J.2 Statement of Work (4 Pages).pdf
PDF 240 KB Posted
- Attached to
- Chadron Window & Door Upgrade Federal contract opportunity
- Solicitation number
- 1240LT23Q0055
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| West Shop Window A EXAMPLE.jpg | JPG image | |
| West Shop Door 1 EXAMPLE.jpg | JPG image | |
| East Shop Door 1 EXAMPLE.jpg | JPG image | |
| Bunkhouse Second Floor Window D EXAMPLE.jpg | JPG image | |
| East Shop Window A EXAMPLE.jpg | JPG image | |
| Bunkhouse First Floor Window C EXAMPLE.jpg | JPG image | |
| West Shop Window B EXAMPLE.jpg | JPG image | |
| Bunkhouse First Floor Window E EXAMPLE.jpg | JPG image | |
| 2023_06_22_PreWork Sign In Sheet.pdf | ||
| 1240LT23Q0055.0001 - Chadron Window.Door Upgrade.pdf | ||
| 1240LT23Q0055 - Chadron Window.Door Upgrade.pdf | ||
| J.3 Drawings and Map (6 Pages).pdf | ||
| J.4 Experience Questionnaire (3 Pages).pdf | ||
| J.1 Wage Determinations (Dawes County, NE) (NE20230079) (02.03.2023) (8 Pages).pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
Contents Project General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Government Furnished
5.0 Deliverables / Schedule
Project Chadron Work Center Window and Door Upgrade.
General Information
1.0 Scope of Work
To include but not limited to: Removal of existing windows and doors, as well as interior and exterior trims and casings.
Inspection and mitigation of structural issues, rot or other problems identified during removal. Installation of new windows and doors identified in the specifications and weather proofing with new exterior trims on bunkhouse and two shop buildings.
2.0 Background
Buildings at site were constructed in the 1970s and have original windows and doors.
Contractor Requirements
3.0 Technical Requirements / Tasks
1. Work for this project includes the following:
a. Base Item – Bunkhouse Window Replacement
1) Removal of existing windows identified in the drawings.
2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing windows.
3) Installation of new Jeld-Wen V-2500 horizontal sliding or V-4500 awning style or equivalent vinyl windows to manufacturer's specifications, Section 085313 Vinyl Windows, and industry standards. For rough sizing and placement see attached drawings.
a) Contractor is responsible for verifying all new window sizes.
b) Color of windows to be approved by the Government.
4) Installation of exterior PVC or vinyl weatherproof trim with industry standard caulking to make weathertight.
a) Color of trim and caulking to be approved by the Government.
b. Option Item #1 – East Shop Window Replacement
1) Removal of existing windows identified in the drawings.
2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing windows.
3) Installation of new Jeld-Wen V-2500 horizontal sliding or equivalent vinyl windows to manufacturer's specifications, Section 085313 Vinyl Windows, and industry standards. For rough sizing and placement see attached drawings.
a) Contractor is responsible for verifying all new window sizes.
b) Color of windows to be approved by the Government.
4) Installation of exterior PVC or vinyl weatherproof trim with industry standard caulking to make weathertight.
a) Color of trim and caulking to be approved by the Government.
c. Option Item #2 – West Shop Window Replacement
1) Removal of existing windows identified in the drawings.
2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing windows.
3) Installation of new Jeld-Wen V-2500 horizontal sliding or equivalent vinyl windows to manufacturer's specifications, Section 085313 Vinyl Windows, and industry standards. For rough sizing and placement see attached drawings.
a) Contractor is responsible for verifying all new window sizes.
b) Color of windows to be approved by the Government.
4) Installation of exterior PVC or vinyl weatherproof trim with industry standard caulking to make weathertight.
a) Color of trim and caulking to be approved by the Government.
d. Option Item #3 – East Shop Door Replacement
1) Removal of existing doors identified in the drawings.
2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing doors.
3) Installation of new CECO Hollow Steel Security Door with Narrow Light Glass and Frame or equivalent to manufacturer’s specifications, Section 081113 Hollow Metal Doors and Frames, and industry standards. For rough sizing and placement see attached drawings.
a) Contractor is responsible for verifying all new door sizes.
4) Installation of industry standard caulking to make weathertight.
a) Color of caulking to be approved by the Government.
e. Option Item #4 – West Shop Door Replacement
1) Removal of existing doors identified in the drawings.
2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing doors.
3) Installation of new CECO Hollow Steel Security Door with Narrow Light Glass and Frame or equivalent to manufacturer’s specifications, Section 081113 Hollow Metal Doors and Frames, and industry standards. For rough sizing and placement see attached drawings.
a) Contractor is responsible for verifying all new door sizes.
4) Installation of industry standard caulking to make weathertight.
a) Color of caulking to be approved by the Government.
4.0 Government Furnished
The work center is open from 0800 to 1630 Monday through Friday, and is otherwise locked, limited space may be available for storage of materials or equipment.
5.0 Deliverables / Schedule
Period of performance is 30 days, and work shall be started and completed in a manner as to not leave openings unweather proofed overnight.
| Project |
| General Information |
| 1.0 Scope of Work |
| 2.0 Background |
| Contractor Requirements |
| 3.0 Technical Requirements / Tasks |
| 1. Work for this project includes the following: |
| a. Base Item – Bunkhouse Window Replacement |
| 1) Removal of existing windows identified in the drawings. |
| 2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing windows. |
| 3) Installation of new Jeld-Wen V-2500 horizontal sliding or V-4500 awning style or equivalent vinyl windows to manufacturer's specifications, Section 085313 Vinyl Windows, and industry standards. For rough sizing and placement see attached drawings. |
| a) Contractor is responsible for verifying all new window sizes. |
| b) Color of windows to be approved by the Government. |
| 4) Installation of exterior PVC or vinyl weatherproof trim with industry standard caulking to make weathertight. |
| a) Color of trim and caulking to be approved by the Government. |
| b. Option Item #1 – East Shop Window Replacement |
| 1) Removal of existing windows identified in the drawings. |
| 2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing windows. |
| 3) Installation of new Jeld-Wen V-2500 horizontal sliding or equivalent vinyl windows to manufacturer's specifications, Section 085313 Vinyl Windows, and industry standards. For rough sizing and placement see attached drawings. |
| a) Contractor is responsible for verifying all new window sizes. |
| b) Color of windows to be approved by the Government. |
| 4) Installation of exterior PVC or vinyl weatherproof trim with industry standard caulking to make weathertight. |
| a) Color of trim and caulking to be approved by the Government. |
| c. Option Item #2 – West Shop Window Replacement |
| 1) Removal of existing windows identified in the drawings. |
| 2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing windows. |
| 3) Installation of new Jeld-Wen V-2500 horizontal sliding or equivalent vinyl windows to manufacturer's specifications, Section 085313 Vinyl Windows, and industry standards. For rough sizing and placement see attached drawings. |
| a) Contractor is responsible for verifying all new window sizes. |
| b) Color of windows to be approved by the Government. |
| 4) Installation of exterior PVC or vinyl weatherproof trim with industry standard caulking to make weathertight. |
| a) Color of trim and caulking to be approved by the Government. |
| d. Option Item #3 – East Shop Door Replacement |
| 1) Removal of existing doors identified in the drawings. |
| 2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing doors. |
| 3) Installation of new CECO Hollow Steel Security Door with Narrow Light Glass and Frame or equivalent to manufacturer’s specifications, Section 081113 Hollow Metal Doors and Frames, and industry standards. For rough sizing and placement see attached ... |
| a) Contractor is responsible for verifying all new door sizes. |
| 4) Installation of industry standard caulking to make weathertight. |
| a) Color of caulking to be approved by the Government. |
| e. Option Item #4 – West Shop Door Replacement |
| 1) Removal of existing doors identified in the drawings. |
| 2) Inspection and mitigation of structural issues, rot or other problems exposed during removal of existing doors. |
| 3) Installation of new CECO Hollow Steel Security Door with Narrow Light Glass and Frame or equivalent to manufacturer’s specifications, Section 081113 Hollow Metal Doors and Frames, and industry standards. For rough sizing and placement see attached ... |
| a) Contractor is responsible for verifying all new door sizes. |
| 4) Installation of industry standard caulking to make weathertight. |
| a) Color of caulking to be approved by the Government. |
| 4.0 Government Furnished |
| 5.0 Deliverables / Schedule |