LPF-QAR-003_ATTACH.pdf

PDF 286 KB Posted

Attached to
Support, Seal Federal contract opportunity
Solicitation number
SPRTA1-25-R-0067
Issued by
Defense Logistics Agency Aviation

About this file

This document (LPF-QAR-003) outlines the LPFR Quality Assurance Requirements for First Article Test Plans and Reports specifically for F100 engine parts referenced in first article data of contracts. The document provides detailed guidelines for preparing test plans and reports for these parts.

The requirements specify that first articles must undergo complete testing including destructive and non-destructive testing, with remaining articles only requiring non-destructive testing. Key testing requirements include dimensional conformance, non-destructive inspection (FPI, ultrasonic, x-ray, visual), material properties testing, and conformance to specifications. The document mandates 100% inspection of all dimensions with no sampling allowed, requires all tooling to be NIST traceable, and specifies that NDI sources must be Pratt & Whitney approved. First Article Test Plans (FATP) and First Article Test Reports (FATR) must be delivered to the Contracting Officer per contract schedule or Form DD1423. The document also stipulates that all articles must be newly manufactured under the current contract and requires OC-ALC/LPFR approval for any changes to previously identified subcontractors.

View the file

Other files for this federal contract opportunity

Other files attached to Support, Seal, newest first.
File Type Posted
3575509_QUALRQMT.pdf PDF
4030382_TRNSPDATA_REPORT.pdf PDF
SPRTA125R0067.pdf PDF
CDRL1_REPORT.pdf PDF
4030383_PKGRQMT_REPORT.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .