JOFOC_-_Elevator_Repair_1.pdf
PDF 334 KB Posted
- Attached to
- Emergency Elevator Repair Federal contract opportunity
- Solicitation number
- 140P6423Q0083
About this file
This document is a justification and approval for other than full and open competition for simplified acquisitions over the micro-purchase threshold for an emergency elevator repair at a National Park Service Midwest Region facility. The elevator at the facility was rendered inoperable due to damage from a lightning strike, which requires replacing the elevator drive unit and diagnosing any other potential damage. The anticipated cost of the repairs is $46,000. An urgent and compelling circumstance exists due to the emergency situation caused by the lightning strike directly causing the elevator to be inoperable. The sole source justification is based on the contractor, Schindler Elevator, being the only elevator company in the locality that can perform the emergency repair work in a timely manner, as they have been performing annual inspections on the elevator for the past five years. The related federal contract opportunity is for the emergency elevator repair work under solicitation number 140P6423Q0083 with the Department of the Interior National Park Service Midwest Region listed as the agency.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
JUSTIFICATION & APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
for SIMPLIFIED ACQUISITIONS OVER THE MICROPURCHASE THRESHOLD (See FAR
Part 2) UP TO SAT (See FAR 13.106-1)
Date: 08/01/2023 PR Number: 40635128
1. Nature and/or description of the item/service being procured and its intended use (include the anticipated cost):
During a thunder and lightning storm on July 29, 2023, at approximately 0520 ET, the monument was struck by lightning. In this event a major component that operates the elevator in the monument was affected and rendered the elevator inoperable. Upon inspection from our elevator service contractor, it was determined that the drive unit to the elevator that was essentially “fried” due to the lightning. The drive is a system of components that gives the elevator the ability to operate. To have the operation of the elevator restored it is necessary to replace this drive and then diagnose if any other damage has occurred to other components of the elevator. Anticipated costs are estimated to be $46,000.00 for the repairs.
2. Sole Source Justification rationale (Check one and explain below):
____ Only one responsible source.
XX FAR 6.302-2 Unusual and compelling urgency.
Explain: A capable elevator company in this locality was contacted and responded to the emergency at PEVI. The company is the only elevator company in the area who can perform the work for the emergency elevator repair in a timely manner due to this lightning strike directly causing the elevator to be inoperable.
3. Market Research. Please explain the results or why one was not performed. State whether any other offers were received or anyone expressed interest:
Schindler Elevator has been performing annual inspections on the elevator for the past 5 years (base year awarded FY18, plus 4 option years FY19 through FY23) and has been ensuring the elevator is safe for use for each of those FY. Schindler Elevator is the only elevator company in this locality who can perform the work for the emergency elevator repair in a timely manner due to this emergency urgent and compelling situation caused by the lightning strike directly causing the elevator to be inoperable.
Last updated 6/2/2016
Last updated 6/2/2016
ATTACHMENT 2
JUSTIFICATION & APPROVAL FOR OTHER THAN FULL AND OPEN COMPETITION
for SIMPLIFIED ACQUISITIONS OVER THE MICROPURCHASE THRESHOLD (See FAR
Part 2) UP TO SAT (See FAR 13.106-1)
PR Number
4. If this is a determination for sole source, the contracting officer certifies:
a. Only one source is available, or urgent and compelling circumstances exist.
b. The anticipated price will be determined fair and reasonable using the price analysis techniques described in FAR Part 13.106-3(a).
(Signature) _____________________________________ _
Type or Print Name: __Chris Kosciewicz, Supervisory Facility Operations Specialist
Title
(Signature) _______________________________________ (Date) ___________________________
Type or Print Name: __________________________________________ Contracting Officer
Over $50,000:(if applicable)
(Signature) _______________________________________ (Date) ______________________
Warranted Individual 1 Level Above Contracting Officer
CHRISTOPHER KOSCIEWICZ Digitally signed by CHRISTOPHER KOSCIEWICZ
__ (Date)____Date: 2023.08. 1 :1 : 2 -04'00' _____________
Katherine Bernard
Digitally signed by Katherine Bernard Date: 2023.08. : : 9 -04'00'