Justification and approval for other than full and open competition.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
JUSTIFICATION AND APPROVAL
FOR OTHER THAN FULL AND OPEN COMPETITION, PRICE JUSTIFICATION (JOFOC)
ACQUISITION OF HOTEL ACCOMMODATIONS IN SUPPORT OF A SENIOR HIGH LEVEL
USG VIP VISIT
1. I recommend that the Department of State use other than full and open competition for the acquisition of hotel rooms for this VIP visit. The estimated cost is
3,996,046.96DKK ($558,172.84USD).
2. Nature and/or description of the action being approved.
Senior High Level USG Principal traveling with a delegation inclusive of support elements in: Security, Communications, Logistics and Operations.
3. A description of the supplies or services required to meet the agency’s needs.
I recommend procuring lodging and conference meeting room facilities from the Arp Hansen Hotel Group, AS (which includes the Tivoli Hotel, the Copenhagen Phoenix Hotel, and the Copenhagen Island Hotel), with headquarters located at:
Nybrovej 75 Gentofte, Denmark 2820 +45 4597 0500
4. An identification of the statutory authority permitting other than full and open competition.
[X] 41 U.S.C. 253 (c) (2), FAR 6.302-2; Unusual and Compelling Urgency;
(Based on the available time and urgency of the requirement as detailed below)
Security concerns prohibit sufficient advanced notification of VIP travel to allow for sufficient time to conduct full and open competition. The Department of State can only communicate with the staff at Posts abroad when authorization is given due to security concerns. They have an extremely short turnaround time when authorization has been granted for negotiations to commence and site selections to be finalized with both the local vendors and Posts before the actual Senior High Level USG VIP visit occurs. Security and logistical teams make determinations during the site survey as to which hotels are most suitable for the Senior High Level USG VIP and his traveling staff to remain overnight.
Consideration of the Senior High Level USG Principal and the location are taken into consideration as a determining factor.
The types of events, meetings, locations and availability of venues to support the Senior High Level USG VIP and the delegation are often times designated by the host countries.
Unique requirements for communications support are under severe time limitations and always a determining factor in the selection process as its capacity to be augmented to the unique requirements necessary to support certain Senior High Level USG Principals. As this is high tourist season in Copenhagen, a relatively small city, vacancy rates are extremely low, and this hotel group (which controls 22% of all room in central Copenhagen), was the only provider with sufficient supply to cover our requirements.
Many of the arrangements for hotel and transportation are often not confirmed until just before the actual visit. In addition to supporting a large delegation within a short time frame, last minute and frequent changes of itineraries for supporting personnel often result in significant changes in how Posts work with the vendors. With the exception of a few trips, contracts are not permitted to be signed until the Department of State (Post) has written confirmation from all supporting agencies, which enables collection of funds from said agencies in the event of cancellation. This results in an unusual and compelling urgency in accordance with 41 U.S.C. 253 (c) (2), FAR 6.302-2.
These unique Senior High Level USG VIP travel requirements result in only a small number of responsible sources with no other supplies or services capable of satisfying agency requirement in accordance with 41 U.S.C. 253 (c ) (2), Far 6.302-2.
5. A demonstration that the proposed contractor’s unique qualifications or the nature of the acquisition requires use of the authority cited.
Security and logistics are the Department of State’s primary considerations when procuring hotel rooms. The Department of State must be able to provide a safe and secure environment for VIP visitors. Frequently VIP visits are not announced or confirmed in sufficient time to conduct a competition, creating an urgent and compelling need. At other times, the security requirements and/or requirements of the host country government limit the acquisition to one or a small number of predetermined hotels.
[X] The VIP visit information was not available in sufficient time thereby creating an urgent and compelling need.
[ ] The host country government requires the use of this/these hotel(s).
[X] The proposed contractor has the following unique qualifications which meet the Department of State’s security and logistical requirements.
[ ] Set-back (hotel is safe distance from the street) [X] Location (able to secure building, travel route; distance to and from event) [X] Size and number of rooms (able to house everyone in one hotel) [X] Conference facilities (adequate space for meetings, press conferences) [ ] Communications (able to install equipment/lines, command center) [X] Accommodating to security needs
6. A description of efforts made to ensure that offers are solicited from as many potential sources as is practicable.
Due to urgency and exception in FAR 25.401(a)(5) this solicitation cannot be posted but the JOFOC will be published in FedBizOpps.
The following other hotels were reviewed but were not adequate because of the following:
We contacted Marriott, Scandic, and a number of other small hotels (larger chains such as Hilton and Hyatt do not have properties in Copenhagen), none of which were able to provide sufficient rooms. Scandic and Marriott will be receiving some smaller portions, which was all they could accommodate during the visit.
7. A determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
The Contracting Officer determines that the anticipated price(s) are fair and reasonable based on current market conditions and established per diem rates.
8. Any other facts supporting the use of other than full and open competition.
None.
9. A listing of sources, if any, that expressed, in writing, an interest in the acquisition.
No vendors expressed a written interest in this acquisition except Arp Hansen Hotel Group
10. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before any subsequent acquisition for the supplies or services required.
The Government will continue to develop relationships with local hotels and other providers to ensure that we can meet the requirements of any future visit with increased competition.
CERTIFICATIONS
I certify that the information in this justification is accurate and contains complete data necessary to support the recommendation for other than full and open competition to the best of my knowledge and belief.
08/15/2019___ /s/ Kimberly Triplett________ Date: Kimberly Triplett, PTS Director
As the Competition Advocate at post, I approve this justification:
08/15/2019___ /s/ Lawrence P Lane________
Date: Lawrence P Lane Management Officer