M6740017T0054.pdf
PDF 886 KB Posted
- Attached to
- Baler Equipment with Installation and Training Federal contract opportunity
- Solicitation number
- M67400-17-T-0054
- Issued by
- United States Marine Corps
About this file
Solicitation
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Latest_Bldg_Pictures.pdf | ||
| M6740017T0054-0001.pdf | ||
| Q&A_17T0054_1.pdf | ||
| Attachment_2.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
M6740017T0054 19-May-2017
b. TELEPHONE NUMBER
011-81-98-970-8145
8. OFFER DUE DATE/LOCAL TIME
09:00 AM 19 Jun 2017
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
M674009. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. MAYUMI NAKAI
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
MARINE CORPS REGIONAL CONTRACTING OFFICE
MARINE CORPS BASE
CAMP S.D. BUTLER
PSC 557 BOX 2000
FPO AP CA 96379-2000
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: 011816117458531
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
NAICS:
333999
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF34
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
M6740017T0054
Section SF 1449 - CONTINUATION SHEET
STATEMENT OF WORK
STATEMENT OF WORK (SOW)
FOR
INSTALLATION AND TRAINING OF THE HORIZONTAL BALER AND ABOVE-GROUND
CONVEYOR
AT RECYCLING CENTER ON CAMP HANSEN, OKINAWA, JAPAN
SECTION I
SCOPE OF WORK AND TASKS
1.0. OBJECTIVE: The key objective of this contract is to provide a wide range of services shipment and installation for a two-ram horizontal baler with tongue and groove plate flooring and above-ground conveyor (the horizontal baler system) at a new Recycling Center on U.S. Marine Corps Installation Pacific (MCIPAC), Camp
Hansen, Okinawa, Japan to ensure safety and proper use of the equipment.
2.0. DESCRIPTION OF SERVICES: The Contractor shall provide all management, special tools, supplies/materials, equipment, shipment and qualified personnel necessary for installation, commissioning, and training of the two-ram horizontal baler and above-ground conveyor. The Contractor shall also be responsible for making all electrical connections necessary for the complete installation of the unit. These services shall be performed at the site of the Recycling Center located at Building 2463, MCIPAC Camp Hansen, Kin Town, Okinawa, Japan. The Contractor shall provide any special warranty information on specific areas of the machine, i.e.
hydraulic pumps.
3.0. GENERAL TASK:
3.1. INSTALLATION (CLIN 0003): Contractor’s tasks include assembling, installing, electrical wire service connection and commissioning of the equipment. The Government will provide on-site material handling equipment such as forklift and/or crane with its operator during installation if required.
3.1.1. PROCEDURE FOR INSTALLATION SERVICE:
(FOR CLIN 0001 and CLIN 0002)
The Following procedures shall apply to installation.
a) INITIAL COORDINATION MEETING: The Contractor Manager shall be available, in person, telephonically or other communications means, for the Initial Coordination Meeting sixty (60) days, no less than thirty (30) days, prior to projected installation date. The dates for the installation shall be confirmed and the Contractor’s responsibilities shall be reviewed.
b) PRE-INSTALLATION MEETING: Upon receipt of order, the Contractor’s Point of Contact (POC) and the installation foreman shall be available, in person for a pre-installation meeting no less than 48 hours prior to projected installation date. During the meeting the installation dates, schedule and process shall be discussed, rules of conduct on Base shall be reiterated, and the installation responsibility listed in this
Installation Information shall be reviewed.
c) POST INSTALLATION INSPECTION: At the end of installation, the on-site foreman and the
Government shall conduct a joint inspection and confirm related equipment have been installed.
Discrepancies shall be corrected before the Government accepts responsibility for the horizontal baler system. The Installation process is considered incomplete until a post installation inspection is completed by the Government and found to be acceptable.
d) PHYSICAL SECURITY: The Contractor shall ensure that all Government Equipment shall be secured in the building areas and shall be protected from damage caused during handling to include but not limited to dirt, contaminants, damage caused by tears, rubbing and outside elements such as moisture and rain.
e) TRANSPORTATION PROCEDURES: Transportation of the horizontal baler system is intended for overseas shipment. The Contractor shall exercise reasonable care in packing, packaging, preservation, handling, consolidating, loading, unloading, set-up and installation of all items. The Contractor shall notify the Contracting Officer, the contract specialist and the Government Representative when shipment has been made by the Contractor to help ensure the completion of shipment of all equipment and clearance through
Japanese customs clearance. The Contractor shall also provide all insurance and customs documentation related to the shipment to Contracting Officer.
f) CLEAN UP: The Contractor is responsible for removing all materials and other debris, accumulated from the installation site spaces as a result of disassembling, loading, unloading the items. Contractor Personnel shall collect and deposit materials and other debris at locations designated by the Government.
g) DISPOSAL OF PACKAGING AND OTHER REFUSE: It is Contractor’s responsibility to make prior arrangements with the Government before disposing any refuse aboard any Government base. Nothing may be placed in any government trash container unless that Contractor has received prior authorization from the Government.
h) DELAYS: Any delay to the schedule agreed upon at the Initial Coordination Meeting shall require agreement between the Contractor and Contracting Officer or his/her duly authorized representative.
i) WARRANTY: 1-year on all parts shall be provided from final acceptance. The bid package shall include all warranty information on the machine. The bid package shall include all warranty information on the machine, i.e. hydraulic pumps. The Contractor shall also provide two (2) on-site maintenance service for
12 months from final acceptance.
3.2. TRAINING (CLIN 0007): The Contractor shall provide training to the Government personnel. A complete training plan shall be submitted to the Contracting Officer for review upon the contract award. The Government will record the training session on video for the purpose of internal training use. The Contractor shall issue training certificates upon completion of the training. No specific format is required for certificate.
The Following procedures shall apply to training.
a) TOPIC 1 – Safety, Machine Components, Machine Set up
b) TOPIC 2 – Operation
c) TOPIC 3 – Maintenance, Troubleshooting
3.3. DELIVERABLES: The Contractor shall submit following documentations to the Contracting Representative upon request.
a) For each equipment, provide four (4) hard copies of operation and maintenance manuals in English.
Manuals shall be included breakout of equipment and replacement part numbers for every component.
b) For each equipment, provide four (4) soft copies of operation and maintenance manuals in English (Four
(4) CD-ROMs (or DVD-ROMS if exceeds CD-ROM capacity)).
4.0 CONTRACTOR QUALITY ASSURANCE:
4.1. QUALITY CONTROL: The Contractor is responsible for controlling the quality of services that conform to the contract specifications. The Contractor shall establish procedures and processes to include, but not limited to inspection to ensure all contract requirements are met to fulfill installation of the horizontal baler system in accordance with this Performance Work Statement.
4.2. QUALITY ASSURANCE: The Government Quality Assurance Surveillance Program is not a substitute for
Quality Control by the Contractor. All findings of incomplete or defective performance will be subject to re-performance. All costs associated with rework are the responsibility of the Contractor. When the Contractor’s overall performance is unsatisfactory, a Discrepancy Report will be issued by the Contracting Officer and the
Contractor shall reply in writing, giving the reason(s) for unsatisfactory performance, and identify the corrective action(s) to be taken to prevent future problems. The Government Representative will perform all inspections expeditiously to minimize delays in Contractor’s performance.
5.0 CONTRACTOR PERSONNEL:
5.1. CONTRACT MANAGER: The Contractor shall provide a Contract Manager as the Primary Point of Contact
(POC) who shall be responsible for the performance of work under this award. This person shall be reachable by both telephone and electronic message, through which all communication shall flow between the Government and the Contractor. This POC must be able to answer question pertaining to all aspects of the order quickly and accurately.
5.2. ON-SITE FOREMAN: The Contractor shall designate an on-site foreman that shall be present during the entire installation for each requirement. That on-site foreman shall be responsible for the conduct of the entire installation crew, and compliance with this Procedure for Installation Services.
5.3. CONTRACTOR EMPLOYEES: The Contractor’s employees shall present a neat appearance and be easily recognized as Contractor employees. This may be accomplished by wearing distinctive clothing bearing the company name and the employee’s name.
5.4. CONTRACTOR ACCESS TO GOVERNMENT INSTALLATIONS: All access to Government installations shall be coordinated with the Government Representative. The identity of this individual will be available to the Contractor during the initial coordination meeting.
5.5. VEHICLE INSTRUCTION: Each contractor vehicle shall have the name of the company neatly exhibited. If renting a car(s), the Contractor shall have company name and contract name displayed in such a manner that it can be easily recognized from outside.
5.6. DAMAGE TO GOVERNMENT PROPERTY AND FACILITIES: In all instances where government property or facilities have been damaged by the Contractor, a full report of the facts and the extent of the damages shall be submitted to the Government Representative within 24 hours following the incident. The Government
Representative shall forward the report to the Contracting Officer within 24 hours of receipt. If the Contractor is found to be negligent, the Contractor shall be held responsible for all expenses related to reimburse of all damages to the Government.
5.7. STORAGE: The Contractor is responsible for storage of delivered items onsite prior to installation.
5.8. SHORTAGES AND MISSING EQUIPMENT AND ACCESSORIES, OR COMPONENTS OF
EQUIPMENT AND ACCESORIES: Missing end items or components must be DELIVERED within a period
NOT TO EXCEED fifteen (15) days of the identification of the shortage. All missing items shall be procured and delivered by the Contractor, and such expenses shall be without cost to the Government.
5.9. EXCESS EQUIPMENT AND ACCESSORIES, OR EXCESS COMPONENTS OF EQUIPMENT AND
ACCESSORIES: The Contractor shall be responsible for the removal or disposal of excess end items or components at no cost to the Government.
5.10. INCIDENTAL DAMAGE TO EQUIPMENT AND ACCESSORIES: Damages to equipment and related accessories caused by Contractor employees shall be replaced at the Contractor’s expense as if it were missing. All repairs and replacements must be completed in a timely fashion to ensure the Contractor meets the delivery schedule.
6.0. GENERAL INFORMATION:
6.1. PLACE OF PERFORMANCE: The services shall be performed at Building 2463, MCIPAC Camp Hansen, Kin Town, Okinawa, Japan.
6.2. HOURS OF OPERATION: The Contractor shall commence set-up and installation during the normal duty hours of 0730 – 1630, Monday through Friday. In cases where installation is needed outside normal working hours, coordination shall be made with the Government Representative.
6.3. PERFORMANCE OF SERVICES: Unless specified differently in the Installation Information, services will not be accepted on Saturdays, Sundays, or Federal holidays. Government Representatives shall sign for inspection and acceptance of all services between 0730 and 1630, Monday through Friday.
Recognized Holidays: The Contractor is not required to provide services on the following Federal Holidays*:
New Year's Day **1 January
Martin Luther King's Birthday Third Monday in January
President's Day Third Monday in February
Memorial Day Last Monday in May
Independence Day **4 July
Labor Day First Monday in September
Columbus Day Second Monday in October
Veterans' Day **11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day **25 December
Notes:
* In addition to these Federal Holidays, if the President of the United States issues an executive order closing the federal government that date shall be considered a recognized federal holiday. (ref: Executive Order 11582 of February 11, 1971, and 5 U.S.C. 5546 and 6103(b) and other similar statues insofar as they relate to the pay and leave of employees of the United States.
**If a holiday falls on a Saturday, it will be observed on the preceding Friday. If the holiday falls on a Sunday, it will be observed on the following Monday.
6.4. GOVERNMENT FURNISHED EQUIPMENT (GFE): The Government will provide a forklift and/or crane with an operator during the installation as necessary.
6.5. GOVERNMENT FURNISHED MATERIAL: N/A
6.6. PERIOD OF PERFORMANCE: The Contractor shall start the installation services within thirty (30) calendar days from the notification by Government Representatives. The training shall be conducted immediately following the installation and commissioning of Baler Equipment.
6.7. TYPHOON READINESS: The Contractor shall depart military bases when Tropical Condition of Readiness
1C (TCCOR 1C or TC-1C) is declared by Military Weather Station authorities. The Contractor shall depart military bases and monitor radio/television until it changes to TCCOR SW. When Tropical Cyclone Condition of Readiness
“STORM WATCH” (TCCOR SW or TC-SW) is declared by Military Weather Station authorities, the contractor shall restart the service within 2 hours. In this case, services will begin the next normal workday at 7:30am.
6.8. SAFETY: The Contractor shall be responsible for ensuring the safety of their personnel along with any other personnel who should enter the worksite. Requirements for safety will be strictly adhered to as they pertain to
Contractor operations and as required by Industrial Safety and Health Law and Related Legislation of Japan (ref: a)), and NAVMAC Directive 5100.8 - Marine Corps Occupational Safety and Health (OSH) Program Manual (ref: b)).
Ref a): http://www.mhlw.go.jp/ (Home Page for “Ministry of Health, Labour and Welfare”)
Ref b): http://www.marines.mil/Portals/59/Publications/NAVMC%20DIR%205100.8.pdf
6.9. SAFETY PLAN: A written safety plan must be submitted as part of the Contractor's quote if the Contractor intends to use overhead devices including (but not limited to): crane, cherry picker, etc., that would create an overhead hazard. If required the plan shall ensure compliance with NAVMAC Directive 5100.8. The Contractor shall address general safety guidelines as well as specific safety requirements, such as fall protection measures. Plan shall also address required training prior provision of required training prior to the start of work in order to perform the work safely. Training must be documented, and documentation of the training must be provided with the safety plan to include, but not to limited to, indication that proper equipment for the work will be utilized.
6.10. KEY PERSONNEL: There will always be a Government representative of the building present during the cleaning process to report any damages or problems that occur with the facilities.
6.11. GOVERNMENT FURNISHED PROPERTY
UTILITIES: The Contractor shall be provided the use of utilities (i.e., water and electricity) when needed to perform the job. The Contractor shall use the utilities conservatively. Lights shall be used only in areas where work is actually being performed. Water faucets or valves shall be turned off when not in use. Use of Government telephones is not authorized.
6.12. THE GOVERNMENT RESPONSIBILITY
The Government will furnish forklift and its operator as needed during installation. It is the Government’s responsibility to accept all of the debris generated from installation of the equipment and to properly dispose of it.
6.13. POLICE AND FIRE DEPARTMENT: The following telephone number is furnished.
The Marine Corps 911 Center: 098-911-1911
7.0. DEFINITIONS:
Contracting Officer (KO): U.S. Government official authorized to enter into, make changes to, or terminate contracts on behalf of the U.S. Government. Contracting Officers are responsible for ensuring performance of all necessary actions for effective contracting, ensuring compliance with the terms of the contract, and safeguarding interests of the United States in its contractual relationships.
Government Representative (Gov’t Rep): Government liaison, which functions as the technical representative monitoring, delivery and performance of the contract. Gov’t rep is not authorized to enter into any agreements, obligate the government or direct any changes to the contract. Gov’t reps (alternative Gov’t reps) of this contract are also responsible for escorting the contractor to the work site when needed and securing keys of the buildings during the periods of performance.
Publication/ MRC Description of Publication Date Ref
NAVMC DIRECTIVE 5100.8
Marine Corps Occupational Safety and Health (OSH) Program Manual 15 May 2006 b)
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each
BALER EQUIPMENT
FFP
Two-Ram baler, Integrated bailer and feed conveyor controls, Multi-material bailing (Paper, Cardboard, Plastics, PET bottles, Steel/Aluminum cans, etc.)
Automatic-tie wiring. See Attachment 1 for salient characteristics.
FOB: Destination
NET AMT
0002 1 Each
CONVEYOR
FFP
Above-ground (or floor) conveyor not required a floor pit. See Attachment 1 for salient characteristics.
0003 1 Lot
INSTALLATION, COMMISSIONING AND TRAINING
FFP
Installation, commissioning & training for CLIN 0001
The Contractor shall provide Installation, commissioning & training as required by the Statement of Work (SOW). Equipment shall be installed in building (Bldg.
2463) at the new Recycling Center located at U.S. Marine Corps Installation
Pacific (MCIPAC) Camp Hansen, Okinawa, japan.
Installation and commssioning shall include integration and synchronizing CLIN
0001 to operate in conjunction with CLIN 0002. Upon completion of Installation
& commissioning,the contractor shall provide training on following topics;
a) TOPIC 1 - Safety, Machine Components, Machine Set up
b) TOPIC 2 - Operation, and
c) TOPIC 2 - Maintenance, Troubleshooting
Installation, commissioning & training shall be completed within ten (10) working days. The equipment shall be delivered directly to the building at which the installation shall take place by the Contractor.
Installation and commissioning to be performed by factory trained personnel. Job to include all manpower, tools, transportation, meals, lodging and labor and/or travel related expenses. Any other costs associated with the installation shall be the responsibility of the contractor.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
0002 N/A N/A N/A Government
0003 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
CLAUSES INCORPORATED BY FULL TEXT
52.212-1 ADDENDUM TO INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (OCT 2015)
The provision at 52.212-1, incorporated by reference, applies with the following changes/additions:
(a) North American Industry Classification System (NAICS) code and small business size standard.
[Added] - Non-U.S. business concerns of any size are not qualifying entities.
(b) SUBMISSION OF QUOTES. [Changed to read as follows]:
Submit signed and dated quotes to the office specified in this Request for Quotes (RFQ), or by email or fax using the specified contact information in section (n) below, at or before the exact time specified in block 8 of this RFQ.
Quotes may be submitted electronically (emailed); however, due to government computer firewall security and file size limitations, please be advised that it is the Quoter’s responsibility to ensure that the Contracting Office receives all required documents. After submitting quote(s), it is the offeror’s responsibility to receive acknowledgment of receipt from the Government.
QUOTES MUST BE SUBMITTED AS INDICATED:
(1) Completed SF1449/SF30. All Pricing and other required information, including:
(a) Block 5, The Request for Quote number;
(b) Block 8, The time specified in the Request for Quotes for receipt of quotes;
(c) Block 17a complete, including the name, address, and telephone number of the offeror;
(d) Block 17b if appropriate, "Remit to" address, if different than mailing address;
(e) SF30 block 15a,b,c; and Acknowledgment of Request for Quotes Amendments, if applicable
(f) Unit Price and extended Price for each Contract Line Item Number (CLIN) / sub-CLIN
(g) Block 26, Total Price Quote
(h) Block 12, Discount Terms [provide amplifying information if necessary]
(2) Technical information. Include, at a minimum:
(a) A technical description of the items/services being offered in sufficient detail to evaluate compliance with the requirements in the Request for Quotes and, for services, the associated
Performance Work Statement PWS. This may include product literature, or other documents, if necessary;
(b) Terms of any express warranty;
(c) Other information relevant to the capability/performance of products/serviced offered
(3) Validation of Representations and Certifications
(a) Option 1 (preferred): Reps/certs completed electronically and registered as current via SAM per 52.212-3(b) need not be re-submitted (see FAR 52.212-3(b) for those representations and certifications that the offeror shall complete electronically). The following information must be provided (submitting the information affirms that the offeror is registered and current in the SAM database):
Commercial And Government Entity Code (CAGE) _________________(U.S. Vendor)
NATO Commercial And Government Entity Code (NCAGE) _________(Foreign Vendor)
Taxpayer Identification Number (TIN) ____________________
Data Universal Numbering System (DUNS) ____________________
(b) Option 2: A completed copy of all representations and certifications at FAR 52.212-3
(4) Licenses/Certifications. License/certification to do business in the country of Japan, if applicable and copies of other necessary licenses, certifications, permits, resumes, as applicable.
(5) Past performance information. Offeror’s past performance information, when included as an evaluation factor, to include identification of recent (within one year) and relevant (similar in nature) contracts for the same or similar items and any other references. Include contract numbers, points of contact with telephone numbers and other relevant information.
(c) Period for acceptance of quotes.
The offeror agrees to hold the prices in its offer firm for 60 calendar days from the date specified for receipt of quotes.
(d) Product samples.
When required by the Request for Quotes, product samples shall be submitted at or prior to the time specified for receipt of quotes. Unless otherwise specified in this Request for Quotes, these samples shall be submitted at no expense to the Government, and returned at the sender's request and expense, unless they are destroyed during pre-award testing.
(e) Multiple quotes.
Offerors are encouraged to submit multiple quotes presenting alternative terms and conditions or commercial items for satisfying the requirements of this Request for Quotes. Each offer submitted will be evaluated separately.
(m) Correspondence.
All and any communications/questions pertaining to this solicitation must be submitted in the format provided in
Attachment 2 to the Point of Contact below, no later than 10:00AM Japan Standard Time (JST) June 2, 2017. If an offeror believes that the requirements in these instructions contain an error, omission, or are otherwise unsound, the offeror shall immediately notify the Contract Specialist in writing with supporting rationale.
Point of Contact:
Regional Contracting Office (RCO)
Attn: Mayumi Nakai
Bldg #355, Marine Corps Installations Pacific - MCB Camp Butler, Okinawa, Japan
Phone: 011-81-98-970-8145 (from U.S.) / 098-970-8145 (Local)
Fax: 011-81-98-970-0969 (from U.S) / 098-970-0969 (Local)
E-mail: mayumi.nakai.ja@usmc.mil
(End of provision)
Addendum to 52.212-2 Evaluation -- Commercial Items (Oct 2014)
(a) This is a commercial item requirement using Simplified Acquisition Procedures under FAR part 12 and 13, respectively. Evaluation will be conducted using simplified procedures in accordance with FAR 13.106.
(b) The Government will award to the responsible offeror whose quote, conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate quotes:
1) Quality/technical merit
2) Price
3) Past Performance
c) FAR 9.103 requires contracting officers to make a determination of responsibility prior to awarding a contract to a prospective contractor. FAR 9.104 identifies standards for a responsibility determination, which includes determination of satisfactory past performance. For purposes of evaluation and determination of responsibility, and in accordance with FAR 13.106-2(b)(3), this assessment will primarily be conducted through Federal Awardee
Performance and Integrity Information System (FAPIIS) / Past Performance Information Retrieval System (PPIRS), but may include other authorized methods described. Past performance, for purposes of this evaluation, will be assessed as ‘satisfactory’ or ‘unsatisfactory’ at the discretion of the contracting officer based on the totality of information available. A past performance determination of ‘unsatisfactory’ will exclude the offer from consideration for award.
d) Solicitations for supplies valued less than $1 million will, alternatively, use the past performance evaluation procedures outlined in DFARS 213.106-2 and described in clause 252.213-7000, incorporated herein.
(e) A written notice of award or acceptance of a quote, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the quote, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
CLAUSES INCORPORATED BY REFERENCE
52.203-3 Gratuities APR 1984
52.203-5 Covenant Against Contingent Fees MAY 2014
52.203-16 Preventing Personal Conflicts of Interest DEC 2011
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber
Content Paper
MAY 2011
mailto:mayumi.nakai.ja@usmc.mil
52.204-7 System for Award Management OCT 2016
52.204-13 System for Award Management Maintenance OCT 2016
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-17 Ownership or Control of Offeror JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-20 Predecessor of Offeror JUL 2016
52.209-7 Information Regarding Responsibility Matters JUL 2013
52.209-11 Representation by Corporations Regarding Delinquent Tax
Liability or a Felony Conviction under and Federal Law
FEB 2016
52.209-11 Representation by Corporations Regarding Delinquent Tax
Liability or a Felony Conviction under and Federal Law
FEB 2016
52.211-6 Brand Name or Equal AUG 1999
52.212-1 Instructions to Offerors--Commercial Items OCT 2016
52.212-3 Alt I Offeror Representations and Certifications--Commercial
Items (JAN 2017) Alternate I
OCT 2014
52.212-4 Contract Terms and Conditions--Commercial Items MAY 2015
52.214-21 Descriptive Literature APR 2002
52.214-34 Submission Of Offers In The English Language APR 1991
52.225-14 Inconsistency Between English Version And Translation Of
Contract
FEB 2000
52.229-6 Taxes--Foreign Fixed-Price Contracts FEB 2013
52.232-8 Discounts For Prompt Payment FEB 2002
52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
DEC 2013
252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992
252.204-7004 Alt A System for Award Management Alternate A FEB 2014
252.204-7011 Alternative Line Item Structure SEP 2011
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.205-7000 Provision Of Information To Cooperative Agreement Holders DEC 1991
252.209-7004 Subcontracting With Firms That Are Owned or Controlled By
The Government of a Country that is a State Sponsor of
Terrorism
OCT 2015
252.211-7006 Passive Radio Frequency Identification JUN 2016
252.213-7000 Notice to Prospective Suppliers on Use of Past Performance
Information Retrieval System--Statistical Reporting in Past
Performance Evaluations
JUN 2015
252.222-7002 Compliance With Local Labor Laws (Overseas) JUN 1997
252.225-7012 Preference For Certain Domestic Commodities DEC 2016
252.225-7020 Trade Agreements Certificate--Basic (Nov 2014) NOV 2014
252.225-7021 Trade Agreements--Basic DEC 2016
252.225-7031 Secondary Arab Boycott Of Israel JUN 2005
252.225-7041 Correspondence in English JUN 1997
252.225-7042 Authorization to Perform APR 2003
252.225-7043 Antiterrorism/Force Protection Policy for Defense
Contractors Outside the United States
JUN 2015
252.225-7048 Export-Controlled Items JUN 2013
252.225-7050 Disclosure of Ownership or Control by the Government of a
Country that is a State Sponsor of Terrorism
OCT 2015
252.229-7000 Invoices Exclusive of Taxes or Duties JUN 1997
252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.232-7008 Assignment of Claims (Overseas) JUN 1997
252.232-7010 Levies on Contract Payments DEC 2006
252.233-7001 Choice of Law (Overseas) JUN 1997
252.237-7010 Prohibition on Interrogation of Detainees by Contractor
Personnel
JUN 2013
252.243-7001 Pricing Of Contract Modifications DEC 1991
252.243-7002 Requests for Equitable Adjustment DEC 2012
252.244-7000 Subcontracts for Commercial Items JUN 2013
252.247-7023 Transportation of Supplies by Sea APR 2014
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2017)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C.
3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
X (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41
U.S.C. 4704 and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June
2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment
Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct 2016) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div.
C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
X (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Oct 2015) (31 U.S.C. 6101 note).
X (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (July 2013) (41
U.S.C. 2313).
____ (10) [Reserved]
____ (11)(i) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (ii) Alternate I (NOV 2011) of 52.219-3.
____ (12) (i) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (OCT 2014)
(if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (ii) Alternate I (JAN 2011) of 52.219-4.
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (Nov 2016) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Nov 2016) of 52.219-9.
____ (iii) Alternate II (Nov 2016) of 52.219-9.
____ (iv) Alternate III (Nov 2016) of 52.219-9.
____ (v) Alternate IV (Nov 2016) of 52.219-9.
____ (18) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (19) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).
____ (20) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C.
657f).
____ (22) 52.219-28, Post Award Small Business Program Rerepresentation (July 2013) (15 U.S.C. 632(a)(2)).
____ (23) 52.219-29, Notice of Set-Aside for, or Sole Source Award to, Economically Disadvantaged Women-
Owned Small Business Concerns (Dec 2015) (15 U.S.C. 637(m)).
____(24) 52.219-30, Notice of Set-Aside for, or Sole Source Award to, Women-Owned Small Business Concerns
Eligible Under the Women-Owned Small Business Program (Dec 2015) (15 U.S.C. 637(m)).
X (25) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
X(26) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (Oct 2016) (E.O. 13126).
X (27) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
X (28) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
X (29) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
X (30) 52.222-36, Equal Opportunity for Workers with Disabilities (July 2014) (29 U.S.C. 793).
X (31) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C. 4212).
X (32) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
X (33)(i) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
____ (34) 52.222-54, Employment Eligibility Verification (Oct 2015). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in
22.1803.)
____ (35) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016). (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).
Note to paragraph (b)(35): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal
Register advising the public of the termination of the injunction.
____ (36) 52.222-60, Paycheck Transparency (Executive Order 13673) (OCT 2016).
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May
2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
X (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (June, 2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(June, 2016) (E.O. 13693).
X (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (Jun 2014) (E.O.s 13423 and
13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (Jun 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT[supreg]-Registered Personal Computer Products (OCT 2015) (E.O.s
13423 and 13514).
____ (ii) Alternate I (Jun 2014) of 52.223-16.
X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
____ (45) 52.223-20, Aerosols (June, 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (June, 2016) (E.O. 13693).
____ (47) 52.225-1, Buy American--Supplies (May 2014) (41 U.S.C. chapter 83).
____(48) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (May 2014) (41 U.S.C. chapter
83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L.
103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (May 2014) of 52.225-3.
____ (iii) Alternate II (May 2014) of 52.225-3.
____ (iv) Alternate III (May 2014) of 52.225-3.
____ (49) 52.225-5, Trade Agreements (Oct 2016) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (50) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (51) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016)
(Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (52) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (53) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.
5150).
____ (54) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 4505, 10 U.S.C.
2307(f)).
____ (55) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (56) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (July 2013) (31
U.S.C. 3332).
____ (57) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (July
2013) (31 U.S.C. 3332).
____ (58) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (59) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (60)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____(1) 52.222-17, Nondisplacement of Qualified Workers (May 2014) (E.O. 13495).
_____ (2) 52.222-41, Service Contract Labor Standards (MAY 2014) (41 U.S.C. chapter 67).
_____ (3) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (4) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple
Year and Option Contracts) (MAY 2014) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY
2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (6) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for
Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (7) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____(8) 52.222-55, Minimum Wages Under Executive Order 13658 (DEC 2015) (E.O. 13658).
_____ (9) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
_____ (10) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (MAY 2014) (42 U.S.C. 1792).
_____ (11) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the
Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (Oct 2015) (41 U.S.C. 3509).
(ii) 52.219-8, Utilization of Small Business Concerns (Nov 2016) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (MAY 2014) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(iv) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(v) 52.222-26, Equal Opportunity (Sept 2016) (E.O. 11246).
(vi) 52.222-35, Equal Opportunity for Veterans (Oct 2015) (38 U.S.C. 4212).
(vii) 52.222-36, Equal Opportunity for Workers with Disabilities (Jul 2014) (29 U.S.C. 793).
(viii) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C. 4212).
(ix) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O. 13496).
Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(x) 52.222-41, Service Contract Labor Standards (May 2014), (41 U.S.C. chapter 67).
(xi) _____ (A) 52.222-50, Combating Trafficking in Persons (March 2, 2015) (22 U.S.C. chapter 78 and E.O.
13627).
_____ (B) Alternate I (March 2, 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xii) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (May 2014) (41 U.S.C. chapter 67.)
(xiii) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain
Services--Requirements (May 2014) (41 U.S.C. chapter 67)
(xiv) 52.222-54, Employment Eligibility Verification (Oct 2015) (E. O. 12989).
(xv)52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (E.O. 13658).
(xvi) 52.222-59, Compliance with Labor Laws (Executive Order 13673) (OCT 2016) (Applies at $50 million for solicitations and resultant contracts issued from October 25, 2016 through April 24, 2017; applies at $500,000 for solicitations and resultant contracts issued after April 24, 2017).
Note to paragraph (e)(1)(xvi): By a court order issued on October 24, 2016, 52.222-59 is enjoined indefinitely as of the date of the order. The enjoined paragraph will become effective immediately if the court terminates the injunction. At that time, DoD, GSA, and NASA will publish a document in the Federal Register advising the public of the termination of the injunction.
(xvii) 52.222-60, Paycheck Transparency (Executive Order 13673) (OCT 2016)).
(xviii) 52.222-62 Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706).
(xix) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section
862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xx) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (May 2014) (42 U.S.C. 1792). Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xxi) 52.247-64, Preference for Privately-Owned U.S. Flag Commercial Vessels (Feb 2006) (46 U.S.C. Appx
1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may include in its subcontracts for commercial items a minimal number of additional clauses…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .