JA - Mass Deacidification - Redacted for Public Release.pdf
PDF 302 KB Posted
- Attached to
- Mass Deacidification 2023 Federal contract opportunity
- Solicitation number
- 01099925170001
- Issued by
- Library of Congress
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| JA - Mass Deacidification - FY24 - Redacted for Public Release.pdf | ||
| JA - SSJ - Preservation Technologies - 2023 03 15 Updated.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification and Approval For Other than Full and Open Competition
Plan ID Number: 01099925170001 – eMGT Plan ID
Form Updated 12/28/2022
Justification & Approval
As a legislative branch agency, the Library is subject to the competition and advertising requirements of 41 U.S.C. § 6101. Like the Competition in Contracting Act and the FAR, 41 U.S.C. § 6101 does not require competition when a contracting officer certifies that only one source or brand-name item is available, when dictated by public exigency, or when otherwise authorized by law.
This document sets forth the justification and approval for award of a contract or order by means providing for other than full and open competition per 41 U.S.C. § 6101, LCR 7-210, and, as applicable, FAR 6.302, FAR 13.106-1, FAR 8.405, and FAR 16.505. Contracting without competition shall not be justified on the basis of a lack of advance planning or concerns related to availability of funds.
This form shall be used to support instances where competition will be limited to a single source, a limited number of sources, including where a brand name product is required.
Part 1 – Identification
1. Contracting Agency and Activity: Library of Congress, LCSG/DPS/PRES/PSD
2. Nature of Action Being Approved
Contract (or modification) LoC or Leg Branch Order (or modification) GSA Schedule or GWAC Other
Plan ID Number: 01099925170001 – eMGT Plan ID Contractor (or Brand Name): Preservation Technologies, LP Estimated Value:
Period of Performance: One 12-month period of performance – stand alone contract (not an IDIQ)
3. Description of Supplies or Services Required to Meet Library Needs
Describe the supplies or services that are required to meet the Library’s minimum needs and the delivery schedule required to meet those needs. Do not focus on a description of the program.
The Library requires the following supplies or services: The Library of Congress requires contractor support for mass deacidification of bound volumes primarily printed on acidic paper. Librarians and archivists have been aware of the worldwide preservation problems that began in the mid 1800s when acidic wood pulp was substituted for cotton rags in the manufacture of paper. The introduction of wood pulp and chemicals in the manufacturing process resulted in printed volumes produced with acidic paper stock which, without intervention, becomes brittle and unusable over time. The objective of mass deacidification is to neutralize the acid components of paper before the paper become brittle. While the Library of Congress mainly uses cold storage to prevent ongoing acidification, other methods have been employed as well, such as mass deacidification of the collections themselves.
The objective of this contract is to treat volumes that are found to be acidic with a process which will neutralize acid in paper. Volumes will be selected onsite by contractor staff, inventoried in the Library’s ILS for documentation and tracking, packed for shipment offsite, treated offsite, returned and reshelved.
The only known business performing this service in the United States is Preservation Technologies, LP.
Part 2 – Program Office Justification & Approval
4. Authority for Contracting Without Competition Over $250,000 For this requirement over $250,000, under FAR part 6, the basis for contracting without providing for full and open competition is:
There is only one responsible source and no other supplies or services will satisfy Library requirements.
41 U.S.C. § 6101(b)(2)(C); FAR 6.302-1.
Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. FAR 6.302-1(b)(1).
Source controls copyrights, patents, raw materials, or secret processes cannot be acquired otherwise, or similar circumstances. FAR 6.302-
1(b)(2).
Other exception identified in FAR 6.302-1
There is such unusual & compelling urgency that the Government would be seriously injured if competition is not limited.
41 U.S.C. § 6101(b)(2)(B); FAR 6.302-2. Option years are not permitted.
Source is expressly authorized or required by statute (e.g., AbilityOne, UNICOR, GPO, GSA Public Buildings Service, Appropriations Act, etc.) per 41 U.S.C. § 6101(b)(1) and FAR 6.302-5: H. Rept. 117-389 - LEGISLATIVE BRANCH APPROPRIATIONS BILL, 2023
Other basis authorized in 41 U.S.C. § 6101(b) or FAR part 6.302:
Library’s needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. FAR 6.302-1(c).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
IT Standard Data Sheet)
Up to and including $250,000 For this requirement up to $250,000, using simplified acquisition procedures under FAR part 13, the basis for contracting without providing for full and open competition is:
Only one responsible source is reasonably available to meet Library requirements. 41 U.S.C. § 6101(b); FAR 13.106-1.
Product or service is reasonably available from only one source.
Source controls copyrights, patents or other exclusive licensing arrangements.
Urgent circumstances; only one source can reasonably deliver by required date. Option years are not permitted.
Source is expressly authorized or required by statute:
Library’s needs can only be satisfied by a brand-name product The Product is listed the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
IT Standard Data Sheet)
GSA Schedule Order For this GSA schedule order under FAR part 8, the basis for not competing among GSA schedule-holders and/or specifying a brand name product or item is:
An urgent and compelling need exists, and following GSA procedures would result in unacceptable delays.
FAR 8.405-6(a)(1)(i)(A).
Only one GSA source is capable of fulfilling the requirement at the level of quality required because the supplies or services are unique or highly specialized. FAR 8.405-6(a)(1)(i)(B).
In the interest of economy and efficiency, the new work is a logical follow-on to an original order that was placed competitively among GSA schedule-holders (i.e., the original order was not sole-source or limited-source.) FAR 8.405-6(a)(1)(i)(C).
Library’s needs can only be satisfied by a brand-name product The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
Order Under Multiple Award Indefinite-Delivery Contract or GWAC For this order under FAR subpart 16.5, the basis for contracting without providing for full and open competition is:
The need is so urgent fair opportunity would result in unacceptable delays. 41 U.S.C. § 6101(b)(2)(C) and FAR 16.505(b)(2)(i)(A).
The Library’s minimum needs can only be satisfied by contractor’s unique capabilities or products. 41 U.S.C. § 6101(b)(1) and FAR
16.505(b)(2)(i)(B).
A logical follow-on order in the interest of economy and efficiency. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(i)(2)(C).
To satisfy a minimum guarantee. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(D).
Authorized or required by statute. 41 U.S.C. § 6101(b)(1) and FAR 16.505(b)(2)(E).
The Library’s minimum needs can only be satisfied by a brand-name product or item which is essential to the Government’s requirement. 41
U.S.C. § 6101(b)(2)(B) and FAR 16.505(a)(4)(i).
The Product is listed on the Library of Congress Enterprise Architecture Repository (LCEAR) database (Attach applicable
5. Rationale for Contracting Without Competition
In supporting an action not providing for full and open competition, it is not sufficient to demonstrate that the contractor is exceptionally well qualified or even the best qualified, or that the required brand name product is well suited to the Library’s needs. The rationale must demonstrate that no one else, or no other competing product, can satisfactorily fulfill the Library’s requirement. Do not focus on the importance of the requirement; the issue is the rationale for not competing.
In supporting urgency, address the following What are the unexpected facts or the unpredictable events that led to this situation? When is the required delivery or performance start date? Why this date? What specific harm to the Government will occur if the delivery is not made or performance not begun as scheduled? (Note that expiration of funds is not sufficient harm to justify not competing.) Demonstrate that the contract is only for items and quantities urgently needed until a competitive procurement action can be developed, or that a separate competitive follow-on is not practical.
In supporting a brand name justification, the brand name or feature must be essential to the Library’s requirements, and market research indicates that other company’s similar products or products with similar features cannot meet or be modified to meet the Library’s needs.
We are authorized to limit competition on the basis of the citation in section 4 because: In accordance with FAR 6.302-1 (b)(1) only one responsible source and no other supplier will satisfy the Agency’s requirements.
The Library has a documented history with this requirement and its sole source nature. Preservation Technologies Limited Partnership (PTLP) has been the sole vendor for mass deacidification services at the Library of Congress since 2001. Historical information is provided below.
This service was awarded as a sole source in 2005 (LSP20050085) and in 2016 (LSP20150082) to PTLP.
Market research and RFIs performed in 2013 (LCLSP13R0004) and 2021 (030ADV21R0066) yielded no other viable sources and no other bids beyond the bids provided by PTLP. There is a European Company with the capability to perform the required work, however, shipment of fragile Library materials to another country would endanger collections and require additional administrative overhead for transport, such as customs declarations, additional shipping costs. PTLP is located in Pennsylvania and can safely and quickly transport and treat materials. In addition, the European business has never actually expressed any interest in performing the work.
In 2022, the requirement was publicly competed on SAM. No businesses other than PTLP provided a proposal.
In addition to the information above, H. Rept. 117-389 - LEGISLATIVE BRANCH APPROPRIATIONS BILL, 2023 mandates that the Library to continue this program for one additional year. It states, “Preservation of the Collection: As stated in the Joint Explanatory Statement to accompany Division I, P.L. 117-103, the Committee will evaluate the need for the continuation of the deacidification preservation program, as a means to preserve the Library's literary and historical treasures, once existing funds are exhausted or expire. The Library shall report to the Committee the status of existing funds for this program at the end of fiscal year 2022 and the number of articles yet to be treated. Further, the Committee recommends $1,000,000 to be reserved should any articles remain that need treatment.”
Because (1) Congress has mandated that the Library continue the mass deacidification program, and (2) PTLP is the only vendor that can provide the requirements needed to continue the program, the Library will award a sole source award to PTLP under FAR 6.302- 1(b)(1).
6. Actions to Overcome Barriers to Competition Before Subsequent Contract Is Required
State what actions, if any, the program office can take to overcome barriers to competition before a contracting for this requirement again, such as:
using action to provide time to develop specifications for a competitive procurement by a certain date; licensing copyrights or patents so other contractors may use the works; or breaking the requirement into parts that may be purchased competitively. If this is a one-time requirement, explain that action to increase future competition is not needed. If the source is expressly required by statute, state “Source is statutory.”
To increase competition, we will:
7. Program Office Certification
I certify that the description of the Government’s minimum needs, schedule requirements, and technical information that provide the basis fo
Plan ID Number: 01099925170001 – eMGT Plan ID
Form Updated 12/28/2022
BPART 3 – CONTRACTING OFFICER DETERMINATIONS & CERTIFICATION
8. Efforts to Solicit from As Many Potential Sources As Practicable Unless a justification is based on FAR 6.302-2, Unusual and compelling urgency, contracting officers shall post justifications for other than full and open competition, including brand name justifications, to the Contract Opportunities website on sam.gov (or eBuy for Brand Name Justifications under FAR Part 8) prior to requesting a proposal or otherwise entering into negotiations.
Advance notice will be published in sam.gov for 15 days before a contract is awarded. FAR 5.203(a).
Advance or concurrent notice will be published in sam.gov for a reasonable time for commercial items FAR 5.203(a) and 12.204(b).
Advance notice will not be published because the action meets the following FAR exception:
Notice would compromise national security. FAR 5.202(a)(1).
Unusual and compelling urgency; notice period would seriously injure Government. FAR 5.202(a)(2).
Expressly authorized or required to be made through another Government agency. FAR 5.202(a)(4).
Order will be placed against an IDIQ contract awarded under FAR 16.5. FAR 5.202(a)(6).
Order will be placed against GSA schedule or other competitively-awarded contract. FAR 5.202(a)(11).
Other:
Advance notice will not be published per 41 U.S.C. § 6101; see attached deviation from the FAR per LCR 7-210 § 3.A.
We made the following efforts to interest potential sources in this award: N/A
9. Listing of Sources That Expressed Interest in Writing
The following sources expressed interest in this award: No business other than PTLP as ever expressed an interest in this project.
10. Additional Information
The following additional information is relevant to this justification and approval: N/A
11. Contracting Officer Determination that Price Is Fair and Reasonable As explained in detail below, I have determined that the prices for this contracting action are fair and reasonable based on comparison of the prices to the following (see FAR 15.404-1(b)(2)):
Historical prices paid by the Government Published competitive price lists Library’s Independent Government Estimate Prices obtained through market research Other: Price Negotiations Prices obtained through competitive proposals
The following analysis (based on attached pricing information) supports my determination: Fair and reasonable pricing shall be determined before an award is made.
12. Contracting Officer Determination of Responsibility Checked System for Award Management – Preservation Technologies is valid in SAM through 01/17/2024
13. Contracting Officer Determination of Best Value I have determined that this action represents the best value to the Government because: A best value determination shall be made before an award is made.
14. Contracting Officer Certification I certify that, to the best of my knowledge and belief, this justification is accurate and complete. For those actions up to $700,000, I approve contracting without competition for this requirement.
File details come from the government source that posted it. Updated .