JFQR B2 DETONATING CORD ASSEMBLY.pdf
PDF 287 KB Posted
- Attached to
- B-2 TLX Kits Federal contract opportunity
- Solicitation number
- FA821321R3042
About this file
This document contains a justification for qualification requirements for detonating cord assemblies to be used on the B-2 bomber. The justification specifies the qualification process a potential vendor must complete prior to being eligible for award of the contract for detonating cord assemblies. Key requirements include notifying the contracting office of intent to qualify, certifying facilities and equipment, submitting test procedures and reports, identifying material sources and process standards, and building and testing a qualification article. Once qualified, the vendor will be listed as approved to supply the 16 part numbers identified for the detonating cord assemblies. The related pre-solicitation notice provides additional details for the planned sole source contract award to Universal Propulsion Co. for TLX Kits to support the B-2 bomber, with the quantities and national stock numbers specified.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
JUSTIFICATION FOR QUALIFICATION REQUIREMENTS
FAR 9.202(a) and DoD 4120.24M
Section A: Item Identification
1. Stock Number (NSN):
1) 1377-01-499-8853ES
2) 1377-01-461-5486ES
3) 1377-01-461-5520ES
4) 1377-01-461-5529ES
5) 1377-01-461-5530ES
6) 1377-01-461-5538ES
7) 1377-01-461-6040ES
8) 1377-01-461-6043ES
9) 1377-01-461-8064ES
10) 1377-01-461-8066ES
11) 1377-01-461-8069ES
12) 1377-01-461-8074ES
13) 1377-01-461-8082ES
14) 1377-01-461-8304ES
15) 1377-01-462-2328ES
16) 1377-01-463-0549ES
2. Contractor Part Number (P/N):
1) 200210068-10 (kit)
2) 52170-086
3) 52170-027
4) 52170-024
5) 52170-021
6) 52170-091
7) 52171-007
8) 52171-001
9) 52170-075
10) 52170-074
11) 52170-044
12) 52170-048
13) 52170-072
14) 52170-080
15) 52170-070
16) 52171-094
3. Noun: CORD ASSEMBLY, DETONATING
4. Application: B-2
Section B: Justification for Establishing a Qualification Requirement and Reason Why Qualification Requirement Must Be Demonstrated Prior to Any Contract Award.
1. Characteristics associated with the manufacture of the CORD ASSEMBLY, DETONATING, if not correct, would result in product functional degradations. This item performs a critical function on the aircraft and special equipment is required for its manufacture and testing. Special care and attention is required but not limited to finish, processing, assembly, performance, and part interchangeability of this item.
2. The prospective bidder’s ability to interpret engineering drawings and specifications and the execution of the qualification requirements specified herein are necessary to verify the structural and functional integrity and/or form, fit, and function of the item being procured.
3. Failure to procure this item from a fully qualified source could result in failure of the part, degradation of aircraft mission capability, or loss of aircraft and crew.
4. Completion of the specified pre-contract award qualification requirements will ensure the government that the prospective bidder is technically capable of producing the item in compliance with the applicable technical specifications and associated drawings and within the schedule and economic constraints of our contracts. To protect the interests of the Air Force, only United States and Canada suppliers will be considered. There are sufficient technical and schedule risks, which can only be minimized by a completion of the requirements prior to contract award.
Section C: Qualification Requirements That Must be Satisfied to Become a Qualified Source and Qualification Waiver Requirements.
1. Prequalification Notice. The offeror shall notify AFLCMC/EBHJ CAD/PAD IPT or, if responding to a solicitation, the contracting officer in AFLCMC/EBHKB of intent to qualify as a source for this item.
2. Facilities. The offeror must certify to the design control activity (AFLCMC/EBHJ CAD/PAD IPT) that he has the required facilities and equipment to manufacture, inspect, test, and package the item. The offeror shall make his facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
3. Data Verification. A qualification test procedure per DI-NDTI-80604 and a qualification test report per DI-NDTI-80604 shall be provided through the AFLCMC/EBHKB contracting office to the AFLCMC/EBHJ CAD/PAD IPT. Qualification testing must be accomplished in accordance with DAA3294P340.
4. Process Verification. The offeror shall identify sources for materials and standards for internally used processes. The offeror shall further define/provide written procedures for the utilization of any special test or inspection facilities and/or equipment. This documentation shall also include a diagnostic procedure showing the process the items being produced would undergo. The production process shall show how the offeror shall test, inspect, diagnose, produce and perform a final functional checkout. Development of special test procedures not available from the government is required. The offeror shall develop those procedures for review and approval by the design control activity. The contractor must be capable of locating alternative components to minimize any diminishing manufacturing sources (DMS) problems.
5. Test and Evaluation or Verification. The offeror shall submit to the design control activity an explanation of how they will certify that the test methods and production procedures meet the specifications for the item. The government retains the option to inspect the offeror’s production and testing facilities. To allow accomplishing this, the offeror’s facilities shall be made available to government inspection during the qualification effort upon ten days written notice of intent to inspect.
6. Qualification Article. Upon satisfactory compliance with the provisions of paragraphs 1 to 5 above, the offeror shall build and test the item DAA3294P340 to demonstrate production capability, form and function and also provide an inert CORD ASSEMBLY, DETONATING to demonstrate proper fit. This production and testing shall be done at the offeror’s expense.
7. Sensitive Military Technology. Not applicable.
8. Testing and Production Evaluation. The offeror shall be required to submit a complete test report for the production capability demonstration verifying compliance with all performance, environmental, mechanical, and quality assurance requirements, including top level drawing and all related item and source control drawings. In addition the test report shall contain detailed documentation describing the testing procedures during production.
This data shall describe in detail the point(s) in the production process that testing occurred, and if failures were noted, the corrective action taken and the results of the retest. The government retains the option to inspect the production and testing process, including on-site witnessing of any or all production and testing activities. The offeror is responsible and liable for ensuring compliance with all applicable system and item requirements. The offeror will provide notification to the government of testing and evaluation 30 days in advance so that the government can witness, if needed, coordinate needed activities, support, etc.
9. Time Completion Estimate. It is the estimate of the design control activity that completion of this qualification effort should require 360 days. This is based on complexity and hazards associated with the item and other factors. This is not a deadline but a notification to a potential offeror of the time we believe will be required. Events that occur during the qualification process may cause this time requirement to increase or perhaps decrease, depending on individual circumstances.
10. Time Limitation. An offeror may not be denied the opportunity to submit and have considered, an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer and cognizant engineering activity that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the contractor with an opportunity to demonstrate its ability to meet the standard specified in this source qualification statement.
11. Evaluation of Proposals Not Previously Qualified. The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in this Justification for Qualification Requirements before the date specified for award of the contract. The government reserves the right to award a contract at the time specified for award, to a qualified source even though other sources may not have finished qualifying.
12. Waiver. Any offeror who has had previous experience in the production of CORD ASSEMBLY, DETONATING or other similar items may apply to the design control activity for a waiver of all or part of the above requirements. A waiver will be granted only if the design control activity can establish the qualification of the offeror from previous knowledge/interface or from written inputs from the offeror.
13. Approval. Once the qualification requirements are met, the offeror will be listed as an approved source for this item. Approval, however, does not guarantee subsequent contract award.
Approved Sources: Cage Code Vendor P/N UPCO 17610 1) 200210068-10 (kit)
UPCO 17610 2) 52170-086
UPCO 17610 3) 52170-027
UPCO 17610 4) 52170-024
UPCO 17610 5) 52170-021
UPCO 17610 6) 52170-091
UPCO 17610 7) 52171-007
UPCO 17610 8) 52171-001
UPCO 17610 9) 52170-075
UPCO 17610 10) 52170-074
UPCO 17610 11) 52170-044
UPCO 17610 12) 52170-048
UPCO 17610 13) 52170-072
UPCO 17610 14) 52170-080
UPCO 17610 15) 52170-070
UPCO 17610 16) 52171-094
Section D: Signatures.
Avery Johnson AFLCMC/EBHJ Project Engineer
Kevin G Flinders, NH-04, DAF Chief, Systems Support Contracting Division AFLCMC/PKZ (Hill)
| JUSTIFICATION FOR QUALIFICATION REQUIREMENTS |
| Section A: Item Identification |
| 2020-06-29T08:55:09-0600 | |
| FLINDERS.KEVIN.G.1231477949 |
| 2020-06-25T16:49:38-0600 | |
| JOHNSON.AVERY.STEVEN.1457505112 |
File details come from the government source that posted it. Updated .