Draft RTPD Operational Support PWS With ARRT.doc
DOC document 159 KB Posted
- Attached to
- TECD Operational Support Federal contract opportunity
- Solicitation number
- M00264-20-SSA-0003
- Issued by
- United States Marine Corps
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Draft RTPD Operational Support PWS With ARRT.docx | DOCX document | |
| M00264-20-SSA-0003 TECD Op Support.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement (PWS)
Range and Training Programs Division (RTPD) Operational Support 01/16/2020 Version 1.0 4Vision Statement
1 Introduction
1.1 Mission
1.2 Background
1.3 Scope
2 General Requirements
2.1 Non-Personal Services
2.2 Business Relations
2.3 Contract Administration and Management
2.3.1 Contract Management
2.3.2 Contract Administration
2.3.3 Personnel Administration
2.4 Subcontract Management
2.5 Contractor Personnel, Disciplines, and Specialties
2.6 Location and Hours of Work
2.7 Travel / Temporary Duty (TDY)
3 Performance Requirements
3.1 The Marine Corps requires a Live, Virtual and Constructive Training Environment capability for Integration of legacy and new systems.
4 Special Requirements
4.1 Security and Safety
4.1.1 Security
4.1.2 Safety
4.2 Transition
4.3 Government Furnished Materials
4.4 Environmental Requirements
4.5 Applicable Directives
4.6 Quality
4.6.1 Quality Control
4.6.2 Quality Assurance Surveillance Plan (QASP)
5 Deliverables
Performance Work Statement (PWS) Range and Training Programs Division (RTPD) Operational Support Vision Statement
To identify the manpower and expertise required to provide seamless Training Support as it applies to exercise design, control and support.
1. Introduction
The objective of this Performance Work Statement (PWS) is greater combat readiness and enhanced operational execution by providing a training continuum which supports planning, preparation, exercise, and assessment capabilities for U.S. Marine units. Training capability requirements describe exercise programs and Modeling and Simulation (M&S) capabilities to meet unit training needs. The Marine Corps Training Environment (MCTE) will be a key component in the development of Fleet Marine Forces as articulated in the 38th Commandant’s Planning Guidance.
1.1 Mission
RTPD provides resource sponsorship and requirements oversight of the MCTE throughout the life-cycle of system training aids, devices, simulators and simulations, live ranges and range instrumentation. Training systems must be developed for interoperability across the MCTE, while supporting operational and institutional, home station, exercise, and deployment training. RTPD identifies, develops, and coordinates the integration of live training systems, with non-standard simulated and virtual training systems in order to provide training capabilities to the Total Force.
RTPD/Synthetic Training Integration and Management (STIM) Branch provides resource sponsorship and requirements oversight of MCTE throughout the life-cycle of system training aids, devices, simulators and simulations, live ranges and range instrumentation. Achieving Department of Defense Training Transformation requires that MCTE training systems be developed for interoperability across the MCTE, while supporting operational and institutional, home station, exercise, and deployment training.
RTPD/Range Training Area Management Branch (RTAMB) RTAMB is responsible for the development and implementation of institutional programs to sustain, upgrade, and modernize Marine Corps training ranges that support the achievement and maintenance of combat readiness. RTAMB is the resource sponsor for institutional range programs and live training systems. RTAM provides for Range and Training Area (RTA) management through a myriad of functions/programs such as range safety, range maintenance/sustainment, range control management/instruction, Force on Force Training Systems (FOFTS), Immersive Training Environments (ITE) and financial support. Tasked with those responsibilities, RTAM executes requirements as derived from numerous Marine Corps Orders and directives that delineate the responsibilities and requirements for range safety and operations.
1.2 Background
Combat readiness is of the utmost importance to the Marine Corps. The Range and Training Programs Division (RTPD) is responsible to the Commanding General, Training & Education Command (TECOM) for the development of the MCTE. The programs RTPD manages are:
· DVTE, a laptop configuration with additional peripherals which host software that allows users to train in decision making through animated avatars, virtually view terrain in 3 dimensions, and operate unmanned aerial vehicles to capture terrain and video. The software application allows users to conduct call for fire, patrol, operate virtual vehicles, etc. in order to increase proficiency of skills associated with their military occupation;
· CACCTUS is a combined arms training system which supports company and battalion teams in decision making associated to fire support and maneuver;
· MTWS is a MAGTF staff training system which provides training scenarios where large forces are maneuvered across a virtual representation of the world.
· ISMT is a marksmanship trainer that support training of small arms and crew-served weapons training;
· SAVT supports the qualification of Joint Terminal Air Controller (JTAC) personnel and supports approximately fifty-nine JTAC controls;
· ODS supports training associated to licensing of personnel in the various vehicles associated to the Marine Corps;
· CCS supports the training of convoy operations, combat and tactical vehicle movement and provides additional training support with dismounting of personnel and weapons engagements;
· CVTS is configured into three separate vehicles M1A1 Tank, AAV, and LAV, which support crew and gunnery skills training as a gateway to live fire trainer; there are also current DUNS in process which will become programs under the non-standard training structure or integrate with current training programs.
As the complexity of training events continues to evolve, training program effectiveness and the capabilities of simulation systems to support and optimize training outcomes becomes an increasingly critical concern. Verification, Validation and Accreditation (VV&A) are three interrelated, but distinct processes that gather and evaluate evidence to determine, based on the model or simulation’s intended use, the capabilities, limitations, and performance relative to the real-world objects it simulates. Tailoring VV&A to meet USMC specific requirements and provide a data-based appraisal of simulators and their ability to meet specified training objectives for all RTAM and STIM programs are the support purpose Future efforts in support of LVC-TE Increment I will provide integration of ADVTE, CACCTUS, DVTE, and SAVT for tactical air-ground training.
1.3 Scope
The Contractor shall provide support to RTPD’s role as requirements and resource sponsor by developing MCTE capabilities, including JCIDS and DoDAF Integrated Architecture products. The Contractor shall support RTPD’s activities in processes such as MCIAP; RTP; Verification, Validation and Accreditation (VV&A); and Planning, Programming, Budgeting, and Execution to provide support to the following tasks: Enterprise Architecture Support, External Information Portal and Website Management, Enterprise-Level Information Technology Engineering/Analysis, Information Systems Security Management, Senior Level Staff Support, Training Capability Assessment Support, Training Processes and Metrics Analysis, and JCIDS Development/Support. These products and activities will guide the development of Marine Corps training aids, devices, simulators and simulations, live ranges and range instrumentation.
2. General Requirements
The Contractor shall provide requirement analytics to RTPD by working in concert with experts in training and education, information management systems, JCIDS, PPBE, defense acquisition, command and control, MAGTF operations, and all other relevant disciplines in the development of MCTE documents. The types of documents that the Contractor shall develop and support include white papers, concepts, concepts of operation/employment, capability requirements, letters of clarification, memoranda of agreement/understanding, DoDAF Integrated Architectures, plans, policies, naval messages, formal taskers, information/position papers, briefs, and other supporting documentation.
The Contractor shall provide analytical assessments on future development of capabilities such as: Future Integrated Training Environment (FITE), Fight Club (wargaming), Mixed Reality Training Prototypes, Army Synthetic Training Environment (STE), Improved Visual Augmentation System (IVAS), Enterprise-level Ground Maintenance Training Simulation (EGMST), Basic Electronic Course Electronics Fundamental Trainer (BECEFT), Leader Focused Decision Games (LFDG), Virtual Reality-Simulator Battlelab Hologram, Training as a Service (TaaS), Contractor Owned, Contractor Operated capability (COCO), Infrastructure as a Service (IaaS), and Platform as a Service (PaaS).
2.1 Non-Personal Services
The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.
2.2 Business Relations
The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.
2.3 Contract Administration and Management
The following subsections specify requirements for contract, management, and personnel administration.
2.3.1 Contract Management
The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at RTPD and the contractor's corporate offices.
2.3.2 Contract Administration
The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.
2.3.3 Personnel Administration
The contractor shall provide the following management and support as required. The contractor shall provide for employees during designated Government non-work days or other periods where Government offices are closed due to weather or security conditions. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks.
The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs).
2.4 Subcontract Management
The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Procuring Contracting Officer (PCO) or Contracting Officer Representative (COR). Cross teaming may or may not be permitted.
2.5 Contractor Personnel, Disciplines, and Specialties
The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor categories as defined in the Labor Categories document (see attachment), labor rates, and man-hours utilized in the performance of each Task Order (PWS line item) issued hereunder will be the minimum necessary to accomplish the task.
The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.
2.6 Location and Hours of Work
Accomplishment of the results contained in this PWS requires work at various contractor, subcontractor, and Government facilities CONUS and OCONUS (but mainly in the continental United States). Normal workdays are Monday through Friday except US Federal Holidays, inclement weather, and local or national emergencies. Workers typically work eight (8) hours per day, 40 hours per week. Flextime workers start not earlier than 0600 and not later than 0900. Core hours of work are from 0930 to 1500 daily. All employees are expected to be available during core hours. In the event that surge hours are required. All surge request shall be approved by the CO/COR prior to execution.
2.7 Travel / Temporary Duty (TDY)
Travel to other government facilities or other contractor facilities may be required and will be specified in the PWS. All travel requirements (including plans, agenda, itinerary, or dates) shall be pre-approved by the government (subject to local policy procedures), and is on a strictly cost reimbursable basis. Costs for travel shall be billed in accordance with the regulatory implementation of Public Law 99-234 and FAR 31.205-46 Travel Costs (subject to local policy & procedures; may reference FAR).
Contractor Travel
| LOCATION |
| Duration (Days) |
| # of Attendees |
| Base Year # of Trips |
| Option-1 # of Trips |
| Option-2 # of Trips |
| Option-3 # of Trips |
| Option-4 # of Trips |
| MCAS Yuma, AZ |
| 1 week |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCLB Barstow, CA |
| 1 week |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCB Camp Pendleton, CA |
| 3 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MWTC Bridgeport, CA |
| 2 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCAGCC Twenty-nine, Palms, CA |
| 2 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCAS Miramar, CA |
| 2 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCRD San Diego, CA |
| 2 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| Orlando, FL |
| 2 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCLB Albany, GA |
| 2 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCB Camp Lejeune/MCAS New River, NC |
| 3 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCRD Parris Island/MCAS Beaufort, SC |
| 2 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCB Camp Smith, HI |
| 5 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCBJ Okinawa, JP |
| 4 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| MCAS Cherry Point, NC |
| 4 days |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| AAFB Guam |
| 1 week |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
3. Performance Requirements
The following section specifies the Performance Objectives and Performance Elements for the contract.
3.1 The Marine Corps requires a Live, Virtual and Constructive Training Environment capability for Integration of legacy and new systems.
The Marine Corps requires a Live, Virtual and Constructive-Training Environment (LVC-TE) that replicates a Contemporary Operational Environment (COE) and describes how units may interact as though they are physically located in the same Operational Environment.
Performance Standards Standard:
a) the Contractor shall provide key expertise in support of the preparation, delivery, and evaluation of training products, including GIS (Geographic Information Systems) data maintenance and development services such as; information technology engineering, security processes, new technology analysis, and quantitative operational analysis.
b) The Contractor shall coordinate documentation for Marine Air/Ground Task Force (MAGTF) training modeling and simulations requirements development and integration for Marine Corps virtual & constructive training capabilities. The Contractor shall assist RTPD utilizing the Joint Capabilities Integration and Development System (JCIDS) in the development of identified gaps/needs that are presented by the Total Force. Must be 100% Compliant with all Regulations
AQL:
3.1.1 The Contractor shall provide DoDAF support to RTPD and develop enterprise architectures for the MCTE. (Optional) Performance Standards Standard:
a) Provide accurate linkages, data exchange requirements, workflows, and associated operational and systems engineering information for legacy, updated, and new training systems and training support systems in the RTPD portfolio, including identification of interoperability requirements with other training systems, training support systems, weapon systems, C2 systems, and training readiness systems some of which are managed external to the RTPD portfolio. Develop all mandated and applicable DODAF Viewpoints for systems within the RTPD portfolio and recommend changes to external viewpoints necessary to address interoperability needs of the Marine Corps training community.
AQL: As defined in the current CJCSI 3170.01 and JCIDS Manual, and the DOD Chief Information Officer's DODAF website (https://dodcio.defense.gov/library/dod-architecture-framework/). The Contractor shall work with approval and coordination authorities to include: OAB, PMTRASYS, and MCSC Deputy Commander for Systems Engineering and Acquisition Logistics (SEAL). The Contractor shall support all steps of the Marine Corps Integrated Architecture Process.
Deliverables
3.1.2 The Contractor shall collect user requirements, design, develop, build, test, deploy, and support an external information portal and website to provide information and resources related to MCTE capabilities to the Marine Corps. (Optional) Performance Standards Standard:
a) Leverage existing repositories and web servers for website content, configure and organize website and SharePoint content, manage security settings and permissions, and handle customer requests.
b) Must provide web accessibility of documents and data content that supports training events, including but not limited to: descriptive capability catalog, training support packages, tutorial videos, simulation scenario files, and simulation terrain datasets.
c) Must provide all necessary data files, documentation, and instructions for the Government, or the Government’s agent, to host and manage the portal and website upon conclusion of this contract with no downtime during the transition.
AQL:
3.1.3 The Contractor shall analytically assess future development, integration and federation of current USMC non-standard training systems, identify possible gaps, and recommend proper courses of action (COA) in order to manage resources and mitigate potential risks to the government. (Optional)
Standard:
a) Provide engineering, technical analysis, and assistance to develop evidence-based recommendations to TECOM leadership, inform requirements, and improve training and education methods and capabilities.
b) The Contractor shall assist in seeking and assessing innovative methods in order to enhance Marine Corps learning. This involves conducting research, drafting information papers, analyzing content or data, reviewing materials and reports, and providing recommendations regarding science and technology S&T program activities, planning, and coordination. This support includes assistance in planning, coordination, synchronization, execution, and integration of S&T initiatives and prototyping activities with TECOM stakeholders and partner organizations. Tasks include providing documentation and data analysis support, which requires excellent writing, analytic, statistical, and communications skills in order to coordinate effectively, assist with analysis, and communicate the results both internally to TECOM and externally.
c) The Contractor shall be able to effectively work independently, with the Marine Corps S&T partners, and with external partner agencies. The Contractor must have basic analytical and technical expertise in following areas: Microsoft Office, user-centered design, research methods, experiment design, statistical software, and/or simulations.
AQL:
Deliverables
3.1.4 The Contractor shall provide enterprise-level information technology engineering and analysis support for M&S development within the MCTE.
Standard:
a) The Contractor shall advise on cloud policy and RMF at Federal, DOD, and Service level and coordinate all efforts with and provide information to DC-I.
b) The Contractor shall evaluate implications of proposed IT engineering decisions on training effectiveness
AQL:
Deliverables
3.1.5 The Contractor shall perform Information Systems Security Officer (ISSO) duties for Range and Training Programs Division. Integral to this effort is expert-level knowledge of IT Services and Marine Corps Risk Management Framework (RMF). The Contractor shall satisfy all responsibilities of, and maintain a cybersecurity program that identifies cybersecurity architectures, requirements, objectives and policies, and processes and procedures. (Optional)
a) Coordinate all efforts with the ISSM to ensure the development, review, endorsement, and maintenance of cybersecurity authorization documentation in accordance with Marine Corps policy. A repository of this documentation and all modifications will be maintained in Marine Corps Certification and Accreditation Support Tool (MCCAST). This document will include the site System Security Authorization Agreement(s) (SSAA) for TECOM/MCSC/PM TRASYS training systems. The Contractor shall work with TECOM Cybersecurity Workforce Program Manager (CSWF-PM) to ensure personnel with privileged access are identified, designated, and appointed in writing. The Contractor shall assist the ISSM with compliance monitoring.
b) Utilizing the TECOM/MCSC/PMTRASYS ISSM's coordinate security measures including analysis, periodic testing, evaluation, verification, accreditation, and review of information system installation at the appropriate classification level within the MEFs, Bases and OpFor organizational network structure.
3.1.6 The Contractor shall provide senior level staff support to the division level and branch level staffs of RTPD and the TECOM G5 Future Learning Branch.
a) Prepare information papers, documents, scene-setters, white papers, reports to DoD or Congress, email responses, and briefing slides in the appropriate formats as required by TECOM Headquarters, other senior organizations, and as required by the RTPD Director, Deputy Director, RTAM or STIM Branch personnel. These documents must represent the RTPD position as it applies to the task or strategy, policy, plans, and processes. The Contractor shall refer to agency regulations and other office reference materials as appropriate (e.g., TECOM templates, the Naval Institute Guide to Naval Writing, Publication Manual of the American Psychological Association) to ensure proper format, grammar, content, and spelling. The contractor shall also provide administration process support, including routing sheet preparation, document staffing, review and adjudication meetings, consultations of references, and coordination assistance.
b) Prepare a variety of correspondence and documents for review that include, but are not limited to updates to CG TECOM, TECOM routing sheets, meeting invitations, meeting minutes, information papers, analysis reports, briefs, and messages.
3.1.7. Conduct Validation and Accreditation (V&A) on simulations in Stand-alone and in a System of Systems configurations (Optional)
a) The Contractor shall gather information, prepare and execute development workshops, draft, submit for staffing, adjudicate comments, execute independent testing and produce statistical/quantitative and qualitative analysis, prepare the final version, arrange for posting on the appropriate electronic medium, and submit an official notification message for the following documents:
· Accreditation Plans for Training M&S Systems in a stand-alone and/or system of systems configurations
· Validation Plans for Training M&S Systems in a stand-alone and/or system of systems configurations
· Validation Reports for Training M&S Systems in a stand-alone and/or system of systems configurations
b) The Contractor shall continuously evaluate V&V methods; training requirement and task analysis, development and plan designs, test execution and practices, results analysis and methodologies, to provide and maintain a best practices manual(s). The Contractor shall execute at a minimum one validation event a year in a stand-alone and/or System of Systems (SoS) configuration. This may include validation of: Training Support Packages (TSP), Training and Readiness (T&R) event execution, partial tasks within T&R manual(s), and programs of instruction.
AQL:
Deliverables
3.1.8 The Contractor shall provide operations research and operational analysis techniques in the development and documentation of enterprise level processes and training event lifecycle support in order to improve efficiency and effectiveness of training capability development, operations, and sustainment.
Performance Standards Standard:
a) Gather training data, including coordination with other agencies that collect related data. Compile, organize and analyze empirical evidence IOT support decisions and to investigate hypotheses about utilization of training systems and effectiveness with respect to Marine Corps readiness.
AQL: The Contractor shall provide collected data gained through study efforts to the government and produce statistical/quantitative and qualitative analysis to answer research questions and inform investment decisions.
3.1.9 The Contractor shall provide support to RTPD by working in concert with Subject Matter Experts (SME’s) to develop JCIDS documents and supporting documentation that will guide the development of Marine Corps live and immersive range training systems and training simulation/simulators.
Standard:
a) The Contractor shall produce JCIDS documents for RTPD and continue to staff, adjudicate comments, and improve them through the RTP and Marine Requirements Oversight Council (MROC) approval. The Contractor shall gather information, prepare and execute development workshops, draft, submit for staffing, adjudicate comments, prepare the final version, arrange for posting on the appropriate electronic medium, and submit an official notification message for documents. The Contractor shall develop Key Performance Parameters (KPPs), Key System Attributes (KSAs), and Additional Performance Attributes (APAs) and assist in the development of Doctrine, Organization, Training, Materiel, Leadership and Education, Personnel and Facilities (DOTMLPF) and Technology Readiness Assessment (TRA) processes.
b) The Contractor shall develop Plans of Action and Milestones (POA&Ms) addressing the development of JCIDS documentation products and supporting documentation up to such time as the JCIDS decision resides with the Marine Corps Requirements Oversight Council (MROC).
JCIDS Documentation includes, but is not limited to the following types of artifacts per program:
· Capabilities developer input for the development of Information Support Plans and Tailored Information Support Plans
· Operational Mode Summaries and Mission Profiles
· Concept for a training capability
· Concept of Operations for a training capability
· Concept of Employment for a training capability
· Initial Capability Document
· Capability Development Document or Information System Capability Development Document
· Operational Requirements Document or Capabilities Production Document (legacy artifacts)
· Capability Requirements Change Letter
· Requirements Memorandum
· Letter of Clarification
· Joint DOTMLPF Change Requests
· Supporting Requirements Documentation i.e., white papers, info papers, messages, etc.
AQL:
Deliverables
4. Special Requirements
Upon hire, contractors are considered part of the cyber IT/CSWF when they are boarded in order to perform Cyber IT/CSWF functions for a designated organization. Contractor Technical Representatives must ensure that these functions are included within their statement of work (SOW) and/or performance work statement (PWS) prior to appointment in a specific position.
The Contractor shall possess credentials (i.e., diploma) to attest to current DoDAF CEA certification through an accredited University; for All Viewpoints (AV), Operation Viewpoints (OV), Capability Viewpoints (CV), Data and Information Viewpoints (DIV), Project Viewpoints (PV), System Viewpoints (SV), and Standard Viewpoints (StdV), and lifecycle system analysis to support future development of MCSTE capabilities within the Marine Corps, and potentially with other Services. DOD CEA certifications must be renewed every three years; transcripts without certification are not acceptable.
The Contractor shall have demonstrated expertise as an operations/exercise MAGTF planner at the Marine Expeditionary Force (MEF)/MEB level; and have the ability to translate operational concepts and technical implications of training capability Concepts and CONOPS to DODAF-compliant architecture products. The Contractor shall demonstrate project management, JCIDS requirements and system integration skills, from concept development to capability fielding.
The Contractor shall provide expertise in animation techniques, be capable of working efficiently in a military/federal government staff environment, and provide expertise in scripting.
4.1 Security and Safety
This section describes the security and safety for this effort. The following sub-sections provide details of various considerations on this effort.
4.1.1 Security
DD Forms 254: Overarching security requirements and Contractor access to classified information shall be as specified in the basic DD Form 254, which will be further identified in the DD Form 254 for each TO, as required. All contractor personnel with access to unclassified information systems, including e-mail, shall have at a minimum a favorable National Agency Check (NAC).
Visitor Group Security Agreement. The contractor shall sign a Contractor Visitor Group Security Agreement to protect classified information involved in performance under this contract or Task Order. The Agreement will outline responsibilities in the following areas: Contractor security supervision; Standard Practice Procedures; access, accountability, storage, and transmission of classified material; marking requirements; security education; personnel security clearances; reports; security checks; security guidance; emergency protection; protection of government resources; DD Forms 254; periodic security reviews; and other responsibilities, as required.
4.1.2 Safety
Contractor Compliance: The contractor and its subcontractors shall comply with Public Law 91-596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E). These requirements shall be incorporated into the contractor's safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation shall participate in the local VPP. Information on the VPP is available at http://www.osha.gov/dcsp/vpp/index.html.
Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government personnel and to cooperate in any resulting safety investigation. The contractor shall notify (via telephone) the cognizant contracting officer, the contracting officer's representative, and/or other applicable members within four (4) hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety office. Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant contracting officer, the contracting officer's representative, and/or the cognizant program manager, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.
4.2 Transition
The contractor shall follow the transition plan submitted as part of the proposal and keep the Government fully informed of status throughout the transition period. Throughout the phase-in/phase-out periods, it is essential that attention be given to minimize interruptions or delays to work in progress that would impact the mission. The contractor must plan for the transfer of work control, delineating the method for processing and assigning tasks during the phase-in/phase-out periods.
4.3 Government Furnished Materials
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Range and Training Programs Division Operational Support as defined in this Performance Work Statement except for those items specified as government furnished services. The Government will provide Standing Operating Procedures (SOPs), Policies and all documentation required to successfully complete the tasks outlined in the PWS.
4.4 Environmental Requirements
The contractor shall comply with all environmental regulations. However, there are no environmental factors impacting the performance of tasks listed in the PWS.
4.5 Applicable Directives
The Contractor shall comply with all applicable Marine Corps Orders and Directive documents associated with the operation and management of RTPD Programs include, but are not limited to:
· MCO 1553.1B The Marine Corps Training and Education System
· MCO 1500.53B Marine Air-Ground Task Force Staff Training Program
· MCO 1553.3B Unit Training Management (UTM) Program
· MCO 3500.11F Marine Corps Air Ground Task Force Training Program
· MCO 3501.1D Marine Corps Combat Readiness Evaluation (MCCRE)
· MCO 3710.6A Marine Corps Aviation Training System
· MCO 3502.7A Marine Corps Ground Combat Element Operations and Tactics Training Program
· MCO 3500.109 Marine Corps Aviation Weapons and Tactics Training Program
· MCO 3502.8 Marine Corps Logistics, Tactics, Training and Education Program
· MCO 3500.14 W/ADMN CH 28JAN11 Aviation Training & Readiness Program
· MCO 3502.3B Marine Expeditionary Unit (MEU) and MEU (Special Operations Capable) (SOC) Pre-Deployment Training Program (PTP)
· MCO 1553.10 Marine Corps Training Information Management System (MCTIMS) Standing Operating Procedures (SOP)
· Defense Acquisition Guidebook, 26 Feb 2017
· DODI 5000.2E, Implementation and Operation of the Defense Acquisition Systems and the Joint Capabilities Integration and Development System, 1 Sep 2011
· CJCSI 3170.01I, Joint Capabilities Integration & Development System, 23 Jan 2015
· DODD 8100.01, Management of the DOD Information Enterprise (DoD IE) 17 Mar 2016
· Manual for the Operation of the Joint Capabilities Integration and Development System 31 Aug 2018
· CJSCI 6212.01G, Interoperability and Supportability of Information Technology and National Security Systems, 12 Feb 2015
· MCO 3900.20, Marine Corps Capabilities Based Assessment, 27 Sep 2016
· SECNAV M-5216.5 Correspondence Manual
· CJSCI 6212.01G, Net Ready Key Performance Parameter (NR KPP), 12 Feb 2015
· MCO 3570.1C Range Safety
· MCO 3550.9_ Marine Corps Range Certification and Recertification program
· MCO 11000.25 Installation Geospatial Information and Services
· Safety Of Use Memorandums (SOUM)
4.6 Quality
This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.
4.6.1 Quality Control
The Contractor shall develop a Task/Delivery Order QCP and maintain an effective quality control program to ensure services are performed in accordance with the IDIQ contract and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which he assures himself that his work complies with the requirement of the contract.
The finalized QCP will be accepted by the Government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change.
The QCP shall be subject to the Government's review and approval. The Government may find the QCP "unacceptable" whenever the Contractor's procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."
4.6.2 Quality Assurance Surveillance Plan (QASP)
The Government shall monitor the Contractor's performance under this Task/Delivery Order in accordance with the Government's QASP.
5. Deliverables
The contractor shall provide deliverables as described in subsequent task orders. Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in CDRLs and/or other means TBD.
| Number |
| Name |
| Frequency |
| Quantity |
| A001 |
| Enterprise Architecture |
| quarterly |
| A002 |
| External Information Portal and Website Management |
| monthly |
| A003 |
| Enterprise-Level Information Technology Engineering/Analysis Support |
| quarterly |
| A004 |
| Information Systems Security Officer Support |
| monthly |
| A005 |
| Senior Level Staff Support |
| monthly |
| A006 |
| Conduct Studies and Analysis Support |
| quarterly |
| 2 per year |
This effort will provide 2 six month studies per year
| A007 |
| Training Capability Assessment Support |
| monthly |
| 1 Validation/ |
TEE a year
| A008 |
| Training Processes and Metrics Analysis Support |
| monthly |
| A009 |
| Synthetic Environment Development and Support |
| monthly |
| A010 |
| Training Environment Repository with Remote Accessibility (TERRA) Development and Management Support |
| monthly |
| A011 |
| JCIDS Development/Support |
| monthly |
�Where did this come from?
�Move this to the Mission section above.
�Some of these would be easier to read if you broke them into sections a, b, c,…
�Should this be a report?
�Aren’t the documents described above the deliverables?
�Move TEE into the VV&A support section.
�Move to 3.1.11 JCIDS support task.
�This is arguably a PM-TRASYS responsibility
�Put ROI language in 3.1.8 (operations research and operational analysis)
�Add “participate and support AoAs” to 3.1.11 JCIDS task.
�Add to 3.1.11 JCIDS task.
�Part of DOTMLPF
�Part of VV&A 3.1.7
�Move to 3.1.11 JCIDS support task
�Delete
�Unless we know exactly what studies we’re going to conduct over the next few years, let’s consider deleting this task and moving the pertinent efforts to other related tasks (see below).
�Shouldn’t the deliverables be study reports?
�Optional. Consider for separate contract.
Completed
�Shouldn’t this go into the performance standard section or AQL?
�Describe the level of detail that must be provided, i.e. near-photo realistic 3D models when viewed at a simulated distance of X, Y, and Z.
Made to a standard and will request AQL from M&S Officer
�How about the models????
�Optional. Consider for separate contract.
Completed
�We need to specify all data layers that must be provided, to include elevation, imagery (at what resolutions?), vector data labels (e.g. road, water, bare earth, vegetation). Where do building models go? In this task or in the 3D modeling task?
(will consult with the M&S Officer)
�Are these the right attributes for terrain data? They look a lot like the attributes from the 3D models.
(Great question, I pulled this from the PWS)
�Duplicate
�What about terrain datasets?
�Indicate how many JCIDS packages per year, that is, how many programs per year will be supported.
(I will consult with JCIDS Lead (Russ))
�Update
�What is delivered quarterly?
�What is happening/delivered monthly?
�Since almost none of these are actual deliverables, it’s not clear why you’re making some monthly and some quarterly.