itb-26042-HTW_Park_Multi-Use_Path_Project_Manual (web).pdf
PDF 16 MB Posted
- Attached to
- South Soccer Sports Complex State and local contract opportunity
- Solicitation number
- 26-042
- Issued by
- Escambia County, Florida
About this file
Summary: Invitation to Bid for Hollice T. Williams Park Multi-Use Path Project
This Invitation to Bid (ITB 26-042) is issued by the City of Pensacola, Florida for construction of a multi-use path project within Hollice T. Williams Park. The project involves the construction of approximately 1.31 miles of 12-foot-wide concrete paths with thermoplastic striping and bicycle symbols, along with associated sidewalks, ADA ramps, and crosswalks connecting to existing park amenities and adjacent streets from Jordan Street to Gonzalez Street. The project is divided into two geographic bid sections: East Jordan Street to East Blount Street (Base Bid #1) and East Blount Street to East Gonzalez Street (Base Bid #2), with contractor responsibilities including site preparation, grading, earthwork excavation and fill, utility coordination, temporary construction fencing, and all necessary permitting. The optional pre-bid conference is scheduled for July 13, 2026, at 10:00 a.m. via Microsoft Teams, with questions due by July 16, 2026. Sealed bids are due July 30, 2026, at 2:30 p.m. at City Hall, with public bid opening on July 31, 2026, at 10:00 a.m. Award is anticipated August 20, 2026, with contract execution by September 15, 2026, and construction duration from September 30, 2026, through February 2027. The contractor must complete all work within 140 calendar days and maintain continuous progress to meet project milestones.
Bidders must submit a five percent bid bond or certified check payable to the City of Pensacola and include a detailed quantity sheet with unit prices and total costs for each bid section. The project is federally funded through the Florida Department of Transportation's Transportation Alternatives (TA) grant program. Bidders must be Florida Department of Transportation (FDOT) prequalified with a current certificate of qualification in Work Classes D, 40 (Sidewalk), and 28 (Pavement Marking), and must possess either a Florida Licensed General Contractor or Florida Licensed Underground Utilities Contractor license. All vendors must provide a Certificate of Good Standing from the Florida Department of State and be registered as active vendors with the state. The City requires comprehensive insurance coverage including Workers' Compensation, Commercial General Liability, Business Auto, Pollution Liability, and Umbrella coverage with minimum limits of $1,000,000 per occurrence and $5,000,000 aggregate, naming both the City of Pensacola and FDOT as additional insureds. Contractor must comply with all federal and state requirements including E-Verify system enrollment, prevailing wage standards, Copeland Anti-Kickback Act compliance, Davis-Bacon Act provisions, nondiscrimination requirements, and Clean Water Act standards.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| South_Soccer_Sports_Complex.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
THE CITY OF PENSACOLA,
FLORIDA INVITATION TO BID
BID NO. 26-042
HOLLICE T. WILLIAMS PARK MULTI USE PATH
A sealed, complete hardcopy bid with original (or electronic) signature, and one (1) complete and identical electronic copy (PDF) on flash drive or CD will be received on July 30, 2026, at 2:30 P.M., central time, at the following location.
City Hall (lobby) 222 West Main Street
Pensacola, Florida, 32502 Attention: Purchasing
The OUTER PACKAGING of the sealed submittal shall identify the respondent, and the solicitation title and number (whether hand-delivered, mailed, or via UPS/FedEx or other courier service). Submittals received after the deadline will not be accepted. Multiple submittals from the same entity will not be accepted.
Alternatively, electronic responses may be submitted to Demandstar or Central Bidding.
Both sites require registration and varying fees for notifications and document downloads.
NOTE: If submitting an electronic response and IF a bid/proposal bond is required:
• An insurance company’s executed bond may be included with the electronic submittal.
OR
• An insurance company’s executed bond, a certified check, or a cashier's check must be delivered to the address above.
Those submittals received will be opened and publicly read the following business day (July 31, 2026, 10:00 A.M., Central time) via Microsoft Teams at the following link:
Microsoft Teams bid opening link.
Specifications will be posted to the City’s website at www.cityofpensacola.com/bids.aspx.
Addenda will be posted to the City’s website. Bidders are responsible for obtaining addenda and are advised to check the website frequently. There is no cost to view or download documents from the City website.
In order to review all contractual requirements associated with this project, an OPTIONAL pre-bid conference will be held on July 13, 2026, 10:00 A.M. via Microsoft Teams at the following link*: Microsoft Teams Pre-Bid Meeting.
Bidders shall submit a certified check, cashier’s check, or insurance company’s executed bond, payable to the City of Pensacola in the amount of five percent (5%) of the base bid for a period of sixty (60) days.
https://www.demandstar.com/app/buyers/dashboard https://www.centralauctionhouse.com/rfpc10737-city-of-pensacola.html https://teams.microsoft.com/l/meetup-join/19%3ameeting_MjE2NDQwNmEtNTA0ZS00ZDk0LWE4YWUtN2ZiZTQ4ZjJkYTFm%40thread.v2/0?context=%7b%22Tid%22%3a%222c65e340-c270-42f3-85c0-f94ce72e1e36%22%2c%22Oid%22%3a%22ee43ac82-7f3f-4ee7-9087-c5d0dc949018%22%7d http://www.cityofpensacola.com/bids.aspx https://teams.microsoft.com/meet/274012116895771?p=UmSdnj9RLVXZiSALpe
Any questions concerning the bid should be addressed and submitted in writing no later than 10:00 A.M., Central time, July 16, 2026, to:
Dedria Lunderman, Purchasing Manager City of Pensacola
222 W. Main St.
Pensacola, FL 32502 purchasing@cityofpensacola.com
A bid tabulation or a Notice of Intent to Award will be posted to the City’s website at www.cityofpensacola.com/bids.aspx. Bidders are advised to check the website frequently.
The City of Pensacola adheres to the Americans with Disabilities Act and will make reasonable accommodations for access to City services, programs, and activities. Please email ADACoordinator@cityofpensacola.com or call (850) 436-5600. Requests must be made at least 48 hours in advance of the event in order to allow the City time to provide the requested services.
Attest: CITY OF PENSACOLA Ericka L. Burnett D. C. Reeves City Clerk Mayor
The City of Pensacola provides equal access in employment and public services.
(*Participation in a Microsoft Teams meeting requires a microphone and speakers; however, webcams are optional. Participants may join the meet-ing either via a PC or Smartphone. Please be sure to check the system requirements at the following link: Microsoft Teams System Requirements Check.)
SECURITY NOTICE
Visitors to City Hall are required to stay in the lobby unless otherwise directed.
Late submittals will not be accepted.
mailto:purchasing@cityofpensacola.com http://www.cityofpensacola.com/bids.aspx mailto:purchasing@cityofpensacola.com mailto:ADACoordinator@cityofpensacola.com
The anticipated schedule for this project is as follows: (Dates subject to change)
EVENT DATE
Bid Advertisement June 30, 2026
Optional Pre-Bid Conference July 13, 2026
Questions Deadline July 16, 2026
Bid Due Date July 30, 2026
Bid Opening / Bids reviewed for completion July 31, 2026
Bids submitted to FDOT for Review August 3 2026
Bids presented to City Council for Award August 20, 2026
Finalize and Execute Agreement September 15, 2026
Issue Notice to Proceed September 22, 2026
Duration of Construction September 30, 2026 – February 2027
All times are Central time.
PURCHASING GENERAL CONDITIONS
To ensure acceptance, all bidders submitting bids to the City of Pensacola shall be governed by the following conditions, attached specifications, and bid form(s) unless otherwise specified. Bids not submitted on the bid form(s) provided shall be rejected, and bids not complying with these conditions will be subject to rejection. Multiple submittals from the same entity will not be accepted.
1. Approved Equivalents or Equals: Any manufacturer's names, trade names, brand names, model numbers, etc. listed in the specifications are for information only and not intended to limit competition. The Bidder may offer any brand for which he is an authorized representative, which meets or exceeds the specifications as written. If the bid is based on an "approved equivalent or equal" item(s) or service(s), supportive information in the form of the manufacturer's printed literature or brochures, sketches, diagrams, and/or complete specifications must accompany the bid. The bidder must explain in detail the reasons why the proposed equivalent or equal will meet specifications and not be considered an exception thereto. The City of Pensacola reserves the right to determine acceptance of proposed equivalent or equal item(s) or service(s).
2. Award of Bids: Recommendations for award of bids are made to the Mayor or
City Council based on the lowest and best responsible bidder meeting all conditions and requirements of the specifications.
3. Bid Bond: The particular item(s) or service(s) outlined within the attached specifications require(s) that a certified check, cashier's check, or insurance company’s executed bond made payable to the City of Pensacola in the amount of five percent (5%) of the base bid accompany your proposal. To ensure its prompt return, please include the company's name and return address on the face of your good faith check or draft.
Checks or drafts accepted as good faith deposits will be retained within the City's Finance Department until award and execution of contract is complete, or until a purchase order is issued to the successful proposer. Any proposer withdrawing his proposal after the proposal opening forfeits the right of return of his good faith deposit.
4. Bid Withdrawal: No bid may be withdrawn after closing time for receipt of bids for a period of sixty (60) days thereafter. The contract award shall be legally binding at the time of award by Mayor or City Council.
5. Delivery: Bid quotations shall include all freight costs to Pensacola, Florida to a point(s) specified herein or specified at the time the purchase order is placed.
No title to the item(s) or service(s) ordered nor any risk of loss shall be passed to the City of Pensacola until after receipt of delivery has been acknowledged by an authorized representative of the City of Pensacola.
6. E-Verify System (Mandatory): In compliance with the provisions of F.S.
448.095, the parties to this contract and any subcontractors engaged in the performance of this contract hereby certify that they have registered with and shall use the E-Verify system of the United States Department of Homeland Security to verify the work authorization status of all newly hired employees, within the meaning of the statute.
7. Governing Law: The laws of the State of Florida shall be the laws applied in the resolution of any action, claim or other proceeding arising out of this contract.
8. Intent of Specifications: It is the intent of the specifications attached hereto to set forth and describe a certain item(s) or service(s) to be purchased by the City of Pensacola including all materials, equipment, machinery, tools, apparatus, and means of transportation (including freight costs) necessary to provide the item(s) or service(s).
9. Interpretations: All questions concerning the specifications or conditions shall be directed in writing to the Purchasing Office at least ten (10) days prior to submittal deadline, unless otherwise instructed on the Invitation to Bid Page.
Inquiries must reference the bid item(s) or service(s) and the date of the bid submittal deadline. Interpretations will be made in the form of an addendum placed on the City’s website. The City shall not be responsible for any other explanation or interpretation.
10. Legal Requirements: All applicable provisions of Federal, State, County, and local laws including all ordinances, rules, and regulations shall govern the development, submittal and evaluation of all bids received in response to these specifications, and shall govern any and all claims between person(s) submitting a bid response hereto and the City of Pensacola, by and through its officers, employees and authorized representatives. A lack of knowledge by the bidder concerning any of the aforementioned shall not constitute a cognizable defense against the legal effect thereof. The Bidder agrees that it will not discriminate on the basis of race, creed, color, national origin, sex, age or disability.
11. Licenses, Registration and Certificates: Each bidder shall possess at the time of submitting its bid all licenses, registration and certificates necessary to engage in the business of contracting (or special contracting if the work to be performed necessitates a particular type of specialty contractor) in the City of Pensacola. Bidder must also possess all licenses, registrations and certificates necessary to comply with federal, state and local laws and regulations. The awarded bidder shall be registered at the time of contract execution as an active vendor with the Florida Department of State, Division of Corporations (www.sunbiz.org).
12. Mistakes: Bidders are expected to examine the conditions, scope of work, proposal prices, extensions, and all instructions pertaining to the item(s) or service(s) involved. Failure to do so will be at the bidder’s risk. Unit prices bid will govern in award.
http://www.sunbiz.org/
13. Payment of Invoices: The City of Pensacola issues checks for payment of invoices on the 10th of each month. The signed receiving copy of the purchase order and a correct invoice must have been received by Accounts Payable Activity prior to the 4th of the month. Item(s) or service(s)s received on or after the 4th will be processed in the following month. All invoices are payable by the City under the terms of Florida Prompt Payment Act, Florida Statute §218.70. All purchases are subject to availability of funds in the City’s budget.
14. Permits and Taxes: The bidder shall procure all permits, pay all charges, fees, and taxes, and give all notices necessary and incidental to the due and lawful prosecution of the work. Bidders who use public roads of the City of Pensacola, Florida for transport of goods of any kind which said goods were transported from a point without the City of Pensacola, Florida to a point within the City of Pensacola shall obtain a “Use of Streets” permit for a fee not in excess of the license paid for by local licensees engaged in the same business.
15. Pre-Bid Meetings: If a bid requires a mandatory pre-bid meeting, any representative of a firm wishing to submit a bid must sign in with the name of the bidding firm.
16. Prohibited Conduct by Bidders: Upon the publication of any solicitation for sealed bids, requests for proposals, requests for qualifications, or other solicitation of interest or invitation to negotiate by any authorized representative of the City of Pensacola, any party interested in submitting a bid, proposal, or other response reflecting an interest in participating in the purchasing or contracting process shall be prohibited from engaging in any communication pertaining to formal solicitations with the Mayor, any member of Pensacola City Council or any member of a selection/evaluation committee for RFPs/RFQs, whether directly or indirectly or through any representative or agent, whether in person, by mail, by facsimile, by telephone, by electronic communications device, or by any other means of communication, until such time as the City has completed all action with respect to the solicitation.
17. Protests: Protests of the plans, specifications, and other requirements of bids and requests for proposals must be received in writing by the Purchasing Office at least ten
(10) business days prior to the scheduled bid submittal deadline. A detailed explanation of the reason for the protest must be included. Protests of the intended award of bid or contract must be in writing and received in the Purchasing Office within five (5) business days of the notice of intent to award. A detailed explanation of the protest must be included.
18. Public Entity Crimes: By submitting a proposal each proposer is confirming that the company has not been placed on the convicted vendors list as described in Florida Statute §287.133 (2) (a).
19. Public Records: Any material submitted in response to this Invitation to Bid will become a public document pursuant to Florida Statute §119.07. This includes material which the responding bidder might consider to be confidential or a trade secret. Any claim of confidentiality is waived upon submission, effective after opening the bid pursuant to Florida Statute §119.07.
20. Public Records Law: The Parties shall each comply with Florida Public Records laws. The Parties hereby contractually agree that each Party shall allow public access to all documents, papers, letters, or other public records as defined in Chapter 119, Florida Statutes, made or received by either Party in conjunction with this agreement, or related thereto, unless a statutory exemption from disclosure exists. Notwithstanding any provision to the contrary, it is expressly agreed that Contractor’s failure to comply with this provision, within seven (7) days of notice from the City, shall constitute an immediate and material breach of contract for which the City may, in the City’s sole discretion, unilaterally terminate this agreement without prejudice to any right or remedy.
21. Sealed Response: All executed City forms must be submitted. All responses must be signed by an authorized representative of the proposer.
A. Hardcopy response: In the event more than one submittal deadline is scheduled for the same date and time, do not include responses concerning different sets of specifications within the same envelope. The face of the sealed envelope shall be plainly marked identifying the responder, the bid/RFP/RFQ title and number. It shall be the sole responsibility of the respondent to assure receipt of the submittal at the Purchasing Office prior to the published time for the submittal deadline.
B. Electronic response: Respondent may submit an electronic submittal to the sites mentioned on page 1. Offers by telephone, fax, or email will NOT BE ACCEPTED.
22. Tax: The City of Pensacola is exempt from all State and local sales tax.
23. Unauthorized Aliens: The City of Pensacola shall consider the employment by any contracted vendor of unauthorized aliens a violation of Section 274A of the Immigration and Nationality Act. Such violation shall be cause for unilateral termination of this contract.
24. Venue: Venue for any claim, action or proceeding arising out of this contract shall be Escambia County, Florida.
ANY AND ALL SPECIAL CONDITIONS AND SPECIFICATIONS ATTACHED HERETO
WHICH VARY FROM THESE GENERAL CONDITIONS SHALL HAVE PRECEDENCE.
INSURANCE AND INDEMNIFICATION
GENERAL
Before starting and until termination of work for, or on behalf of the City, the Contractor shall procure and maintain insurance of the types and to the limits specified.
The term CITY as used in this section of the Contract is defined to mean the City itself, any subsidiaries or affiliates, elected and appointed officials, employees, volunteers, representatives and agents.
The term FDOT as used in this section of the contract is defined to mean the State of Florida Department of Transportation, including the Department’s officers and employees.
With regard to the Contractor’s obligation for products and completed operations, the Contractor shall be responsible for providing and maintaining insurance and contractual agreements for a minimum period of at least three (3) years subsequent to the City’s acceptance of the Product or Completed Operation.
Insurance shall be issued by an insurer whose business reputation; financial stability and claims payment reputation is satisfactory to the City, Unless otherwise agreed, the amounts, form and type of insurance shall conform to the following minimum requirements:
WORKER'S COMPENSATION
The Contractor shall purchase and maintain Worker's Compensation Insurance Coverage for all Workers' Compensation obligations whether legally required or not.
Additionally, the policy, or separately obtained policy, must include Employers Liability Coverage of at least $100,000 each person -accident, $100,000 each person - disease, $500,000 aggregate - disease.
COMMERCIAL GENERAL, AUTOMOBILE, POLLUTION AND UMBRELLA
LIABILITY COVERAGES
The Contractor shall purchase coverage on forms no more restrictive than the latest editions of the Commercial General Liability and Business Auto policies filed by the Insurance Services Office. The CITY and FDOT shall be an Additional Insured on all coverages except workers’ compensation and such coverage shall be at least as broad as that provided to the Named Insured under the policy for the terms and conditions of this Contract. The CITY and FDOT shall not be considered liable for premium payment, entitled to any premium return or dividend and shall not be considered a member of any mutual or reciprocal company. Minimum limits of $1,000,000 per occurrence and $5,000,000 aggregate, and per accident, combined single limit for liability must be provided, with umbrella insurance coverage making up any difference between the policy limits of underlying policies coverage and the total amount of coverage required. If the required limits of liability afforded should become impaired by reason of any claim, then the Contractor agrees to have such limits of $1,000,000 per occurrence and $5,000,000 aggregate, reinstated under the policy.
Commercial General Liability coverage must be provided, including bodily injury and property damage liability for premises, operations, products and completed operations, contractual liability, damage from collapse and underground exposures (c, u), and independent contractors. The coverage shall be written on occurrence-type basis.
Business Auto Policy coverage must be provided, including bodily injury and property damage arising out of operation, maintenance or use of owned, non-owned and hired automobiles and employee non-ownership use.
Contractor’s Pollution Liability coverage for bodily injury, property damage, fines, penalties, defense, and clean up must be included. Coverage must include both sudden/accidental and non-sudden/gradual.
Umbrella Liability Insurance coverage shall not be more restrictive than the underlying insurance policy coverages. The coverage shall be written on an occurrence-type basis.
CERTIFICATES OF INSURANCE
Required insurance shall be documented in the Certificates of Insurance that provide that the CITY and FDOT shall be notified at least thirty (30) days in advance of cancellation, nonrenewal or adverse change or restriction in coverage. The CITY and FDOT shall be named on each Certificate as an Additional Insured and this contract shall be listed. If required by the CITY, the Contractor shall furnish copies of the Contractor's insurance policies, forms, endorsements, jackets and other items forming a part of, or relating to such policies. Certificates shall be on the "Certificate of Insurance" form equal to, as determined by the CITY an ACORD 25. Any wording in a Certificate which would make notification of cancellation, adverse change or restriction in coverage to the CITYan option shall be deleted or crossed out by the insurance carrier or the insurance carrier's agent or employee. The Contractor shall replace any canceled, adversely changed, restricted or non-renewed policies with new policies acceptable to the CITY shall file with the CITY and FDOT Certificates of Insurance under the new policies prior to the effective date of such cancellation, adverse change or restriction. If any policy is not timely replaced, in a manner acceptable to the CITY, the Contractor shall, upon instructions of the CITY, cease all operations under the Contract until directed by the C I T Y , in writing, to resume operations. The "Certificate Holder" address should read: City of Pensacola, Department of Risk Management, Post Office Box 12910, Pensacola, FL 32521.
A separate certificate of insurance with “Certificate Holder” address should read:
Florida Department of Transportation, Office of Comptroller, MS 24, 605 Suwannee Street, Tallahassee, FL 32399-0405.
INSURANCE OF THE CONTRACTOR PRIMARY
The Contractor required coverage shall be considered primary, and all other insurance shall be considered as excess, over and above the Contractor's coverage. The Contractor's policies of coverage will be considered primary as relates to all provisions of the contract.
LOSS CONTROL AND SAFETY
The Contractor shall retain control over its employees, agents, servants and subcontractors, as well as control over its invitees, and its activities on and about the subject premises and the manner in which such activities shall be undertaken and to that end, the Contractor shall not be deemed to be an agent of the CITY and FDOT.
Precaution shall be exercised at all times by the Contractor for the protection of all persons, including employees, and property. The Contractor shall make special effort to detect hazards and shall take prompt action where loss control/safety measures should reasonably be expected.
HOLD HARMLESS
To the extent provided by law, the Contractor shall indemnify, defend, and hold harmless the CITY and the State of Florida, Department of Transportation, including the Department’s officers, agents, and employees, against any actions, claims, or damages arising out of, relating to, or resulting from negligent or wrongful act(s) of the Contractor, or any of its officers, agents, or employees, acting within the scope of their office or employment, in connection with the rights granted to or exercised by the Contractor.
The foregoing indemnification shall not constitute a waiver of the Department’s or CITY’s sovereign immunity beyond the limits set fort in Florida Statutes, Section 768.28.
Nor shall the same be construed to constitute agreement by the Contractor to indemnify the CITY for the negligent acts or omissions of the CITY, its officers, agents, or employees, or third parties. Nor shall the same be construed to constitute agreement by the Contractor to indemnify the Department for the negligent acts or omissions of the Department, its officers, agents, or employees, or third parties. This indemnification shall survive the termination of this agreement.
PAY ON BEHALF OF THE CITY
The Contractor agrees to pay on behalf of the CITY and FDOT, as well as provide a legal defense for the CITY and FDOT, both of which will be done only if and when requested by the CITY or FDOT, for all claims as described in the Hold Harmless paragraph. Such payment on the behalf of the CITY and FDOT shall be in addition to any and all other legal remedies available to the CITY and FDOT and shall not be considered to be the CITY’s and FDOT 's exclusive remedy.
INSTRUCTIONS TO BIDDERS
1. AWARD OF CONTRACT
The contract will be awarded as soon as practicable to the lowest responsible bidder, price and other factors considered, provided their bid is reasonable, it is to the interest of the City to accept it, and there is Florida Department of Transportation concurrence.
2. BID OPENING
At the time fixed for the opening of bids, their contents will be made public for the information of bidders and others properly interested.
3. BIDDERS INTERESTED IN MORE THAN ONE BID
If more than one bid is offered by any one party, by or in the name of their clerk, partner, or other person, all such bids will be rejected. A party who has quoted prices to a bidder is not thereby disqualified from quoting prices to other bidders or from submitting a bid directly for the work.
4. BIDDER'S QUALIFICATIONS
This solicitation requires that the Contractor be Florida Department of
Transportation (FDOT) prequalified per Florida Statutes 337.14(1) and Rule Chapter 14-22, F.A.C. A qualified contractor must have a current certificate of qualification in accordance with Rule Chapter 14-22, F.A.C. as of the date of bid opening and must be prequalified in the following Work Class: D. Other work associated with this project shall be performed by the contractor that is prequalified in the following Work Classes:
• Sidewalk (40).
• Pavement Marking (28).
Florida Statutes 607.1501 requires that all vendors who wish to do business in the State of Florida be licensed to do business through the Department of State of Florida and be in good standing with the State of Florida. As such, to do business with the City of Pensacola, a vendor must provide a Certificate of Good Standing with their bid/proposal package to the City. For more information on doing business in the State of Florida, please refer to the Florida Department of State. The website to register is https://dos.myflorida.com/sunbiz/manage-business/certification/.
5. COMMENCEMENT
The bidder further proposes and agrees hereby to commence the work with an adequate force and equipment within (10) consecutive calendar days after being notified by the City of Pensacola to do so.
https://dos.myflorida.com/sunbiz/manage-business/certification/ https://dos.myflorida.com/sunbiz/manage-business/certification/
6. PROJECT COMPLETION, PHASING, AND SCHEDULE
The contractor shall perform all work and testing in accordance with the approved phasing plan and required phasing schedule outlined below. Strict adherence to these timelines is required, and any deviation may result in applicable penalties. To meet these completion dates, the contractors shall line up materials, resources, and manpower necessary to maintain continuous progress and meet the project milestones.
The contractor is also responsible for the proper installation and maintenance of temporary construction fencing. For the efforts associated with the entire duration of all phases and add alternates, the entire work area must be fully enclosed with fencing to ensure public safety.
Should the City elect to move forward with an add alternate, the same level of construction fencing shall be installed and relocated as necessary to accommodate phasing and public safety.
Finally, while it will not be used as a determining factor in the award of bid, as part of the bid package, the contractor must submit a detailed project schedule to the City. This schedule should follow with the below required phasing schedule and outline weekly task milestones based on the project timeline described below and include plans for the contractor to attend weekly onsite project update meetings. Prior to execution of the contract, the contract shall reconfirm they will strictly adhere to their submittal project phasing schedule/milestones.
7. CONDITIONS AT SITE OF WORK
Bidders shall be responsible to visit the site to ascertain pertinent local conditions readily determined by inspection and inquiry, such as the location, and general character of the site, labor conditions, the character and extent of existing work within or adjacent thereto, and any other work being performed thereon.
8. DECLARATIONS
The bidder hereby declares that the only person or persons interested in the
Bid as principal or principals is or are named herein and that no other person than herein mentioned has any interest in this Bid or in the Contract to be entered into; that this Bid is made without connection with any other person, company or parties making a bid or proposal; and that it is in all respect fair and in good faith without collusion or fraud.
The bidder further declares that he has examined the site of the work and has informed himself fully in regard to all conditions pertaining to the place where the work is to be done; that he has examined the plans and specifications for the work and the contractual documents relative thereto, including the Advertisement, Bid Form, Form of Contract, General Conditions, and all specific conditions; and that he has satisfied himself relative to the work to be performed.
The bidder proposes and agrees, if this Bid is accepted, that it will not discriminate on the basis of race, creed, color, national origin, sex, age or disability and to contract with the City of Pensacola in the form of contract specified, to furnish all necessary materials, equipment, machinery, tools, apparatus, means of transportation, and labor necessary to complete the project.
9. LICENSING REQUIREMENT
Each bidder shall possess at the time of submitting its bid all licenses, registration and certificates necessary to engage in the business of contracting (or special contracting if the work to be performed necessitates a particular type of specialty contractor) in the City of Pensacola. Bidder must also possess all licenses, registrations and certificates necessary to comply with federal, state and local laws and regulations. The awarded bidder shall be registered at the time of contract execution as an active vendor with the Florida Department of State, Division of Corporations: (www.sunbiz.org).
Without limiting the foregoing, bidder for the project shall hold one or more of the following licenses in order to submit a bid and have qualifying experience relative to the subject project.
A. Florida Licensed General Contractor B. Florida Licensed Underground Utilities Contractor
10. LIEN RELEASE AND AFFIDAVIT
Each Application for Payment shall be accompanied by a Lien Release and
Affidavit from each subcontractor and each supplier showing that all materials, labor, equipment and other bills associated with that portion of the work in which payment is being requested for have been paid in full. The City shall not be required to make payment until and unless these affidavits are furnished by the Contractor.
11. PENALTIES
The bidder further agrees that in case of failure on his part to execute the said
Contract and Bond within (10) calendar days after written notice being given of the award of the Contract, the check or bid bond accompanying this bid, and the monies payable thereon, shall be paid into the funds of the City of
Pensacola as liquidated damages for such failure; otherwise, the check or bid bond accompanying the Bid shall be returned to the undersigned.
12. PREPARATION OF BIDS
A. Bids shall be submitted on the forms furnished or copies thereof, and must be manually signed. If erasures or other changes appear on the forms, each such erasure or change must be initialed by the person signing the bid.
B. The form of bid will provide for quotation of a price, or prices, for one or more items which may be lump sum bids, alternate prices, scheduled items resulting in a bid on a unit of construction or a combination thereof.
Where required on the bid form, bidders must quote on all items and they are warned that failure to do so may disqualify the bid. When quotations on all items are not required, bidders should insert the words “no bid” in the space provided for any item on which no quotation is made.
13. RECEIPT AND OPENING OF BIDS
No responsibility will attach to any City employee for the premature opening of, or the failure to open, a bid not properly addressed and identified.
14. REJECTION OF BIDS
The City reserves the right to reject any and all bids when such rejection is in the interest of the City; to reject the bid of a bidder who has previously failed to perform properly or complete on time contracts of a similar nature; and to reject the bid of a bidder who is not, in the opinion of the Engineer, in a position to perform the contract.
15. SPECIAL CONDITIONS
A. Public Entity Crimes - Any person or affiliate who has been placed on the convicted vendor list following a conviction for a public entity crime may not submit a bid on a contract to provide any goods or services to a public entity, may not submit a bid on a contract with a public entity for the construction or repair of a public building or public work, may not submit bids on leases of real property to a public entity, may not be awarded or perform work as a contractor, supplier, subcontractor, or consultant under a contract with any public entity, and may not transact business with any public entity in excess of the threshold amount provided in Section 287.017, for CATEGORY TWO for a period of 36 months from the date of being placed on the convicted vendor list.
B. All bidders are advised that compliance with The Occupational Safety and Health Administration Excavation Safety Standards, 29 C.F.R.s 1926.650-652 of Sub part P will be required.
C. The Contractor agrees that it will not discriminate on the basis of race, creed, color, national origin, sex, age or disability.
D. Florida State Statute 93.240 under section 556.101 through 556.111 requires that all excavators notify gas companies of their intention to perform any excavation at least forty- eight (48) hours (excluding Saturday, Sundays and holidays) prior to beginning work. If excavating, digging, boring, tunneling, blasting or otherwise disturbing the earth in any manner where a buried gas line may be damaged is proposed, please call the toll free number 1-800-432-4770 between the hours of 6:30 a.m. and 4:00 p.m. CST Monday through Friday, forty-eight (48) hours before starting the proposed work, (weekends and holidays excluded). Contractor shall notify all utility companies to locate and mark all utility facilities forty-eight (48) hours before starting any excavation.
E. The general contractor will submit a maintenance traffic plan which will satisfy the traffic conditions outlined in the general notes.
F. The general contractor shall post the construction site with "NO TRESPASSING" signs, to prevent amateur archaeologists from entering the site without authorization.
SCOPE OF WORK
Hollice T. Williams Multi Use Path City of Pensacola, Florida
1. PROJECT OVERVIEW
The Hollice T. Williams Multi Use Path will be a standalone construction phase associated with a larger park improvement initiative that will be a transformative landmark in the heart of the City to address flooding and water quality improvements, provide recreational, historical, and cultural experiences, and revitalize an urban corridor. Depending on timing, construction may occur simultaneously with the larger park project funded through another federal grant or immediately following it, therefore, the contractor shall be prepared to work within an active construction site. The contractor’s scope of work described herein is funded by the Florida Department of Transportation's Transportation Alternatives (TA) grant program and federally funded. The funding is applied to two geographic areas within the park as indicated in the quantity sheet. They are: 1) East Jordan Street to East Blount Street and 2) East Blount Street to East Gonzalez Street.
Proposed Improvements The proposed project improvements will include construction of a 12' wide concrete path for approximately 1.31 miles with thermoplastic striping and bicycle symbols, with associated sidewalks for pedestrian and bicycle use within Hollice T. Williams Park from Jordan Street to Gonzalez Street. The curvilinear paths will traverse through the park and connect in some instances to existing amenities like the parking lot, Cecil T Hunter pool and tennis courts, along with connections to adjacent streets for access to the park with associated ADA ramps and crosswalks.
2. ROLES AND RESPONSIBILITIES:
City of Pensacola (City): As the owner, the City shall serve as the primary contact for the project during construction activities.
Geosyntec Consultants Inc. (Geosyntec): As the prime civil engineer, Geosyntec is responsible for overall project management and civil engineering design.
Contractor: The contractor will execute the construction work as per the Issued for Construction (IFC) design set, coordinating with Geosyntec, MVVA, JDP, and Current Edge for clarifications, submittals, and inspections. The contractor is also responsible for developing and implementing a robust Maintenance of Traffic (MOT) plan and coordinating with local residents to minimize disruption during construction.
3. SCOPE OF WORK FOR CONTRACTOR:
This multi-use path project will include site preparation, grading, and construction of proposed improvements depicted in the design drawings, and any appropriate permitting. Proposed improvements include 1.31 miles of concrete paths for bicycle and pedestrian use with thermoplastic striping delineating travel ways and bicycle symbols. Sidewalks will be constructed to connect to adjacent streets with curb ramps and thermoplastic crosswalks. The bicycle and pedestrian facilities outlined in the provided plans under FDOT TA funding are the responsibility of the contractor. All other work such as stormwater, landscaping, roadway improvements, etc., will be handled through a separate contract. A unique feature of this project is that the contractor will be responsible for all the earthwork excavation, fill, and placement for the project area between Blount Street and Gonzalez Street.
Contractor’s work shall include the necessary coordination of all existing utilities with respective owners and to timely address any potential conflicts with required work.
All work shall be in accordance with the standards and specifications of the Contract Documents, City of Pensacola, and the Florida Department of Transportation.
4. PROJECT COMPLETION, PHASING, AND SCHEDULE
The contractor shall perform all work within one hundred and forty (140) calendar days. To meet these completion dates, the contractors shall line up materials, resources, and manpower necessary to maintain continuous progress and meet the project milestones. The contractor is also responsible for security of its work and safety of the public by the proper installation and maintenance of temporary construction fencing.
5. DELIVERABLES
The contractor shall provide the following deliverables to the City:
Copies of all contractor-secured permits (City Building Inspections, FDOT, CSX, etc.)
Shop Drawings: Submit shop drawings for all materials and systems for approval prior to installation.
Progress Reports: Submit monthly progress reports during construction, including an updated construction schedule, MOT updates, and business owner coordination logs.
As-Built Drawings: Provide as-built drawings at the completion of construction for contractor to prepare record drawings.
Close-Out Documents: Submit any required close-out documents, including warranties, certifications, and maintenance manuals.
Necessary documents for CEI compliance specialist to meet federal regulations.
6. COORDINATION AND COMPENSATION
Primary Contact (City of Pensacola):
Brad Hinote P.E., City Engineer, 222 W. Main Street, Pensacola, FL 32502
(850) 435-1685 bradhinote@cityofpensacola.com
On-Site Coordination: The contractor shall refrain from interaction with property owners. Instead, they shall designate a point of contact to liaise.
mailto:bradhinote@cityofpensacola.com
PROPOSAL
BID NO. 26-041
HOLLICE T. WILLIAMS MULTI USE PATH PROJECT
AMOUNTS MUST BE TYPED OR CLEARLY WRITTEN.
Base Bid #1 – E. Jordan to E. Blount
(Written)
Base Bid #2 – E. Blount to E. Gonzalez
(Written)
*A quantity sheet must be filled out and included for the submittal to be considered.
Bid Security in the proper form and in the amount of five percent of the base bid is submitted.
Dunns#/UEID: ________________ (Federal Transparency Act Reporting Requirement)
Florida Department of Professional Regulation Contractor's Certification or Registration
No. _______________ Expiration Date _______________
Survey: How did you obtain this solicitation?
City of Pensacola website Central Bidding Demandstar
Other:
Signature Date:
Printed Name: Title:
Company: Address:
Telephone: City:
Fax: State: Zip:
E-mail:
FAILURE TO INCLUDE THIS FORM IN SUBMITTAL MAY DISQUALIFY THE BID.
*Note: Mobilization includes field engineering, temporary facilities, and general conditions.
Signature Date:
Printed Name: Title:
Company:
HOLLICE T WILLIAMS MULTI USE PATH
QUANTITY SHEET
Base Bid #1 - East Jordan Street to East Blount Street
No. Category FDOT Pay Item Qty Unit Unit Price Total Cost
1 MOBILIZATION* 101 1 1 EA
2 MAINTENANCE OF TRAFFIC 102 1 1 EA
3 TYPE B STABILIZATION 160 4 5261 SY
4 CONCRETE, SIDEWALK, 4" THICK 522 1 5261 SY
PAINTED PAVEMENT MARKINGS, STANDARD,
WHITE, MESSAGE OR SYMBOL
710 11160 73 EA
THERMOPLASTIC, STANDARD, WHITE, SOLID, 12"
FOR CROSSWALK AND ROUNDABOUT
711 11123 1285 LF
THERMOPLASTIC, STANDARD-OTHER
SURFACES, WHITE, SOLID, 6”
711 16 131 0.75 GM
BASE BID #1 TOTAL
Base Bid #2 - East Jordan Street to East Blount Street
8 MOBILIZATION* 101 1 1 EA
9 MAINTENANCE OF TRAFFIC 102 1 1 EA
10 REGULAR EXCAVATION 120 1 4,056 CY
11 EMBANKMENT 120 6 4,434 CY
12 TYPE B STABILIZATION 160 4 4733 SY
13 CONCRETE, SIDEWALK, 4" THICK 522 1 4733 SY
PAINTED PAVEMENT MARKINGS, STANDARD,
WHITE, MESSAGE OR SYMBOL
710 11160 45 EA
THERMOPLASTIC, STANDARD, WHITE, SOLID, 12"
FOR CROSSWALK AND ROUNDABOUT
711 11123 1,905 LF
THERMOPLASTIC, STANDARD-OTHER
SURFACES, WHITE, SOLID, 6”
711 16 131 0.56 GM
BASE BID #2 TOTAL
APPENDIX A, 44 C.F.R. PART 18 – CERTIFICATION REGARDING LOBBYING
Certification for Contracts, Grants, Loans, and Cooperative Agreements
The undersigned certifies, to the best of his or her knowledge and belief, that:
1. No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of an agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement.
2. If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, “Disclosure Form to Report Lobbying,” in accordance with its instructions.
3. The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly.
This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code.
Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure.
The Contractor, __________________________________, certifies or affirms the truthfulness and accuracyof each statement of its certification and disclosure, if any. In addition, the Contractor understands and agrees that the provisions of 31 U.S.C. Chap.
38, Administrative Remedies for False Claims and Statements, apply to this certification and disclosure, if any.
Signature of Contractor’s Authorized Official Date
Name and Title of Contractor’s Authorized Official
State of Florida Affidavit Regarding the Use of Coercion for Labor and Services
Pursuant to Florida Statute 787.06(13)
Section 787.06(13) Florida Statutes requires all nongovernmental entities executing, renewing, or extending a contract with a governmental entity to provide an affidavit signed by an officer or representative of the nongovernmental entity under penalty of perjury that the nongovernmental entity does not use coercion for labor or services.
The undersigned hereby certifies that he/she is an officer or authorized representative of the vendor identified above and that said vendor does not use coercion for labor or services as defined in Section
787.06 Florida Statutes.
Florida Statute 787.06 (2)(a) “Coercion” means:
1. Using or threatening to use physical force against any person;
2. Restraining, isolating, or confining or threatening to restrain, isolate, or confine any person without lawful authority and against her or his will;
3. Using lending or other credit methods to establish a debt by any person when labor or services are pledged as a security for the debt, if the value of the labor or services as reasonably assessed is not applied toward the liquidation of the debt, the length and nature of the labor or services are not respectively limited and defined;
4. Destroying, concealing, removing, confiscating, withholding, or possessing any actual or purported passport, visa, or other immigration document, or any other actual or purported government identification document, of any person;
5. Causing or threatening to cause financial harm to any person;
6. Enticing or luring any person by fraud or deceit; or
7. Providing a controlled substance as outlined in Schedule I or Schedule II of s. 893.03 to any person for the purpose of exploitation of that person.
(2)(e) “Labor” means work of economic or financial value.(2)(h) “Services” means any act committed at the behest of, under the supervision of, or for the benefit of another. The term includes, but is not limited to, forced marriage, servitude, or the removal of organs.
Vendor Name:
Vendor FEIN: Phone Number:
Vendor's Authorized Representative Name and Title:
Address:
City: State: ZIP:
Email Address:
Under penalties of perjury, I declare that I have read the foregoing document and that the facts stated in it are true.
By:
AUTHORIZED SIGNATURE
Print Name and Title:
Date:
City of Pensacola Florida
CERTIFICATION
for
EROSION AND SEDIMENTATION COMPLIANCE
All site excavation and site disturbance shall comply with the following federal, state and local regulations related to erosion and sedimentation:
A. Federal Clean Water Act as amended in 1987 B. State Florida Statutes, Chapter 373 and 403, and the rules promulgated thereunder C. Local Code of the City of Pensacola, Chapter 12-9
By signature of its undersigned authorized representative, the Bidder hereby assures the City of Pensacola that any soil-disturbing activities performed by the Bidder will comply with all applicable federal, state, and local regulations.
The cost of compliance with applicable erosion and sedimentation regulations is estimated by the Bidder to be $ _____________, which cost is included in the amount of the bid.
The specific methods of compliance with applicable federal, state, and local regulations and the associated costs are as follows:
Authorized Official
SWORN STATEMENT UNDER SECTION 287.113(3)(a), FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED IN THE PRESENCE OF A NOTARY PUBLIC OR
OTHER OFFICER AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted with Bid, Proposal or Contract No.
for .
2. This sworn statement is submitted by .
[name of entity submitting sworn statement] whose business address is and (if applicable) its Federal Employer Identification Number (FEIN) is
(If the entity has no FEIN, include the Social Security number of the individual signing this sworn statement: ( .)
3. My name is and my relationship to [please print name of individual signing] the entity named above .
4. I understand that a “public entity crime” as defined in Paragraph 287.133(1)(g), Florida Statutes, means a violation of any state or federal law by a person with respect to and directly related to the transaction of business with any public entity or with an agency or political subdivision of any other state or with the United States, including, but not limited to, any bid or contract for goods or services to be provided to any public entity or an agency or political subdivision of any other state or the United States and involving antitrust, fraud, theft, bribery, collusion, racketeering, conspiracy or material misrepresentation.
5. I understand that “convicted” or “conviction” as defined in Paragraph 287.133(1)(b), Florida Statutes, means a finding of guilt or a conviction of a public entity crime, with or without an adjudication of guilt, in any federal or state trial court of record relating to charges brought by indictment or information after July 1, 1989, as a result of a jury verdict, nonjury trial, or entry of a plea of guilty or nolo contendere.
I understand that an “affiliate” as defined in Paragraph 287.133(1)(a), Florida Statutes, means:
1. A predecessor or successor of a person convicted of a public entity crime: or
2. An entity under the control of any natural person who is active in the management of the entity…