DRAFT_PWS.doc

DOC document 47 KB Posted

Attached to
Advanced Machine Shop Training Federal contract opportunity
Solicitation number
M67001-15-T-1331
Issued by
United States Marine Corps

About this file

DRAFT PWS

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIESEL ENGINE TRAININ PWS

PERFORMANCE WORK STATEMENT

1.0 Background: General Support Maintenance Company(GSM Co), 2d Maintenance Battalion, II Marine Expeditionary Force (II MEF), Marine Corps Base (MCB), Camp Lejeune, NC provides support to the operating forces of II MEF. One of GSM Co. tasks from its mission statement is to provide field level maintenance and configuration management on motor transport, ordnance and engineer equipment secondary reparables (SecReps) from the secondary reparable float. These SecReps include, but not limited to engines, transmissions, fuel pumps, starters and alternators.

GSM is comprised of various Military Occupational Specialties (MOS): 3521 Motor Transport Mechanic; 1341 Heavy Equipment Mechanic; 2141 Amphibious Assault Vehicle Mechanic; 2147 Light Assault Vehicle Mechanic, which conduct maintenance on the SecReps. In order to meet the unit’s mission statement, it is required of the Marines to repair SecReps from different communities. This type of training is required to ensure the unit’s accomplishment of their mission statement and to continue to provide support to the operating forces.

2.0 Objectives: To provide the Marines of GSM Co. additional training in the inspection, repair, and testing of diesel engines. The training must consist of the following items:

2.1 Engine Disassembly, Cleaning, and Inspection Techniques and Procedures

2.2 Boring/Honing of cylinders, resurfacing deck areas, installation of cam bearings, expansion plugs, and oil galley plugs Techniques and Procedures

2.3 Engine Assembly Techniques and Procedures

2.4 Dynamometer Testing Techniques and Procedures

3.0 Scope: The Contractor shall provide all services at FC-280 2d Maintenance Battalion, Camp LeJeune, NC. The services shall be completed in two, four week training sessions; Monday thru Friday from 0800 to 1700. The training will be given to (10) Marines. The first training session shall start no later than (2) weeks after award of contract. The second training session shall start (6) months following the completion of the first training session.

4.0 Tasks/Performance Requirements Summary:

Performance Objective
Performance Standard
AQL
Surveillance Method
What do we want to accomplish as the end result
The benchmark against which performance will be measured
Acceptable variation from the standard
How performance will be checked
Ability to effectively disassemble Engine
· Proper procedures, techniques and sequences in the tear down of the diesel engine, per applicable technical manuals.

· Identification of all parts and subassemblies of diesel engines.

· Identification and use of appropriate common use and specialty tools needed for disassembly of diesel engines.

90% pass rate
Hands on, Practical Application
Ability to effectively clean and inspect engine and components
· Proper cleaning techniques of all parts and subassemblies

· Inspection of all components for serviceability, damage and recoverability using special tools such as micrometers, dial indicators, bore gauges, etc.

· Use of the Magnetic Particle Inspection Machine to conduct non-destructive tests and identify cracks, fractures and breaks in the engine block, heads, crankshafts, can shafts and other engine components.

· Identify, per applicable technical manuals, all recoverable/repairable items and instruct/teach how to determine items are unserviceable. Items include but not limited to cylinder heads, engine block, fuel metering pump, etc.

· Identify and create parts list, based off the inspection process per applicable technical manuals.

90% pass rate
Hands on, Practical application.
Ability to effectively repair engine block, heads, and sub-assemblies
· Techniques, tactics and procedures for engine block and head components and sub-assemblies repair; Boring and honing, resurfacing the head, measure and installation of cam bearings, installation of expansion plugs and oil galley plugs

· Instruction on the proper operation of the Sunnen Vertical Honing Machine, Valve Guide and Seat Machine, Centerless Valve Refacer, and Rodgers Machine Co. Surface Milling Machine

90% pass rate
Hands on, Practical application, Acceptable Engine performance run on dynamometer test.
Ability to effectively assemble Engine
· Identification and instruction of all common use and specialty tools.

· Engine Assembly preparation

· Instruction on the proper assembly, installation, and measurements of all engine components during a complete engine rebuild

· Final quality control procedures to ensure quality engine build

90% pass rate
Hands on, Practical application, Acceptable Engine performance run on dynamometer test.
Engine Dynamometer Testing
· Techniques, tactics and procedures in assembling and connecting engine to dynamometer.

· Inspection, adjustments and tuning of engine during dynamometer testing procedures per applicable technical manuals

· Final quality control procedures, checks and services to determine pass/fail criteria of engine per manufacturer’s specification.

100% pass rate
Hands on, Practical application, Acceptable Engine performance run on dynamometer test.
Defined checklist for procedures during the disassembly, inspection, assembly and dynamometer testing phases
· Review of current shop checklists and procedures during the engine repair/testing phases.

· Recommend changes to current techniques, tactics and procedures of the engine repair/testing phases.

100% accuracy
Validated checklist

5.0 Deliverables:

1. First session to start 14 days after award of contract.

2. Proposed teaching curriculum submitted to contracting officer within 5 working days after award of contract.

6.0 Government Furnished Property: GSM Co will provide (6) diesel engines technical publications, , all required repair parts, and tool kits. In addition GSM Co has the following equipment available to conduct cleaning, repair, and testing of the engine and components:

1. DCM Tech Mfr. Magnetic Particle Inspection Machine; Model MPI-4830B

2. Axe Mfr. Parts Washer; Model SW50GHT

3. Sunnen Vertical Honing Machine; Model SV-10-D

4. Sunnen Valve Guide and Seat Machine; Model VGS-20-P

5. Sunnen Centerless Valve Refacer; Model VR-7000-K

6. Rodgers Machine Co. Surface Milling Machine; Model RMC-10V

3. Power Test Engine Dynamometer; Model 25x18 and 50x02

7.0 Place of Performance: FC-280 GSM maintenance bay, 2d Maintenance Battalion, Camp LeJeune, NC

File details come from the government source that posted it. Updated .