This document is an item description for the remanufacture of two custom ABS Blast Abrasive Floor Auger Systems for the Department of the Air Force Oklahoma City Air Logistics Complex (OC-ALC) at Tinker Air Force Base.
The document outlines the required remanufacturing work, which includes removing and cleaning the existing auger system components, repairing or replacing various damaged or corroded parts, and reinstalling the system. Specific parts identified for remanufacture include bearings, seals, shafts, and bushings. The document also requires correction of any damaged concrete areas and application of concrete sealant.
This item description is related to the federal contract opportunity "Auger System Removal Cleanout" (Solicitation Number FA8125-24-Q-0092) issued by the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation - FA812524Q0092.pdf | ||
| SOW for Auger Remanufacture.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
OKLAHOMA CITY AIR LOGISTICS COMPLEX (OC-ALC)
TINKER AIR FORCE BASE OKLAHOMA
Item Description
A25-008 B3228 Auger System Remanufacture
The AMXG (569th Squadron) is requesting utilization of funds for the remanufacturing of our custom ABS Blast Abrasive Floor Auger System. The requested equipment item descriptions/specifications are outlined below
Remanufacture on Two (2) Abrasive Floor Auger System, Model Number: Custom / Serial # 804 OC #’s 20729/20730, to include the following:
o Removal of Lids, Grating, Shed Plates, Augers, and Throughs o Clean & Clear Water and Debris from under Media Reclaim Trough including pressure wash (x2) separate reclaims that are approximately 39’ in length.
o Clean & Clear Water and Debris from under Media Reclaim Trough including pressure wash (x2) separate reclaims that are approximately 39’ in length.
o Remanufacture of the following parts needing repair due to corrosion/damage:
Four (4) each, ABS-BRG2000FB (BRG2000FB / 2" Flange Bearing, 4-bolt)
Four (4) each, ABS-SRP-2 (Seal Retainer Plate for 2" Flange Bearing, apprx. 6" x 6")
Sixteen (16) each, ABS-SPACER BAR-2FB (SPACER BAR-2FB / Spacer Bar for 2" Flange Bearing)
Four (4) ABS-SEALFE2 (Felt Seal for 2" Flange Bearing - (apprx. 6" x 4"),)
Two (2) each, ABS-BRG2000HB (2" Hanger Bearing) Two (2) each, ABS-SEALFEHB (Felt Seal for 2" Hanger Bearing, Large
Hole) Two (2) each, ABS-SEALFEHBS (SEALFEHBS / Felt Seal for 2" Hanger
Bearing, Small Hole) One (1) each, ABS-HGRBRGCVRS-LH (Hanger Bearing Cover, Standard
Style, Left Hand) One (1) each, ABS- HGRBRGCVRS-RH (Hanger Bearing Cover, Standard Style, Right Hand) Two (2) each, ABS-SH2X2434D4 (2" Dia x 24-3/4" Long Drive Shaft with 4" Keyway (shaft closest to elev.)) Two (2) each, ABS-SH2X2450QRC (2" Dia x 24-1/2" Long Coupling
Shaft, Quick Release) Two (2) each,ABS-SH2X1534E (2" Dia x 15-3/4" Long Free End Shaft)
Four (4) each, ABS-POLYBUSHING-0 (2" ID x 5" OD x 10" Long Polyurethane Bushing with 5/8" dia. Bolt Holes)
Twenty (20) each,ABS-BOLT-AUGER-7G8 ((1) 5/8-11 x 7" Grade 8 Hardened Bolt & (1) Nylock Nut for auger) o Correct any concrete areas that are damaged, to include applying concrete sealant to exposed dry pits, and any damage that occurs during removal of troughs.
o Reinstallation of Troughs, Augers, Shed Plates, Grating, and Lids