Item Description.pdf

PDF 163 KB Posted

Attached to
Foam Laser Machine Federal contract opportunity
Solicitation number
FA812624Q0001
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document outlines equipment specifications and requirements for a federal contract opportunity with the Department of the Air Force Materiel Command Air Force Sustainment Center. It seeks one OptiFlex 52" x 100" laser system or equivalent with minimum 100W sealed CO2 laser, 3" part clearance, 0.0025" position and repeatability accuracy, aluminum honeycomb table, and KCAM and CoreIDRAW software. It also requires a 3/4HP closed loop chilling system, 2HP top and bottom exhaust blowers, and UL certified electrical panel operating at 480V 3-phase. Additional requirements include one day of onsite technical training and a purge filter assembly. The related solicitation FA812624Q0001 is for a foam laser machine.

View the file

Other files for this federal contract opportunity

Other files attached to Foam Laser Machine, newest first.
File Type Posted
CSS FA812624Q0001.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

22 September 2023

The requested equipment item descriptions/specifications are outlined below.

1) One (1) OptiFlex (Work Area) 52" x 100" Laser System or Equivalent -Dual Servo Motor Motion Package -2.5" Lens Assembly w/Air Assist -Vacuum Table with Fume Exhaust -Gantry Arm Fume Exhaust -Aluminum Honeycomb Table -High Performance Computer Package -KCAM Laser Software -CoreIDRAW Graphics Software -2 Year Laser System Warranty

- Position accuracy =/-0.0025 in/ft -Repeatability =/-0.0025 in/ft -Footprint (W x L x H): 120”W x 200”L x 120”H -Part clearance Minimum 3”

- 100W Minimum Sealed Co2 -3 Year Laser Advance Replacement Warranty(Desired)

3/4HP Closed Loop Chilling System

2HP Top Exhaust Blower

2HP Bottom Exhaust Blower

UL Certified Electrical Panel (480V/3PH )

2) 1 Day Onsite Technical / Training

3) Purge Filter Assembly

File details come from the government source that posted it. Updated .