ITB and Project Manual P100.pdf

PDF 8 MB Posted

Attached to
FVSU- Poultry Lab Modifications` State and local contract opportunity
Solicitation number
PE-53300-RFP-2026-000000047
Issued by
Paulding County, Georgia

About this file

This document is a comprehensive construction bid and contract manual for the Poultry Lab Modifications project at Fort Valley State University, prepared by the Board of Regents of the University System of Georgia and involving multiple local and state jurisdictions. The project involves modifying 3,575 square feet of an existing 23,340 square foot Equine Facility, transforming unused interior space into offices, a classroom, and a poultry science laboratory. The bid is scheduled to be opened on August 5, 2025, at 2:00 PM, with a mandatory pre-bid conference on July 10, 2025, at 10:00 AM. The contract will be awarded on a lump sum basis to the lowest responsive and responsible bidder, with a construction period of 210 consecutive calendar days.

The project is funded through the Board of Regents and will be competitively bid, with contractors required to submit a bid bond of 5% of their total bid. The contract includes provisions for potential budget adjustments, with the owner reserving the right to supplement the budget or negotiate with the lowest bidder to bring costs within the established budget. Bidders will be evaluated on multiple criteria, including financial stability (current ratio of 1.0 or higher), safety record (Experience Modification Rate not exceeding 1.2), and past performance on public works projects. The project encourages minority business enterprise participation and offers potential state income tax credits for subcontracting with minority-owned businesses.

View the file

Other files for this state and local contract opportunity

Other files attached to FVSU- Poultry Lab Modifications`, newest first.
File Type Posted
SPD_SP045TaxComplianceForm(1).doc DOC document
DRAWINGS_P100 POULTRY LAB 7_1_25.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P100

POULTRY LAB MODIFICATION

FORT VALLEY STATE UNIVERSITY

TABLE OF CONTENTS

Pages

24018 Poultry Lab Modifications At Equine Facility, FVSU Table of Contents-1

DIVISION 00 - CONTRACTING REQUIREMENTS

Front End 22 General Conditions 106

DIVISION 01 - GENERAL REQUIREMENTS

01 1100 Summary of Work 1 01 2600 Contract Modification Procedures 2 01 2900 Payment Procedures 2 01 3100 Project Management and Coordination 3 01 3216 Construction Progress Schedules 2 01 3233 Photographic Documentation 1 01 3300 Submittal Procedures 3 01 4000 Quality Requirements 3 01 4523 Testing and Inspection Services 3 01 5000 Temporary Facilities and Controls 4 01 6000 Product Requirements 2 01 7329 Cutting and Patching 2 01 7700 Closeout Procedures 4

DIVISIONS 2 - DEMOLITION

02 4120 Selective Building Demolition 2

DIVISIONS 3 - CONCRETE

03 1000 Concrete Forming 3 03 2000 Concrete Reinforcing 2 03 3000 Cast-In-Place Concrete 12 03 3536 Polished Concrete Finish 5

DIVISIONS 4 - MASONRY

04 0513 Masonry Mortaring 3 04 0516 Masonry Grouting 2 04 2000 Unit Masonry 7

DIVISIONS 5 - METALS

05 5000 Metal Fabrications 4

DIVISIONS 6 – WOOD, PLASTICS AND COMPOSITES

06 1000 Rough Carpentry 2 06 6116 Solid Surfacing Fabrications 3

DIVISIONS 7 - THERMAL AND MOISTURE PROTECTION

07 1113 Bituminous Dampproofing 2

At Equine Facility, FVSU Table of Contents-2

07 2115 Insulation 2 07 8400 Firestopping 3 07 9200 Joint Sealers 3

DIVISIONS 8 - OPENINGS

08 1113 Hollow Metal Doors and Frames 5 08 1416 Flush Wood Doors 3 08 4113 Aluminum-Framed Entrances and Storefronts 5 08 7100 Door Hardware 7 08 8000 Glazing 10

DIVISIONS 9 - FINISHES

09 2200 Metal Support Assemblies 3 09 2900 Gypsum Board 4 09 3000 Tiling 5 09 5100 Acoustical Ceilings 3 09 6513 Resilient Base 2 09 6519 Resilient Tile Flooring 3 09 9100 Painting 7

DIVISIONS 10 - SPECIALTIES

10 1423 Interior Panel Signs 3 10 2813 Toilet Accessories 3 10 4413 Fire Extinguishers and Cabinets 2

DIVISIONS 11 – EQUIPMENT

11 3100 Equipment 2

DIVISIONS 22 – PLUMBING

22 0513 Common Requirements for Plumbing Equipment 10 22 0514 Closeout Documents for Plumbing 4 22 0519 Meters and gages for plumbing Piping 2 22 0523 General-Duty Valves for Plumbing Piping 2 22 0529 Hangers & Supports for Plumbing Piping & Equipment 8 22 0716 Plumbing Equipment Insulation 4 22 1116 Domestic Water Piping 6 22 1119 Domestic Water Piping Specialties 2 22 1126 Facility Liquefied-petroleum Gas Piping 6 22 1316 Sanitary Waste and Vent Piping 6 22 1319 Sanitary Waste Piping Specialties 4 22 3300 Electric, Domestic-Water Heaters 4 22 4000 Plumbing Fixtures 6 22 6113 Compressed-Air, Vacuum, Helium, Nitrogen, Oxygen and Carbon Dioxide Piping for Laboratory Facilities 6

At Equine Facility, FVSU Table of Contents-3

DIVISIONS 23 – MECHANICAL

23 0513 General Requirements for HVAC Equipment 14 23 0514 Closeout Document Requirements for HVAC 6 23 0529 Hangers and Supports for HVAC Piping and Equipment 8 23 0553 Identification for HVAC Piping and Equipment 2 23 0593 Testing, Adjusting and Balancing for HVAC 8 23 0716 HVAC Equipment Insulation 6 23 0900 Instrumentation and Control for HVAC 10 23 2300 Refrigerant Piping 6 23 3113 Metal Ducts 8 23 3300 Air Duct Accessories 12 23 3423 HVAC Power Ventilators 6 23 3713 Diffusers, Registers and Grilles 4 23 4100 Particulate Air Filtration and Bi-polar Ionization Units 4 23 6200 Packaged Compressor and Condenser Units 6 23 7433 100% Outdoor Air Condensing Units 6 23 7434 100% Outdoor Air Handling Unit 6 23 8126 Split-System Air-Conditioners 6 23 8219 Fan Coil Units 4

DIVISIONS 26 – ELECTRICAL

26 0500 Common Work Results for Electrical 8 26 0519 Low-Voltage Electrical Power Conductors and Cables 6 26 0526 Grounding and Bonding for Electrical Systems 4 26 0529 Hangers and Supports for Electrical Systems 6 26 0533 Raceway and Boxes for Electrical Systems 12 26 0537 Cable Hook Support System 2 26 0553 Identification for Electrical Systems 6 26 0943 Building Lighting Controls 6 26 2419 Motor-Control 4 26 2726 Wiring Devices 6 26 2813 Fuses 2 26 2816 Enclosed Switches and Circuit Breakers 4 26 5100 Interior Lighting 6

DIVISIONS 27 – COMMUNICATIONS

27 0500 Common Work Results for Communications 6 27 1301 Voice & Data Communication Cabling & Network Equipment 14

DIVISIONS 28 – ELECTRONIC SAFETY AND SECURITY

28 0500 Common Work Results for Electronic Safety and Security 6 28 3110 Fire Alarm System 10

END OF TABLE OF CONTENTS

DBB CONSTRUCTION CONTRACT

VERSION 07/01/2010

DESIGN-BID-BUILD

CONSTRUCTION CONTRACT

BETWEEN CONTRACTOR AND OWNER

TO BE USED WITH

BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA’S

DESIGN PROFESSIONAL (ARCHITECTURAL) CONTRACT

BETWEEN

LEGAL CONTRACTOR FIRM NAME

(CONTRACTOR)

AND

BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA

(OWNER)

For the Use and Benefit of:

Fort Valley State University

PROJECT NO. – P100

POULTRY LAB MODIFICATIONS AT THE EQUINE FACILITY

INCLUDES:

Executive Summary of Contents Preface Form of Contract Contract 1 to Contract 4 Bid Requirements pp 1 - 13 Table of Contents pp i to iv General Conditions pp 1 to 74 Forms Forms 1 to Forms 29

EXECUTIVE SUMMARY OF CONTENTS

BOARD OF REGENTS DESIGN-BID-BUILD CONTRACT

GENERAL CONDITIONS

VERSION 05/10/2006

EXECUTIVE SUMMARY OF CONTENTS

FORM OF CONTRACT

BID REQUIREMENTS

GENERAL CONDITIONS

SECTION 1 – GENERAL

Part 1 - General Part 2 - Contractor’s General Responsibilities and Duties.

Part 3 - Owner’s General Responsibilities and Rights.

Part 4 - Protection of Persons and Property Part 5 - Bonds, Indemnity, and Insurance Part 6 - Hazardous Conditions and Materials Part 7 - Miscellaneous Provisions.

SECTION 2 – PRE-COMMENCEMENT PHASE

Part 1 - Pre-commencement Phase Services Part 2 - Construction Documents and Site Plan

SECTION 3 – CONSTRUCTION PHASE

Part 1 - Construction Phase Services Part 2 - Changes to the Work Part 3 - Time.

Part 4 - Correcting the Work, Inspections, Covering and Uncovering Work Part 5 - Subcontractors, Trade Contractors, and Suppliers

SECTION 4 – COMPENSATION

Part 1 - General.

Part 2 - Payments Withheld Part 3 - Liens

SECTION 5 - CONTRACT ADJUSTMENTS, DISPUTES, AND TERMINATION

Part 1 - Owner’s Right to Suspend Work Part 2 - Contract Adjustments and Disputes Part 3 - Termination

SECTION 6 – PROJECT COMPLETION

Part 1 - Material Completion Part 2 - Final Completion Part 3 - Inspections for Completion of the Work Part 4 - Final Documents Part 5 – Payment for Material Completion and Final Payment Part 6 - Correction of the Work after Final Completion

SECTION 7 – FORMS

Performance Bond Payment Bond Contractor Affidavit and Certificate of Compliance Subcontractor Affidavit and Certificate of Compliance Non-Influence Affidavit Statutory Affidavit Five Year Bond on Roofs and Walls Specimen Certificate of Manufacturer Certificate of Insurance Bond to Discharge Claim Change Order Forms Application for Payment Form Subcontractor Retainage Release Certificate Final Certification of Costs

CONTRACT 1

DBB FORM OF CONTRACT INSERT PROJECT NUMBER (INSTITUTION ACRONYM)

VERSION 07/01/2010 INSERT DATE OF CONTRACT

BETWEEN CONTRACTOR AND OWNER

THIS CONSTRUCTION CONTRACT (hereinafter the “Contract”) made this day of (hereinafter the

“Effective Date”), by and between the BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA (hereinafter the “Owner”), for the use and benefit of Fort Valley State University (hereinafter the “Using Agency” or “Institution”) LEGAL Firm Name , (hereinafter the “CM/GC”), whose address is MUST be a physical address. NO P.O. Boxes.

(a) Contractor’s FEIN or Tax Identification Number:

(b) Contractor’s Georgia License Type and Number:

(c) Contractor’s Federal Employment Verification Certification:

The Contractor is registered with, authorized to use, is using and will continue to use, the federal work authorization program throughout the term of the contract, and holds the following authorization:

User Identification Number:

Date of Authorization:

WITNESSETH, that the Contractor and the Owner, for the consideration set forth herein, the adequacy and sufficiency of which is hereby acknowledged by each party, agree as follows:

Project No. P100

Project Name and Description: POULTRY LAB MODIFICATIONS AT THE EQUINE FACILITY (hereinafter the “Project.”)

1. Existing Documents. The Contractor has reviewed and taken into consideration the Bidding Documents in preparing his bid.

2. The Contract Sum: The Owner shall pay the Contractor for the performance of the contract, subject to additions and deductions provided by approved change orders, in current funds, the Contract Sum as follows:

INSERT CONTRACT SUM Dollars ($ )

3. The Material Completion and Occupancy Date shall be achieved within TWO Hundred TEN (210) consecutive calendar days beginning the date specified in the Proceed Order.

4. The agreed daily amount for Liquidated Damages is: $ 0 per day.

5. The agreed daily amount for Time Dependent Overhead Costs is: $ per day.

6. Notice. All notices in accordance with Section 1.1.5 shall be given to the following addresses:

CONTRACTOR: Contractor Name Physical Address, NO P.O. Boxes City, State Zip

Attention: Contractor POC for Project Phone Number: Contractor Phone Facsimile Number: Contractor Fax Email: Contractor Email address

CONTRACT 2

OWNER: Board of Regents of the University System of Georgia 270 Washington Street, SW, 6th Floor Atlanta, Georgia 30334 Attention: Vice Chancellor for Facilities Phone Number: 404-656-2243 Facsimile Number: 404-657-7433

OWNER’S REPRESENTATIVE: Board of Regents of the University System of Georgia 270 Washington Street, SW, 6th Floor Atlanta, Georgia 30334

Attention: Choose One Phone Number: BOR - PM Phone Facsimile Number: 404-657-1479 Email: Choose Appropriate Email

USING AGENCY (Institution): Fort Valley State University 1005 State University Drive Fort Valley, Georgia 31034314

Attention: Dr. Paul Jones Phone Number:

Facsimile Number:

Email:

DESIGN PROFESSIONAL: SP Design Group, Architects and Engineers Inc.

5191 Columbus Road Macon, Georgia 31206

Attention: Robert A. Day Phone Number: 478 745 1167 Facsimile Number:

Email: bday@spdesigngrp.com

7. Scope Of The Work: The Contractor shall furnish all the materials, perform all of the Work, and do all things required by the Contract Documents.

8. Schedule and Completion: The Pre-commencement Phase Services to be performed under this Contract shall commence upon the Effective Date of the Contract and be completed within 70 days thereafter. Activities on the Site shall commence on the date specified in the Proceed Order and shall be materially complete in accordance with established Milestones, and not later than the Material Completion and Occupancy Date.

9. Periodic Progress Payments: The Owner shall make progress payments, less retainage, as set forth in Section 4 of the General Conditions.

10. Payment for Material Completion: The Contractor may request payment of the remaining contract balance, including retainage, less amounts credited the Owner or incurred as liquidated damages, and less amounts withheld for the Punchlist by reason of Minor Items or Permitted Incomplete Work (See Paragraph 6.5.3.2). Payment for Material Completion shall be made by a check payable jointly to the Contractor and Surety and shall be mailed to the Surety.

11. Final Payment: Final Payment shall be made within ten days of receipt of the final payment application as set forth in Section 6, Part 2 of the General Conditions, provided that all other requirements of the Contract shall have been met in full.

12. The Contract Documents: This Contract, together with the Bidding Documents and the Bid, shall constitute the Contract Documents for the Project.

13. Bonds: The Contractor shall furnish both a performance bond and a payment bond and shall pay the premiums thereon as a Cost of the Work. The Performance Bond shall guarantee the full performance of the Contract.

14. Full Performance: The Owner and the Contractor hereby agree to the full performance of the Contract Documents.

15. Applicable Law: This Contract and all rights, privileges and responsibilities shall be interpreted and construed according to the laws of the State of Georgia.

16. No Conflict Of Interest: The Contractor covenants that it presently has no interest and shall not acquire any interest, direct or indirect, that would conflict in any manner or degree with the performance required under this Contract. The Contractor

CONTRACT 3

further covenants that, in the performance of this Contract, it shall neither contract with nor employ any person having any such interest.

17. Transactions With State Officials, Ethics: The parties hereto certify that the provisions of law contained in the Act prohibiting full-time appointive officials and employees of the State from engaging in certain transactions affecting the State as defined in O.C.G.A. §§45-10-20–26 and the Governor’s Executive Orders governing ethics, have not and will not be violated in any respect in regard to this contract and further certifies that registration and all disclosures required thereby have been complied with.

18. No Assignment: This Contract and the proceeds of this Contract may not be assigned or sublet as a whole, nor may the performance thereunder be assigned, without the prior written consent of the Owner.

19. No Waiver: The failure of the Owner at any time to require performance by the Contractor of any provision hereof, shall in no way affect the right of the Owner thereafter to enforce any provision or any part of the Contract, nor shall the failure of the Owner to enforce any breach of any provision hereof to be taken or held to be a waiver of such provision, or as a waiver, modification or rescission of the Contract itself.

20. Full Agreement. The Contract Documents supersede all prior negotiations, discussion, statements, and agreements between Owner and Contractor and constitute the full, complete, and entire agreement between Owner and Contractor. There can be no changes to this Contract by oral means, nor by course of conduct of the parties, nor by custom of the trade. No changes to this Contract will be binding on either party hereto unless such change is properly authorized, in writing, in accordance with Section 3, Part 2 of the General Conditions.

[Remainder of Page Intentionally Left Blank]

[Signatures Begin on Next Page]

CONTRACT 4

IN WITNESS WHEREOF the parties hereto have executed this Contract the day and year first written above.

Contractor

ATTEST:

_ (L.S.) BY: ______________________________ (L.S.)

, SECRETARY , PRESIDENT

(SEAL, OVER SIGNATURE)

(If not a corporation, signature must be notarized.)

APPROVED: USING AGENCY

BY:

Dr. Paul A. Jones, PRESIDENT

WITNESS:

(PRINT NAME / TITLE)

Attachments:

1. General Conditions and Forms

2. Supplementary General Conditions

BID REQUIREMENTS

INVITATION TO BID

BID REQUIREMENTS–1

INVITATION TO BID

The Owner will receive sealed bids from Licensed General Contractors in the Family Development Auditorium of the Family Development Building at Fort Valley State University, Carver Drive, Fort Valley, Georgia. Bids must be physically on the table in the Bid Room by 2:00 o’clock pm., at the time legally prevailing in Fort Valley, Georgia on August 5, 2025, for the construction of Project No. P100, POULTRY LAB MODIFICATIONS AT THE EQUINE FACILITY, located in Fort Valley, Georgia. At the time and place noted above, the bids will be publicly opened and announced.

Bidding Documents may be obtained online at the Georgia Procurement site.

Bidders are cautioned that acquisition of Bidding Documents through any unauthorized source is not advisable.

Acquisition of Bidding Documents from unauthorized sources places the bidder at risk of receiving incomplete or inaccurate information upon which to base a bid.

There will be a pre-bid conference held on July 10, 2025, at 10:00 a.m. in the Family Development Auditorium of the Family Development Building on Carver Drive on the campus of Fort Valley State University. Attendance at this conference is MANDATORY for any Contractor intending to bid on this project. Others may attend if they so desire.

Contract, if awarded, will be on a lump sum basis. No bid may be withdrawn for a period of thirty-five days after time has been called on the date of opening except in accordance with the provisions of Georgia law. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount equal to not less than five percent of the Bid. Both a performance bond and a payment bond will be required, each in an amount equal to 100 percent of the Contract Sum prior to execution of contract.

The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the rights in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget. The Owner anticipates that the contract will be awarded to the responsive and responsible bidder who provides the lowest bid within the budget. In judging whether the bidder is responsible, the Owner will consider, but is not limited to, the following:

• Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority;

• Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract;

• Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1.0 or higher;

• Whether the bidder can demonstrate a commitment to safety with regard to Workers' Compensation by having an Experience Modification Rate (EMR) over the past three years not having exceeded an average of 1.2; and

• Whether the bidder’s past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder’s contract obligations.

In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to rejecting all bids, reserves the right either to supplement the budget or to negotiate with the lowest responsive and responsible bidder (after all deductive alternates are taken) but only for the purpose of making changes to the project that will result in a cost to the Owner that is within the budget, as it may be supplemented.

BOARD OF REGENTS OF THE UNIVERSITY SYSTEM OF GEORGIA

BY: Ms. Becky Horton

INSTRUCTIONS TO BIDDERS

BID REQUIREMENTS–2

1. Basis of Contract. Contract, if awarded, will be on a lump sum basis and will be substantially in accordance with the Contract shown on pages Contract – 1 to Contract – 4.

2. Examination of Site. In undertaking the work under this Contract, the Contractor acknowledges that he has visited the Project Site and has taken into consideration all observed conditions that might affect his work.

3. Surety and Insurance Companies. The Contract provides that the surety and insurance companies must be acceptable to the Owner. Only those sureties listed in the Department of Treasury’s Listing of Approved Sureties (Department Circular 570) are acceptable to the Owner. At the time of issuance, all insurance and bonds must be issued by a company licensed by the Georgia Insurance Commissioner to transact the business of insurance in the State of Georgia for the applicable line of insurance. Such company shall be an insurer (or, for qualified self insurers or group self insureds, a specific excess insurer providing statutory limits) with an A.M. Best Financial Strength Rating of "A-" or better and with an A.M. Best Financial Size Category of Class V or larger.

4. Bidding Documents. The Bidding Documents comprise the Construction Documents, the Invitation to Bid, the Instructions to Bidders, the Bid Form, and all Addenda, upon which the bidder submits a bid.

5. Addenda. All Addenda issued prior to bid date adjust, modify, or change the drawings and specifications as set forth in the Addenda. No Addenda will be issued within five days of the date set for opening bids without an extension of the bid date. All such Addenda are part of the contract.

6. Interpretations. No oral interpretation will be made to bidders as to the meaning of the drawings and specifications.

Requests for interpretation of drawings and specifications must be made in writing to the Design Professional not later than six days prior to the date set for receipt of the bids. Failure on the part of the successful bidder to request clarification shall not relieve him as Contractor of the obligation to execute such work in accordance with a later interpretation by the Design Professional. All interpretations made to bidders will be issued in the form of Addenda to the plans and specifications and will be sent to all plan holders of record. Acknowledgement of receipt of such Addenda shall be listed in the Bid Form by the Contractor.

7. Alternates. Unless otherwise stipulated, all alternate bids are added. It is in the best interest of the public, and the intent of the Owner is, that the entire Project be constructed within the funds allocated in the Project budget.

8. Sales Tax. Unless otherwise provided for in the Contract Documents, the Contractor shall include in his bid all sales taxes, consumer taxes, use taxes, and all other applicable taxes that are legally in effect at the time bids are received.

9. Trade Names, Specifications.

(a) No Restriction of Competition. When reference is made in the Contract Documents to trade names, brand names, or to the names of manufacturers, such references are made solely to indicate that products of that description may be furnished and are not intended to restrict competitive bidding. If it is desired to use products of trade or brand names or of manufacturers’ names that are different from those mentioned in the Bidding Documents, application for the approval of the use of such products must reach the hands of the Design Professional at least ten days prior to the date set for the opening of bids (see 9(b) below). This provision applies only to the party making a submittal prior to bid. If approved by Design Professional, the Design Professional will issue an addendum to all bidders. This provision does not prevent the Owner from initiating the addition of trade names, brand names, or names of manufacturers by addendum prior to bid.

(b) Request for Approval of Substitute Product. All requests for approval of substitution of a product that is not listed in the Bidding Documents must be made to the Design Professional in writing. For the Design Professional to prepare an addendum properly, an application for approval of a substitute product must be accompanied by a copy of the published recommendations of the manufacturer for the installation of the product together with a complete schedule of changes in the drawings and specifications, if any, that must be made in other work in order to permit the use and installation of the proposed product in accordance with the recommendations of the manufacturer of the product. The application to the Design Professional for approval of a proposed substitute product must be accompanied by a schedule setting forth in which respects the materials or equipment submitted for consideration differ from the materials or equipment designated in the Bidding Documents.

BID REQUIREMENTS–3

(c) Burden of Proof. The burden of proving acceptability of a proposed product rests on the party making the submission. Therefore, the application for approval must be accompanied by technical data that the party requesting approval desires to submit in support of its application. The Design Professional will consider reports from reputable independent testing laboratories, verified experience records showing the reputation of the proposed product with previous users, evidence of reputation of the manufacturer for prompt delivery, evidence of reputation of the manufacturer for efficiency in servicing its products, or any other written information that is helpful in the circumstances. The degree of proof required for approval of a proposed product as acceptable for use in place of a named product or named products is that amount of proof necessary to convince a reasonable person beyond all doubt. To be approved, a proposed product must also meet or exceed all express requirements of the Contract Documents.

(d) Issuance of Addenda. If the Design Professional approves the submittal, an addendum will be issued to all prospective bidders indicating the approval of the additional product(s). Issuance of an addendum is a representation to all bidders that the Design Professional in the exercise of his professional discretion established that the product submitted for approval is acceptable and meets or exceeds all express requirements. If a submittal is initially rejected by the Design Professional, but determined to be acceptable to Design Professional after a conference with the Owner, an addendum covering the said submittal will be issued prior to the opening of bids. The successful bidder may furnish no products of any trade names, brand names, or manufacturers' names except those designated in the Contract Documents unless approvals have been published by addendum in accordance with the above procedure. Oral approvals of products are not valid.

(e) Conference with the Owner. Any party who alleges that rejection of a submittal is the result of bias, prejudice, caprice, or error on the part of the Design Professional may request a conference with a representative of the Owner, provided: that the request for said conference, submitted in writing, shall have reached the Owner at least six days prior to the date set for the opening of bids, time being of the essence.

10. Employment of Georgia Citizens and Use of Georgia Products. The work provided for in this Contract is to be performed in Georgia. It is the desire of the Owner that materials and equipment manufactured or produced in Georgia shall be used in the work and that Georgia citizens shall be employed in the work at wages consistent with those being paid in the general area in which the work is to be performed. This desire on the part of the Owner is not intended to restrict or limit competitive bidding or to increase the cost of the work; nor shall the fulfillment of this desire be asserted by the Contractor as an excuse for any noncompliance or omission to fulfill any obligation under the contract.

11. Trading with the State Statutes, Ethics. By submitting a bid, the bidder certifies that the provisions of law contained in O.C.G.A. Sections 45-10-20 to 45-10-71, which prohibit officials and employees of the state from engaging in certain transactions with the state and state agencies, and the Governor’s Executive Orders governing ethics, have not and will not be violated in any respect in regard to this contract and further certifies that registration and all disclosures required thereby have been complied with.

12. Georgia Security and Immigration Compliance Act Requirements. No bid will be considered unless the Contractor certifies its compliance with the Immigration reform and Control Act of 1986 (IRCA), D.L. 99-603 and the Georgia Security Immigration Compliance Act OCGA 13-10-90 et seq. Contractor shall certify that Contractor has registered at https://www.vis-dhs.com/EmployerRegiastration to verify information of all newly hired employess in order to comply with the Immigration reform and Control Act of 1986 (IRCA), D.L. 99-603 and the Georgia Security Immigration Compliance Act. The Contractor shall execute the Georgia Security and Immigration Compliance Act Affidavit, as found in Section 7 of the Construction Contract. Contractor also agrees that it will execute any affidavits required by the rules and regulations issued by the Georgia Department of Labor set forth at Rule 300-10-1-01 et seq. If the Contractor is the successful bidder, contractor warrants that it will include a similar provision in all written agreements with any subcontractors engaged to perform services under the Contract.

13. Owner’s Policy Statement. The policy of the Owner is that minority business enterprises shall have the maximum opportunity to participate in the Owner’s purchasing process. The Owner encourages all minority business enterprises to compete for, win, and receive contracts for goods, services, and construction. In addition, Georgia law provides a state income tax credit available to any business that subcontracts with a minority-owned business. [See O.C.G.A. §48-7-38 and O.C.G.A. §50-5-130. See also Executive Order of the Governor No. A-11-0002-1992.] For more information, please contact the Board of Regents’ Office of Business Development by e-mail at BusinessDevelopment@usg.edu. Any questions regarding statements contained hereunder should be directed to {Name, Address, and Telephone Number of Designee, as described in the box below}.

NOTE TO DESIGN PROFESSIONAL

By Executive Order of the Governor, all state agencies, authorities, commissions, and institutions shall have appointed a designee to act as a liaison between their organization and minority vendors to provide one-on-one assistance and to ensure that bid information is widely and appropriately disseminated. The name, address, and telephone number of this person is to be posted on all Bidding Documents.

The Governor's Small Business Center (http://www2.state.ga.us/departments/doas/gsbc/index.html; phone 404.656.6315 or 1.800.395.0053) is charged with assisting in these matters.

https://www.vis-dhs.com/EmployerRegiastration file://Bortw-s010.atl.bor.usg.edu/eaf/FPM/_Legal/Contract%20Documents/DBB/GC/BusinessDevelopment@usg.edu http://www2.state.ga.us/departments/doas/gsbc/index.html

BID REQUIREMENTS–4

14. Bids.

(a) Bid Opening. Bids will be opened and announced as stated in the Invitation to Bid.

(b) Bid Submission. All bids must be submitted on the Bid Form as attached hereto and must be signed, notarized, and sealed by a notary public. All blanks for information entry in bid forms submitted to Owner should be filled.

Blanks left unfilled constitute irregularities in the bid and place the bidder at risk of having the bid rejected unless the Owner rules the irregularity to be an informality or technicality that the director can waive, as is made clear in Paragraph 16 of these “Instructions to Bidders” and on the Bid Form. Numbers shall be written in English words and in Arabic numerals. The inclusion of any condition, alternate, qualification, limitation, or provision not called for shall render the bid nonresponsive and shall be sufficient cause for rejection of a bid.

(c) Bid Security. Bids must be accompanied by a Bid Bond made payable to the Owner in an amount not less than five percent of the Bid. Bid Bonds should be furnished on forms accepted as standard by the insurance industry, but shall be substantially in accordance with the Bid Security Form attached hereto.

(d) Delivery of Bids. Bids are to be addressed to the Owner, at the address and room number shown in the Invitation to Bid. Bids must be enclosed in an opaque, sealed envelope; marked with the Bid Date, Bid Time, Bid Number, Name of Project; and identified with the words "Bid for Construction.” Bids must be placed in the hands of the Owner at the specified location by not later than the hour and date named in the Invitation to Bid. After that time, no bids may be received. It is the sole responsibility of the bidder to ensure the delivery of the bids to the required address.

(e) Alternates. A bid must be submitted for all alternates. Failure to so may render the bid nonresponsive and be sufficient cause for rejection of a bid.

(f) Withdrawal of Bids. Bids may be withdrawn by bidders prior to the time set for official opening. After time has been called, no bid may be withdrawn for a period of thirty-five days after the time and date of opening except as provided in O.C.G.A Section 13-10-22 (appreciable error in calculation of bid). Negligence or error on the part of any bidder in preparing his bid confers no right of withdrawal or modification of his bid after time has been called except as provided by Georgia law.

15. Contract Award. Award shall be made on a lump sum basis to the lowest responsive and responsible bidder. The lowest bid will be the bid whose price, after incorporating all accepted alternates, is the lowest responsive bid that was received from a responsible bidder. No bid may be withdrawn for a period of thirty-five days after time has been called on the date of opening except in accordance with the provisions of law.

16. Owner’s Rights Concerning Award. The Owner reserves the right in its sole and complete discretion to waive technicalities and informalities. The Owner further reserves the right in its sole and complete discretion to reject all bids and any bid that is not responsive or that is over the budget, as amended. In judging whether the bidder is responsible, the Owner will consider, but is not limited to consideration of, the following:

(a) Whether the bidder or its principals are currently ineligible, debarred, suspended, or otherwise excluded from bidding or contracting by any state or federal agency, department, or authority;

(b) Whether the bidder or its principals have been terminated for cause or are currently in default on a public works contract;

(c) Whether the bidder can demonstrate sufficient cash flow to undertake the project as evidenced by a Current Ratio of 1.0 or higher;

(d) Whether the bidder can demonstrate a commitment to safety with regard to Workers' Compensation by having an Experience Modification Rate (EMR) over the past three years not having exceeded an average of 1.2; and

BID REQUIREMENTS–5

(e) Whether the bidder’s past work provides evidence of an ability to successfully complete public works projects within the established time, quality, or cost, or to comply with the bidder’s contract obligations.

17. Owner’s Right to Negotiate with the Lowest Bidder. In the event all responsive and responsible bids are in excess of the budget, the Owner, in its sole and absolute discretion and in addition to the rights set forth above, reserves the right either to (i) supplement the budget with additional funds to permit award to the lowest responsive and responsible bid, or (ii) to negotiate with the lowest responsive and responsible bidder (after taking all deductive alternates) only for the purpose of making changes to the Project that will result in a cost to the Owner that is within the budget, as it may be amended.

18. Contract Forms. The contract forms, including the payment and performance bonds, shall be as set forth in the General Conditions, Section 7 – Forms.

[Remainder of Page Intentionally Left Blank]

BID FORM

BID REQUIREMENTS–6

VERSION 07/01/2010

Organization and Classification of Contract Documents

BID REQUIREMENTS–7

To: OWNER _______________________________ _______________________________

Re: Project Name and No. P100, POULTRY LAB MODIFICATIONS AT THE EQUINE FACILITY

Bid Date: August 5, 2025, 2:00 pm

THE BID:

Bid. Having carefully examined the Specifications entitled PROJECT NO. P100, POULTRY LAB MODIFICATIONS AT THE EQUINE FACILITY, and the Bidding Documents and Addendum (a) No.(s) A1, _______________, as well as the Site and conditions affecting the Work, bidder hereby proposes to furnish all services, labor, materials, and equipment called for by them for the entire Work, in accordance with the aforesaid documents, for the sum of:

______________________________________________________________ Dollars ($ ___________________________) which sum is hereinafter called the Bid. The Bid shall be the amount of the Contract Sum executed between the Owner and the Contractor unless Alternates are accepted.

Alternates. We further propose that, should any of the following alternates (see section 01 2300, Alternates) be accepted and be incorporated in the Contract, the Bid will be altered in each case as follows:

NONE

Errors or Revisions. Prior to the bid opening date and hour, errors may be stricken or revisions may be made and corrections entered on this proposal form or on the bid envelope with sufficient clarity to be easily understood. All such annotations shall be binding on the bidder.

No Withdrawal. For and in consideration of the sum of $10.00, the receipt of which is hereby acknowledged, bidder and Owner agree that this bid may not be revoked or withdrawn after the time set for the opening of bids, except as provided in Georgia law, but is an irrevocable offer that shall remain open for acceptance for a period of thirty-five days following the time set for the opening of bids.

Execution of the Contract. If bidder is notified in writing by statutory mail of the acceptance of this bid within thirty-five days after time set for the opening of bids, bidder agrees to execute within ten days the Contract for the Work for the above stated Bid, as adjusted by the accepted Alternates, and at the same time to furnish and deliver to the Owner a Performance Bond and a Payment Bond on forms shown in Section 7 of the General Conditions of the Contract, both in an amount of equal to 100 percent of the Contract Sum.

Commencement and Completion of Work. Upon the Effective Date of the Contract, bidder agrees to commence all Preconstruction Activities. Upon issuance of a Proceed Order, bidder agrees to commence physical activities on the Site with adequate forces and equipment and to complete to Material Completion all work in Two Hundred Ten (210) consecutive calendar days beginning the day after the date of the Proceed Order.

Bid Bond. Enclosed herewith is a Bid Bond (NO OTHER FORM ACCEPTABLE) in the amount of _________________________________________ Dollars ($ _____________________ ) (being not less than five percent of the Bid). Bidder agrees that the above stated amount is the proper measure of liquidated damages that the Owner will sustain by bidder’s failure to execute the Contract or to furnish the Performance and Payment Bonds should bidder’s bid be accepted.

Obligation of Bid Bond. If this bid is accepted within thirty-five days after the date set for the opening of bids and bidder fails to execute the Contract within ten days after Notice of Successful Bid, or if bidder fails to furnish both Performance and Payment Bonds, the obligation of the Bid Bond will remain in full force and effect and the money payable thereon shall be paid into the funds of the Owner as liquidated damages for such failure; otherwise, the obligations of the Bid Bond will be null and void.

BID REQUIREMENTS–8

Bidder Certification

Certification under Oath. Under oath I certify that I am a principal or other representative of the bidder, and that I am authorized by it to execute the foregoing bid on its behalf; and further, that I am a principal person of the bidder with management responsibility for the construction for the bidder, and as such I am personally knowledgeable of all its pertinent matters. I further certify that this bid is made without prior understanding, agreement, or connection with any corporation, firm, or person submitting a bid for the same services, materials, labor, supplies, or equipment and is in all respects fair and without collusion or fraud. Bidder and its principals understand that collusive bidding is a violation of state and federal law and can result in fines, prison sentences, and civil damage awards. Bidder agrees to abide by all conditions of this bid.

BY: __________________________________________

Authorized Signature (BLUE INK)

Printed Name Title

Sworn to and subscribed before me this Day of , 20 .

Notary Public

My commission expires: ______________

(SEAL)

NOTE: THE NOTARY SEAL MUST BE APPLIED UNDER GEORGIA LAW, WHETHER OR

NOT THE LAW OF THE STATE WHERE EXECUTED PERMITS OTHERWISE.

STATEMENT OF BIDDER'S QUALIFICATIONS

BID REQUIREMENTS–9

VERSION 07/01/2010

STATEMENT OF BIDDER'S QUALIFICATIONS:

(To be subscribed and sworn to before a notary public.)

The bidder submits the following statement of bidder’s qualifications for consideration by the Owner.

Bidder’s Name: _________________________________________________________

LEGAL NAME OF BUSINESS

Bidder’s Address: __________________________________________________________

LEGAL BUSINESS ADDRESS (P.O. BOX IS INSUFFICIENT)

CITY STATE ZIP

MAILING ADDRESS IF DIFFERENT FROM ABOVE

Telephone Number: ___________ ______________________

AREA CODE NUMBER

The full names of persons and firms interested in the foregoing bid as principals are as follows:

(1)____________________________________________________________________ Circle One: President Partner Owner Other

(2)____________________________________________________________________ Circle One: Vice President Secretary Partner Other

(3)____________________________________________________________________ Circle One: Vice President Secretary Partner Other

Note: If incorporated: The names of both the President and Corporate Secretary must be indicated.

If a partnership, all partners must be indicated.

Social Security Number or FEIN: _____________________________________

Contractor’s Georgia License Type and Number:

Contractor’s Federal Employment Verification Certification:

The Contractor is registered with, authorized to use, is using and will continue to use, the federal work authorization program throughout the term of the contract, and holds the following authorization:

User Identification Number:

Date of Authorization:

State Where Organized or Incorporated: ______________________________

Plan of Organization: (Circle One) Proprietorship Corporation Partnership Joint Venture Other (Describe)

Years Engaged in Construction Contracting in Present Firm Organization: ____________ years.

Bidder Hereby Certifies that bidder:

a. Has never refused to sign a contract at the original bid on a public works contract except as allowed under Georgia law.

b. Has never been terminated for cause on a public works contract.

c. Has had no (criminal or felony) convictions, suspensions, or debarments of the bidder, its officers, or its principals for building code violations, bid rigging, or bribery in the last ten years.

BID REQUIREMENTS–10

VERSION 07/01/2010

d. Is not and its organization or its principals are not debarred, suspended, declared ineligible, or otherwise excluded by any Federal or State department or agency from doing business with the Federal Government or a State.

e. Has insurance required by the Contract Documents in place or has arranged to obtain it from an insurer authorized to do business in the State of Georgia.

f. Has sufficient bonding capacity to obtain a payment and performance bond from a surety meeting the requirements of the Contract Documents and authorized to do business in the State of Georgia.

g. Has sufficient cash flow to perform this Project.

Remarks or explanations of the above paragraphs a through g:

Bidder Certification

Certification under Oath. Under oath I certify that I am a principal or other representative of the bidder, and that I am authorized by it to execute the foregoing Statement of Bidder’s Qualifications is true and correct, including any explanation above and submitted under oath.

BY: __________________________________________

Authorized Signature (BLUE INK PLEASE)

Printed Name Title

Sworn to and subscribed before me this Day of , 20 .

Notary Public

My commission expires: ______________

(SEAL)

NOTE: THE NOTARY SEAL MUST BE APPLIED UNDER GEORGIA LAW, WHETHER OR

NOT THE LAW OF THE STATE WHERE EXECUTED PERMITS OTHERWISE.

BID REQUIREMENTS–11

VERSION 07/01/2010

Statistical Information. This request is made for statistical purposes only.

PLEASE INDICATE BELOW WHICH OF THE FOLLOWING DESCRIPTIONS APPLY TO YOUR COMPANY:

____ MINORITY BUSINESS ENTERPRISE (MBE) – One of the following statements describes this business: a) Owned by a member of a minority race; or b) a partnership of which a majority of interest is owned by one or more members of a minority race; or c) a public corporation of which a majority of the common stock is owned by one or more members of a minority race. A member of a minority race is defined as a person who is a member of a race that comprises less than fifty percent of the total population of the State of Georgia. For recordkeeping purposes, this includes, but is not limited to, persons who are Black, Hispanic, Asian-Pacific American, Native American, or Asian-Indian American.

____ GEORGIA MINORITY BUSINESS ENTERPRISE (GMBE) – Business meets the definition of a minority-owned business and, in addition, meets the following criteria: a) was organized in the State of Georgia; or b) reports income from the business for Georgia Income Tax purposes; or c) minority stockholders report earnings for Georgia Minority Business Enterprise. For more information, please contact the Board of Regents’ Office of Business Development by e-mail at BusinessDevelopment@usg.edu.

____ NEITHER DESCRIPTION APPLIES TO YOUR COMPANY.

file://Bortw-s010.atl.bor.usg.edu/eaf/FPM/_Legal/Contract%20Documents/DBB/GC/BusinessDevelopment@usg.edu

BID SECURITY FORM

BID REQUIREMENTS-12

VERSION 07/01/2010

BID SECURITY FORM

KNOW ALL BY THESE PRESENTS, That we, {Insert Contractor’s Legal Name and Address} as Principal, hereinafter called the Principal, and {Insert Legal Name and Address of Surety}, a corporation duly organized under the laws of the State of {Insert State of Corporate Organization}, as Surety, hereinafter called the Surety, are held and firmly bound unto:

OWNER:

Attention:

Phone Number:

Facsimile Number:

as Obligee, hereinafter called the Obligee in the sum of ______________________________________________ (Not less than five percent of the Bid) Dollars ($ _______________________ ), for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.

WHEREAS, the Principal has submitted a Bid for ________________________________________________________;

{Insert Owner’s Project Number and Project Description}

NOW, THEREFORE, if the Obligee shall accept the Bid of the Principal and (1) the Principal shall enter into a Contract with the Obligee in accordance with the terms of such Bid, and the Principal shall execute the Contract and give such bond or bonds as may be specified in the Bidding or Contract Documents with good and sufficient surety for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) in the event of the failure of the Principal to enter such Contract and give such bond or bonds, and the Principal shall pay to the Obligee the difference not to exceed the difference hereof between the amount specified in said Bid and such larger amount for which the Obligee may in good faith contract with another party to perform the Work covered by said Bid; then this obligation shall be null and void, otherwise to remain in full force and effect.

Signed and sealed this _______ Day of _______________, 20___

Name of Contractor:

Principal Witness

By: (Seal)

Title

Name of Surety:

Surety Witness

By: (Seal) (*)

(*) Attach Power of Attorney

NOTE TO CONTRACTOR: Use of Surety’s standard Bid Bond form is acceptable as long as it substantially complies with the following:

At Equine Facility, FVSU Table of Contents-1 13-Bid Requirements

DIVISION 00 - CONTRACTING REQUIREMENTS

Bid Requirements 22 General Conditions 106

DIVISION 01 - GENERAL REQUIREMENTS

01 1100 Summary of Work 1 01 2600 Contract Modification Procedures 2 01 2900 Payment Procedures 2 01 3100 Project Management and Coordination 3 01 3216 Construction Progress Schedules 2 01 3233 Photographic Documentation 1 01 3300 Submittal Procedures 3 01 4000 Quality Requirements 3 01 4523 Testing and Inspection Services 3 01 5000 Temporary Facilities and Controls 4 01 6000 Product Requirements 2 01 7329 Cutting and Patching 2 01 7700 Closeout Procedures 4

DIVISIONS 2 - DEMOLITION

02 4120 Selective Building Demolition 2

DIVISIONS 3 - CONCRETE

03 1000 Concrete Forming 3 03 2000 Concrete Reinforcing 2 03 3000 Cast-In-Place Concrete 12 03 3536 Polished Concrete Finish 5

DIVISIONS 4 - MASONRY

04 0513 Masonry Mortaring 3 04 0516 Masonry Grouting 2 04 2000 Unit Masonry 7

DIVISIONS 5 - METALS

05 5000 Metal Fabrications 4

DIVISIONS 6 – WOOD, PLASTICS AND COMPOSITES

06 1000 Rough Carpentry 2 06 6116 Solid Surfacing Fabrications 3

DIVISIONS 7 - THERMAL AND MOISTURE PROTECTION

07 1113 Bituminous Dampproofing 2

At Equine Facility, FVSU Table of Contents-2 13-Bid Requirements

07 2115 Insulation 2 07 8400 Firestopping 3 07 9200 Joint Sealers 3

DIVISIONS 8 - OPENINGS

08 1113 Hollow Metal Doors and Frames 5 08 1416 Flush Wood Doors 3 08 4113 Aluminum-Framed Entrance and Storefronts 5 08 7100 Door Hardware 7 08 8000 Glazing 10

DIVISIONS 9 - FINISHES

09 2200 Metal Support Assemblies 3 09 2900 Gypsum Board 4 09 3000 Tiling 5 09 5100 Acoustical Ceilings 3 09 6513 Resilient Base 2 09 6519 Resilient Tile Flooring 3 09 9100 Painting 7

DIVISIONS 10 - SPECIALTIES

10 1423 Interior Panel Signs 3 10 2813 Toilet Accessories 3 10 4413 Fire Extinguishers and Cabinets 2

DIVISIONS 11 – EQUIPMENT

11 3100 Equipment 2

DIVISIONS 22 – PLUMBING

22 0513 Common Requirements for Plumbing Equipment 10 22 0514 Closeout Documents for Plumbing 4 22 0519 Meters and gages for plumbing Piping 2 22 0523 General-Duty Valves for Plumbing Piping 2 22 0529 Hangers & Supports for Plumbing Piping & Equipment 8 22 0716 Plumbing Equipment Insulation 4 22 1116 Domestic Water Piping 6 22 1119 Domestic Water Piping Specialties 2 22 1126 Facility Liquefied-petroleum Gas Piping 6 22 1316 Sanitary Waste and Vent Piping 6 22 1319 Sanitary Waste Piping Specialties 4 22 3300 Electric, Domestic-Water Heaters 4 22 4000 Plumbing Fixtures 6 22 6113 Compressed-Air, Vacuum, Helium, Nitrogen, Oxygen and Carbon Dioxide Piping for Laboratory Facilities 6

At Equine Facility, FVSU Table of Contents-3 13-Bid Requirements

DIVISIONS 23 – MECHANICAL

23 0513 General Requirements for HVAC Equipment 14 23 0514 Closeout Document Requirements for HVAC 6 23 0529 Hangers and Supports for HVAC…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .