JA 19-02533 Final - REDACTED JA.pdf
PDF 153 KB Posted
- Attached to
- Redacted J&A for the B-1 Power Supply Federal contract opportunity
- Solicitation number
- FA8117-21-D-0013
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CAD 19-02533 - REDACTED JA - FINAL.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FD2030-19-02533
JUSTIFICATION FOR OTHER THAN
FULL AND OPEN COMPETITION
I. CONTRACTING ACTIVITY
United States Air Force
AFSC/PZA
3001 Staff Drive Tinker AFB, OK 73145
Purchase Request (PR) # FD2030-19-02533
II. NATURE AND/OR DESCRIPTION OF THE ACTION BEING PROCESSED
This new individual Justification and Approval (J&A) authorizes the use of other than full and open competition procedures to obtain a new, follow-on, firm-fixed price requirements type contract. This contract is non-commercial and is not a bridge action.
This contract is for a repair of the Power Supply used on the B-1, from Symetrics Industries LLC (CAGE) code 22830. In accordance with FAR Part 16, a 1-year basic contract with four, 1-year option ordering periods is considered to be appropriate for this acquisition. The estimated total value of this award is $ with an estimated award date of 22 March 2020
Previous Contract Number: FA8117-17-D-0010 Date of Award: 22 March 2017 Completion Date: In Production Basis of Award: Sole Source
Awardee: Symetrics Industries, LLC
III. DESCRIPTION OF THE SUPPLIES REQUIRED TO MEET THE AGENCY’S
NEEDS
This is a services contract. The dollar values listed below reflect the anticipated value of the acquisition. Under the contemplated contract, Symetrics Industries LLC will provide the repair of the B-1 Power Supply.
Estimated Dates Estimated Dollars Basic Mar 2020-Mar 2021 $ Option I Mar 2021-Mar 2022 $ Option II Mar 2022-Mar 2023 $ Option III Mar 2023-Mar 2024 $
Option IV Mar 2024-Mar 2025 $ O & A Mar 2020-Mar 2025 $ O & A (Expedite Fee/ Surge Option)
Mar 2020-Mar 2025 $
Total Contract $0.00
PR Line Item 0001
Major Repair of NSN: 6130-01-266-9739 P/N: 710335-02 Noun: Power Supply Application: B-1 Function: Converts 230 VAC input voltage to 28 VDC and routes it to the Stability Enhancement Function (SEF) DC BUS, which stabilizes the aircraft in case of load shift.
Type of Appropriation: 97X4930 Total Estimated Dollars for PR Line Item 0001: $
Year Qty Unit Price Estimated Dollars Period of Performance
Basic 12ea $ $ Mar 2020-Mar 2021 Option I 12ea $ $ Mar 2021-Mar 2022 Option II 12ea $ $ Mar 2022-Mar 2023 Option III 12ea $ $ Mar 2023-Mar 2024 Option IV 12ea $ $ Mar 2024-Mar 2025
PR Line Item 0002
Minor Repair of NSN: 6130-01-266-9739 P/N: 710335-02 Noun: Power Supply Application: B-1 Function: Converts 230 VAC input voltage to 28 VDC and routes it to the Stability Enhancement Function (SEF) DC BUS, which stabilizes the aircraft in case of load shift.
Type of Appropriation: 97X4930 Total Estimated Dollars for PR Line Item 0002: $
Year Qty Unit Price
Estimated Dollars Period of Performance
Basic 1 $ $ Mar 2020-Mar 2021 Option I 1 $ $ Mar 2021-Mar 2022 Option II 1 $ $ Mar 2022-Mar 2023 Option III 1 $ $ Mar 2023-Mar 2024 Option IV 1 $ $ Mar 2024-Mar 2025
PR Line Item 0003
No Fault Found (NFF) Type of Appropriation: 97X4930 Total Estimated Dollars for PR Line Item 0003: NFF costs are less than the cost of repair. They are applied through de-obligated funds from the cost of repair, thereby reducing the dollar value of the contract. Cost estimation is unnecessary.
PR Line Item 0004
Over and Above (O&A) Is negotiated on an as needed basis. O&A is estimated at 10% of total estimated repair dollars based on historical requirements.
Type of Appropriation: 97X4930 Total Estimated Dollars for PR Line Item 0004: $
PR Line Item 0005
O&A Surge Option/Expedite Fee O&A Surge Option/Expedite Fee is to be negotiated (TBN) and is estimated by using 25% of the total estimated repair dollars.
Type of Appropriation: 97X4930 Total Estimated Dollars for PR Line Item 0003: $
PR Line Item 0006
Data Not separately priced Data IAW DD 1423 CDRL CAV-AF Reporting
Due to the circumstances described below in Sections V, IX and XI, there are no additional actions that could be taken to develop competition. Therefore, it is considered appropriate to seek approval for more than one fiscal year’s requirements. If other qualified or approved sources become known at any time during the contract, competition will be utilized to the maximum extent possible.
IV. STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN
COMPETITION
10 U.S.C. 2304 (c)(1), as implemented by FAR 6.302-1(a)(2)(iii)
V. DEMONSTRATION THAT THE CONTRACTOR’S UNIQUE
QUALIFICATIONS OR NATURE OF THE ACQUISITION REQUIRES THE
USE OF THE AUTHORITY CITED ABOVE (APPLICABILITY OF
AUTHORITY)
The B-1 Power Supply described in Section III is a component of the B-1 aircraft which converts 230 VAC input voltage to 28 VDC and routes it to the Stability Enhancement Function (SEF) DC BUS, which stabilizes the aircraft in case of load shift. The B-1 Power Supply repair data and specifications are not owned or licensed by the Air Force, and require special tools, equipment, and test interface boxes to adequately perform the repair that returns the item to a serviceable condition. Symetrics is the only known vendor that possesses the necessary repair data to repair the B-1 Power Supply described in Section III. Accordingly, Symetrics is the only known source that can provide the services described in Section III. Therefore, this acquisition is for the continued performance of a highly specialized service.
The item identified in Section III contains critical characteristics and, at a minimum, meets the requirements of a critical application item as defined in the Aviation Critical Safety Item Management Handbook. The complexity of this item and its criticality to safe operation of the aircraft requires the source of repair be an approved source possessing the data, experience, skills, and equipment necessary to restore this item to a serviceable condition. Symetrics Industries LLC is currently the only known qualified source possessing the required tech data, test equipment, and special tooling to perform this repair. completed repair from September 1994 to January 2011, however agreed to license data exclusively to Symetrics Industries LLC in April 2017. The Government does not possess validated/verified technical data for the repair of the power supply. Only Symetrics Industries LLC possesses the data/expertise to perform the required work. Symetrics Industries is licensed by to complete repair, however does not own data. Per a phone call with a representative for on 29 Jan 20, has not licensed any other company and are not willing to sell the data to the government.
Reverse engineering the repair process is not feasible within allowable timeframes.
Based on previous Consolidated Sustainment Activity Group (CSAG) efforts, reverse engineering the repair process is estimated to take a minimum of 5 years from the initiation of a CSAG Sustaining Engineering project. This timeframe includes the budget request period, purchase request processing, contract negotiation and award, period of performance, qualification testing of the reverse engineering process and source approval.
The 422 SCMS believes that award to any other source would result in unacceptable delays in fulfilling the Air Forces requirement. Such unacceptable delays will impact the Air Force mission by causing the backorder posture to continue to increase and will have continued visibility as a Mission Impaired Capability Awaiting Part (MICAP) driver.
Ultimately a lack of repair parts may cause aircraft to be grounded.
Accordingly, Symetrics Industries LLC is the only firm capable of providing the services described in Section III above without the U.S. Air Force experiencing unacceptable delays in fulfilling its requirements.
VI. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS ARE
SOLICITED FROM AS MANY POTENTIAL SOURCES AS DEEMED
PRACTICABLE
On 17 July 18, this requirement was synopsized and posted in BETA.SAM.GOV for 30 days under FA8117-18-SS-0021. As of 16 August 18 two businesses showed interest by the response date; , and . See Section X for details. Two sources indicated interest, however to date no source approval packages have been received from these sources. Additional internet market research was conducted by 01 July 19. No additional sources were found.
This requirement will be synopsized in http://www.beta.sam.gov as a notice of proposed contract action IAW Far 5.201. Expected date of publication is 17 July 2018.
VII. DETERMINATION BY THE CONTRACTING OFFICER THAT THE
ANTICIPATED COST TO THE GOVERNMENT WILL BE FAIR AND
REASONABLE
The Contracting Officer will ensure that the items described herein are negotiated at a fair and reasonable price to the Government. IAW FAR as supplemented, the contractor will be required to submit Certified Cost or Pricing Data and/or Other Than Certified Cost or Pricing Data. A detailed cost analysis and price analysis will be performed. The Contracting Officer will request a technical evaluation from the Defense Contract Management Agency (DCMA) to aid in the evaluation of the contractor’s proposal. The Contracting Officer will seek audit assistance from the Defense Contract Audit Agency (DCAA) if necessary.
VIII. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AND THE
RESULTS, OR A STATEMENT OF THE REASONS MARKET RESEARCH
WAS NOT CONDUCTED
Market research, in accordance with FAR 10, was conducted by a multi-functional team consisting of the Item Manager, Equipment Specialist, Logistics Officer, and Engineer.
This research included inquiries into internet sites including Google, the Thomas Register, Haystack, and similar item manufacturer’s websites and was conducted over a period ending 29 Jan 20. This is a non-developmental item that is a military unique requirement. Other sources manufacture similar items but none have been identified as having access to the data described in Section V necessary to meet the requirement described in Section III. Further, this requirement cannot be modified nor be satisfied with a commercial or modified commercial item.
http://www.beta.sam.gov/
A Sources Sought Synopsis was also conducted; see Section VI for more details. Based on this market research, Symetrics Industries LLC was found to be the only source able to fulfill the requirement described in Section III.
IX. ANY OTHER FACTS SUPPORTING THE USE OF OTHER THAN FULL AND
OPEN COMPETITION
Symetrics Industries is licensed to complete repair however does not own data. Per a phone call with a representative for on 29 Jan 20, has not licensed any other company and will not sell data to the government.
X. LIST OF SOURCES, IF ANY, THAT EXPRESSED INTEREST IN THE
ACQUISITION
Symetrics Industries, LLC CAGE: 22830
1615 W NASA BLVD
329012613 USA
Phone: 3212541500
See section VI for more detail.
XI. A STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY TAKE TO
REMOVE OR OVERCOME ANY BARRIERS TO COMPETITION BEFORE
MAKING SUBSEQUENT ACQUISITIONS FOR THE SUPPLIES OR SERVICES
REQUIRED
As a result of continued refusal by the OEM to provide data as well as the duplication of cost or unacceptable delay of developing additional sources per Sections V and IX, there are no known additional actions which can be taken to remove barriers to competition and therefore, specific actions and milestones cannot be established.
Per PGI 206-304(a)(S-70 – As indicated by signature on the Coordination and Approval Document, the previous Justification and Approval has been reviewed and the Approval Authority determines that all stated actions to remove barriers to competition have been accomplished.
XII. CONTRACTING OFFICER’S CERTIFICATION
The Contracting Officer’s signature on the Coordination and Approval Document evidences that she has determined this document to be both accurate and complete to the best of her knowledge and belief.
XIII. TECHNICAL/REQUIREMENTS PERSONNEL’S CERTIFICATION
As evidenced by their signatures on the Coordination and Approval Document, the technical and/or requirements personnel have certified as accurate and complete all supporting data, which is their responsibility, contained herein IAW FAR 6.303-2 (c).
JUSTIFICATION FOR OTHER THAN
File details come from the government source that posted it. Updated .