This justification and approval document awards a sole source contract to Moog Component Group for upgraded slip ring assemblies and containers for use on M1A2 Abrams tanks. The Defense Logistics Agency Land and Maritime will acquire 65 upgraded slip ring assembly kits initially for $10 million with a 100% option for an additional 65 kits. The upgraded slip ring assembly is a critical component that allows continuous power, fluid, signal, and air transfer between the tank hull and turret to enable 360-degree rotation. Moog Component Group is currently the only approved source according to the source control drawing. Developing an additional supplier through reverse engineering is estimated to take 66 months and cost $10.71 million, with no guarantee of success. No other suppliers expressed interest in competing for this requirement.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEFENSE LOGISTICS AGENCY

LAND AND MARITIME

P.O. BOX 3990

COLUMBUS, OHIO 43218-3990

SPRDL1-20-R-0167 (JA-00177)

(No Previous J&A)

JUSTIFICATION AND APPROVAL

FOR OTHER THAN FULL AND OPEN COMPETITION

SPRDL1-20-R-0167

1. Contracting Agency: Defense Logistics Agency - DLA Land Warren.

2. Description of Action: The proposed action is to award a new Firm-Fixed-Price (FFP), one time buy with 100% option contract for the Upgraded Slip Ring Assembly With Container, National Stock Number (NSN) 5977-01-676-1562 for use on the M1A2 System Enhancement Package Version 3 (SEPv3) Abrams Tank. Competition will be limited to Moog Component Group; Commercial and Government Entity (CAGE) 99932.

This action will be funded with Army Working Capital Funds (AWCF).

3. Description of Supplies/Services: The items to be acquired under the proposed contract are new Upgraded Slip Ring Assembly with Container, NSN 5977-01- 676-1562, Government Part Number 57K7327. The estimated unit price is and the base quantity for this contract is 65 units with 100% option with a total quantity of 130 units. The total estimated value of the contract is

Acquisition Method Code (AMC) 4 - Acquire, for the first time, directly from the actual manufacturer.

Acquisition Method Suffix Code (AMSC):

B - This part must be acquired from a manufacturing source(s) specified on a source control or selected item drawing as defined by the current version of DoD-STD-

100. Suitable technical data, Government data rights, or manufacturing knowledge are not available to permit acquisition from other sources, nor qualification testing of another part, nor use of a second source part in the intended application. Although, by DoD- STD-100 definition, altered and selected items shall have an adequate Technical Data Package (TDP), data review discloses that required data or data rights are not in Government possession and cannot be economically obtained. If one source is available, AMCs 3, 4, or 5 are valid. If at least two sources exist, AMCs 1 or 2 are valid.

4. Authority Cited: The statutory authority permitting other than full and open competition for this effort is 10 United States Code (U.S.C.) 2304(c) (1) as implemented by the Federal Acquisition Regulation (FAR) 6.302-1, Only one responsible source and no other supplies or services will satisfy agency requirements.

5. Reason for Authority Cited: The Upgraded Slip Ring Assembly with Container is a kit (57K7327) that contains the Ring Assembly, Elect (Upgraded Slip Ring Assembly) (United States Government (USG) Part Number: 12592206 / Manufacture Part Number: ED7015-2) and the long-term storage container (Manufacture Part Number: 19980-070). The Upgraded Slip Ring Assembly is the power, fluid, electrical and pneumatic conduit between the vehicle’s hull and turret that represents more than roughly 80% of the cost of the kit. The Upgraded Slip Ring Assembly provides constant transfer of electrical power, fluid power, signals and pneumatic (low-pressure) air from the hull allowing the turret to rotate 360 degrees continuously. The Engineering Change Proposal (ECP) 1 Program requires Legacy Hydraulic and Pneumatic capability along with the addition of increased power, Controller Area Network, Gigabit Ethernet, Isolation for Communications, and Radio Frequency (RF) signal transfer.

This item is source controlled to Moog Component Group (CAGE: 99932). It is a critical item of the M1A2 SEPv3 Abrams for the power, fluid, electrical and pneumatic system and will meet the requirements specific to its intended function in accordance with Source Control Drawing 12592206/19207 and requirements as specified in specification SC-SA19770. A substitute item must not be used without prior approval by the Tank-automotive and Armaments Command (TACOM). This product is a survivability item and is critical for Soldier safety as loss of function of this component would hinder the performance of the turret movability and deteriorate performance in battlefield conditions.

Currently Moog Component Group (CAGE: 99932) is the only approved source to make this item for the Government. This manufacturer is the sole owner of the build to print TDP. Reverse engineering is the only option for the USG to develop a competitive TDP

– which is needed for full and open competition. Reverse engineering is a multi-layered process; it requires the procurement and testing of prototypes and the release of the design. These efforts involve a significant amount of time and money. The USG does not have the funding required to develop and qualify additional sources for this product.

Even if a reverse engineering effort was affordable, this process would incur excessive lead-time delay. A new manufacturer’s prototype needs to be tested in conjunction with the overall electrical system of the M1A2 SEPv3 Abrams Tank. The cost to reverse engineer this unique component is estimated at $10.71M and 66 months to complete.

Reverse engineering the TDP includes, but is not limited to, the following:

Reverse Engineering Activity Delay Costs Obtain existing part samples 6 months $710K Hardware design, integration and fabrication/install 24 months $2M Component and vehicle system testing, Quality Test 24 months $7.5M Documentation (drawings/ Engineering Change Proposal 12 months $500K /Technical Manuals)

Total Estimated Time to Reverse Engineer 66 months $10.71M

X

X compatible with the Abrams Tank.

Replacement for this component cannot be by a commercial off-the-shelf (COTS) item, and there is no other manufacturer producing this item for the Abrams Tank. This item has been designed by Moog Component Group specifically to meet the M1A2 SEPv3 Abrams Tank unique requirements. Installing hardware that has not undergone similar verifications or qualifications could lead to a failure on the slip ring. Under battlefield conditions, such a failure will render the tank unable to proceed with its mission function and will endanger the lives of the crew.

9. Interested Sources: A Sources Sought Synopsis for this NSN was posted to Beta.Sam.Gov on 31 March 2021. To date, no sources have written to express an interest, nor has the Government identified any other source possessing an interest in being an alternate source for these items.

10. Other Facts: Procurement History: No procurement history is available.

11. Technical Certification: I certify that the supporting data under my cognizance which are included in the justification are accurate and complete to the best of my knowledge and belief.

Name:

Title: Division Chief Program Engineering (PE) Email:

8/30/2021

Signature:

Signed by:

12. Requirement Certification: I certify that the supporting data under cognizance which are included in the justification are accurate and complete to the best of knowledge and belief.

Name:

Title: Combat Maneuver & Recovery (CM&R) PSID Director Email:

9/1/2021

Signature:

9/23/2021

X Jamal M. Brooks

13. Fair and Reasonable Cost Determination: I hereby determine that the anticipated cost to the Government for this contract action will be fair and reasonable.

This determination will be based on the results of a detailed cost and or price analysis.

The contractor will be required to submit certified cost and pricing data as the expected value of this procurement falls within the threshold. This item is non-commercial.

Name: Brooks, Jamal M Title: Chief, Abrams Branch Email: jamal.brooks@dla.mil

Signature: Signed by: BROOKS.JAMAL.M.1377179982

14. Contracting Officer Certification: I certify that this justification is accurate and complete to the best of my knowledge and belief.

Name: Brooks, Jamal M Title: Chief, Abrams Branch Email: jamal.brooks@dla.mil