M002(I)_QLR ARSR.pdf
PDF 65 KB Posted
- Attached to
- QLR (Guam) ARSR HVAC Replacement Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00487
About this file
This solicitation is seeking proposals for the HVAC replacement project at the Mt. Santa Rosa Long Range Radar site in Yigo, Guam. The selected contractor shall furnish all labor, equipment, materials, and costs associated with demolishing the existing HVAC system and installing the new HVAC system in accordance with the statement of work, specifications, and project drawings. The total estimated contract value is between $250,000 and $500,000. This opportunity is set aside solely for small business concerns. An optional site visit will be held on August 25, 2022, with advanced notice required by August 24th. Proposals are due by September 7, 2022. The soliciting agency is the Department of Transportation's Federal Aviation Administration Southwestern Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 9. Wage Determination - GU20220005.pdf | ||
| M001(I)_QLR ARSR.pdf | ||
| SUMMARY OF WORK_QLR ARSR HVAC Replacement.docx | DOCX document | |
| 697DCK-22-R-00487 SIR.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTER
AIR HANDLER
UP TO RADOME
STORAGE
CORRIDOR
AIR HANDLING ROOM
SUPPLY AIR CHAMBER
OFFICE
CORRIDOR
BREAK ROOM
FLOOR HATCH
MAINTENANCE ROOM
JANITOR
BATHROOM
UPSTAIRS
LOBBY
UPSTAIRS
LOBBY
EXHAUST
DUCT
AH-3
AH-4
CATWALK
OVER
STAIR NO. 1
STAIR NO. 2
OPENING
ABOVE
24X36 ø 8
F
IL
E
S
D
A T
E
T
IM
E
N
A M
E
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
M002(I)
SECOND FLOOR PLAN
QLR ARSR: HVAC REPLACEMENT PROJECT
LINES (TYP)
REFRIGERANT
CONTROLLER
OAS HVAC
GENERAL NOTES:
NEW EQUIPMENT
APPROVED BY ONSITE FAA REPRESENTATIVE
RELOCATE INTERFERENCES AS-REQUIRED; ALL RELOCATIONS MUST BE5.
OF MOISTURE
NEW REFRIGERANT LINES; SEAL ALL PENETRATIONS TO PREVENT ENTRY
MODIFY EXTERIOR WALL PENETRATIONS AS REQUIRED TO INSTALL4.
BE MOUNTED BY STUDS TO WALLS/FLOOR, AS REQUIRED
BUILD INTERIOR SUPPORTS USING 2"x2" UNISTRUT; SUPPORTS SHALL 3.
CLOUDED PORTIONS DENOTE AREAS OF WORK2.
TO FINAL FABRICATION
CONTRACTOR SHALL FIELD VERIFY ALL ON-SITE MEASUREMENTS PRIOR1.
FAA PROVIDED OAS HVAC CONTROLLER1
File details come from the government source that posted it. Updated .