J and A - Sole Source_Redacted.pdf

PDF 846 KB Posted

Attached to
RAC MOTOR & COMPRESSOR KIT Federal contract opportunity
Solicitation number
SPMYM4-24-Q-0634
Issued by
Defense Logistics Agency Land and Maritime

About this file

This document is a Sole Source Justification Memorandum that explains the rationale for limiting competition to a single source for a simplified acquisition under the simplified acquisition threshold.

The key details are:

  • The requirement is for Johnson Controls proprietary parts (isolation pads, shims, and inserts) for refrigeration and air conditioning (RAC) units. These parts cannot be fabricated by other manufacturers due to Johnson Controls' proprietary rights and special manufacturing methods.
  • The estimated cost is under the simplified acquisition threshold.
  • The related federal contract opportunity is a solicitation (SPMYM4-24-Q-0634) issued by DLA Maritime Pearl Harbor for "RAC MOTOR & COMPRESSOR KIT". The solicitation is set aside for 100% small business and has a sole source requirement.
  • Quotes are due by 07/29/2024 and must include pricing, contact information, tax ID, Unique Entity ID, Cage Code, business size, and payment terms.
  • The North American Industry Classification System code is 332722.

View the file

Other files for this federal contract opportunity

Other files attached to RAC MOTOR & COMPRESSOR KIT, newest first.
File Type Posted
Kit Parts List.pdf PDF
S1. SPMYM4-24-Q-0634.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEMORANDUM TO THE FILE

SUBJECT: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION

UNDER THE SIMPLIFIED ACQUISITION THRESHOLD

I. BACKGROUND

1. FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contracting Officers may solicit from one source if the Contracting Officer determines that the circumstances of the contract action deem only one source reasonably available (e.g., urgency, exclusive licensing agreements, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition, as only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE

Manufacturer or Service Provider: ___________________________________________________

Point of Contact: _ ______ Phone Number: _____

Street: ___________________________

City: ______________ State: ____________ Zip Code: _______

Dealer Representative (if applicable): ________________________________________________

Point of Contact: __________________________ Phone Number: ________________________

Street: _________________________________________________________________________

City: _______________________ State: ________________ Zip Code: ________________

Estimated Cost: ________

Required Delivery Date or Period of Performance: _______________

Provide a description of the item or service required, to include its intended use. If applicable, provide manufacturer part number.

JOHNSON CONTROLS

N/A

ITEMS CANNOT BE FABRICATED AND ARE JCI PROPRIETARY PARTS FOR RAC #1 AND

RAC #2 BED PLATES. MFR PART NUMBERS:

076-88480-000 076-90541-000 076-88484-000 076-88482-000 076-88481-001 076-88483-001 076-88485-001 076-88481-002 076-88483-002 076-88485-002 076-88481-003 076-88483-003 076-88485-003 076-88481-004 076-88483-004 076-88485-004

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN

COMPETITION IS BASED ON THE FOLLOWING: (select all that apply):

A. ☐ ONLY ONE RESPONSIBLE SOURCE (select all that apply):

1. ☐ RESTRICTIVE RIGHTS

The source has established proprietary rights, limited rights in data, patent rights, copyrights or secret processes in the item or service required.

Explain what rights are restricted, why the restrictive rights make the required item or service available from only one source, and why another company could not satisfy the Government’s need.

2. ☐ EXCLUSIVE LICENSING AGREEMENTS

The item or service is only available from the Original Equipment Manufacturer (OEM), or there is only one authorized distributor or technical representative for the OEM.

Explain the circumstances surrounding why the item or service is only available from the manufacturer or service provider.

OR

Provide evidence of the exclusive licensing agreement as an attachment to this document.

NOTE: If there is more than one distributor/authorized technical representative for an OEM part, then Part B, BRAND NAME SOLE SOURCE, is applicable, and Part A, ONLY ONE RESPONSIBLE SOURCE, should be left blank.

JOHNSON CONTROLS HAS PROPRIETARY RIGHTS TO THE ISOLATION

PADS (THERMOPLASTIC), SHIMS, AND INSERTS. JOHNSON CONTROLS

USE SPECIAL METHODS TO BALANCE THE RAC PLANTS UTILIZING

SPECIAL INSERT OFFSETS AND BALANCING SHIMS. THE PROPREITARY

ISOLATION PADS ARE USED AS A METHOS TO MAINTAIN NOISE

CONTROL AT THEIR INSTALLED LOCATION.

3. ☐ OTHER REASONS

Other reason not identified above. Provide details on mission impact if requirement is not solicited from only one source.

B. ☐ BRAND NAME

Item required must be a brand name product, or feature of a product, particular to one manufacturer.

Discuss why you are precluding consideration of a product manufactured by another company. Describe how the particular brand name, product, or feature is essential to the Government’s requirements and why a “brand name or equal” purchase description cannot be used (see FAR 11.104). Describe how market research indicates other companies’ similar products or products lacking the particular feature do not meet, or cannot be modified to meet, the agency’s needs.

C. ☐ UNUSUAL AND COMPELLING URGENCY

The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits bids or proposals. Urgent requirements are supplies or services that will result in a work stoppage, or are mission critical and the routine processing time would result in injury to the Government. The determination that the procurement for the above item/service is an urgent and compelling requirement is based on the following:

1. Date on which the requirement was first identified: _______________________________

2. Explanation of why delivery/commencement of services by the date mentioned above is required:

Explain the impact to the mission if the date above is not met, any special circumstances or conditions that exist which validate the requirement as “urgent,” estimated production lead time for the item, etc.

3. If appropriate, include any additional pertinent information.