M6700121Q1071-0002 Amendment.docx
DOCX document 33 KB Posted
- Attached to
- Air Compressor Quarterly Service Federal contract opportunity
- Solicitation number
- M6700121Q1071
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| M6700121Q1071-0002 Conformed Copy.docx | DOCX document | |
| M6700121Q1071-0001 Amendment.docx | DOCX document | |
| M6700121Q1071-0001 Conformed Copy.docx | DOCX document | |
| M6700121Q1071.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M6700121Q1071
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 02-Mar-2021 11:00 AM to 05-Mar-2021 11:00 AM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The CLIN extended description has changed from:
Routine service to be performed quarterly on-site, aboard MCAS New River, NC. Contractor shall perform air quality testing, preventative maintenance, and repairs on Air Compressor in accordance with the Performance Work Statement.Manufacturer: Bauer CompressorsModel # C-2/DV/NAVYSerial # 76221To include travel, labor, routine service parts and a single NFPA 1989 Single Air Kit.
To:
Routine service to be performed quarterly on-site, aboard MCAS New River, NC. Contractor shall perform air quality testing, preventative maintenance, and repairs on Air Compressor in accordance with the Performance Work Statement.Manufacturer: Bauer CompressorsModel # C-2/DV/NAVYSerial # 76182 To include travel, labor, routine service parts and a single NFPA 1989 Single Air Kit.
CLIN 0004
The CLIN type priced has been deleted.
The CLIN description has changed from Air Compressor Maint. & Testing to Repairs.
Routine service to be performed quarterly on-site, aboard MCAS New River, NC. Contractor shall perform air quality testing, preventative maintenance, and repairs on Air Compressor in accordance with the Performance Work Statement.Manufacturer: Bauer CompressorsModel # C-2/DV/NAVYSerial # 76182 To include travel, labor, routine service parts and a single NFPA 1989 Single Air Kit.
Required replacement parts and materials for repairs are to be provided by the contractor in an amount not-to-exceed $TBD each for CLIN 0005. Parts shall be billed at the contractor’s actual cost. The contractor shall submit a copy of their current price list or a copy of invoice from the sources from which the parts were obtained in support of the requested cost of the parts.
The pricing detail quantity 4.00 has been deleted.
The unit of issue Each has been deleted.
The FOB Destination has been deleted.
The PSC code J042 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 811310 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
CLIN 1003
Routine service to be performed quarterly on-site, aboard MCAS New River, NC. Contractor shall perform air quality testing, preventative maintenance, and repairs on Air Compressor in accordance with the Performance Work Statement.Manufacturer: Bauer CompressorsModel # C-2/DV/NAVYSerial # 76221To include travel, labor, routine service parts and a single NFPA 1989 Single Air Kit.
Routine service to be performed quarterly on-site, aboard MCAS New River, NC. Contractor shall perform air quality testing, preventative maintenance, and repairs on Air Compressor in accordance with the Performance Work Statement.Manufacturer: Bauer CompressorsModel # C-2/DV/NAVYSerial # 76182 To include travel, labor, routine service parts and a single NFPA 1989 Single Air Kit.
CLIN 1004
The CLIN type priced has been deleted.
The CLIN description has changed from Air Compressor Maint. & Testing to Repairs.
Routine service to be performed quarterly on-site, aboard MCAS New River, NC. Contractor shall perform air quality testing, preventative maintenance, and repairs on Air Compressor in accordance with the Performance Work Statement.Manufacturer: Bauer CompressorsModel # C-2/DV/NAVYSerial # 76182 To include travel, labor, routine service parts and a single NFPA 1989 Single Air Kit.
Required replacement parts and materials for repairs are to be provided by the contractor in an amount not-to-exceed $TBD each for CLIN 0005. Parts shall be billed at the contractor’s actual cost. The contractor shall submit a copy of their current price list or a copy of invoice from the sources from which the parts were obtained in support of the requested cost of the parts.
The pricing detail quantity 4.00 has been deleted.
The unit of issue Each has been deleted.
The FOB Destination has been deleted.
The PSC code J042 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 811310 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0004 has been deleted:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 1 yr. ADC |
| 4 |
| M00272 |
CHANDLER COSGROVE
MWSS-272/ EFR BUILDING 4192
MCAS NEW RIVER NC 28540
449-7468 FOB: Destination M00272
The following Delivery Schedule for CLIN 1004 has been deleted:
| DELIVERY DATE |
| QUANTITY |
| SHIP TO ADDRESS |
| DODAAC / CAGE |
| 2 yrs. ADC |
| 4 |
| M00272 |
CHANDLER COSGROVE
MWSS-272/ EFR BUILDING 4192
MCAS NEW RIVER NC 28540
449-7468 FOB: Destination M00272
INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0004 has been changed from:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| N/A |
| N/A |
| N/A |
| N/A |
The Acceptance/Inspection Schedule for CLIN 1004 has been changed from:
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| Destination |
| Government |
| Destination |
| Government |
| INSPECT AT |
| INSPECT BY |
| ACCEPT AT |
| ACCEPT BY |
| N/A |
| N/A |
| N/A |
| N/A |
The following have been modified:
PERFORMANCE WORK STATEMENT
1.0 Introduction. Expeditionary Fire and Rescue (EFR) has a requirement for quarterly on-site visits from the contractor to conduct preventative maintenance, repairs, and air quality testing to (4) Bauer air compressors located at Marine Wing Support Squadron (MWSS) 272 aboard Marine Corps Air Station (MCAS) New River, North Carolina.
2.0 Scope. The contractor shall perform quarterly preventative maintenance, required repairs, and air quality testing for the compressor systems in order to ensure proper function and quality of breathing air provided for the Marines in accordance with NFPA 1989, NAVAIR 00-80R-14, and OSHA 1910.134 standards.
3.0 Period of Performance. (1) base year plus (1) one-year option.
| Base Year: | TBD |
| Option Year 1: | TBD |
Period of performance dates are not firm until the contract is awarded.
4.0 Hours of Performance. The contractor shall travel to MWSS-272, MCAS New River to performance maintenance and testing once a quarter. All services must be performed within the hours of 0700 – 1530.
5.0 Place of Performance.
Building AS-4192 Douglass Rd.
MCAS New River Jacksonville, NC 28540
6.0 Government Point of Contact.
| Name: | Sgt Chandler Cosgrove |
| Phone | (910) 449-5031 |
| Email: | chandler.cosgrove@usmc.mil |
7.0 Materials to be serviced.
Manufacturer: Bauer Compressors, Inc.
Model # C-D/DV/NAVY Serial #’s 37510; 37515; 76182
8.0 Service Procedures. All service procedures that take place shall be documented for each compressor and submitted to the POC.
8.1 Compressor Requirements
| a. Check unit for visual damage & cleanliness | |
| i. Ensure cooling fans are clean | |
| ii. Ensure flywheel is clean | |
| iii. Ensure final separator is clean | |
| iv. Clean all as required by manufacturer specifications | |
| b. Drain and replace compressor oil | |
| c. Check oil pump function at sight glass | |
| d. Check for hydraulic/ pneumatic leaks | |
| i. Repair as necessary | |
| e. Inspect all hoses for damage/ swelling and replace as necessary | |
| f. Check carbon monoxide/ moisture indicator on purifier cartridge & replace as necessary | |
| g. Inspect all guards & replace as necessary | |
| h. Inspect v-drive belt & replace as necessary | |
| i. Check torque valve fasteners & adjust as necessary | |
| j. Check dryer and purifier elements for contamination & replace as required | |
| k. Replace intake filter element | |
| l. Test all safety valves & repair as necessary | |
| m. Inspect compressor valves & replace as necessary | |
| n. Inspect pistons and piston rings & replace as necessary | |
| o. Inspect oil/ water separator & replace as necessary |
8.2 Engine Requirements
| a. Check spark arrester – clean/ replace as necessary |
| b. Check air cleaner element – clean/replace as necessary |
| c. Check fuel filter – clean/ replace as necessary |
| d. Drain and replace engine oil |
| e. Inspect pull string assembly – repair/ replace as necessary |
8.3 Operation/ Air Quality Testing
| a. Ensure proper start up and operation of entire system | |
| i. Ensure no excessive vibrations or unusual noises | |
| ii. Ensure fill hose output of 4500 psi | |
| b. Conduct air quality test for Grade D breathing air | |
| i. Take sample from each unit | |
| ii. Ensure samples are sent and tested at a certified air quality lab | |
| iii. Ensure unit POC receives a copy of the breathing air quality records for documentation. |
(End of Summary of Changes) image1.wmf
File details come from the government source that posted it. Updated .