RFQ M67400-19-Q-0010 for Network Communications Infrastructure and DWDM & GPON Sustainment for Marine Corps Installations Pacific-Japan

View the file

Other files for this federal contract opportunity

Other files attached to Network Communications Infrastructure and DWDM & GPON Sustainment Services, newest first.
File Type Posted
M67400-19-Q-0010-00001_Q&A_final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

M6740019Q0010 15-Feb-2019

b. TELEPHONE NUMBER

011-81-98-970-3120

8. OFFER DUE DATE/LOCAL TIME

06:30 AM 18 Mar 2019

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

M674009. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

MS. SUBER M. SUSANA

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

MARINE CORPS REGIONAL CONTRACTING OFFICE

MARINE CORPS BASE

CAMP S.D. BUTLER

PSC 557 BOX 2000

FPO AP CA 96379-2000

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 16. ADMINISTERED BY

SEE SCHEDULE

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

X SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

FAX:

TEL: 011816117458531 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$11,000,000

NAICS:

811213

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF83

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

SUSTAINMENT SUPPORT ALL SYSTEMS

FFP

The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS).Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

NET AMT

0001AA 12 Months

USMC CAMP BUTLER & CAMP FUJI

FFP

USMC CAMP BUTLER and CAMP FUJI - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS).Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.3.1 of the PWS FOB: Destination

PSC CD: D399

0001AB 12 Months

U.S. NAVAL HOSPITAL, OKINAWA

FFP

USNH - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS). Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.4 of the PWS

0001AC 12 Months

MCAS IWAKUNI

FFP

MCAS IWAKUNI - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS). Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.5 of the PWS

0001AD 12 Months

USMC CAMP BUTLER - OTHER SYSTEMS

FFP

USMC CAMP BUTLER - Other Systems: Operator Consoles, Callegra Voice Messaging Systems, 248 Media Gateways, Stratum Level Timing, CISCO L2/L3 switches, Secure Logix and Telephony Firewall - The Contractor shall provide remote Technical assistance in accordance with the Performance Work Statement

(PWS).

See Section 1.6 of the PWS

EQUIPMENT REPAIR AND RETURN

T&M Repair and Return equipment - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

Contractor FFP Labor Rate:

TOT ESTIMATED PRICE

CEILING PRICE

0002AA

USMC CAMP BUTLER & CAMP FUJI

T&M Repair and Return of failed components of the equipment located at USMC CAMP BUTLER and CAMP FUJI - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.3 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $95,000

0002AB

U.S. NAVAL HOSPITAL, OKINAWA

T&M Repair and Return of failed components of the equipment located at USNH - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.4 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $10,000

0002AC

MCAS IWAKUNI

T&M Repair and Return of failed components of the equipment located at MCAS IWAKUNI - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.5 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $220,000

0002AD

USMC CAMP BUTLER - Other Systems

T&M Repair and Return USMC CAMP BUTLER - Other Systems : Operator Consoles, Callegra Voice Messaging Systems. The contractor shall replace or replenishment of failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.6 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $5,000

OPTION SUSTAINMENT SUPPORT ALL SYSTEMS

FFP

The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS).Remote support includes

1001AA 12 Months

OPTION USMC CAMP BUTLER & CAMP FUJI

FFP

USMC CAMP BUTLER and CAMP FUJI - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS).Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.3.1 of the PWS

1001AB 12 Months

OPTION U.S. NAVAL HOSPITAL, OKINAWA

FFP

USNH - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS). Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.4 of the PWS

1001AC 12 Months

OPTION MCAS IWAKUNI

FFP

MCAS IWAKUNI - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS). Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.5 of the PWS

1001AD 12 Months

OPTION USMC CAMP BUTLER - OTHER SYSTEMS

FFP

USMC CAMP BUTLER - Other Systems: Operator Consoles, Callegra Voice Messaging Systems, 248 Media Gateways, Stratum Level Timing, CISCO L2/L3 switches, Secure Logix and Telephony Firewall - The Contractor shall provide remote Technical assistance in accordance with the Performance Work Statement

(PWS).

See Section 1.6 of the PWS

OPTION EQUIPMENT REPAIR AND RETURN

T&M Repair and Return equipment - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work

1002AA

OPTION USMC CAMP BUTLER & CAMP FUJI

T&M Repair and Return of failed components of the equipment located at USMC CAMP BUTLER and CAMP FUJI - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.3 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $95,000

1002AB

OPTION U.S. NAVAL HOSPITAL, OKINAWA

T&M Repair and Return of failed components of the equipment located at USNH - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.4 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $10,000

1002AC

OPTION MCAS IWAKUNI

T&M Repair and Return of failed components of the equipment located at MCAS IWAKUNI - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.5 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $220,000

1002AD

OPTION USMC CAMP BUTLER - Other Systems

T&M Repair and Return USMC CAMP BUTLER - Other Systems : Operator Consoles, Callegra Voice Messaging Systems. The contractor shall replace or replenishment of failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.6 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $5,000

OPTION SUSTAINMENT SUPPORT ALL SYSTEMS

FFP

The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS).Remote support includes

2001AA 12 Months

OPTION USMC CAMP BUTLER & CAMP FUJI

FFP

USMC CAMP BUTLER and CAMP FUJI - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS).Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.3.1 of the PWS

2001AB 12 Months

OPTION U.S. NAVAL HOSPITAL, OKINAWA

FFP

USNH - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS). Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.4 of the PWS

2001AC 12 Months

OPTION MCAS IWAKUNI

FFP

MCAS IWAKUNI - Remote Technical Assistance (TA) - The Contractor shall provide remote maintenance diagnosis, software patching, routine technical assistance, and emergency technical assistance services in accordance with the Performance Work Statement (PWS). Remote support includes assistance via telephone and direct remote access to the equipment via Government provided connection.

See Section 1.5 of the PWS

2001AD 12 Months

OPTION USMC CAMP BUTLER - OTHER SYSTEMS

FFP

USMC CAMP BUTLER - Other Systems: Operator Consoles, Callegra Voice Messaging Systems, 248 Media Gateways, Stratum Level Timing, CISCO L2/L3 switches, Secure Logix and Telephony Firewall - The Contractor shall provide remote Technical assistance in accordance with the Performance Work Statement

(PWS).

See Section 1.6 of the PWS

OPTION EQUIPMENT REPAIR AND RETURN

T&M Repair and Return equipment - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work

2002AA

OPTION USMC CAMP BUTLER & CAMP FUJI

T&M Repair and Return of failed components of the equipment located at USMC CAMP BUTLER and CAMP FUJI - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.3 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $95,000

2002AB

OPTION U.S. NAVAL HOSPITAL, OKINAWA

T&M Repair and Return of failed components of the equipment located at USNH - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.4 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $10,000

2002AC

OPTION MCAS IWAKUNI

T&M Repair and Return of failed components of the equipment located at MCAS IWAKUNI - The contractor shall replace or replenish failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.5 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $220,000

2002AD

OPTION USMC CAMP BUTLER - Other Systems

T&M Repair and Return USMC CAMP BUTLER - Other Systems : Operator Consoles, Callegra Voice Messaging Systems. The contractor shall replace or replenishment of failed components of the equipment in accordance with the Performance Work Statement (PWS).

See Section 1.6 of the PWS The Government's estimated amount for this Sub-CLIN is Not To Exceed Amount of $5,000

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 N/A N/A N/A N/A 0001AA Destination Government Destination Government 0001AB Destination Government Destination Government 0001AC Destination Government Destination Government 0001AD Destination Government Destination Government 0002 N/A N/A N/A N/A

0002AA Destination Government Destination Government 0002AB Destination Government Destination Government 0002AC Destination Government Destination Government 0002AD Destination Government Destination Government 1001 N/A N/A N/A N/A 1001AA Destination Government Destination Government 1001AB Destination Government Destination Government 1001AC Destination Government Destination Government 1001AD Destination Government Destination Government 1002 N/A N/A N/A N/A 1002AA Destination Government Destination Government 1002AB Destination Government Destination Government 1002AC Destination Government Destination Government 1002AD Destination Government Destination Government 2001 N/A N/A N/A N/A 2001AA Destination Government Destination Government 2001AB Destination Government Destination Government 2001AC Destination Government Destination Government 2001AD Destination Government Destination Government 2002 N/A N/A N/A N/A 2002AA Destination Government Destination Government 2002AB Destination Government Destination Government 2002AC Destination Government Destination Government 2002AD Destination Government Destination Government

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT

NETWORK COMMUNICATIONS INFRASTRUCTURE

AND

DENSE WAVE DIVISION MULTIPLEXING

SUSTAINMENT CONTRACT

MARINE CORPS INSTALLATIONS PACIFIC, JAPAN

DESCRIPTION OF SERVICES

DESCRIPTION OF SERVICES

1. GENERAL DESCRIPTION

1.1 OBJECTIVE: The contractor shall provide Routine and Emergency Technical Assistance Support (TAS) for Nortel and Avaya Telephone Switching Equipment and associated equipment supporting voice services, to include Coriant/Tellabs Dense Wave Division Multiplexing (DWDM) and Gigabit Passive Optical Networking (GPON) equipment installed at USMC locations throughout Japan. Additionally, the contractor will repair/replace, and return, failed components of this same hardware.

1.2 SCOPE OF WORK

1.2.1 ROUTINE AND EMERGENCY TECHNICAL ASSISTANCE (FFP):

The contractor shall provide 24/7 remote maintenance, diagnostics, software patching, routine technical assistance, and emergency technical assistance services (emergency status determination resides within the Government). Remote support shall include both telephonic assistance and direct remote access to the equipment via Government provided connection. Purpose of remote support is to mitigate catastrophic component, equipment, or part failure affecting the delivery of mission critical IT services by isolating, troubleshooting and identifying component, equipment, or part failure. The contractor shall open a trouble ticket and begin troubleshooting for routine TAS requests in no more than four (4) hours from Government service request. Troubleshooting for Emergency TAS (ETAS) requests shall be initiated in no more than one (1) hour from Government service request. The contractor will perform testing, diagnostic fault isolation, problem resolution, and system restoration from the contractor’s facilities for all systems/subsystems identified in section 1.3 through 1.15.12. The Contractor shall actively work all trouble tickets until the Government end user provides documented, affirmative response that the issue is resolved. Service shall be provided for each of the following major components: Nortel Switches, DC Power Systems, Avaya Switches, DWDM and GPON. REGULATORY/SECURITY COMPLIANCE REQUIREMENT: The contractor shall be knowledgeable and comply with all applicable requirements of the most current Department of Defense (DoD) Unified Capabilities Requirements (UCR) at the time of service.

1.2.2 REPAIR AND RETURN (T&M):

Contractor shall repair and return failed components of the equipment described in section

1.3 below. The contractor shall provide repair/replacement (R/R) services to all Nortel/Avaya and Coriant/Tellabs system hardware, electronic circuit packs, subassemblies, assemblies, and peripheral equipment, to include all manufacturer proprietary station equipment and other vendor equipment as identified in section 1.3 below. For routine replacement, contractor shall provide Depot Level Maintenance for the components installed in the systems identified below, consisting of all functions required to restore all failed components and end items to serviceable operating condition. Repaired items shall operate the same as new items and will be returned to the Government within 30 days of receipt. For emergency replacement, contractor shall provide emergency replenishment services to the USMC as requested/needed; the Government is the authority on defining what constitutes an emergency. Emergency replacement consists of like-kind replacement items shipped within 24 hours of a verbal replacement request from authorized callers at the respective Base Telephone Office. The Government will provide this list at time of award and update upon turnover of personnel. To meet the Government’s high-priority, short lead-time emergency requirements, contractor shall ensure emergency repair/replacement request, items shall be shipped via overnight delivery. Service will be provided for each of the following major components being covered under this contract:

Nortel Switches, DC Power Systems, Avaya Switches, DWDM and GPON.

1.2.2.1 Requirement for Pre-Approval. Estimate, Preparation and Evaluation

Following equipment inspection, or if requested by the COR, the Contractor shall provide a written quote that will include the following minimum information:

(1) Contractor name and address

(2) Contract number

(3) Date inspection was performed/call placed.

(4) Equipment description (make, model, serial number, software version, etc…) and description of repair required.

(5) Itemized list of parts, labor and shipping and handling required to perform repair, including quantity and price for each item with supporting documentation:

The preferred documentation will be three vendor quotes. If three competitive quotes are provided the COR will be authorized to accept the lowest-priced quote.

If three competitive quotes are not provided, the contractor will have to provide suppliers' quotes, previous order invoices, manufacturers' suggested retail price list, or other supporting documentation to the COR for approval prior to placing the order.

Repairs will not proceed until the quote is approved by the respective base telephone officer. The contractor shall immediately notify the COR of any equipment that may be non-repairable due to obsolete parts or excessive damage to receive disposition or replacement instructions.

1.3 United States Marine Corps, Okinawa and Camp Fuji Components/Systems (CLINs 0001AA, 0002AA 1001AA, 1002AA, 2001AA & 2002AA):

1.3.1 Nortel Switches

1.3.1.1 Camp Courtney Switch:

A Nortel SL-100 SNSE (XA Core) digital switch, located in Building 4219 on Camp Courtney (Okinawa), is equipped for 4418 lines, wired for 6624 lines and has 3427 active lines. The current software load is SE09.1. Trunking is supported via six (6) Integrated Services Digital Network (ISDN) capable Line Trunk Controllers (LTC’s) equipped for 96 T-1’s, wired for 120 T-1’s and presently terminating 81 T-1’s for DSN, RCC2’s, and commercial trunks. There are also four (4) non-ISDN Digital Trunk Controllers (DTC’s) and one (1) ISDN capable DTC equipped for 70 T-1’s, wired for 100 T-1’s, and presently terminating 57 T-1’s for DSN and commercial trunks. This SL-100 has three (3) Input Output Modules (IOM’s) and two (2) NT1X80AA Enhanced Digital Recorded Announcement Machines (EDRAM) units installed. It also hosts an Intelligent Peripheral Equipment (IPE) shelf at a remote location which supports 240 analog subscribers via fiber. There are analog, digital, and ISDN line cards installed in the switch.

Courtney Remote Switching Units (RSU’s): The SL-100 at Camp Courtney supports three RCU’s.

(1) Camp Hansen Building 2397 is equipped for 4937 lines, wired for 6016 lines and has 4645 active lines.

(2) Camp Schwab Building 3658 is equipped for 2150 lines, wired for 2944 lines and had 2030active lines.

(3) White Beach Building 1142 is equipped for 879 lines, wired for 960 lines, and has 410 active lines.

There are analog, digital and some ISDN Basic Rate Interface (BRI) lines installed in all RSU’s.

1.3.1.2 Camp Foster Switch:

A Nortel DMS-100 (XA Core) digital switch, located in Building 481 on Camp Foster (Okinawa), is equipped for 15069 lines, wired for 17120 lines and has 7025 active lines.

The current software load is SE09.1. Trunking is supported via nine (9) ISDN capable LTC’s equipped and wired for 160 T-1’s and presently terminating 146 T-1’s for DSN, RCC2 and commercial services. There are also three (3) non-ISDN DTC’s and one (1) ISDN DTC equipped for 54 T-1’s, wired for 60 T-1’s and presently terminating 36 T-1’s for DSN and commercial trunks. This Digital Multiplex Switch (DMS)-100 has three (3) IOM’s and two (2) NT1X80BA EDRAM units installed. There is a Nortel 64 port Integrated Conference Bridge installed in an IPE shelf. There are analog, digital, and ISDN line cards installed in the switch.

Foster Remote Switching Units:

(1) Camp Kinser Building 104 is equipped for 4927 lines, wired for 4932 lines and 3865 are active.

(2) MCAS Futenma Building 101 is equipped for 3374 lines, wired for 4032 lines and 2821 are active.

(3) Camp Butler Bldg. 5 is equipped for 1993 lines, wired for 2016 lines and 1605 are active.

(4) Plaza Housing Building 4251 is equipped for 1461 lines, wired for 1536 lines and 473 are active.

(5) Camp Foster Building 324 (Towers) is equipped for 2036 lines, wired for 2560 lines and 1305 are active.

1.3.2 Dial Central Office Power Systems:

1.3.2.1 Rectifiers for the Courtney Switch: The SL-100 at Camp Courtney has a quantity of eighteen (18)

Netsure R48-3200 Power Conversion Units (PCU) that provide a maximum of 1080 -48VDC Amps. The installed Netsure 701 system has three functioning shelves installed with a maximum service capacity of 18 PCU’s that if fully provisioned, would provide a maximum of 1080 -48VDC Amps. This equipment was installed and accepted in January 2010.

1.3.2.2 Rectifiers for the Courtney RSU’s:

(1) Camp Hansen RSU has a quantity of six (6) Emerson model IR483200 rectifiers (Netsure 721).

(2) Camp Schwab RSU has a quantity of four (4) Nortel model NT5C08 rectifiers.

(3) White Beach RSU has a quantity of two (2) Nortel model Nt5C08 rectifiers.

1.3.2.3 Inverters for the Courtney Switch: The SL-100 at Camp Courtney has a quantity of twelve (12) Peco II model 827E inverters.

1.3.2.4 Inverters for the Courtney RSU’s:

(1) Camp Hansen RSU has a quantity of six (6) Peco II model 827E inverters.

(2) Camp Schwab RSU has a quantity of six (6) Peco II model 827E inverters.

(3) White Beach RSU has a quantity of three (3) Pylon model CFR1000 inverters.

1.3.2.5 Batteries for the Courtney Switch: The SL-100 at Camp Courtney shall have quantity of (96) East Penn

Unigy II 3AVR95-33 LOI Batteries. They are in four strings with (24) cells in each string. (72) Batteries were installed in December 2008, they are being replaced with (96) in February 2019.

1.3.2.6 Batteries for the Courtney RSU’s:

(1) Camp Hansen RSU has a quantity of (48) East Penn 6AVR95-15 LOI batteries in two parallel strings.

These were installed in November 2009.

(2) Camp Schwab RSU has a quantity of (48) C&D AT-27P batteries in two parallel strings. These were installed in January 2013.

(3) White Beach RSU has a quantity of (48) Absolyte 90P-11 GNB batteries in two parallel strings. These were installed in August 2011.

1.3.2.7 Rectifiers for the Foster Switch: The DMS-100 at Camp Foster has a quantity of (72) GNB 100G51 model batteries newly installed with catalyst caps in May 2018.

1.3.2.8 Rectifiers for the Foster RSU’s:

(1) Camp Kinser RSU has a quantity of three (3) Reliance model RL200D50 rectifiers. These are in the process of being replaced by spring 2019 with an equivalent solution.

(2) MCAS Futenma RSU has a quantity of three (3) Reliance model RL200D50 rectifiers. These are in the process of being replaced by spring 2019 with an equivalent solution.

(3) Camp Butler Bldg. 5 RSU has a quantity of four (4) Reliance model RL100D50 rectifiers.

(4) Plaza Housing RSU has a quantity of four (4) Reliance model RL100D50 rectifiers.

(5) Camp Foster Towers RSU has a quantity of three (3) Reliance model RL100D50 rectifiers.

1.3.2.9 Foster Switch Inverters: The DMS-100 at Camp Foster has a quantity of sixteen (16) Peco II model 827E inverters and three (3) Reliance model WAA501B inverters.

1.3.2.10 Foster RSU Inverters:

(1) Camp Kinser RSU has a quantity of one (1) Pylon model CFR500 inverter, one (1) Reliance model WAA501B inverter and one (1) Unipower 1KVA INV481R-N inverter.

(2) MCAS Futenma RSU has a quantity of one (1) Reliance model WAA501B inverter and one (1) Unipower 1KVA INV481R-N inverter.

(3) Camp Butler Bldg. 5 has a quantity of one (1) Pylon model CFR500 inverter, one (1) Reliance model WAA501B inverter and one (1) Unipower 1KVA INV481R-N inverter.

(4) Plaza Housing RSU has a quantity of one (1) Pylon model CFR500 inverter and one (1) Unipower 1KVA INV481R-N inverter.

(5) Camp Foster Towers RSU has a quantity of one (1) Pylon model CFR500 inverter.

1.3.2.11 Foster Switch Batteries: The DMS-100 at Camp Foster has a quantity of (72) Absoylte II 100A93 GNB batteries newly installed with catalyst caps in February 2007 (Note, contract for replacement awarded and scheduled to completed by April 2018).

1.3.2.12 Foster RSU Batteries:

(1) Camp Kinser RSU has a quantity of (48) C&D AT-39P batteries. Batteries were installed December

2012.

(2) MCAS Futenma RSU has a quantity of (48) C&D AT-39P batteries. Batteries were installed December

2012.

(3) Camp Butler Bldg. 5 RSU has a quantity of (72) East Penn Unigy II 6AVR95-09 LOI batteries. Two strings totaling (48) batteries were installed in November 2009. A third string of (24) batteries installed in December 2012.

(4) Plaza Housing RSU has a quantity of (48) Absolyte 90G09 GNB batteries. These were installed in September 2010.

(5) Camp Foster Towers RSU has a quantity of (48) Absolyte 90G09 GNB batteries. These were installed in September 2010.

1.3.2.13 Rectifiers for Camp Fuji: The Avaya CM6 at Camp Fuji has a quantity of nine (9) Emerson, model R48- 3500e rectifiers.

1.3.2.14 Inverters for Camp Fuji: The Avaya CM6 at Camp Fuji has a quantity of thirteen (13) Peco II model 827E inverters. .

1.3.2.15 Camp Fuji Batteries: The Avaya CM6 at Camp Fuji has a quantity of (48) Absolyte 90P-13 GNB batteries

(installed August 2011) and (24) Absolyte 100G31 GNB batteries (Installed March 2013).

1.3.3 Okinawa Avaya Switches

1.3.3.1 Two HP DL360 servers are included in the system architecture for the Local Session Controllers (LSC) at

Camps Foster and Courtney. Each of these four (4) servers is provisioned with a single Intel Xeon E5620

2.4 GHz 4-core processor, redundant 460W power supplies, dual 1GB network interfaces, two 300GB hard drives in a RAID 1 configuration, and run Red Hat Enterprise Linux 5.3 as its operating system. The server pair at Camp Foster functions as the primary survivable core, with the pair at Camp Courtney functioning as the secondary core. There are a total of twelve (12) Dell Latitude E6420 laptops used exclusively for workstations to manage the DWDM, GPON, Avaya, Nortel, and Callegra, and other peripheral communications support systems.

Two G450 media gateways are included in the LSC configurations at both Camps Foster and Courtney. The gateway configurations for each site are identical and are used to provide T1 PRI tie trunks to the local SL-100 for access to DSN and local trunk facilities. They are also used to provide PRI QSIG interfaces to the Callegra.UC voice mail system at each site. Each gateway is equipped with dual power supplies and Ten MM710B T1 media modules with four 80 channel daughterboards. This hardware equips the LSC at each site with ten T1 PRI tie trunks. Five cards each are installed in each gateway.

One Dell PowerEdge R210 is included in the LSC design for Camps Foster and Courtney to provide support systems and services required for DISA Security Technical Implementation Guide (STIG) compliance. This RAE server provides centralized access control and security management capabilities to all Avaya CM6 and ASLAN components. Services are consolidated on the single Dell R210 server at each site. Using Hypervisor 2008 and two Windows Server 2008 O/Ss, two virtual RAE suites will be configured on the single server, providing Active Directory services to support centralized authentication bundled with Domain Name Service (DNS), Online Certificate Status Protocol (OCSP) via Tumbleweed Desktop Validator 4.9 to provide OCSP certificate revocation response based on locally updated DoD Public Key Infrastructure (PKI) Certificate Revocation List (CRL) for user authentication as well as SYSLOG via Kiwi Syslog 9.4 to provide a SYSLOG repository for all LSC and ASLAN components in the system architecture.

One JITC-certified ION SA5620 security appliance is included in the LSC architecture at Camps Foster and Courtney for secure remote dial-up access.

1.3.3.2 Camp Fuji: The enterprise survivable Local Session Controller at Camp Fuji consists of the following:

Four (4) HP DL360 servers running Red Hat Enterprise Linux 5.3. One server pair functions as the primary survivable server pair. The second server pair functions as the back-up.

One G650 Media Ten G450 Media Two 24-port Cisco 3560 layer 2 switches One Dell R210 server to host required Information Assurance (IA) applications One ION SA5620 secure modem Two Dell Latitude E6420 laptops used exclusively for workstations to manage the Avaya, Nortel, and Callegra systems and other peripheral support systems.

1.3.4 DWDM: A Tellabs 7100 Nano Optical Transport System (OTS) with 7100E is installed at nine (9) separate locations on Okinawa. The system configuration consists of a nine (9) node, two (2) degree, Reconfigurable Optical Add Drop Multiplexer (ROADM) ring connecting all seven Area Distribution Node (ADN) locations with each Core Node location.

The equipment is installed in the facilities listed below:

a. Camp Foster Bldg. 481 (Core Node 0)

b. Camp Courtney Bldg. 4219 (Core Node 1)

c. Camp Foster Bldg. 960 (ADN)

d. Camp Foster Bldg. 5 (ADN)

e. Plaza Housing Bldg. 4251 (ADN)

f. MCAS Futenma Bldg. 101 (ADN)

g. Camp Kinser Bldg. 104 (ADN)

h. Camp Hansen Bldg. 2397 (ADN) I. Camp Schwab Bldg. 3658 (ADN)

1.3.4.1 CORE NODE 0 DETAILS:

DWDM equipment installed at Camp Foster consists of the following:

-Two (2) Tellabs 7100 Nano main shelves -One (1) Tellabs 7100 Nano port shelf -Six (6) SPM modules installed -Two (2) ROADM modules installed -Four (4) degrees equipped -Two (2) ESM20 modules -Eighty-eight (88) degrees equipped per ROADM -Four (4) SONET Switching Modules (SSM-X) installed, equipped with -Forty-eight (48) multi-rate SFPs for client interfaces -Four (4) tunable XFPs for line interfaces -Two High Density Ten Gigabit Modules (HDTG) installed, equipped with -Ten (10) XFPs for client interfaces -Ten (10) tunable XFPs for line interfaces -One (1) Tellabs 7100E shelf equipped with redundant power supplies -Eight (8) 63 port T1 cards in a 1+1 configuration -Two (2) multi-rate SFPs

1.3.4.2 CORE NODE 1 DETAILS:

DWDM equipment installed at Camp Courtney consists of the following:

-Three (3) Tellabs 7100 Nano main shelves (One shelf configured as an optical line amplifier) -One (1) Tellabs 7100 Nano port shelf -Eight (8) SPM modules installed -Two (2) ROADM modules installed -Four (4) degrees equipped -Two (2) ESM20 modules -Eighty-eight (88) degrees equipped per ROADM -Four (4) SONET Switching Modules (SSM-X) installed, equipped with -Forty-eight (48) multi-rate SFPs for client interfaces -Four (4) tunable XFPs for line interfaces -Two High Density Ten Gigabit Modules (HDTG) installed, equipped with -Ten (10) XFPs for client interfaces -Ten (10) tunable XFPs for line interfaces -Two (2) Eighty-Eight (88) channel long range input amplifiers installed

-One (1) Tellabs 7100E shelf equipped with redundant power supplies -Eight (8) 63 port T1 cards in a 1+1 configuration -Two (2) multi-rate SFPs

1.3.4.3 MCAS FUTENMA AND PLAZA HOUSING AREA DISTRIBUTION NODE DETAILS:

DWDM equipment installed at MCAS Futenma (Bldg. 101) and Plaza Housing (Bldg. 4251) consists of the following:

-Three (3) Tellabs 7100 Nano main shelves (One shelf configured as an optical line amplifier) -One (1) Tellabs 7100 Nano port shelf -Eight (8) SPM modules installed -Two (2) ROADM modules installed -Four (4) degrees equipped -Two (2) ESM20 modules installed (Futenma only) -Eighty-eight (88) degrees equipped per ROADM -Two (2) SONET Switching Modules (SSM-X) installed, equipped with -Twenty-four (24) multi-rate SFPs for client interfaces

-Two (2) tunable XFPs for line interfaces -Two High Density Ten Gigabit Modules (HDTG) installed, equipped with -Ten (10) XFPs for client interfaces -Ten (10) tunable XFPs for line interfaces -Two (2) Eighty-Eight (88) channel intermediate range input amplifiers installed

-One (1) Tellabs 7100E shelf equipped with redundant power supplies -Eight (8) 63 port T1 cards in a 1+1 configuration -Two (2) multi-rate SFPs

1.3.4.4 REMAINING AREA DISTRIBUTION NODE DETAILS:

DWDM equipment installed at the five (5) remaining ADN locations (Foster Bldg 5, Hansen, Kinser, Schwab and Foster Bldg 960) consists of the following:

-Two (2) Tellabs 7100 Nano main shelves -One (1) Tellabs 7100 Nano port shelf -Six (6) SPM modules installed -Two (2) ROADM modules installed -Four (4) degrees equipped -Two (2) ESM20 modules installed (Applies to Camps Schwab, Kinser, and Hansen) -Eighty-eight (88) degrees equipped per ROADM -Two (2) SONET Switching Modules (SSM-X) installed, equipped with -Twenty-four (24) multi-rate SFPs for client interfaces -Two (2) tunable XFPs for line interfaces -Two High Density Ten Gigabit Modules (HDTG) installed, equipped with -Ten (10) XFPs for client interfaces -Ten (10) tunable XFPs for line interfaces -One (1) Tellabs 7100E shelf equipped with redundant power supplies -Eight (8) 63 port T1 cards in a 1+1 configuration -Two (2) multi-rate SFPs

Table 1: Basic Depiction of the DWDM and GPON architecture in Okinawa

1.3.5 GPON: The GPON architecture for Okinawa consists of eight (8) Tellabs 1150 Multiservice Access Platforms (MSAP) Optical Line Terminals and eight (8) Tellabs 729G Optical Networking Terminals (ONT) installed at the following locations:

a. Camp Foster Bldg. 481 (Core Node 0)

b. Camp Courtney Bldg. 4219 (Core Node 1)

c. Camp Foster Bldg. 960 (ADN)

d. Camp Foster Bldg. 5 (ADN)

e. MCAS Futenma Bldg. 101 (ADN)

f. Camp Kinser Bldg. 104 (ADN)

g. Camp Hansen Bldg. 2397 (ADN)

h. Camp Schwab Bldg. 3658 (ADN)

The contractor will also provide support for seventy (70) 729G ONT’s which are deployed at various end user buildings or maintained by MCB G-6 as on hand spares.

The 1150 MSAP at each of the above locations is configured as follows:

-Redundant fans and power supplies -Two (2) QOIU7 PON cards -Redundant Ethernet Switching Unit (ESU) cards equipped with a single 10Gbps SM XFP

1.3.5.1 Intel Battalion GPON: In addition to the GPON equipment in 1.3.5, the contractor shall provide support for the following equipment supporting 3rd Intel Battalion on Camp Hansen:

Part Number Description QTY

4125053 MDS5 Chassis, 16 I/O SLOT 2

4195091 MDS5 FAN TRAY ASSY + PWR CABLE 3

4125055 MDS5 CHASSIS POWER CABLE – RAW ENDED 2

4115091 ESU2 (2x 10G + 4X 1G) 4

4125004 QOIU7 QUAD GPON (4 SFP) 8

4125005 AMU1 (ALARM MAINT UNIT) – 16 DRY CONTACTS I/O 2

128211 1G SFP 850NM MULTIMODE LC DUPLEX OPTIC XCVER MMF – 550M 14

81.11P-PWRSHV19-R5 OEM SHELF RECT 19” VALERE C 1

0470-0132 CONTROLLER 48V, SYSTEM CONTROLLER W/ETHERNET 1

81.11P-PWRV1150-R5 TELLABS 1150 MDS5/MDS7 VGW PWR KIT 2

0470-0095 VALERE 40A RECTIFIER MODULE 4

81.16G-709GP00X-R6 ONT709GP, 4G, POE, NO POTS, NO-PLUG 147

81.11K-ONTBKTFS-R6 BRACKET, FIBER MGMT – INDOOR ONTS 704F, 704G, 709, 709GP

(CARTON OF 10 BRACKETS)

81.BC1100FP256 Tellabs Panorama INM/NE license, 10 NE or Client Capacity; includes NE software FP25.6.x Panorama 9.x INM for Unix or Windows, CORBA Interface, CAS, AUP, NE Software, online help, and documentation CD, and Orbix 6.3 standard edition

1.3.5.2 Operator Consoles: Contractor will provide 24/7 remote technical support, software upgrades/support and repair/return of hardware for operator consoles as described below:

Camp Foster Bldg. 481: SPOK Console system

QTY Part Number Description 1 SPOK-Upgrade CTI SPOK Database Administration – Enterprise System – Includes

SPOK Directory, Web Admin Software Console, OpStats, CTI, System Admin, System Maint, Management tools, Automated Backup utility, standard reports

13 SPOK-Upgrade SPOK Console Software 2 RHEL5 Number of Red Hat Enterprise Linux (RHEL) 5 Server Licenses

(64 bit OS)

1 Oracle Oracle Database 11gR2

1 Oracle Oracle WebLogic 11gR2

1 Dell R430 K-Server Dell;R430;1U;2CPU

1 Dell R730 Dell Server; R730XL; 2RU; 2CPU

1 KVM KVM Access, mount up to 8 servers mouse /monitor /keyboard

13 Dell OptiPlex PC DELL; OPTIPLEX; with keyboard, mouse, with monitor

13 M5316BLK CSBP*M5316BLK*E*MERIDIAN 16BTN CENTREX H/FW/DSP

PHONE

13 CSI-380 Centrex Serial Interface

2 SPOK-Upgrade Spōk Console Software (spare)

2 Dell OptiPlex PC DELL; OPTIPLEX; with keyboard, mouse, with monitor (spare)

2 M5316BLK Centrex Serial Interface (spare)

2 CSI-380 Spōk Console Software (spare)

15 TMP-636 Transmit Recording Patch (Greetings)

15 CBL-44 Cable Dynametric Adaptor (Greetings)

1.4. USNH Okinawa Components/Systems (CLINs 0001AB, 0002AB, 1001AB, 1002AB, 2001AB & 2002AB): The local survivable remote extended port network at the USNH consists of the following major components, :

One HP DL360 server to provide local survivability for the Hospital gateway One G650 Media Gateway for ISDN BRI U or S/T subscriber capability Eighteen G450 Media Gateways for analog and digital subscriber capability Two 24-port Cisco 3560 layer 2 switches

Rectifiers for the USNH: The USNH has an Emerson Netsure 801 rectifier system equipped with five 200 amp modular rectifiers. System is capable of up to 2400 amps, all shelves and slots are fully wired.

This equipment was newly installed and accepted in January 2013.

Inverters for the USNH: The USNH has a Benning Invertronic 120/208VAC modular 3-phase inverter system. It is equipped with four 10kVa inverter modules.

Batteries for the USNH: The USNH has three strings of C&D MSEndur AT-39P batteries. Each string is rated for 2,180 amp-hours. Batteries were newly installed in December 2012.

1.5 MCAS Iwakuni Components/Systems (CLINs 0001AC, 0002AC, 1001AC, 1002AC, 2001AC &

2002AC):

Dial Central Office Power Systems:

1.5.1 Rectifiers for the MCAS-Iwakuni Switch: The CM7 has a quantity of one (1) Netsure 802 Distribution Bay, LMS1000 Monitoring System, and Netsure High efficiency 200 amp eSure rectifier R4812000Le (208V AC) Power Conversion Units (PCU’s) that provide a maximum of 2000 Amps at -48VDC. The installed Netsure 802 system has two functioning shelves installed with a maximum service capacity of ten (10) and is provisioned with five (5) PCU’s, would provide a maximum of 1000 -48VDC Amps. This equipment was installed March 2015 and accepted in June 2015 .

1.5.2 Rectifiers for the MCAS-Iwakuni RSC’s:

(1) Building 6003 has a quantity of one (1) Netsure 802 Distribution Bay, LMS1000 Monitoring System, and Lorain 200 amp rectifier LPS200D50 Power Conditioning Unit (PCU’s) that provide a maximum of 2000 Amps at -48 VDC. The installed Netsure 802 system has two functioning shelves installed with a maximum service capacity of ten (10) and is provisioned with five (5) Netsure High efficiency 200 amp eSure rectifier R4812000Le (208V AC) PCU’s providing a maximum of 1000 amps at -48 VDC.

(2) Building 9569 has a Fuji Uninterruptable Power System 6000D-3 (UPS) 200kVA. This system includes rectifier, inverter, and power conditioning subsystems.

(3)Building ATG119 has a quantity of one (1) Emerson Vertiv Netsure 721 Rectifier 2000W, -48VDC, and Benning Invertronic 60kVA inverter system equipped with two 10kVA inverter modules N+ 1. This system was installed March 2018.

1.5.3 Batteries for the MCAS-Iwakuni Switch: The CM7 has a quantity of (48) C&D Technologies VRLA AT- 39P Batteries. They are in two 2,180 Amp strings with (24) cells in each string. Batteries were installed in April 2010.

1.5.4 Batteries for the MCAS-Iwakuni RSC’s:

(1) Building 6003 has a quantity of (48) C&D Technologies VRLA AT-39P Batteries. They are in two 2,180 Amp strings with (24) cells in each string. Batteries were installed in April 2010.

(2) Building 9569 has a quantity of (150) Furukawa Battery FVL500AH batteries. There is one (1) 2,180 Amp string with (180) cells in the string at 2 volts each. Batteries were installed in March 2014.

(3) Building ATG119 Two strings of C&D MSEndur AT-25P batteries with two strings of C&D MSEndur AT-25P batteries. Each string is rated for 1,376 amp-hours. This system was installed March 2018.

1.5.5 Inverters for the MCAS-Iwakuni Switch: The CM7 has a quantity of one (1) BENNING INVERTERONIC-M 120/208 VAC 3P 60/120KVA inverter. It has a maximum of six (6) and is provisioned with five (5) 10 KVA Modules (48 VDC in/208 VAC out) model 120028 inverters.

1.5.6 Inverters for the MCAS-Iwakuni RSC’s:

(1) Building 6003 has a quantity of one (1) BENNING INVERTERONIC-M 120/208 VAC 3P 60KVA inverters. It has a maximum of six (6) and is provisioned with four (4) 10 KVA Modules (48 VDC in/208 VAC out) model 120028 inverters.

(2) Building ATG119 has a quantity of one (1) Benning Invertronic 60kVA inverter system equipped with two 10kVA inverter modules N+1. This system was installed March 2018.

1.5.7 DC Distribution for the MCAS-Iwakuni Switch:

The Emerson NetSure 502 is a 19 position rack mounted distribution panel. It supports up to 600 Amps with various disconnect options. There are two (2) located in the DCO.

1.5.8 DC Distribution for the MCAS-Iwakuni RSC’s:

(1) Building 6003 has two (2) Lorain DB 48500 48 volt distribution panels. These supply the DC power to the individual racks in their respective rows.

Building 9569 has one (1) Emerson Power 502 Netsure NLDB. It has a max capacity of eight (8) and is provisioned with five (5) eSure Rectifier 2000 watt 48 volt 1R482000E rectifiers.

Building ATG119 has a NetSure 721 power plant ‘s distribution panels. Six 300 amp feeds provide the DC input to the modular inverters. This system was installed March 2018.

1.5.9 Starline Bus Power Distribution MCAS-Iwakuni Switch: The bus way is a suspended power distribution network that is supplying the DCO with AC 208Y/120V 3-phase power 225 amp bus per row. There are one to two Geist vertical PDUs mounted in the rear of cabinet connected to two of the available 3-phases supplied by a breaker module and drop cord. The Starline is providing power to row C, E, and F a total of 24 racks and or cabinets provisioned with 34 breaker modules.

1.5.10 Electrical Busway Power Distribution MCAS-Iwakuni RSC’s:

(1) Building 6003 The bus way is a suspended power distribution network that is supplying the RSC with AC 208Y/120V 3-phase power 225 amp bus per row. There are one or two Geist vertical PDUs mounted in the rear of cabinet connected to two of the available 3-phases supplied by a breaker module and drop cord. The electrical busway is providing power to row A, B, C, and D a total of 31 racks and or cabinets provisioned with 12 breaker modules.

(2) Building 9569 The bus way is a suspended power distribution network that is supplying the RSC with AC 208Y/120V 3-phase power 225 amp bus per row, except for row G which is provisioned at 400 amps. There are one or two Geist vertical PDUs mounted in the rear of cabinet connected to two of the available 3-phases supplied by a breaker module and drop cord. The electrical bus provides power to row A thru G a total of 40 racks and or cabinets provisioned with 71 breaker modules.

Building ATG119 The bus way is a suspended power distribution network that is supplying the RSC with AC 208Y/120V 3-phase power 225 amp bus per row. There are one or two Geist vertical PDUs mounted in the rear of cabinet connected to two of the available 3-phases supplied by a breaker module and drop cord. The electrical busway provides power to row A thru C a total of 27 racks and or cabinets provisioned with 54 breaker modules.

1.5.11 MCAS-Iwakuni Avaya Switches

1.5.11.1 An Avaya Communication Management 7 (CM7) digital switch, is licensed for 13,634 lines. Building 471 is wired for 4488 lines and has 3678 active lines. The current software load is 7.1. Trunking is equipped for 32 T- 1’s, wired for 23 T-1’s and presently terminating 15 T-1’s for DSN and commercial trunks. This was upgraded from CM6 to CM7in April 2018

1. 5.11.2 MCAS-Iwakuni: Two Dell R630 servers are included in the system architecture for the Local Session Controllers (LSC) at Building 471 and 9569. Each of these four (4) servers is provisioned with a single Intel Xeon E5620 2.4 GHz 4-core processor, redundant 460W power supplies, dual 1GB network interfaces, One new 16 terabyte (TB) NETGEAR ReadyNAS,, and run Red Hat Enterprise Linux 5.3 as its operating system. Dual power supplies are installed for all servers. The server pair at 9569 is the primary survivable core, with the pair at 471 functioning as the secondary core.

The Seventy-four (74) G450 media gateways are included in the LSC configurations at buildings 471, 9569, 6003 and ATG119. The gateway configuration varies for each site. They are used to provide T1 PRI tie trunks for access to DSN and local trunk facilities. They are also used to provide PRI QSIG interfaces to the Callegra UC voice mail system at building 471. Each gateway is equipped with dual power supplies and provisioning up to eight (8) daughter-boards containing an assortment of MM710B T1 media modules, MM716 Analog media modules, and MM717 Digital media modules.

There are four (4) G650 media modules with two located at building 471 and two at 9569. The two G650’s at building 471 are provisioned as follows: The G650 media gateway will provide ISDN BRI, 50% of digital line size requirements, as well as analog subscriber line capability. All G650 media gateways will be equipped with the following hardware:

Dual G650 power supplies, One (1) IPSI circuit pack for system signaling, Six (6) TN2198 ISDN BRI line cards spread between the two gateways, Two (2) TN2224 digital circuit packs spread between the two (2) gateways, Fifteen (15) TN793c analog line cards spread between the two (2) gateways, The…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.