1510-56_PRE-BID_eginshelters_Combined.pdf

PDF 2 MB Posted

Attached to
EGIN LAKES RECREATION SITE SHELTERS 2015 Federal contract opportunity
Solicitation number
L15PS00250
Issued by
Department of the Interior Bureau of Land Management Idaho Region

About this file

EGIN LAKES RECREATION SITE SHELTERS 2015

View the file

Other files for this federal contract opportunity

Other files attached to EGIN LAKES RECREATION SITE SHELTERS 2015, newest first.
File Type Posted
Sol_L15PS00250_Amd_000003.pdf PDF
Sol_L15PS00250_Amd_000002.pdf PDF
Sol_L15PS00250_Amd_000001.pdf PDF
Sol_L15PS00250.pdf PDF
Combined_Specifications.pdf PDF
Combined_Drawings.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form 1510-56

(December 1985)

UNITED STATES

DEPARTMENT OF THE INTERIOR

BUREAU OF LAND MANAGEMENT

SITE INSPECTION TOUR / PREBID CONFERENCE RECORD

1. Solicitation No. : L15PS00250 4. Meeting Place: Egin Lakes Recreation Site

2. Title: Egin Lakes Recreation Site Shelters 2 5. Conducted by: Steve Janzen, COR

3. Date and Time: April 1, 2015 @ 10:00 AM Josh Connors, PI

7. Attended By: (Attach Separate Sheet , if Necessary)

Name and Firm Address (include zip code) Phone No.

(include area code)

Jared - J.B. Kay Construction 950 Vista Ave 208-716-2374

Cody - Rendon 2924 Pennsylvania Ave 801-888-3671

Nicole - Lucky Dog PO Box 603, Ashton, ID 83420 208-652-7926

DePatco 2205 E200N St, St. Anthony, ID 83445 208-458-4000

Brandon Larson - Advantage Recreation (ICON) PO Box 1426, Idaho Falls, ID 83403 208-569-8676

8. Questions asked and responses given: (Use Reverse if necessary)

Which locations shown on the drawings will need to be demolished?

All seven (7) locations shown in the drawings have an existing concrete pad to be demolished. The pad at site C14 is ADA accessible and is surrounded by asphalt on all sides.

Are wind screens required for the shelters? The drawings show wind screens on the existing shelters, but the specifications don’t mention them.

Yes, windscreens comparable to the existing shelter’s windscreens will be required on two sides of each of the seven shelters.

Where should asphalt patching be included in the bid pricing?

Payment for this item shall be included in the bid price for Demolition

As per Specification 02223 3.2B, Damage of existing facilities shall be repaired or replaced at the Contractor’s expense.

What are the ADA Standards for this project?

As per Specification 02300 3.8B, all pads and changes in elevation must comply with ADA standards for accessible routes. This will include transitions in asphalt paved areas.

Who is responsible for utility locations?

The contractor will be responsible for the locating of existing utilities. Attached is a drawing from the last utility installation done in this area. Contractor shall not use this drawing as their sole source of locating utilities. The drawing is for information only and may not show all utilities installed in the area.

What materials will the contractor find under the existing concrete pads?

Attached are photos from the installation of the previous Egin Shelters. These photos show sand as the base material below the pad. This may not be the case for all locations. For the three sites to the West, the foundations may be in structural fill rather than sand.

9. Was a complete site inspection made? Yes No. (If “No,” explain)

By (Name) Title Date

Steven Janzen Contracting Officer’s Representative 04/01/2015

CONTRACTION OFFICER COR PI COPY

1510-56 PRE-BID_eginshelters2 full
0449-E1.1
Previous Base for Pads (2)
Structural Fill under pads

File details come from the government source that posted it. Updated .