Justification and Approval for Other Than Full and Open Competition (JOFOC) DVPI Evaluation Project 2020.pdf
PDF 191 KB Posted
- Attached to
- Evaluation Services Federal contract opportunity
- Solicitation number
- IHS1400412
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Justification and Approval.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Acquisition Title:
Service Unit/Clinic: Department:
Acquisition Year:
Author/Title:
2. Description of Action:
Name of Proposed Contractor(s):
Street Address:
City, State, Zip:
3. Description of Supplies or Services:
Basis for Approval (FAR 6.303-1(d)): Individual Basis Class Basis
The estimated value of the proposed action, including all options, is:
As applicable, briefly describe the services or supplies required to meet the agency's needs, including make & model number where appropriate. Include quantities of supplies or period of performance for services. Provide information for any options included. If the action is a modification to an existing contract, distinguish clearly between the work covered by the basic order and the work to be obtained by the proposed modification.
4. Authority and Rationale: Identify the statutory authority, FAR title and FAR citation permitting other than full and open competition. It may be one of the following most commonly used citations by the operating divisions of the Department of Health and Human Services (HHS), but other exceptions may apply per FAR Subpart 6.3.
Actions other than simplified acquisition procedures (select only one and provide an explanation):
Pricing: Firm-Fixed Price Other
FOR OTHER THAN FULL AND OPEN COMPETITION
Template for Justification and Approval for Other Than Full and Open Competition
Completion Instructions: The Department of Health and Human Services (HHS) has established a standard template for the preparation of a J&A for Other Than Full and Open Competition. If this is an 8(a) set-aside, please note this form is not required unless the acquisition is valued (including all options) at greater than $22 million. This template may be used for simplified acquisition procedures ( FAR Subpart 13.5 ) but not for Federal
Supply Schedule orders ( FAR 8.4 ) or task or delivery orders subject to fair opportunity ( FAR 16.505 ).
Tailor all aspects of this template to the individual acquisition. Consult FAR Subpart 6.3 for guidance.
JUSTIFICATION AND APPROVAL
Nature: New Requirement Follow-on Requirement
Provide a citation to the applicable section of FAR 6.3 and a full explanation to justify use of the exception.
FAR 6.302-5: Authorized or Required by Statute, 41 U.S.C. 3304(a)(5)
Provide a citation to the statutory authorization and a brief description of its content, or identify the specified source or other agency.
Other (See FAR Subpart 6.3 for additional authority):
If unusual and compelling urgency is the basis for the justification, explain the chronological events leading up to the requirement and explain why time constraints cannot permit even a limited competition. Establish that the action will cover only the minimum quantity or period of performance necessary; in most cases options are unacceptable when citing urgency. Describe impact of required delivery/performance date. Describe the detrimental effects/serious injury to the mission of the requiring activity or to the government, financial or otherwise, that will result if this justification is not approved and the product or service cannot be provided by the intended sole source contractor. Failure to plan for expiring funds is not a valid reason for citing this exception.
May not exceed one year, including all options, unless the head of the agency determines that exceptional circumstances apply.
FAR 6.302-1: Only one responsible source and no other supplies or services will satisfy agency requirements, 41 U.S.C. 3304(a)(1)
Explain why the intended contractor is the only responsible source who can provide the required supplies or services. Discuss the unique capabilities, expertise, etc. that support the lack of competition/why no other type of supplies or services will satisfy agency requirements. Explain factors/unique qualifications such as proprietary data or exclusive licensing rights, if applicable. If brand name, explain why an adequate purchase description or other information suitable to solicit by full and open competition has not been developed or are not available. If in connection with a follow-on contract for continued development or production of highly specialized equipment, detail the substantial duplication of cost or unacceptable delays.
FAR 6.302-2: Unusual and compelling urgency, 41 U.S.C. 3304(a)(2) mbilly Highlight
5. Bridge Contracts:
6. Actions to Increase Competition:
7. Market Research: FAR 10
For contract extensions or bridge contracts when a competitive follow-on is in the process of being developed, summarize history of current contract and explain the reasons for any delays in the acquisition. Include discussion of the milestones for the follow-on action; the milestones should be as efficient as possible. Discuss why it would be neither cost effective nor realistic to expect another contractor to perform during the brief interim period; include issues such as start-up costs, phase-in, transfer of GFP, recruitment and staffing, etc. If the action is because of a protest, provide a brief discussion of the protest including the date the protest was filed and the basis of the protest. Explain that the action will provide the minimum quantity or performance period.
Describe efforts made to compete the action, including whether a notice was or will be publicized as required by
FAR Subpart 5.2 or which exception under FAR 5.202 applies. If a notice was publicized, discuss the number of written responses to the synopsis and the results of the assessment of the written responses. List sources, if any, that expressed, in writing, an interest in the acquisition. Provide rationale if interested sources were rejected. If applicable, state that no other sources have expressed interest, but all offers received shall be considered. Describe what actions will be taken to increase competition before subsequent acquisition of the supplies or services is required. You may state that an action is a one-time requirement, but if a similar requirement arises, every effort will be made to compete it to the maximum extent possible. If action is sole source because of proprietary data or licensing rights and there will be a continuing need for the requirement, there must be evidence that advanced planning has been initiated to overcome the barriers to competition, or there should be documentation to support an analysis that replacement costs/licensing purchase costs outweigh the benefits of competition. If the action is a contract extension or bridge, explain actions to compete the follow-on. If action is an urgent new requirement and a competitive follow-on is anticipated, explain that efforts are underway to facilitate a full and open competition.
Describe the extent of the market research conducted to identify all qualified sources and the results thereof.
“Market Research” is defined as those attempts you made to ascertain whether other qualified sources exist, and can include contact with knowledgeable experts regarding similar or duplicate requirements, contact with industry, results of a sources sought synopsis, or draft solicitations. Research of the marketplace may consist of written, electronic (i.e. email) telephonic, or world wide web inquiries. Lack of advanced planning is not an acceptable reason for the lack of market research, but true urgency may necessitate abbreviated market research that is limited to readily available historical and commercial information. If action is a contract extension or bridge contract, describe the market research efforts underway or completed for the follow-on. See
FAR 10.002(b)(2).
mbilly Highlight
8. Additional Information to support the justification:
Signature:
Signature: Date:
Date:
10. Fair and Reasonable Price/Cost Determination: As Contracting Officer, by my signature below, I hereby determine that the anticipated price/cost to the Government for this contract action will be fair and reasonable.
Provide the basis for this determination, e.g., describe techniques to be used to determine fair and reasonable price ( FAR Subpart 15.402 ), such as price analysis, cost analysis, cost realism. Per FAR Subpart 15.403-
4(a)(1) , the threshold for obtaining cost or pricing data is $750,000.
11. Contracting Officer's Approval (Required for proposed contract above $3,500 not to exceed $700,000 (value calculated including all options)): I hereby certify that this justification is accurate and complete to the best of my knowledge.
Name: Phone:
If applicable, explain why technical packages or specifications to facilitate competition were not developed or available; describe actions taken to remedy the situation.
9. Technical / Requirements Certification: By my signature below , I certify that the supporting data included in this J&A is accurate and complete.
Department Supervisor (or one level above Department Supervisor)
Name:
Position Title:
Email address:
Signature: Date:
Name: Phone:
12. Advocate for Competition (Required for proposed contract over $700,000 but not exceeding $13.5 million value calculated including all options)):
I have reviewed this justification and find that it adequately supports other than full and open competition.
13. IHS Head of Contracting Activity (Required for proposed contract over $13.5 million but not exceeding $68 million value calculated including all options)):
Name: Phone:
Signature: Date:
| Name: Marcella Francis |
| Position Title: HP Coordinator |
| Email address: marcella.francis@ihs.gov |
| Date: |
| Name_2: |
| Phone: |
| Date_2: |
| Name_3: |
| Phone_2: |
| Date_3: |
| Name_4: |
| Phone_3: |
| Date_4: |
| Acq Title: DVPI Evaluation Project |
| Department: Health Promotion Departmemt |
| Author: Marlene Jasperse, PhD, HP Specialist |
| Proposed: Social Vision: David Broudy |
| Street Address: 1719 Norte Dame, NE |
| Dropdown2: [Gallup Indian Medical Center] |
| Dropdown3: [2019] |
| Check1: Off |
| Check2: Yes |
| Check3: Yes |
| Check4: Off |
| Check5: Yes |
| Estimated: 40000 |
| City State Zip: Albququerque, NM 87106 |
| Modification: The Navajo Area Indian Health Service, Gallup Service Unit proposes to enter into a contract on a basis of other than full and open competition in support of the Health Promotion Disease Prevention (HPDP), Domestic Violence Prevention Initiative project (DVPI). NAIHS intends to award a new contract to DVPI Evaluation Project. This is for a sole source, firm fixed price contract to continue to lead and guide the mandatory data report & comparative data reports, and create PPT presentations to showcase selected DVPI contracted projects at the national or regional conferences for a total cost of $40,000 from February 2020 through September 29, 2020 as DVPI's final year. This will allow the HPDP department to accomplish its mission, insuring effective and engaging project activities are implemented for promoting and strengthening healthy choices for the youth and adults from domestic violence, bullying, dating violence and other violent behaviors within Gallup Service Unit. |
| Check6: Off |
| Authority: The statutory authority permitting other than full and open competition is 41 U.S.C. 3304(a)(1) as implemented by the Federal Acquisition (FAR) Subpart 6.302-1 entitled, Only One Responsive Source and No Other Supplies or Services will satisfy agency requirements. |
| FAR 6: |
| 302-1: Why the intended contractor is the only responsible source who can provide the required supplies or service is that the contractor worked with the DVPI project for 4 years, developed & finalized the mandatory local data plan template with the DVPI contractors, has in-depth knowledge and skills for program evaluation that he has set up with the DVPI contractors and analysis as applied to DVPI project activities; he has developed an approach to the local data plan (LDP) required by the funding agency; he has developed a unique Navajo |
Wellness Model evaluation format with the DVPI Director and the Hozho Go Nahataa Project consultant; and he is familiar with and has worked with the DVPI collaborators, contributing to successful project activities.
| 302-2: |
| 302-5: |
| 3 Other: |
| Check7: Off |
| Check8: Off |
| Check9: Off |
| Check10: Off |
| Bridge: |
| Market Research: Ample time was spent meeting and conversing with different public health consultants exploring for best approaches or practices to use for project evaluation in a rural setting and enriched with different cultures, customs and language. David Broudy, PhD, best matched the evaluation expectation for the project. He has worked with Indian Health Service. He is familiar working with the Navajo people. He is aware of the poverty and health issues of the local area. The consultant had worked with the DVPI Director before on a national research project and he has demonstrated excellent work performance on participatory evaluation.. In addition to his quality work, he was also familiar with the IHS structure, the area and the population that DVPI worked with. It is difficult to hire an evaluator. DVPI had a difficult time finding an evaluator. For these reasons, the market research was not done. |
| Actions: |
| Supporting: This is the final year, Year 5, for GIMC DVPI Project. It is not feasible to bring on a new and different contractor for the DVPI Evaluation Project. The current contractor is doing an excellent job guiding the DVPI project collaborators to choose the appropriate evaluation methodologies and has developed an appropriate approach for the Local Data Plan that the funding agency requires. He has formed a positive networking with the project collaborators. It will not be cost effective nor feasible to bring on a new evaluation consultant. |
The feasible approach is to successfully complete the final year with Dr. David Broudy as the evaluation consultatio for DVPI Project.
| Fair: |