INL/Honduras – TIGRES Dormitory Furniture FedBid Buy #: 907158 Solicitation #: JDLRFQ18 Questions & Answers
Questions Answers
How far apart are the two locations for installation?
The base in Lepaterique is located aprox. 50 km from the US Embassy in Tegucigalpa. The base in El Progreso is located aprox. 240 km from the US Embassy in Tegucigalpa
Are there AutoCAD or pdf layouts of the buildings? Yes, we have layouts on AutoCad and on pdf.
Which will be provided to the awardee.
What days of the week can installation can occur (ie: can we work on weekends as well?)
Installation can occur during the week or the weekend.
What is the number of floors, elevators, loading dock in the buildings?
Buildings are ground level, only 1 floor in both bases
Is there a forklift and driver available to us to assist in unloading the containers, as the lockers will be heavy?
No, there is no forklift nor driver available at the locations.
Are there any particular insurance requirements necessary to work in this space?
No, no particular insurance requirements.
Are the installers required to be US citizens? No, they are not required to be US Citizens.
What is the anticipated date of the award? - Product will take approximately 30 days to be manufactured and will then have to be shipped, so period of performance should be 60 days from the date of award (versus 30 days)
Preferred delivery date is 30 days from the time of the award considering the date of the Ribbon Cutting Ceremony.
Will sheets and blankets also be needed for this project, along with pillows?
Sheets and blankets are not needed for this. Only the pillows are needed.
Clarifying that shipping and handling should be separate on Line 5 and NOT included FOB OCONUS as stated in the Buy Terms.
The vendor is responsible for all shipping and handling as specified in the SOW.
In SOW 2.3.1 Delivery Date it states "Delivery Date is Sixty (30) days from date of contract award.". Is it 60 as per spelled out or 30 as per what's in the the (30)?
The intent is 30 day delivery.
For CLIN 001 we have found numerous models and manufacturers that are within 10% of specs. Is there a preferred model and manufacturer for this item that you are looking for?
There is not a preferred model.