II_01_c_RFP Attachment 2 - QASP.docx

DOCX document 21 KB Posted

Attached to
AMENDMENT 02- Terrorism Risk Insurance Program (TRIP) Data Collection, Validation, and Analysis Federal contract opportunity
Solicitation number
2032H323R00005
Issued by
Department of the Treasury Departmental Offices

About this file

This document outlines a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide Terrorism Risk Insurance Program (TRIP) Data Collection, Validation and Analysis services. The contractor will be responsible for conducting the annual data call on behalf of TRIP by aggregating and validating insurance industry data and making recommendations to the Federal Insurance Office regarding the TRIP Section 111 Data Collection and use during the annual data call process. The QASP defines the roles of the Integrated Project Team members, identifies performance objectives, describes the methodologies for monitoring and evaluating contractor performance against those objectives, outlines quality assurance documentation requirements, and analyzes the results of quality assurance monitoring. Acceptable quality levels are established at 100% accuracy for all deliverables. The government will use monitoring methods like periodic and spontaneous inspections as well as customer feedback to determine whether performance standards have been met.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 02- Terrorism Risk Insurance Program (TRIP) Data Collection, Validation, and Analysis, newest first.
File Type Posted
II_02_Amendmend 02_2032H323R00005 Questions and Answers.pdf PDF
II_02_Amendment 01_RFP 2032H323R00005.pdf PDF
II_01_d_RFP Attachment 3 - Price Submission Wrksht.xlsx XLSX spreadsheet
II_01_a_RFP 2032H323R00005 final.pdf PDF
II_01_b_RFP Attachment 1 - PWS v2.pdf PDF
II_01_e_RFP Attachment 4 - SB Concerns Subcontracting Plan Outline v2.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRIP DATA COLLECTION, VALIDATION AND ANALYSIS

QUALITY ASSURANCE SURVEILLANCE PLAN

(QASP)

1 INTRODUCTION

This Quality Assurance Surveillance Plan (QASP) is pursuant to the requirements listed in the Performance Work Statement (PWS) entitled Terrorism Risk Insurance Program (TRIP) Data Collection, Validation and Analysis. This plan sets forth the procedures and guidelines the Federal Insurance Office will use in ensuring the required performance standards or services levels are achieved by the contractor.

1.1 Purpose

1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s Quality Control Plan (QCP), and to ensure that the government pays only for the level of services received.

1.1.2 This QASP defines the roles and responsibilities of all members of the Integrated Project Team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.

1.2 Performance Management Approach

1.2.1 The PWS structures the acquisition around “what” service or quality level is required, as opposed to “how” the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken by the Federal Insurance Office to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.

1.2.2 Performance management represents a significant shift from the more traditional Quality Assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, as long as the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract as long as the critical outcomes expected are being achieved and/or the desired performance levels are being met.

1.3 Performance Management Strategy

1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s own quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or by subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.

1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determination regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.

2 ROLES AND RESPONSIBILITIES

The Contracting Officer (CO) is responsible for monitoring contract compliance, contract administration, and cost control and for resolving any differences between the observations documented by the Contracting Officer Representative (COR) and the contractor. The CO will designate a COR as the government authority for performance management.

3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS

The required performance standards and/or quality levels are included in the PWS, which is included as Attachment 1. If the contractor meets the required service or performance level, it will be paid the amount agreed on in the contract in accordance with the invoice schedule. Failure to meet the required service or performance level will result in withholding of payment until deliverables that comply with the attached PWS are delivered and accepted by the Government.

4 METHODOLOGIES TO MONITOR PERFORMANCE

4.1 Surveillance Techniques

To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are periodic and spontaneous inspection.

4.2 Customer Feedback

The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.

Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems but the customer always has the option to communicate complaints to the Contracting Officer, as opposed to the contractor.

Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the COR. The COR will accept those customer complaints and investigate.

Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.

4.3 Acceptable Quality Levels

For all deliverables, the desired performance level is established at 100 percent accuracy.

5 QUALITY ASSURANCE DOCUMENTATION

The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and are assessed prior to Government acceptance of each deliverable. The COR will retain a copy of all documentation to the contractor regarding performance in the project file.

5.1.1

6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT

6.1 Determining Performance

6.1.1 Government shall use the monitoring methods cited to determine whether the performance standards have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels. Failure to meet the performance standards may result in rejection of any invoices submitted for rejected goods/services.

6.2 Reviews and Resolution

The CO or COR may require the contractor’s project manager, or a designated alternate, to meet with the CO or COR and other government personnel as deemed necessary to discuss performance evaluation. The agenda of the reviews may include:

· Monthly performance assessment data and trend analysis

· Issues and concerns of both parties

· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis

· Recommendations for improved efficiency and/or effectiveness

File details come from the government source that posted it. Updated .