Power Contro Assembly Federal contract opportunity
Solicitation number
Not on record
Issued by
Defense Logistics Agency Aviation

About this file

NOUN: CONTROL BOX ASSY, POWER STEERING AFT LANDING GEAR NSN: 1680-0-557-7523 P/N: 414ES210-9

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AVN Form S53 FOR OFFICIAL USE ONLY 2

AMSC K. This part must be produced from class 1 castings under MIL-STD-2175.

AMSC L. The annual buy value of this part falls below the screening threshold established by DoD.

AMSC M. Manufacture of this part requires use of master or coordinated tooling.

AMSC N. Manufacture of this part requires special test and/or inspection facilities to maintain function or system integrity.

AMSC P. The rights to use the data needed to purchase this part from additional source(s) are not owned by the

Government and cannot be purchased, developed, or otherwise obtained.

AMSC Q. The Government does not have adequate data, lacks rights to data, or both. It is not economical to buy the data or rights to the data.

AMSC R. The Government does not own the data or rights to the data needed to purchase this part from another source. It is not economical to procure the data or rights to the data.

AMSC S. Acquisition of this item is restricted to Government approved source(s) because the item involves military sensitive technology.

AMSC U. The cost to the Government to breakout this part and acquire it competitively has been determined to exceed the projected savings over the life span of the part.

AMSC V. This part has been designated a high reliability part. Probability of failure would be unacceptable. The engineering activity has determined that data to define and control reliability limits cannot be obtained.

AMSC Y. The design of this part is unstable. Engineering, manufacturing, or performance characteristics indicate that the required design objectives have not been achieved.

AMSC Z. This part is a commercial/no-developmental/off-the-shelf item.

Other:___________________________________________________________________________________

6. Efforts to ensure that offers are solicited from as many sources as practicable are:

The acquisition will be synopsized on or about _________________ and any firm requesting a solicitation copy will be provided one.

A synopsis exception cited in FAR 5.202 applies: (Explain) ________________________________________________ Manufacturers of similar products identified in the market survey will be solicited.

Dealers of the manufacturers will be solicited.

Other: (Explain) ___________________________________________________________________________________

7. I hereby determine that the anticipated cost to the Government will be fair and reasonable. (Explain) _________________________

8. A market survey as defined by FAR 10:

was conducted, and firms indicating an interest in the acquisition will be solicited. Market research efforts, include:

was not conducted due to: ___________________________________________________________________________

9. Additional facts supporting other than full and open competition are:

Based upon the technical certification on file, technical data is not available and cannot be developed to permit full and open competition. The data presently available reflects the minimum needs of the Government.

When FAR 6.302-1 is cited for follow-on acquisitions as described in 6.302-1(a)(2)(ii), an estimate if the cost to the Government that would be duplicated and how the estimate was derived. ______________________________________

10/15/15

A sources sought notice was posted on or around 10/15/2015. To date no offerors have responded.

The overall cost of this acquisition will be fair and reasonable to the

Government .In accordance with FAR 15.403-4, the contractor will be required to provide certified cost and pricing data to be used in supporting the Government’s evaluation of the proposed cost.

The proposed skill mix of labor, labor hours, types and quantities of material, other direct costs, and direct and indirect rates will be negotiated by the Government based on recommendations from the Defense Contract Audit Agency (DCAA) and expert technical personnel supporting the program. The contract price will be negotiated in accordance with the procedures in FAR Part 15 ensuring the ultimate cost to the Government is fair and reasonable.

Market Research was conducted based on knowledge of individuals within the requirements community. This item was not published in the CASL because it is a newly provisioned item.

It has been determined hat the Government’s need cannot be met by an item available in the commercial marketplace; therefore, FAR Part 12 will not be used.