Itemized Pricing.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
USS STERETT (DDG-104) CIS PIPE LAGGING Federal contract opportunity
Solicitation number
N5523623Q0210
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This itemized pricing sheet outlines the requirements for a pipe lagging services contract for the USS Sterett (DDG-104). The contractor will be responsible for removing existing pipe insulation and lagging on board the ship, disposing of materials, and installing new insulation and lagging according to the statement of work. Specific tasks include removing and disposing of piping insulation, lagging, and reusable covers for locations identified in the purchase order; installing new pipe lagging, insulation, lagging pads, and reusable covers to match surrounding areas; and insulating engine exhaust uptakes. Pricing is provided on a unit price basis for various pipe sizes and systems. The purchase order period of performance is from September 22, 2023 to October 6, 2023. The contractor must provide all required labor, materials, equipment, and services to complete the work in accordance with contract, statement of work, and itemized pricing requirements.

View the file

Other files for this federal contract opportunity

Other files attached to USS STERETT (DDG-104) CIS PIPE LAGGING, newest first.
File Type Posted
23Q0210_SF18 Solicitation.pdf PDF
23Q0210_RFC.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 Itemized Pricing

CONTRACT:PIPE LAGGING SERVICES
CONTRACTOR:
PURCHASE ORDER:
SHIP:USS STERETT (DDG-104)
LOCATION:NAVY REGION SOUTHWEST
ITEM NO CLINDESCRIPTIONQTYUNIT OF ISSUEUNIT PRICEEXTENDED AMOUNT
0001COMMERCIAL INDUSTRIAL SERVICES (CIS) PIPE LAGGING SERVICES CONTRACT FOR THE REMOVAL OF EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS AND/OR INSTALLATION OF NEW AND/OR EXISTING PIPE INSULATION AND LAGGING, LAGGING PADS, AND/OR REUSABLE COVERS ONBOARD THE USS STERETT(DDG-104)1LOT$0.00
REMOVAL, DISPOSAL AND INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the removal and disposal of all existing piping insulation, lagging and/or reusable covers for the locations and system identified in the Purchase Order. Removal and disposal requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

INSTALLATION REQUIREMENTS:

The Contractor shall provide labor services, equipment, laboratory testing, and materials for the installation of new pipe lagging, insulation, lagging pads, and/or reusable covers for the locations and system identified in the Purchase Order. The Contractor shall accomplish the cleaning and painting requirements for new piping insulation, lagging, and/or re-usable covers to match surrounding areas. The Installation and painting requirements shall be accomplished IAW the requirements of the statement of work and references C.1.1.(a) through C.1.1.(aa).

ER09 1671FILTER CLEANING SHOP 01-188-2-Q18Pipe size: Three and one-half (3 1/2) inch NPS and smaller TEMPERATURE OF 125 OR LOWER
SS02 1104OFFICER WASHROOM, WATERCLOSET AND SHOWER 01-338-1-L12
25-SPASSAGE 2-410-0-L6
EA01 3730CHILLED WATER PUMP ASSEMBLY UNIT NO. 3 4-220-0-E24Pipe size: (4) inch NPS to (9) inch NPS TEMPERATURE OF 125 OR LOWER
`SS02 1104OFFICER WASHROOM, WATERCLOSET AND SHOWER 01-338-1-L4Pipe size: 3 1/2 inch NPS and smaller TEMPERATURE OF 125 OR LOWER. VALVES AND FLANGES
ER09 1671FILTER CLEANING SHOP 01-188-2-Q20
EM01 2247HOSE, GTM 1A START AIR 4-174-0-E20
EA01 3730CHILLED WATER PUMP ASSEMBLY UNIT NO. 3 4-220-0-E36Pipe size: 4 inch NPS to 9 inch TEMPERATURE OF 125 OR LOWER. VALVES AND FLANGES
EM02 2645HOSE, GTM 2B START AIR 4-254-0-E30
EM01 2247HOSE, GTM 1A START AIR 4-174-0-E20
EM02 2645HOSE, GTM 2B START AIR 4-254-0-E30Insulation and lagging for engine exhaust uptakes (Gas, turbine, diesel and engines) in accordance with the statement of work.
EM01 2248HOSE, GTM 1B START AIR 4-174-0-E34
EM01 2247HOSE, GTM 1A START AIR 4-174-0-E10
EM02 2644HOSE, GTM 2A START AIR 4-254-0-E30

BRUNO LARA NAVARRO 21 AUG 2023

NEW MILESTONE EVENTDATE
PURCHASE ORDER START DATE22-Sep-2023
PURCHASE ORDER END DATE6-Oct-2023
NOTES:
1. The Contractor shall provide all management, administrative services, materials, tools, equipment, labor, rigging, services, crane services, gas free services, scaffolding, utilities (i.e. air, water and electricity, etc.) and required services and support to accomplish the work specified in this contract in accordance with the requirements of the contract, the references of the Statement Of Work (SOW), and the Itemized Pricing listed in the scope of work.
2. The Contractor shall perform the requirements of this contract in accordance with the Statement Of Work (SOW), references C.1.1 (a) through C.1.1.(aa), and the requirements of the Itemized Pricing listed in the scope of work.