IFB 858 Guardrails 2025 ATTACHMENT A Bid Response Sheet.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
Guardrails 2025 State and local contract opportunity
Solicitation number
858
Issued by
Pueblo County, Colorado

About this file

This document is an Invitation for Bid (IFB) 858 Guardrails 2025 Bid Response Sheet for Routt County, Colorado, detailing guardrail replacement and repair projects for roads and bridges. The bid covers multiple guardrail locations on CR 129 and CR 76, including replacing galvanized and Corten guardrails, end treatments, wood posts, and W-beam sections at various mile markers. The project is to be completed by November 28, 2025, with a targeted fully executed contract date of October 14, 2025. The bid sheet provides a comprehensive breakdown of guardrail segments, specifying quantities in linear feet and including separate sections for road and bridge guardrail replacements.

The bid response sheet is structured to allow bidders to enter unit prices for each line item, with automatic total calculations for both road and bridge guardrail projects. The document includes separate pricing columns for mobilization and traffic control, which are to be entered as lump sum totals. While no specific pricing is filled in on this template, the bid sheet is designed to capture detailed cost information for each guardrail segment, including different types of replacements, end treatments, and associated components. The bid appears to be part of a broader infrastructure maintenance and safety improvement initiative for Routt County's transportation infrastructure.

View the file

Other files for this state and local contract opportunity

Other files attached to Guardrails 2025, newest first.
File Type Posted
IFB 858 Guardrails 2025 ATTACHMENT C Locations Map.pdf PDF
IFB 858 Guardrails 2025.pdf PDF
IFB 858 Guardrails 2025 ATTACHMENT B Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Guardrail Bid for Roads

IFB 858 Guardrails 2025Attachment A Bid Response for Roads
Enter the price per unit for each line item. The totals will auto-calculate.
Note: Quantities for replacement are to be calculated in feet.
Note: Mobilization and Traffic Control are to be entered as lump sums.
Road Guardrail Name & LocationGuardrail TypeItemPrice Per Unit (Each)Estimated QuantityTotal
CR 129 Guardrail #9 Mile Marker 12.6 (Two Accidents)GalvanizedReplace625$0.00
3K low speed end treatment (North end treatment is new)1$0.00
$0.00
$0.00
$0.00
Total$0.00
CR 129 Guardrail #7 Mile Marker 11.9 (Accident)GalvanizedReplace550$0.00
3K low speed end treatment (slow speed)1$0.00
$0.00
$0.00
$0.00
Total$0.00
CR 129 Guardrail #12 Mile Marker 12.4GalvanizedReplace1650$0.00
3K end Treatment (slow speed)2$0.00
$0.00
$0.00
$0.00
Total$0.00
CR 129 Guardrail #17? Mile Marker 19 (South End) (Accident)GalvanizedReplace51$0.00
Post (Wood) and blocks6$0.00
W beam1$0.00
3K end treatment (slow Speed) posts and 25' W beam1$0.00
$0.00
Total$0.00
CR 76 (Cog) Guardrail #7CortenReplace End Treatment (slow speed)1$0.00
Wood Post1$0.00
12.5 W beam1$0.00
$0.00
$0.00
Total$0.00
CR 76 (Cog) Guardrail #6 Upper EndCortenReplace37.5$0.00
3K End Treatment (replace galvanized ET)1$0.00
$0.00
$0.00
$0.00
Total$0.00
CR 76 (Cog) Guardrail #6 Lower EndCortenFix 3K End Treatment1$0.00
Post (Wood)1$0.00
Block1$0.00
$0.00
$0.00
Total$0.00
CR 76 (Cog) Guardrail #5CortenReplace115$0.00
3K End Treatments (high speed)2$0.00
$0.00
$0.00
$0.00
Total$0.00
CR 76 (Cog) Guardrail #3 Upper EndCortenReplace End Treatment with 3K (high speed currenty SKT)1$0.00
$0.00
$0.00
$0.00
$0.00
Total$0.00
CR 76 (Cog) Guardrail #3 Lower EndCortenRepair End Treatment1$0.00
$0.00
$0.00
$0.00
$0.00
Total$0.00
Mobilization Lump Sum Total
Traffic Control Lump Sum Total
Grand Total Roads$0.00

Guardrail Bids for Bridges

IFB 858 Guardrails 2025 Bid Response for Bridges
Select the guardrail type. Enter the price per unit for each line item. The totals will auto-calculate.
Note: Quantities for replacement are to be calculated in feet.
Note: Mobilization and Traffic Control are to be entered as lump sums.
Bridge Guardrail Name & LocationGuardrail TypeItemPrice Per Unit (Each)Estimated QuantityTotal
CR 33A - Mile Marker .3 (South/West End)Replace (reuse end treatment)102$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
CR 33A - Mile Marker .3 (South/East End)Replace (reuse end treatment)51$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
CR 33A - Mile Marker .3 (North/East End)3K end treatment slow speed (12.5' rail)1$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
$0.00
$0.00
$0.00
$0.00
$0.00
Total$ - 0
Mobilization Lump Sum Total
Traffic Control Lump Sum Total
Grand Total Bridges$ - 0

File details come from the government source that posted it. Updated .