L4WC26 PD C130 Prop Shop Test Stand 21 June 24.pdf

PDF 178 KB Posted

Attached to
L4WC26_C130 Prop Shop Test Stands (NP2000 Compatible) Federal contract opportunity
Solicitation number
FA857124Q0116
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document is a Purchase Description for the procurement of two NP2000 Compatible C-130 Propeller Shop Test Stands for the 402d Commodities Maintenance Group at Robins Air Force Base. The requirement is for a turnkey solution that includes shipping, delivery, installation, training, and 5 years of sustainment support. The test stands must be capable of fully testing various propeller control assemblies under simulated flight conditions. The procurement will be a sole source acquisition from Hamilton Sundstrand Corporation DBA Collins Aerospace. The period of performance is 20 months from award, and the contractor must provide a 5-year warranty on the test stands. Key requirements include conducting design reviews, providing operating/maintenance manuals and training, and complying with various Air Force policies and procedures related to security, safety, environmental management, and supply chain risk management.

View the file

Other files for this federal contract opportunity

Other files attached to L4WC26_C130 Prop Shop Test Stands (NP2000 Compatible), newest first.
File Type Posted
L4WC26 CDRL A005 Safety Plan.pdf PDF
L4WC26 CDRL A002 CDR Material.pdf PDF
L4WC26 CDRL A001 PDR Material.pdf PDF
L4WC26 Appendix C for C130 Prop Shop Test Stand.pdf PDF
L4WC26 CDRL A006 Accident Incident Report.pdf PDF
L4WC26 CDRL A004 COTS Manuals.pdf PDF
Solicitation - FA857124Q0116.pdf PDF
SSJ_Redacted.pdf PDF
L4WC26 CDRL A003 FDR Material.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PURCHASE DESCRIPTION

C130 Prop Shop Test Stands (NP2000 Compatible)

21 June 2024

1.0 DESCRIPTION. This requirement is for a Contractor to provide to the 402d Commodities Maintenance Group (CMXG), Robins Air Force Base, all materials, parts and labor necessary to provide two (2) NP2000 Compatible Test Stands. This shall be a turnkey solution that shall include shipping, delivery, rigging, installation, leveling, utilities connections, initial training, and five years of sustainment. The test stands shall be capable of fully testing 54H60 and NP2000 propeller control assemblies in accordance with manufacturer's specifications while under simulated flight conditions.

1.1. Included items:

1.1.1. Contractor shall support the dismantling and removal of two of the existing GS1400 test stands.

1.1.2. During development of the test stand, contractor shall conduct a preliminary design review (“PDR”), critical design review (“CDR”) and final design review (“FDR”) (CDRL A001, A002 and A003, DI-ALS-81546/T, Production Inspection Equipment Test Systems Engineering Design Data)

1.1.3. Test stands shall be capable of testing the following components:

PN Description Acronym Propeller 714325-6,(-3,-7) Valve Housing Assembly VHA 54H60 826620-2 Valve Housing Assembly VHA EPCS/EVH200-1 826650-2 Valve Housing Assembly VHA NP2000 733872-2 Pump Housing Assembly PHA 54H60 733872-6 Pump Housing Assembly PHA 54H60 733872-8 Pump Housing Assembly PHA EPCS/EVH200-1 733872-10 Pump Housing Assembly PHA NP2000 Slave 733872-13 Pump Housing Assembly PHA EPCS/EVH200-1

The test stands shall be developed to allow the future integration of test capability for testing actuator valve module assemblies PN 1006712-2 and 1006712-4. The stands shall be able to be augmented in a subsequent acquisition with the capability to test the module assemblies via any physical additions and software upgrades necessary.

1.1.4. Contractor shall provide test stand operator/maintenance training as well as operating/maintenance manuals NLT 15 days after installation and acceptance of the first test stand. (CDRL A004, DI-TMSS-80527C NOT 1/T, Commercial Off the Shelf Equipment Manuals and Associated Documents (Operator/Maintenance Manuals, Spare Parts List, Schematics)

2.0 Service Support.

2.1 Government Point of Contact.

2.2 Shipping/Delivery/Period of Performance. The Contractor shall provide delivery NLT 20 months ARO to the following address:

Attn.: Chad Steger

402 CMXG

Address 455 First Street Robins AFB, GA 31098 FOB Destination DoDAAC FH2076 Comm: 478-222-4720 Email: chad.steger@us.af.mil

2.3 Incidental Services.

2.3.1 Installation.

2.3.2 Training. Contractor shall provide an initial set of test stand spares. Spares shall be specifically identified after CDR.

2.3.3 Technical support. Contractor shall provide sustainment support for all test stands.

Sustainment consists of technical support via phone/email and a single onsite visit to WR-ALC each calendar year for a 5-year period.

2.4 Warranty. Contractor shall provide a 5-year warranty for each of the test stands.

3.0 Government Furnished Equipment and Services or Government Furnished Property (GFP) and services. None

4.0 General Information.

4.1 Place of Performance and Hours of Work. On-site contract services shall be performed at the Warner Robins Air Logistic Complex. The work will take place in building 140 at Robins Air Force Base, GA. The Contractor’s work hours (shifts) shall normally be from 6:30 am to 3:15 pm (EST), Monday through Friday. The Government may adjust the Contractor’s work hours based on workload requirements, with the flexibility to start work earlier, work odd shifts, and/or work weekends. The Government will provide the Contractor the required work hours

Primary Government Representative Alternate Government Representative

Name: Chad Steger Name: Heath Henry Unit: 402 CMXG Unit: 402 CMXG Phone: 478-222-4720 Phone: 478-222-4068 Email: chad.steger@us.af.mil Email: heath.henry.1@us.af.mil

(schedule) for contractor personnel, and will provide a 48-hour notice prior to changing any work hours.

4.2 Recognized Holidays. Unless otherwise required by the Government, the Contractor shall not have access to Government facilities to work or telework on all federal holidays or during facility closings as authorized by the Government. If the holiday falls on Saturday, it is observed on Friday. If the holiday falls on a Sunday, it is observed on Monday.

4.3 Security Requirements.

4.3.1 Visitors Only – No Badging ID. The Air Force has mandated all visitors consent to a check of their criminal history prior to being allowed access to installations. The check will be conducted at the Visitor Control Center (VCC) off Watson Boulevard, Robins AFB, GA.

Visitors requiring unescorted access will need their driver’s license or state-issued ID along with insurance and registration if driving on base. The pass issued by the Visitor Control Center authorizes unescorted entry to Robins AFB for the bearer only. For visitors, a short term pass is up to 60 days. Any time greater than 60 days requires a secondary form of ID (Social security card, birth certificate or passport).

4.3.2 Operations Security (OPSEC). The purpose of OPSEC is to reduce the vulnerability of USAF missions to adversary collection and exploitation of critical information. The Contractor shall comply with DoDD 5205.02E “DoD Operations Security”, DoD Manual 5205.02-M and AFI 10-701 “Operations Security” to protect United States (U.S. Government interest. The Contractor shall ensure compliance with OPSEC requirements including procedures to protect classified and/or sensitive, but unclassified, Government projects and/or programs. The Contractor shall ensure Contractor personnel who perform work at Robins AFB or another Government facility comply with the OPSEC procedures of the facility.

4.3.3 Security Incident or Violation. The Contractor shall immediately notify the Government Security Office of any potential or actual security incidents or violations including potential or actual unauthorized disclosure or compromise of classified and/or sensitive, but unclassified, information.

4.4 Supply Chain Risk Management. The Contractor shall implement risk management procedures to ensure that system, equipment, components, software, maintenance equipment, and supplies do not incorporate counterfeit parts, malicious code, or other elements that would allow adversaries to gain access to data and critical program information and disrupt operations.

Contractor risk management procedures shall comply with:

Air Force Pamphlet (AFPAM) 63-113, Program Protection Planning for Life Cycle Management, SAE Aerospace Standard AS5553C, Counterfeit Electrical, Electronic, and Electromechanical (EEE) Parts; Avoidance, Detection, Mitigation and Disposition, National Institute of Standards and Technology (NIST) Special Publication 800-53 Rev 5, Security and Privacy Controls for Information Systems and Organizations.

4.5 Contractor Identification. Contractor personnel shall wear visible identification designating them as contractors at all times while on Robins Air Force Base.

4.6 Contractor Vehicle Entry. The Contractor shall contact the Robins Air Force Base Visitor's Center to and comply with local procedures for obtaining credentials and vehicle entry.

Information may be obtained by calling the following phone number: Commercial 478-222- 1972.

4.7 Agency Affirmative Procurement Program. In accordance with FAR 23.404(b)(1), 100% of purchases of Environmental Protection Agency (EPA)-designated products included in the Comprehensive Procurement Guidelines (CPG) list [https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program] and/or United States Department of Agriculture (USDA)-designated products included in the bio based product listings [http://www.biopreferred.gov] shall, at a minimum, meet the EPA or USDA standards for recovered materials or bio based content, respectively, unless an item cannot be acquired competitively within a realistic timeframe, meet appropriate performance standards, and/or be acquired at a reasonable price.

4.7.1 In accordance with FAR 23.404(a)(3)(iii), the Contractor shall provide estimates and verification of recovered material for EPA-designated CPG products and certification for both EPA-designated CPG products and USDA-designated bio based products. In accordance with the Robins Air Force Base, Georgia / Affirmative Procurement Program (formerly Green Procurement Program (GPP)) Plan, the Contractor shall provide estimates and certifications to the Government for completion of the applicable attachment(s) to be included in the Purchase Request (PR) package.

4.8 Environmental Management Systems (EMS) Awareness. Environmental Management Systems (EMS) Awareness Training: All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force-provided initial EMS Awareness Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Robins AFB Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of EMS Training may result in termination of the contract.

4.8.1 EMS training is provided by Environmental Management. Request for Robins EMS Awareness training through email at 78ceg.cev.FrontOfc@us.af.mil. Contractors have two options to satisfy the mandatory EMS Awareness Training requirement. (Front Desk: 478-926- 8178.)

4.8.2 Option 1: Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database: https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293 Directions:

1. Hover your mouse over the Courses and Transcripts tab.

2. Click on Transcripts

3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.

4. When you are on the transcript, click on the blue “Search for Course” button.

5. When the pop up appears enter the course name or course number and press search.

6. Once you find the course you want to add, click on the +Select button to add the course to your transcript.

(Note: TEACH may not supported by Internet Explorer; recommend using Chrome.)

4.8.3 Option 2: Contractor requests a copy of the Robins EMS Awareness Training PowerPoint Presentation from Environmental Management. The request should be sent to the Environment Management Workflow Box at the following email address, 78ceg.cev.FrontOfc@us.af.mil.

Once the presentation is received, the contractor is responsible for ensuring that all his/her employees view the training.

4.9 ISO 50001-Energy Management. System Due to the WR-ALC being ISO 50001 certified, all contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.

4.9.1. EnMS Training. All contractor personnel working on Robins AFB who perform activities on the installation are required to complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Robins AFB.

4.9.1.1. EnMS training is provided by the Energy Assurance Office. The Contractor shall request the training by sending an email to 402MXSG.MXDEA.EnergyAssurance@us.af.mil.

4.9.2. Notification of training completion shall be sent to the Energy Assurance Office (402MXSG.MXDEA.EnergyAssurance@us.af.mil) and the CSMO POC to be maintained for tracking purposes. Failure to provide documentation of EnMS Training prior to beginning work may result in termination of the contract.

4.10 Contractor’s Safety Program. (See Appendix C, Part II, Para 7) The Contractor shall establish and maintain an acceptable safety program in accordance with their accepted Safety and Health Plan. The Air Force is part of the OSHA Voluntary Protection Program (VPP). All shall familiarize themselves with the requirements of VPP. Information on the VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html. Additionally, the Contractor is responsible for the safety and health of all subcontractor employees. No more than two Class C mishaps per contract year and Zero Class A or B mishaps will be tolerated. All changes to the plan must also be submitted in writing and approved by the Government.

4.10.1 Safety and Health Plan: Within 10 calendar days after contract award, the contractor shall email a copy of their company Safety Plan that is required to ensure compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596) to 402mxw.se.wf@us.af.mil.

The Safety Plan will be provided to the Safety Office for review. The Safety Office will provide acceptance or non-acceptance within 5 working days of receipt to the government point-of-contact who will notify the CO. (CDRL A005, DI-SAFT-82080/T NOT 1, Contractor's Safety Plan).

4.10.2 The Contractor Safety Plan shall address in detail the items listed in the Contract Appendix C, Part II through Part IV as applicable. For task specific procedures identified in the Contract Appendix C, the contractor’s internal procedures for those tasks must be identifiable within the submitted Safety Plan or shall be provided in an amendment or addendum to the company’s Safety Plan. If task specific procedures identified in the Contract Appendix C, are not submitted with the contractor’s Safety Plan, the submitted Safety Plan will be returned as NOT ACCEPTED. The contractor will have 5 working days to resubmit the Safety Plan, amendment or addendum to address or correct issues identified for non-acceptance. The Safety Office will provide acceptance or non-acceptance of the resubmission within 5 workings days of receipt to the government POC who will notify the CO.

4.11 Mishap Notification. (See Appendix C, Part II, Para 5) The Contractor shall notify the Robins AFB Safety Office telephonically at (478)-222-0043 during duty hours and (478)-926- 3567 after hours, within four (4) hour after initial notification of all mishaps or incidents for damage to DoD property (material plus labor) entrusted by this contract and employee injuries as a result of the contract operation. A follow-up (written or e-mail) of this mishap/incident notification shall be sent within three calendar days to the Government Representative, the Procurement Contracting Officer (PCO) or the Administrative Contracting Officer (ACO) (with a copy to program manager), who will forward it to the Safety Office. The information that is not available at the time of the initial notification shall be provided within 20 calendar days after the mishap. Mishap notification shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Impound Authority Name and Phone Number (as applicable)

g. Nomenclature of equipment and personnel involved in accident/incident

h. Corrective actions (taken or proposed)

i. Other pertinent information (CDRL A006, DI-SAFT-81563 NOT 2, Accident/Incident Report)

4.12 Inspection of Services/Inspection of Supply: In accordance with the Inspection of Supply/Services clause(s) identified in the contract/order, the Government reserves the right to inspect Contractor performance.

4.13 Invoice/Payment and Receipt/Acceptance: In accordance with DFARS clause 252.232-7003, Electronic submission of Payment Requests and Receiving Reports, the Contractor shall submit/process payment requests (invoices, Receiving Reports or combos) and receipt/acceptance documents via Procurement Integrated Enterprise Environment (PIEE) through module Wide Area Workflow (WAWF). Access at the following site:

https://piee.eb.mil/

5.0 Appendices - List any attachment to the purchase description

File details come from the government source that posted it. Updated .