J-01a_JAN Drawings Updated Window Wetting_1.pdf
PDF 895 KB Posted
- Attached to
- Window Wetting System at Jackson ATCT in Jackson, MS Federal contract opportunity
- Solicitation number
- 697DCK-23-R-00334
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign in Sheet from Site Visit.pdf | ||
| J-4_ Pump Schedule.pdf | ||
| J-5_Past Performance Questionnaire.pdf | ||
| J-3_Cab Level Window Plan Plumbing.pdf | ||
| J-2_Wage Determination_MS20230051 01_27_2023.pdf | ||
| J-01_JAN Window Wetting System SOW RN Modified 012323.pdf | ||
| 697DCK-23-R-00334.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
H
G
F
E
D
C
B
A
MOMENTARY
SWITCH (TYP)
TO POWER PANEL
r�
� FUSE
,0>---------, 24VAC
rDRAIN SWITCH SPRING
FREEZESTAT LOADED TO AUTO POSITION
SET 35
TIME
SWITCH
SMIN.
4PDT
RELAY
DRAIN VALVE
�TIME DELAY RELAY
2222' ¢¢001
2222< 66001
4PDT
RELAY
s1 -if 0>----<6111 1111 (V) # 1 0 RELAY COIL (TYP)
� 0>-------<0 I I I I I I ( V l # 2 0
S3 ifo-------<61 1111 (v) #
S4 if o,____--b 11 I I (V) # 4 o
� o>-----------<o I I I (V) # s 0
�v-----------0-1-+--�Vl-#_6 ___ --C)
� O>---------M---<vl # 7 Q
S8 if O
SYSTEM MAIN VALVE 6 � # 8 I
1 TYPICAL CONTROL DIAGRAM
E012 NOT TO SCALE
CONTROL DIAGRAM NOTES
1. NOT USED.
2. CONTROL WIRING TO SOLENOID VALVES IS 14 AWG.
3. FREEZESTAT IS AUTOMATIC RESET TYPE SET FOR 35 F'
OUTSIDE AIR T-STAT "JOHNSON CONTROLS A19ANC-1C
INSTALLED IN SOLENOID J BOX AT CAT WALK.
4. TIME DELAY RELAYS AN 'ON-DELAY" TYPE WHICH BREAKS THE
CIRCUIT AFTER 5 MINUTES (ADJUSTABLE); FINDER SERIES 80.
5. MULTIPLE POLE RELAYS OMRON.
6.
7.
8.
9.
TIMER SHALL BE A SPRING RETURN TYPE WITH UP TO 5 MINUTE
SELECTION AND WITHOUT "HOLD" POSITION. "GRAINGER" 6X545,
OR APPROVED EQUAL.
DRAIN SWITCH IS MOMENTARY CONTACT-PUSH BUTTON TYPE
WITH NORMALLY OPEN CONTACTS.
WINDOW DEFOGGER SWITCHES ARE MOMENTARY CONTACT
PUSH BUTTON TYPE.
TRANSFORMER EMERSON 120124 AC VOLT, 500 VA CAPACITY.
7 6 i,, 1-v
2 314" --- --- -i ------
N �
O� D�FOGGER
-1----------1-------0F,-€(-f SYSTEM TIMER
-1----+-----(0)
DRAIN :-
I �WINDOW1 �WINDOW 2
:1 I �WINDOW 3 �WINDOW 4
iii
:1 I �WINDOWS �WINDOWS
iii
WINDOW7 r=._Q;=]w1NDOW 8
T 11,4• � 1 1/4" 3•
L_ .1._ _ __:,, __________________________ _
2 CAB DEFOGGER CONTROL PANEL- FACE PLATE
E012 NOT TO SCALE
CONTROL SWITCH PANEL NOTES
1. PANEL GENERAL GRADE LAMINATED PLASTIC WITH ENGRAVED
LETTERING NAME PLATES MOUNTED ON A 3132" THICK ALUMINUM
PLATE.
2. 24 VOLT TRANSFORMER , RELAYS, TIMER, WIRING AND TERMINAL
STRIP MOUNTED IN A CONTROL BOX BEHIND THE SWITCH PANEL
MOUNTING PLATE.
5 + 4
SEQUENCE OF OPERATION
1. TURN SYSTEM TIME KNOB CLOCK'!/ISE TO Srl.ECTfD TIME INTERVAL
(1 TO 5 MINUTES). THIS OPENS SYSTEM I,1/\IN VALVE.
2. SELECT A WINDOW FOR DEFOGGING AND DEPRESS /\ND HOLD ITS WINDOW
SWITCH TO ACTIVATE ITS CONTROL VALVE. VJHE'N W/\SHDOWN IS
COMPLETED, ANOTHER WINDOW I.1AY BE SEL[CTED. rDR PROPER
OPERATION, ONLY ONE WINDOW AT A TIME SHOULD BE DEFOGGED.
3. A FREEZE PROTECTION CONTROL (SET FOR 35'F) IS BUil T INTO
THE SYSTEM WHICH AUTOMATICALLY OPE
A SOLENOID VALVE
TO DRAIN THE SYSTEM PIPING. THE SYSTE MAY ALSO BE MANUALLY
DRAINED BY PLACING THE SYSTEM TIMER WITCH IN THE "OFF"
POSITION AND SETTING THE DRAIN TIMER WITCH. THIS OPENS THE
DRAIN VALVE. ALLOW APPROXIMATELY ON (1) MINUTE FOR DRAINDOWN.
H
G
F
E i.-
01/14/2020 I AS-BUILT DT#18600
REVI � C<SCIUl'TlOH JCN
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMTNISTRA TION
REDUNE I= ,,.,.
A TO - TECHNJCAL OPERATIONS EASTERN SERVICE AREA
ATCT
CAB WINDOW WASH DETAILS AND NOTES
JACKSON JACKSON INTERNATIONAL AIRPORT MS
REVEWED BY 8UBMITTU)<; cl3 c,\G c,\V ,; 5 c,\G c,\G <,\r:, c,,r:,�
D
C
I
,o <:,O �o ,,o " <:,O oO oO oO --
PROJECT ENGINEER MGR: ENGINEERING - CENTER A
A -I--
DESIGNED
RNI
ISSUEDBY °"TE 01/14f20201JCN BNAATCT
DAAWN •
� SERVICES CAA ..... "°
1-1 ""'= NXS l OPERATIONS JAN-D-ATCT-E012 �
THISOAAWIHOPfltOOIJCEOOHAIOREOIOHliaCftOl'TATIOHIYSTtM
H
G
F
E
D
C
B
J � I l i A
I
7 6 5 y 4 r- SOLENOIDS (NORl�ALLY CLOSf,D) (8 REQ'D) i�b:�
CONTROL PANEL LOCATfD IN CAB CONSOi E, SEE/2\ CAW;ALK LEVEL
PIPING SLOPES /-- · - , -
TOWARD DRAIN ---
WATERPROOF
JUNCTION BOX
SEE ffi
UTILITY CHASE
PUMP (WWBP-1),
SEE SCHEDULE ON 1·cu----!, THIS SHEET AND
SEE NOTE 1----�
WATER TANK (T-2),
SEE NOTE 2
METAL FLOOR GRATE
SUPPORT BASE
ANCHORED TO FLOOR
I
., - . -·-.,Ii--• -· �- --· -· - · - ,,Ii- ·-·T
5\
--PIPING SLOPED TOWARDS DRAIN
�\:::,::,,, -n-�;::1- .!��
TO CAB CONTROLS
POWER
PANEL
SOURCE
.L,__ 1 • cu
BV-3 (NO),
SEE NOTE 12
:PZ BACKFLOW
'REVENTER SEE
NOTE 13
'RAINER,
;EE NOTES
'P) -·----�H.M{I
I i
� GAUGE
; PRESSURE!
-·O - 0-•
-•O -4!- 0-•
-•O 0-•
-·O O-•
RELAYS FOR CONTROLS
IN CONTROL PANEL
MAIN SOLENOID VALVE
(NORMALLY CLOSED)
•ltJ,-ffH ·, ____ .J !
"'- SWITCH I
SET AT j PSI
1" SOLENOID DRAIN VALVE
(NORMALLY CLOSED)
BV
BV
SURFACTANT
TANK (T-3),
SEE NOTE 8
CHEMICAL FEED PUMP
(CFP-1 ), SEE NOTE 8
•CATCH BASIN
I
I t----1·
·SUPPORT BASE
AND PAD
!' :·"r --------1
HUB DRAIN
PUMP AND TANK PIPING DETAIL
P003) NOT TO SCALE
1" LINE TO EXISTING
OPEN DRAIN PIPE
TAG SERVICE GPM HEAD
FT.
WWBP-1 JUNCTION LEVEL 30.6 92.4
CFP-1 JUNCTION LEVEL -
I 2
NOTES
1.
2, PUMP (WVIIJP-1) rRANKlin ELECTRIC 30 n.lH153 PUMP CAPACITY 30 GPM
WITH A DISC MARGE PRESSURE OF 40 PSIG AND 1 HP MOTOR
(115V/1 PHi60HZ). METAL SUPPORT FRAME ANCHORED TO WALL.
WATER TANK (T-2) VlcLL XTROL WX250. TANK PRE-CHARGED
DIAPHRAGM TYPE, VERTICAL MOUNTED WITH 52 GALLON CAPACITY, 14
GALLON DRAW DOWN AT 40-60 PSI, PRE CHARGE TO 40 PSI. ANCHORED
TO FLOOR TO SECURE TANK.
3. ALL PENETRATIONS OF FLOORS, WALLS OR CEILINGS SHALL BE
PROPERLY SEALED AND FIRESTOPPED AS APPROPRIATE.
4, SPRINKLER NOZZLE MODEL 25PJDA-C, FROM RAIN BIRD, CAPABLE OF
COVERING A 25 FT. RADIUS AT 40 PSI WITH A DISCHARGE RATE OF 3.8 GPM
WITH INFINITELY ADJUSTABLE ARC AND ADJUSTABLE DIFFUSER PIN FOR
DISTANCE, DISTRIBUTION CONTROL, AND SPECIAL LOCKING FRICTION
COLLARS. ALL PARTS SHALL BE BRASS OR STAINLESS STEEL. 5 SETS OF
SPARE SPRINLER HEADS PROVIDED FOR FUTURE MAINTENANCE.
5, ALL MOUNTING HARDWARE (NUTS, BOLTS, WASHERS, STRAPS, ETC.)
SHALL BE STAINLESS STEEL AISI 304, OR HOT DIPPED GALIVANIZED.
6, STRAINER - MUELLER NO, 11.
7, GAUGE • ASME B40.1.
8, PULSAFEEDER 35 GALLON SURFACTANT TANK (T-3) MODEL 40365 WITH
PUMP MOUNTED TO WALL.PULSA FEEDER MODEL #LC04 CHEMICAL FEED
PUMP (CFP-1). SURFACTANT ENVIRONMENTTALLY SAFE DOW ECOSURF
SA-7. TANK IS SET ON OVERSPILLCATCH BASIN.
9. 1" CU AT JUNCTION LEVEL GOES TO 1"x1"x1" TEE AT CATWALK.
10, FLOW SWITCH· SERIES FS4-3T (1"),
11, SOLENOID VALVES-ASCO 8210G004. SOLENOID VALVES ARE NORMALLY
CLOSED.
12. BV-3 - 3 PIECE BALL VALVE (82-105-01)
13. RPZ BACKFLOW PREVENTER - WATTS (LF009M2-QT)
14. WINDOW WASH SYSTEM CONTROL PANEL: 120V/1PH. WITH 2#12, 1#12G-3/4"C
CONNECTED TO PANEBREAKER LOCATED ON THE JUNCTION LEVEL.
PUMP SCHEDULE
H.P. VOLTS PHASE HERTZ NOTES
1 115 1 60 40 PSI AT SPRINKLER HEAD
130 WATTS 115 1 60 MAX. 80 PSI
IH
IG
I F
IE
D
112" LIQUID-TITE
FLEXIBLE CONDUIT
TO SOLENOID VALES
�--- LB (TYP) SEE NOTES THIS SHEET FOR PUMP MANUFACTURER AND MODEL C
(TYP)
���,���t8r;=={+l---== ===� Ji TYPICAL LB (3/4")
�3/4"LB
3/4" RGS
CONDUIT
1 1/4"CON
3J
UIT
HOFFMAN
A12106CHQRFG
WATERPROOF
JUNCTION BOX.
2 JUNCTION BOX DETAIL ELEVATION
P003 NOT TO SCALE
(TYP. ALL OTHER
AROUND CAB PERIMETER)
NOTES
1. WATER SOURCE IS 1" COLD WATER LINE RUNNING VERTICALLY THROUGH
UTILITY CHASE. TEE OFF THIS LINE WITH A 1·x1·x1· LINE, BALL VALVE
(3 PIERCE) AND INSTALL BACKFLOW PREVENTER TO AVOID POLLUTION TO
DOMESTIC WATER. WATER FLOWS THROUGH BOOSTER PUMP WHICH
IS IN-LINE WITH TANK AND THEN THROUGH A TEE WHERE SURFACTANT
(SURFACE TENSION REDUCER)· NOTE 8 FROM TANK IS INJECTED. WATER
THEN, AT PRESSURE CONTROLLED BY REGULA TOR, IS HELD AT OPEN BY
A VALVE. MAIN PUMP (WWBP-1) MAINTAINS A SYSTEM PRESSURE
OF 4�0 PS�BY USE OF A PRESSURE REGULATOR. THE FLOW SWITCH
ACTIVATES/DEACTIVATES THE SURFACTANT PUMP (CFP-1) BASED ON
FLOW / NO FLOW RESPECTIVELY.
2. ALL WATER PIPING IS ASTM BBS, HARD DRAWN, TYPE L COPPER WITH
WROUGHT COPPER FITTINGS.
5 4 3
01/W2020 I AS-BUILT OT #18600
REVI � � JCH
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
� INYO
ATO • TECHNlCAL OPERA TJONS EASTERN SERVICE AREA
JACKSON
REVIEWEO�
ATCT
CAB WINDOW DEFOGGER SYSTEM
PIPING RISER, DETAIL AND SCHEDULES
JACKSON ll<TERNATIONAI. AIRPORT MS
..-mm,;,� 4,"' ,;,,v"' 9v"' s� ,;,,v� ,;,,v"' ,;,,v"' ,;,,rJ i
I
�-�-�-�-�1�-� � � � u u u u ,, 0 ,- 0 ,- 0 ,- 0 ,.
I PROJECT ENGINEER MGR: ENGINEERING • CEl<TER A A
DESIGNED RN UUED BY DATE 01/14/2020 JCH BNMTCT
DRAWN ENGtNEERtlG SERVICES DAAWINO NO RF/
L---1----'-------"NXS= OPERATIONS CHECl<ED JAN-D-ATCT-P003 llCS OAAWNO PR000CE0 OH A.10 REOIOH t.lCR08TATION sntBa
I
H
G
F
E
D
C
B
A
I 6 5 y_
ADJUSTABLE SPRAY PATTERN,
FIELD ADJUST AS NECESSARY
SS 3/4"x 1/2"
HEX BUSHING
(TYP OF 12)
LINE OF SIGHT
1" SOLENOID VALVE, SEE 2/P003
RUBBER SPEED BUMP WITH CHANNELED
BOTTOM TO PROTECT WATER PIPE FROM
FOOT TRAFFIC-SETON#51033 -48'Lx12"Wx2 1/2"H
EXISTING 4" VENT THRU EXTERIOR WALL
�' s � 1 · I • , , , • ', ' 1" WASHDOWN SUPPLY WATER
I -11 I I DOWN BELOW TO SUBJUNCTION
MECHANICAL CHASE
MOTORIZED 2-WAY VALVE
(NORMALLY CLOSED)
CTED
I
1 • CW CONiE
CW RISER---------- :
TO EXISTIN
�I r
SUB JUNC:TION LEVEL
I •
• I I ,
• 1 I,
• 1 ! -i-1· I •
• I ! j
WWBP-1 I ,
!=1::-::i j L______ 1
T-2
.l.-1•
I
CFP-1
SECTION
T-3
HUB DRAIN
P004) NOT TO SCALE
'!>-1" I
1"WINDOW WASH DRAIN LINE
DRAIN LINE RUN TO OPEN
DRAIN PIPE
4 3
4 3
01/14/2020 I AS-BUILT DT #18600
REV) � - �
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADM1NISTRA TION
�E IAM>
ATO - TECHNICAL OPERATIONS EASTERN SER VICE AREA
JACKSON
ATCT
CAB WINDOW
DEFOGGER SECTION
JACKSON INTERNATIONAL AIRPORT MS
� BY SUBM1TTEo9 cf• c,,G c,,G 9 .-, c,,G c,,G c,,G ,,,r}
\o f':Jo 0o . 09 _ nO O �o (\o (\o (\o
PROJECT ENGINEER MGR: ENGINEERING· CENTER A
I I I:':: _: I oo:�s 1::_HO o1114/20201� sNMi�I
JAN-D-ATCT-P004
H
G
F
E
D
C i
A no� PA00UCE> ON AIO lltE.OIOH 1,1(1'()S'TATlOH SYST[M
3//4" UNIONS FOR ADJUSTING SPRAY NOZZLES
File details come from the government source that posted it. Updated .