M001(I)_QEA ARSR.pdf
PDF 111 KB Posted
- Attached to
- QEA ARSR HVAC and Facility Improvements Federal contract opportunity
- Solicitation number
- 697DCK-22-R-00527
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 697DCK-22-R-00527.pdf | ||
| 9. Wage Determination - MA20220001.pdf | ||
| SOW _North Truro_MA_QEA ARSR HVAC MOD Proj.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VD
C U
R
C U
R
VD-1
VD-2
UPS ROOM
SECURITY SCREEN
CENTERLINE
OF TOWER
M
D-3
NC
VD
VDVD
VD
CFM
SEE DWG. M106
FLOOR STAND
SEE DWG. M106
FLOOR STAND
14" DIA
12" DIA
12" DIA
16" DIA ENGINE GENERATOR ROOM
M
M
RAINHOOD W/
INSECT SCREEN
SECURITY SCREEN
CU-1 CU-2
REFRIGERANT PIPING
CU-1
DISC. SW CU-2
DISC. SW
PADS
CONCRETE
EXISTING
TS-2
(TYPICAL FOR CRU-1 & CRU-2)
SEE DETAIL DWG. (M102)
OF UNIT CONNECTION
26"x 48" DN. TO 82"
(TYP 6 PL.)
1300 CFM
24"x 24" SUPPLY DIFFUSER
(TYP 2 PL.)
280 CFM
DN. TO DIFFUSER
10" DIA FLEXIBLE TUBING
M
(TYP 2 PL.)
DIFFUSER 500 CFM
DN TO 24"x 24" SUPPLY
12" DIA FLEXIBLE TUBING
32" DIA
UNITS
CONDENSING
NEW
TS-1
WORK
PANEL FOR DUCT
CEILING ACCESS
26" x
48"
26" x
48"
VD
CABLE TRAY
RUN ABOVE ELECTRICAL
SUPPLY DUCT TO
28" DIA
VDVD
PL.)
SIDE OF WALL (TYP 2
GRILLES, ONE EACH
(2) 8"x 12" TRANSFER
14" DIA
24" DIA
(TYP 6 PL.)
DN TO SUPPLY DIFFUSER
18" DIA FLEXIBLE TUBING
EQUIPMENT ROOM
(TYP 2 PL.)
SUPPLY REG.
14"x 14"
(TYP)
HEATER
UNIT
RESTROOM
CFM
(EXISTING TO REMAIN)
EXHAUST FAN 50 CFM
EXHAUST GRILLE
18"x18"
RELIEF DAMPER
TELCO ROOM
DIFFUSER 1000 CFM
TUBING DN. TO SUPPLY
14" DIA FLEXIBLE
ROOM
STORAGE
DIA
10"
VD
VD
DIA
10"
PLENUM
48"L x 26"W x 5"H
16" DIA18" DIA
16" DIA
16" DIA
16" DIA
4'-2"
4'-2"10'-4"
16" DIA
FUSED DISCONNECT
CUR-1, 100 AMP NON-
2'-10"
DISCONNECT
NON-FUSE
CUR-2, 100 AMP
2'-1 3/4" 1'-1 3/4"
M001
HVAC FLOOR PLAN
NOT TO SCALE
M001
UPS ROOM DOOR
NOT TO SCALE
HORIZONTALLY
8" VERTICALLY AND
#4 REBAR SPACED EVERY
ENTIRE OPENING
EXPANDED METAL COVERING
M001
F
IL
E
S
D
A T
E
T
IM
E
N
A M
E
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
GENERAL NOTES:
NEW EQUIPMENT
FAIL IN THE OPEN POSITION
(MOTOR) CLOSE DAMPER WHEN E/G IS NOT IN OPERATION; DAMPERS TO
CONTROL PANEL TO (SPRING) OPEN DAMPERS UPON E/G START AND
INTERLOCK NEW MOTORIZED CONTROL DAMPERS WITH E/G ENVIRONMENTAL4.
TO THE DOOR ON THE EQUIPMENT ROOM SIDE
UPS ROOM DOOR SECURITY BARS/EXPANDED METAL SHALL BE ATTACHED3.
CLOUDED PORTIONS DENOTE AREAS OF WORK2.
TO FINAL FABRICATION
CONTRACTOR SHALL FIELD VERIFY ALL ON-SITE MEASUREMENTS PRIOR1.
EQUIVALENT)
IS BELIMO AFBUP, SIDE MOUNT (OR FAA APPROVED
MODEL CD60SS (OR FAA APPROVED EQUIVALENT); ACTUATOR
2 EA - 48"W X 48"H MOTORIZED CONTROL DAMPER, RUSKIN1
M001(I)
QEA ARSR: HVAC MOD PROJECT
File details come from the government source that posted it. Updated .