processes in the execution of combat vehicle tests which are continuously under development and improvement.
Upcoming events include the Assault Amphibious Vehicle (AAV) reserve buoyancy test, personnel egress test, hull measurement, the Reliability, Availability, and Maintainability (RAM) baseline assessment. Additionally, AVTB will support vendor demonstrations and studies for the Marine
Personnel Carrier (MPC). As a component of the current tactical ground vehicle strategy for the Marine
Corps, the vendor demonstrations and studies will aid decision makers with future source selection decisions.
T&E projects at AVTB follow a standardized business process. This process consists of seven phases
(Initiate, Plan, Prepare, Execute, Analyze, Report, and Close). The contractor will assist with all phases, depending on project scope, duration, and technical requirements. AVTB typically conducts between 10 and 20 projects per year.
1.2 Scope
The scope of this effort is to provide technical writing and project management for AVTB engineering tasks and test events. In addition to technical writing and project management, the Electronics &
Metrology lab, one of the seven main functional areas at AVTB, requires reinforcement of the current electronics technical support, which supports the organizational mission by providing instrumentation, data acquisition, and audio/video recording. The electronic technician holds primary responsibility for the installation, maintenance, and operation of these systems discussed in the instrumentation statement below:
Instrumentation – The term instrumentation refers to the electronic and electromechanical sensors and systems used to measure and record physical phenomena in the form of usable data. Instrumentation includes, but is not limited to, pressure transducers, current meters, tachometers, flow meters, accelerometers, thermocouples, inclinometers, spectrometers, telemetry systems, load cells, survey equipment, video capture systems, and data acquisition systems. Instrumentation is used to acquire data from vehicle reactions over various terrains and in various environmental conditions. Parameters measured include temperature, fluid pressure, fluid flow, air pressure, mechanical pressure, mechanical movement, position, inclination, control and maneuverability, tracking, speed, ride quality, and vehicle behavior on land and water.
2 APPLICABLE DOCUMENTS
2.1 Compliance Documents
The following documents are applicable to this PWS:
a. American National Standards Institute (ANSI), Z39.18-2005 (R2010), Scientific and Technical
Reports – Preparation, Presentation, and Preservation, 13 May 2010.
b. Department of the Navy, SECNAV M-5216.5, Correspondence Manual, June 2015.
c. HQMC, MCO 5216.20A, Marine Corps (MC) Supplement to the Department of the Navy (DON)
Correspondence Manual, 15 August 2013.
d. HQMC, MCO 4733.1C, Marine Corps Ground Test, Measurement and Diagnostic Equipment
(TMDE) Calibration and Maintenance Program (CAMP), 23 June 2015.
e. NISPOM, DOD Directive 5220.22-M
2.2 Resources
The following resources will be provided to the contractor:
a. Government Printing Office Style Manual
b. AVTB style and formatting guidance
c. Access to the digital AVTB Process Asset Library
d. Access to the digital AVTB Project Center
e. Instructions for updating information on the AVTB Project Center
f. Instructions for the application of the AVTB file naming convention
g. Computer program for converting Level 1 data to Level 2 data
h. Access to the AVTB Records Management System.
3 PERFORMANCE REQUIREMENTS
The contractor shall report all contractor labor hours (including subcontractor hours), required to perform the services provided under this contract with AVTB, via a secure data collection site. The contractor is required to fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance for each government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data for each FY shall be reported by the contractor no later than 31 October of each calendar year. Contractors may direct questions to the help desk at: https://doncmra.nmci.navy.mil.
3.1 Copyediting and Proofreading
The contractor shall edit AVTB test planning, test managing, and test reporting documents. The AVTB civil service employees will author the documents and forward written copies, or proof sheets, to the contractor for proofreading. The contractor shall return the documents (CDRL A001) to the author with corrections and comments within two days of receipt. The contractor-edited documents shall be technically accurate and grammatically correct. For planning purposes, the typical workload involves processing between 1 and 6 documents per week, ranging in length from 1 to 50 pages for each document.
3.2 Project Management Support
3.2.1 During the Initiate Phase of Every AVTB T&E Project
The contractor shall update the four below listed CDRLS to reflect the information provided by AVTB civil service employees regarding the new project.
CDRLS are as follows:
Integrated Project Schedule (IPS) – used to reflect a new project with the default planning duration in accordance with CDRL A003.
AVTB Master PowerPoint Slides – used to maintain the list of potential projects, project status, and pending test requests in accordance with CDRL A004.
Charter Template – used to reflect current details about the project in accordance with CDRL
A002.
https://doncmra.nmci.navy.mil/
Project Launch/Closeout Checklist – used to reflect the status of the tasks in accordance with
CDRL A005.
After the CDRLs are completed, the contractor shall notify AVTB Operations Officer of the project launch.
3.2.2 During the Close Phase of Every AVTB T&E Project
The contractor shall ensure archiving Project Data is complete when reviewed and accepted by the Project
Manager. The contractor shall apply proper naming conventions as detailed in AVTB file naming convention instructions to all project documents, populate required metadata fields, and upload the documents to the AVTB records management system, per the instructions for updating information on the
AVTB Project Center.
The contractor shall update the four CDRLS listed in (paragraph 3.2.1), to reflect the information provided by AVTB civil service employees regarding the closed project. The contractor shall notify
AVTB Operations Officer of the project closure within one day when action is complete.
3.3 Test Process Development Support
During all process phases, except the initiate and close phases, the contractor shall update and proofread existing forms, templates, checklists, and flow diagrams authored by AVTB civil service employees. The contractor shall proofread and apply formatting standards listed in paragraph 2.2 (e) & (f) to the process assets in preparation for the AVTB internal review process. AVTB generates approximately three new process assets per month.
The contractor shall facilitate the approval and launch of process assets by updating the signature documentation, scanning the documents after approving signatures are applied, and uploading the documents to the AVTB Process Asset Library within five working days of receipt of signature documentation, as listed in Paragraph 2.2 above.
3.4 Operations Support
During all process phases, except the initiate and close phases, the contractor shall transfer project summary information from the weekly Project Sync Working Group (PSWG) slides to the executive level
Branch Biweekly slides to facilitate staff coordination and decision support.
3.5 Meeting Support
The contractor shall upload the audio recordings of meetings, provided by AVTB civil service employees, to the AVTB audio repository, listed in paragraph 2.2. above, to support configuration management and decision traceability.
The contractor shall update the existing master list of action items provided by the Operations Officer for the weekly meetings and keep running tallies of action items from previous weeks.
The contractor shall archive meeting records by uploading them to the AVTB records management system, listed in paragraph 2.2 above, or other designated areas.
Per CDRL 004, the contractor shall update the Master PowerPoint Slides template to maintain consistency across the organization prior to the meetings scheduled below.
The following list provides an estimate for the meeting volume at AVTB:
Project Sync Working Group Meetings (one per week)
Process Review Committee Meetings (one per week)
Branch Biweekly Review Meetings (two per month)
Test Readiness Reviews (approximately two per month)
Ad Hoc Meetings (approximately two per month)
Project Management Team Meetings (approximately two per month)
3.6 Technical Department Records Management
The contractor shall organize and manage the Technical Department’s paper and electronic records. The
Technical Department’s electronic records include files on the Technical Department network drives, SharePoint portal spaces, and Technical Department inputs to the Records Management Library. Access to these drives, portals, and libraries shall be in accordance with paragraph 2.2. The contractor shall either scan into digital format or file Technical Department paper files according to the SECNAV M-5210.1
Department of the Navy Records Management Manual, listed in paragraph 2.2 above.
3.7 Technical Department Training Coordination
The contractor shall coordinate on-site training events for the Technical Department by scheduling dates and times, ensuring the availability of correct equipment and materials (e.g., laptops, conference room, notebooks, easels), completing and submitting funding documentation, and managing training certificates.
On-site training events occur approximately twice per year.
3.8 Lab Technician Support
3.8.1 Lab Test Planning Support
The contractor shall support test planning activities by coordinating lab resources, gathering information, furnishing technical advice, and solving issues. The contractor shall provide Operation Officer with lab related information, which will be included in detailed test plans by AVTB civil service employees. This
Lab related information includes instrumentation specifications, measurement capabilities, and data collection methods.
3.8.2 Lab Instrumentation Preparation
The contractor shall assemble and maintain instrumentation according to the needs and requirements described in the detailed test plans. The contractor shall prepare, align, and calibrate instrumentation to include pressure transducers, current meters, tachometers, flow meters, accelerometers, thermocouples, inclinometers, spectrometers, telemetry systems, load cells, survey equipment, video capture systems, and data acquisition systems. The contractor shall bench test and verify instrumentation in accordance with instructions and procedures established by the AVTB Lab personnel prior to test vehicle installation.
3.8.3 Instrumentation Installation
The contractor shall install instrumentation onto one to four (1 to 4) test vehicles according to the
Government-provided detailed test plan for a single event. The contractor shall ensure that the sensors accurately measure the intended physical phenomenon as stated in the detail test plan for each event. The contractor shall ensure that the installations are robust against heat, vibration, snags, impacts, and fluids in accordance with the test plans. After each installation, the contractor shall submit a written report as detailed in CDRL A006 to the lab director. This report will describe what, where, and how the instrumentation was installed, including the extent of possible deficiencies and the plans for correction.
3.8.4 Active Monitoring of Instrumentation
The contractor shall observe instrumentation operation to detect malfunctions and ensure the electronic data being collected by the data acquisition system is complete, valid, accurate, and sufficient to characterize the system under test. The contractor shall conduct this observation via wireless telemetry or through direct physical observation and active video recording. The contractor shall provide real-time verbal reports to test team members concerning instrumentation status. The contractor shall notify the test team immediately if a problem is observed. Previously established go/no-go criteria in the Detailed Test
Plan for each event will be used to determine if the test should continue.
3.8.5 Data Processing
The contractor shall retrieve and process instrumentation data collected from test vehicles during the course of formal testing. Data processing involves converting raw data (i.e., Level 1 data) into Level 2 data, using the Government-provided computer programs and knowledge gained from the active monitoring of instrumentation during test execution. Level 2 data is defined as “reduced data or data taken from the raw form and consolidated with invalid or unnecessary data points identified as such with supporting rationale.” The contractor shall record the data during formal test execution and shall provide to the Operations Officer
3.8.6 Lab Contributions to Technical Reports
The contractor shall provide technical information concerning possible instrumentation problems and exceptions, a description of data acquisition system performance, an assessment concerning the accuracy of final measurements, and any possible caveats accompanying measurement results for technical reports.
3.8.7 Lab Inventory Control
The contractor shall support quarterly lab inventory reviews by completing the provided inventory checklists from the lab team lead. Inventory reviews involve locating the government-owned item, verifying that the serial number matches the record, and if necessary, returning the item to its appropriate location.
4 DELIVERABLES
Prior to the submission of any deliverable, the contractor shall provide the Contracting Officer’s
Representative (COR) with a copy of the formatted deliverable for format approval, unless otherwise stated. Contract Data Requirements Lists (CDRLs) are contained in Section J, Exhibit A
4.1 Copyediting and Proofreading
The contractor shall provide a weekly progress status report to track the volume of documents reviewed, a list of current review tasks, and issues related to the ongoing review tasks.
CDRL A001 – CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT
4.2 Project Management Support
4.2.1 During the Initiate Phase of Every AVTB T&E Project
The contractor shall update the four tracking documents to reflect the information provided by AVTB civil service employees regarding the new project.
CDRL A002 – COMPLETED PROJECT CHARTER
CDRL A003 – UPDATED INTEGRATED PROJECT SCHEDULE
CDRL A004 – UPDATED AVTB MASTER POWERPOINT SLIDES
CDRL A005 – UPDATED PROJECT INITIATE/CLOSE CHECKLIST
4.2.2 During the Close Phase of Every AVTB T&E Project
The contractor shall ensure the WBS Element 6.5 – Archive Project Data is complete. The contractor shall update the four tracking documents to reflect the information provided by AVTB civil service employees regarding the closed project.
CDRL A002 – COMPLETED PROJECT CHARTER
CDRL A003 – UPDATED INTEGRATED PROJECT SCHEDULE
CDRL A004 – UPDATED AVTB MASTER POWERPOINT SLIDES
CDRL A005 – UPDATED PROJECT INITIATE/CLOSE CHECKLIST
4.3 Lab Technician Support
4.3.1 Instrumentation Installation
The contractor shall submit a written report to the lab director after each installation that describes what, where, and how the instrumentation was installed, including the extent of possible deficiencies and plans to correct them in accordance with CDRL A006 – INSTRUMENTATION INSTALLATION REPORT
4.3.2 Lab Contributions to Technical Reports
The contractor shall provide technical information concerning possible instrumentation problems and exceptions, a description of data acquisition system performance, an assessment concerning the accuracy of final measurements, and any possible caveats accompanying measurement results for technical reports in accordance with CDRL A006.
4.3.3 Instrumentation System Development
The contractor shall update and create SOPs for deployed instrumentation solutions in accordance with
CDRL A006. These SOPs are used to inform planners and to cross-train electronics technicians in the operation and maintenance of lab instrumentation. The contractor shall update these procedures when changes are applied to the standardized instrumentation suites.
4.4 Unclassified End Products
Unclassified end products shall be delivered with a letter of transmittal to the COR.
5 PERIOD OF PERFORMANCE
The contract period of performance for this task is anticipated to be one year in duration from date specified in the award, with four one-year option periods.
6 GOVERNMENT FURNISHED EQUIPMENT & FACILITIES
6.1 Government Furnished Equipment
No government furnished equipment will be provided.
6.2 Access to Government Property
The government will provide a work space for up to ten personnel. Access to government telephone services will be made available in the designated work area, but restricted to government and contractor coordination or as necessary to conduct business relevant to this PWS. All off-site calls shall be logged by the contractor in the log book maintained by the lab team lead. The time, number, and official nature of the call made over government telephones shall be recorded.
6.3 Access to Government Facilities
The government will provide access to the engineering labs and other environments within AVTB to execute the tasks within this PWS during normal working hours (0700 to 1600, Monday through Friday).
The contractor must seek prior approval of the COR for access to AVTB during government holidays.
6.4 Government Furnished Material
No government furnished material will be provided under this PWS.
The government will not reimburse the contractor for cell phone charges or commercial internet service under this PWS.
6.5 Government Furnished Information
The government will provide the contractor access to the following information and automated services in support of this PWS:
1. The technical information required for the performance of this PWS. The contractor shall submit a written request to the COR, at least two calendar days in advance, for specific information.
2. A user account and email account on the Marine Corps Enterprise Network (MCEN), to include a
Common Access Card (CAC) to support Public Key Infrastructure (PKI) access and Marine
Corps Web Services, if determined as necessary for the performance of this PWS. Contractors are required to complete two classes before being issued an email account.
a. DoD-IAA-V12.0 DoD Cyber Awareness Challenge V2
b. DoD-PII-2.0 Privacy and Personally Identifiable Information (PII) Awareness
7 PERSONNEL
The contractor shall provide sufficient key personnel with the following experience and qualifications:
7.1 Lab Technician(s)
Ten years of experience or technical training relevant to the tasks listed in paragraph 3.8.1 through 3.8.7.
7.2 Operations Analyst
College degree or six years of business experience relevant to the tasks listed in paragraph 3.2 through
3.7.
7.3 Technical Editor
College degree or six years of editorial experience relevant to the tasks listed in paragraph 3.1.
7.4 Personnel Availability
In the event an individual is not able to perform a role due to illness, death, termination, or other reasons, the contractor will provide a substitute with the requisite skills to ensure uninterrupted performance. The contractor shall provide the Contracting Officer with notification of the substitution, including a resume for the proposed individual. Since this is a performance based requirement, failure of the contractor to provide personnel with the requisite skills to perform the contract task may result in a breach.
8 TRAVEL REQUIREMENTS
The contractor is not required to travel outside Camp Pendleton, CA. There is no travel anticipated for the base year. The contractor may be required to travel in support of this PWS to the locations listed below, when notified by the COR for each option year. If additional travel is required, the contract will be modified by the Contracting Officer. Authorized travel shall be in accordance with the contract. The actual travel required will vary, depending on test requirements and schedules as they evolve throughout the performance period.
Table 8-1 Off-Site Test Support Location Year/Duration Personnel
Twentynine Palms, CA FY 18 – 45 working days 2
Alaska FY 19 – 45 working days 2
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 Destination Government Destination Government
0003 Destination Government Destination Government
0004 Destination Government Destination Government
0005 Destination Government Destination Government
0006 Destination Government Destination Government
0007 Destination Government Destination Government
0008 Destination Government Destination Government
0009 Destination Government Destination Government
1001 Destination Government Destination Government
1002 Destination Government Destination Government
1003 Destination Government Destination Government
1004 Destination Government Destination Government
1005 Destination Government Destination Government
1006 Destination Government Destination Government
1007 Destination Government Destination Government
1008 Destination Government Destination Government
1009 Destination Government Destination Government
1010 Destination Government Destination Government
2001 Destination Government Destination Government
2002 Destination Government Destination Government
2003 Destination Government Destination Government
2004 Destination Government Destination Government
2005 Destination Government Destination Government
2006 Destination Government Destination Government
2007 Destination Government Destination Government
2008 Destination Government Destination Government
2009 Destination Government Destination Government
2010 Destination Government Destination Government
3001 Destination Government Destination Government
3002 Destination Government Destination Government
3003 Destination Government Destination Government
3004 Destination Government Destination Government
3005 Destination Government Destination Government
3006 Destination Government Destination Government
3007 Destination Government Destination Government
3008 Destination Government Destination Government
3009 Destination Government Destination Government
3010 Destination Government Destination Government
4001 Destination Government Destination Government
4002 Destination Government Destination Government
4003 Destination Government Destination Government
4004 Destination Government Destination Government
4005 Destination Government Destination Government
4006 Destination Government Destination Government
4007 Destination Government Destination Government
4009 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC
0001 POP 03-JUN-2016 TO
02-JUN-2017
N/A M90133
AVTB ATTN: SUPPLY OFFICER
BLDG 210536 KRAUS ST
CAMP PENDLETON CA 92055-5217
760-763-4428
M90133
0002 POP 03-JUN-2016 TO
N/A N/A
0003 POP 03-JUN-2016 TO
0004 POP 03-JUN-2016 TO
0005 POP 03-JUN-2016 TO
0006 POP 03-JUN-2016 TO
0007 POP 03-JUN-2016 TO
0008 POP 03-JUN-2016 TO
0009 POP 03-JUN-2016 TO
1001 POP 03-JUN-2017 TO
02-JUN-2018
1002 POP 03-JUN-2017 TO
1003 POP 03-JUN-2017 TO
1004 POP 03-JUN-2017 TO
1005 POP 03-JUN-2017 TO
1006 POP 03-JUN-2017 TO
1007 POP 03-JUN-2017 TO
1008 POP 03-JUN-2017 TO
02-JUN-2019
1009 POP 03-JUN-2017 TO
1010 POP 03-JUN-2017 TO
2001 POP 03-JUN-2018 TO
2002 POP 03-JUN-2018 TO
2003 POP 03-JUN-2018 TO
2004 POP 03-JUN-2018 TO
2005 POP 03-JUN-2018 TO
2006 POP 03-JUN-2018 TO
2007 POP 03-JUN-2018 TO
2008 POP 03-JUN-2018 TO
2009 POP 03-JUN-2018 TO
2010 POP 03-JUN-2018 TO
3001 POP 03-JUN-2019 TO
02-JUN-2020
3002 POP 03-JUN-2019 TO
3003 POP 03-JUN-2019 TO
3004 POP 03-JUN-2019 TO
3005 POP 03-JUN-2019 TO
3006 POP 03-JUN-2019 TO
3007 POP 03-JUN-2019 TO
3008 POP 03-JUN-2019 TO
3009 POP 03-JUN-2019 TO
3010 POP 03-JUN-2019 TO
4001 POP 03-JUN-2020 TO
02-JUN-2021
4002 POP 03-JUN-2020 TO
4003 POP 03-JUN-2020 TO
4004 POP 03-JUN-2020 TO
4005 POP 03-JUN-2020 TO
4006 POP 03-JUN-2020 TO
4007 POP 03-JUN-2020 TO
4009 POP 03-JUN-2020 TO
SECTION G CONTRACT ADMINISTRATION DATA
G.1 ADMINISTRATIVE AUTHORITY
G.1.1 Contracting Officer
Only the Contracting Officer has the sole authority to authorize deviations from the terms and conditions of this contract, including deviations from the specifications and requirements stated herein. In the event of a contractor deviation, without the issuance of a duly executed contract modification, such deviation shall be at the risk of and any costs related thereto shall be borne of the contractor.
G.1.2 Contracting Officer’s Representative (COR)
Robert Lamont at (760) 763-7431 or at robert.lamont@usmc.mil, is the COR for this contract. The COR is limited to providing program specific clarification to the contractor’s task leader for this contract. The COR does not have the authority to take action (directly or indirectly) that would change the pricing, quality, place of performance, delivery schedule, or other terms and conditions of this contract, or to direct outside the scope of this PWS. If the contractor perceives the COR or other government personnel is requesting an effort outside the scope of this contract, the contractor shall promptly notify the Contracting Officer in writing. No action shall be taken by the contractor until the Contracting Officer has issued a contractual change or otherwise resolved the issue. The government reserves the right to reassign the COR position.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause—
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area
WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and
Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training
Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data
Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
https://wawf.eb.mil/
2 in 1 for Services
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in
WAWF, as specified by the contracting officer.
N/A
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC M67443
Issue By DoDAAC M68909
Admin DoDAAC M68909
Inspect By DoDAAC M90133
Ship To Code M90133
Ship From Code N/A
Mark For Code N/A
Service Approver (DoDAAC) N/A
Service Acceptor (DoDAAC) M90133
Accept at Other DoDAAC N/A
LPO DoDAAC N/A
DCAA Auditor DoDAAC N/A
Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send
Additional Email Notifications” field of WAWF once a document is submitted in the system.
N/A
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
TBD
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
(End of clause)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1 PERFORMANCE LOCATION
Work efforts in support of this task will be conducted at AVTB, Camp Pendleton, CA. AVTB will provide on-site workspace to ensure that sensitive information stays within the AVTB network. This on-site workspace supports information security and reduces costs by eliminating the need for an off-site facility to meet security regulations.
The government will provide access to the engineering labs and other environments within AVTB to execute the tasks within this PWS during normal working hours (0700 to 1600, Monday through Friday). Access to AVTB facilities outside normal working hours shall be scheduled with the AVTB COR and security officer at least one working day prior to the date access is required. The contractor must seek prior approval of the COR for access to
AVTB during government holidays.
H.2 SECURITY REQUIREMENTS
This contract will require the contractor to have a Secret Facility Clearance and will require certain contractors to obtain and maintain classified access eligibility. The contractor shall have a valid Secret Facility Clearance prior to classified performance. The prime contractor and all sub-contractors (through the prime contractor) shall adhere to all aspects of DoD Directive 5220.22-M. All personnel identified to perform on this contract shall maintain compliance with Department of Defense, Department of the Navy, and Marine Corps Information and Personnel
Security Policy to include completed background investigations (as required) prior to classified performance. This contract shall include a DoD Contract Security Classification Specification (DD Form 254) as an attachment. The contractor shall notify the Government (written notice) within twenty-four hours of any contractor personnel added or removed from the contract that have been granted classified access, issued a Common Access Card.
The contractor shall introduce themselves, or be introduced, as contractor personnel and display badges or other visible identification for meetings with government personnel. In addition, contractor personnel shall identify themselves as contractor employees in telephone conversations and in written correspondence.
H.2.1 Base Security
The contractor shall comply with Marine Corps Base (MCB) Camp Pendleton, CA security regulations and policies.
The contractor’s staff shall be U.S. or naturalized citizens, whose military duty was not terminated by a dishonorable or bad conduct discharge, are not subject to an outstanding criminal warrant, have no felony convictions, and have no more than three criminal misdemeanor convictions within the last seven years. Additionally, no criminal misdemeanor or felony conviction for crimes of a sexual nature, crimes of violence, crimes related to gang activity or hate crimes, or crimes resulting from the possession or distribution of any illegal drug are acceptable.
All contractor personnel aboard MCB Camp Pendleton, with the exception of emergency personnel, shall wear a properly issued badge at all times. All contractor personnel shall comply with all emergency rules and procedures established for MCB Camp Pendleton. All personnel aboard MCB Camp Pendleton are subject to random inspections of their vehicles, personal items, and themselves. Consent to these inspections is given when personnel enter MCB Camp Pendleton, CA.
H.2.2 OPSEC Requirements
The practice of Operations Security (OPSEC) prevents the inadvertent compromise of sensitive unclassified and classified activities, capabilities, or intentions at the tactical, operational, and strategic levels. The contractor’s staff must adhere to all government OPSEC measures currently in place at the government facility. The contractor shall provide OPSEC training to all contractor personnel supporting this effort. Taking pictures from cameras or cell phones is not allowed while aboard the compound or in the test areas.
H.2.3 Common Access Card (CAC) Requirement
The COR will identify and approve those contractor employees performing on this contract that require Common
Access Cards (CACs) in order to perform their job function. In accordance with Headquarters, United States Marine
Corps issued guidance relative to Homeland Security Presidential Directive – 12 (HSPD-12), all personnel must meet eligibility criteria to be issued a CAC. In order to meet the eligibility criteria, contractor employees requiring a
CAC, must obtain and maintain a favorably adjudicated Personnel Security Investigation (PSI.) Prior to authorizing a CAC, the employee’s JPAS record must indicate a completed and favorably adjudicated PSI or (at a minimum) that a PSI has been submitted and accepted (opened.) The minimum acceptable investigation is a National Agency
Check with Written Inquiries (NACI.) If a contractor employee’s open investigation closes and is not favorably adjudicated, the CAC must be immediately retrieved and revoked.
Facility Security Officers (FSOs) are responsible for notifying the MCSC Security Director if any contractor performing on this contract receives an unfavorable adjudication after being issued a CAC. The FSO must also notify the MCSC Security Director of any adverse/derogatory information associated with the 13 Adjudicative
Guidelines/Factors concerning any contractor issued a CAC, regardless of whether a JPAS Incident Report is submitted.
Each CAC is issued with a “ctr.usmc.mil” e-mail account that the individual contractor is responsible to keep active by logging in on a regular basis (at least twice a month), sending an e-mail and clearing any unneeded e-mails.
Contractors are prohibited from “auto-forwarding” their .mil e-mail account to their .com e-mail account. If the ctr.usmc.mil e-mail account is not kept active, the G-6 will deactivate the account and CAC will lose its functionality.
Common Access Cards (CACs) will only be issued to those contractors supporting this contract that have been authorized by the COR. The COR will only authorize CACs for those contractors that meet current Homeland
Security Presidential Directive – 12 (HSPD-12) criteria and have a definitive requirement.
If a contractor loses their eligibility for a CAC due to an adverse adjudicative decision, they have also lost their eligibility to perform on MCSC contracts. CACs are not issued for convenience.
H.3. ORGANIZATIONAL CONFLICT OF INTEREST
(a) “Organizational Conflict of Interest” means that because of other activities or relationships with other persons, a person is unable or potentially unable to render impartial assistance or advice to the government, or the person’s objectivity in performing the contract work is or might be otherwise impaired, or a person has an unfair competitive advantage. “Person” as used herein includes Corporations, Partnerships, Joint Ventures, and other business enterprises.
(b) The contractor warrants that to the best of their knowledge and belief, and except as otherwise set forth in the contract, the contractor does not have any organizational conflict of interest(s) as defined in paragraph (a).
(c) It is recognized that the effort to be performed by the contractor under this contract may create a potential organizational conflict of interest on the current programs or on a future acquisition efforts. In order to avoid this potential conflict of interest, and at the same time to avoid prejudicing the best interest of the government, the right of the contractor to participate in future procurement of equipment and/or services that are the subject of any work under this contract shall be limited as described below in accordance with the requirements of FAR 9.5.
(d) (1) The contractor agrees that it shall not release, disclose, or use in any way that would permit or result in disclosure to any party outside the government any proprietary information provided to the contractor by the government during or as a result of performance of this contract. Such information includes, but is not limited to, information submitted to the government on a confidential basis by other persons. Further, the prohibition against release of government provided information extends to cover such information whether or not in its original form, e.g., where the information has been included in contractor generated work or where it is discernible from materials incorporating or based upon such information. This prohibition shall not expire after a given period of time.
(d) (2) In accordance with DFARS 252.204-7000, the contractor shall not release to anyone outside the contractor's organization any unclassified information, regardless of medium (e.g., film, tape, document), pertaining to any part of this contract or any program related to this contract, unless the Contracting Officer has given prior written approval.
(d) (3) The prohibitions contained in subparagraphs (d)(1) and (d)(2) shall apply with equal force to any affiliate of the contractor, any subcontractor, consultant, or employee of the contractor, any joint venture involving the contractor, any entity into or with which it may merge or affiliate, or any successor or assign of the contractor. The terms of paragraph (f) of this Special Contract Requirement relating to notification shall apply to any release of information in contravention of this paragraph (d).
(e) The contractor further agrees that, during the performance of this contract and for a period of one year after completion of performance of this contract, the contractor, any affiliate of the contractor, any subcontractor, officers of the company participating in the contract, any joint venture involving the contractor, any entity into or with which it may subsequently merge or affiliate, or any other successor or assign of the contractor, shall not furnish to the
United States Government, either as a prime contractor or as a subcontractor, or as a consultant to a prime contractor or subcontractor, any system, component or services which is the subject of the work to be performed under this contract. This exclusion does not apply to any re-competition for those systems, components, or services furnished pursuant to this contract. As provide in FAR 9.505-2, if the government procures the system, component, or services on the basis of work statements growing out of the effort performed under this contract, from a source other than the contractor, subcontractor, affiliate, or assign of either, during the course of performance of this contract or before the one year period following completion of this contract has lapsed, the contractor may, with the authorization of the cognizant Contracting Officer, participate in a subsequent procurement for the same system, component, or service. In other words, the contractor may be authorized to compete for procurement(s) for systems, components, or services subsequent to an intervening procurement.
(f) The contractor agrees that, if after award, it discovers an actual or potential organizational conflict of interest; it shall make immediate and full disclosure in writing to the Contracting Officer. The notification shall include a description of the actual or potential organizational conflict of interest, a description of the action, which the contractor has taken or proposes to take to avoid, mitigate, or neutralize the conflict, and any other relevant information that would assist the Contracting Officer in making a determination on this matter. Notwithstanding this notification, the government may terminate the contract for the convenience of the government if determined to be in the best interest of the government.
(g) Notwithstanding paragraph (f) above, if the contractor was aware, or should have been aware, of an organizational conflict of interest prior to the award of this contract or becomes, or should become, aware of an organizational conflict of interest after award of this contract and does not make an immediate and full disclosure in writing to the Contracting Officer, the government may terminate this contract for default.
(h) If the contractor takes any action prohibited by this requirement or fails to take action required by this requirement, the government may terminate this contract for default.
(i) Nothing in this requirement is intended to prohibit or preclude the contractor from…