IBM09B0003 Spec Division 00
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
8-7-2009
TECHNICAL SPECIFICATIONS
LOWER RIO GRANDE FLOOD CONTROL PROJECT
Rehabilitation of Hidalgo Protective Levee (HPL) & Banker Floodway (BF) South Levee
HPL Modified Phase I, From Just East of Northbound Hidalgo-Reynosa International Bridge
To Just West of Southbound Hidalgo Reynosa International Bridge
HPL Modified Phase II, From Approximately 0.8 Mile South of the Common Levee To the Common Levee
BF South Levee, From Hidalgo Protective Levee / Common Levee To Spur 115
Hidalgo County, Texas
Prepared for:
United States Section, International Boundary & Water Commission
Prepared by:
Texas Firm No. 1582
Project Manager: Daniel O. Rios, PE Deputy Project Manager: Sharlotte L. Teague, PE Senior Project Manager: Michael C. Riojas, PE
In Cooperation With:
Raba-Kistner Consultants, Inc.
Contract No. IBM05D0001 Task Order Nos. IBM09T0019, 25 and 29
(This Page Is Intentionally Blank)
Lower Rio Grande Flood Control Project Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
DIVISION 00-
USIBWC Contract No.: IBM09B0003 PROCUREMENT AND CONTRACTING REQUIREMENTS
US INTERNATIONAL BOUNDARY & WATER COMMISSION
GOVERNING TECHNICAL SPECIFICATIONS AND PROVISIONS
DIVISION 00 – PROCUREMENT AND CONTRACTING
REQUIREMENTS
(INTRODUCTORY / AVAILABLE INFORMATION)
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
DIVISION 00-
USIBWC Contract No.: IBM09B0003 PROCUREMENT AND CONTRACTING REQUIREMENTS
This Page Intentionally Blank
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
PROJECT TITLE
USIBWC Contract No.: IBM09B0003 Page 00.01.01 - 1
INTRODUCTORY INFORMATION 00.01.01
The title of this project is as follows:
International Boundary & Water Commission – United States Section
Rehabilitation of Hidalgo Protective Levee (Modified Phase I and II) and Banker Floodway – South Levee, Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.01.01 - 2
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
TABLE OF CONTENTS
USIBWC Contract No.: IBM09B0003 Page 00.01.10 - 1
INTRODUCTORY INFORMATION 00.01.10
GOVERNING SPECIFICATIONS AND PROVISIONS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SPECIFICATION 00 01 01 PROJECT TITLE
SPECIFICATION 00 01 10 TABLE OF CONTENTS
SPECIFICATION 00 01 15 LIST OF CONTRACT DRAWINGS
SPECIFICATION 00 01 20 LIST OF SCHEDULES
SPECIFICATION 00 31 19 EXISTING CONDITION INFORMATION
SPECIFICATION 00 31 21 SURVEY INFORMATION
SPECIFICATION 00 31 24 ENVIRONMENTAL ASSESSMENT INFORMATION
SPECIFICATION 00 31 26 EXISTING HAZARDOUS MATERIAL INFORMATION
SPECIFICATION 00 31 32 GEOTECHNICAL DATA
SPECIFICATION 00 31 43 PERMIT APPLICATION
SPECIFICATION 00 31 50 OTHER PROJECT INFORMATION
DIVISION 01 - GENERAL REQUIREMENTS
SPECIFICATION 01 01 00 IDENTIFICATION OF TECHNICAL SPECIFICATIONS
SPECIFICATION 01 19 00 SCOPE OF WORK
SPECIFICATION 01 27 00 MEASUREMENT AND PAYMENT
SPECIFICATION 01 31 00 PROJECT MANAGEMENT AND COORDINATION
SPECIFICATION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
SPECIFICATION 01 33 00 SUBMITTALS
SPECIFICATION 01 39 00 SAFETY
SPECIFICATION 01 42 00 REFERENCES
SPECIFICATION 01 46 00 QUALITY CONTROL / QUALITY ASSURANCE
SPECIFICATION 01 51 00 TEMPORARY UTILITIES
SPECIFICATION 01 56 00 BARRICADES AND SIGNS
SPECIFICATION 01 57 00 TEMPORARY EROSION, SEDIMENTATION AND
ENVIRONMENTAL CONTROLS
SPECIFICATION 01 59 00 TEMPORARY CONTROLS FOR WORK AREAS / PROJECT-
SPECIFIC LOCATIONS
SPECIFICATION 01 69 00 CONTROL OF MATERIALS
SPECIFICATION 01 70 00 MOBILIZATION
SPECIFICATION 01 71 00 FIELD ENGINEERING
SPECIFICATION 01 77 00 CONTRACT CLOSE-OUT
DIVISION 02 - EXISTING CONDITIONS
SPECIFICATION 02 02 00 EXISTING CONDITIONS & FACILITIES
SPECIFICATION 02 91 00 INSTALL, REMOVE AND/OR RELOCATE FENCE
DIVISIONS 31 / 33 - SITE GRADING
SPECIFICATION 31 04 00 REMOVING CONCRETE
SPECIFICATION 31 11 00 PREPARING RIGHT OF WAY
STANDARD DIVISIONS
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.01.10 - 2
SPECIFICATION 31 12 00 OBLITERATE EXISTING ROAD
SPECIFICATION 31 14 00 REMOVE / STOCKPILE EXISTING MATERIALS
SPECIFICATION 31 81 00 PROOF ROLLING
SPECIFICATION 31 92 00 VEGETATION FOR EROSION CONTROL
SPECIFICATION 33 46 00 PIPE UNDERDRAIN
DIVISION 35 - WATERWAY / MARINE
SPECIFICATION 35 41 00 CONSTRUCTION OF LEVEE
SPECIFICATION 35 42 00 WATERWAY BANK PROTECTION
DIVISION 50 - ROADWAY CONSTRUCTION
SPECIFICATION 50 11 00 ROADWAY EMBANKMENT
SPECIFICATION 50 12 00 ROADWAY EXCAVATION
SPECIFICATION 50 20 00 ROADWAY BASE
SPECIFICATION 50 21 00 PRIME COAT
SPECIFICATION 50 22 00 ASPHALT ANTISTRIPPING AGENTS
SPECIFICATION 50 23 00 EQUIPMENT FOR ASPHALT CONCRETE PAVEMENT
SPECIFICATION 50 24 00 ASPHALT, OILS, AND EMULSIONS
SPECIFICATION 50 25 00 HOT MIX ASPHALT CONCRETE PAVEMENT
SPECIFICATION 50 29 00 CONCRETE CURB AND GUTTER
DIVISION 60 - STRUCTURES
SPECIFICATION 60 02 00 TRENCH EXCAVATION PROTECTION
SPECIFICATION 60 04 00 DRIVING PILING
SPECIFICATION 60 05 00 FOUNDATION TEST LOAD
SPECIFICATION 60 07 00 STEEL PILING
SPECIFICATION 60 10 00 EXCAVATION AND BACKFILL FOR STRUCTURES
SPECIFICATION 60 20 00 CONCRETE STRUCTURES
SPECIFICATION 60 21 00 HYDRAULIC CEMENT
SPECIFICATION 60 27 00 SURFACE FINISHES FOR CONCRETE
SPECIFICATION 60 38 00 CLEAN AND SEAL JOINTS
SPECIFICATION 60 40 00 REINFORCING STEEL
SPECIFICATION 60 41 00 STEEL STRUCTURES
SPECIFICATION 60 42 00 METAL FOR STRUCTURES
SPECIFICATION 60 45 00 GALVANIZING
SPECIFICATION 60 46 00 CLEANING AND PAINTING STEEL
SPECIFICATION 60 47 00 STRUCTURAL BOLTING
SPECIFICATION 60 48 00 STRUCTURAL FIELD WELDING
SPECIFICATION 60 50 00 RAILING
SPECIFICATION 60 64 00 REINFORCED CONCRETE PIPE
SPECIFICATION 60 67 00 SLOPE END – SAFETY END TREATMENT
SPECIFICATION 60 79 00 ABANDON AND PLUG STRUCTURE
SPECIFICATION 60 80 00 FLOOD GATE
SPECIFICATION 60 81 00 POLYVINYL CHLORIDE PIPE
SPECIFICATION 60 96 00 REMOVING EXISTING STRUCTURES
SPECIFICATION 60 98 00 CLEAN EXISTING STRUCTURES
SPECIAL DIVISIONS
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
LIST OF CONTRACT DRAWINGS
USIBWC Contract No.: IBM09B0003 Page 00.01.15 - 1
INTRODUCTORY INFORMATION 00.01.15
The Contract Drawings applicable to this Contract are as follows:
• “United States Section International Boundary and Water Commission, Lower Rio Grande Flood Control Project, American Recovery and Reinvestment Act, Rehabilitation of Hidalgo Protective Levee (Phase I) and Banker Floodway (South Levee).” An index of drawings is identified on the title sheet, and includes the following:
INDEX OF SHEETS-HIDALGO PROTECTIVE LEVEE (PHASE I)
SHEET NO. DESCRIPTION
1 TITLE SHEET
2-2A PROJECT LAYOUT
3 GENERAL NOTES & SPECIFICATION DATA
4 ESTIMATE OF QUANTITIES
04.01 ESTIMATE OF QUANTITIES
5-5A SUMMARY OF QUANTITIES
6, 6A-6B TYPICAL SECTIONS
7-7A ALIGNMENT DATA
8., 8A-8H PLAN & PROFILES
9, 9A-9DD PROPOSED CROSS SECTIONS
10 STRUCTURE DETAILS – CROSS SECTION
11, 11A-11C STANDARDS
• “United States Section International Boundary and Water Commission, Lower Rio Grande Flood Control Project, American Recovery and Reinvestment Act, Rehabilitation of Hidalgo Protective Levee (Phase II).” An index of drawings is identified on the title sheet, and includes the following:
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.01.15 - 2
INDEX OF SHEETS-HIDALGO PROTECTIVE LEVEE (PHASE II)
SHEET NO. DESCRIPTION
1 TITLE SHEET
2 PROJECT LAYOUT
2A-2E SEQUENCE OF WORK AND TRAFFIC CONTROL PLAN
3 GENERAL NOTES & SPECIFICATION DATA
4 ESTIMATE OF QUANTITIES
5 SUMMARY OF QUANTITIES
6 TYPICAL SECTIONS
7 ALIGNMENT DATA
8 - 8A PLAN & PROFILES
9, 9A-9E PROPOSED CROSS SECTIONS
10 STRUCTURE DETAILS – CROSS SECTION
10-10A FLOODWALL PLAN & PROFILE
10AA, 10B, 10C FLOODWALL BORING LOGS
10D-10HH FLOODWALL / FLOODGATE DETAILS
11, 11A-11B RAIL DETAILS
11C CHAIN LINK FENCE RETROFIT
12, 12A-12B EROSION CONTROL STANDARDS
13 TRAFFIC CONTROL DETAILS
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
LIST OF SCHEDULES
USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 1
INTRODUCTORY INFORMATION 00.01.20
1. Schedule of Submittals. For this Project, the requirements for submittals are identified on the Contract Drawings and Technical Specifications (Divisions 00, 01, 02, 31, 33, 50, 60, and 90). For this project, a schedule of submittals includes, but may not be limited to the following: (The Contractor shall refer to each Technical Specification for a full description of applicable submittals and submittal requirements.)
SPECIFICATION
Submittal(s)
00 31 24 Environmental Assessment Information Upon Government Request:
Documentation of certification activities including environmental consultant reports, Contractor documentation regarding certification decisions and contacts, and correspondence with the resource agencies.
01 31 00 Project Management and Coordination Schedule of Work (Reference 01 32 00) 01 32 00 Construction Progress Documentation Progress Schedule (PS) 01 33 00 Submittals Schedule for Submittals (SFS);
Construction Photographs; and, Record Drawings
01 39 00 Safety Accident Prevention Plan;
Material Safety Data Sheets;
OSHA Form 300 (frecordable accidents);
OSHA Citations & Reports and Contractor Written Corrective
Action; and, Excavation Protection System and Plan (if trenching required)
01 46 00 Quality Control / Quality Assurance Contractor Quality Control Plan, Certifications for Testing Personnel
01 56 00 Barricades and Signs Designation of Contractor’s Responsible Person (CRP); Traffic
Control, Barricade and Signing Plans; and, Material Certifications for Traffic Barrier 01 57 00 Temporary Erosion, Sedimentation, And
Environmental Controls Field Environmental Monitor (FEM)
Qualifications; Storm Water Pollution Prevention Plan (SWP3)
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 2
01 59 00 Temporary Controls For Work Areas / Project-Specific Locations
Upon Government Request:
Documentation of certification activities including environmental consultant reports, Contractor documentation regarding certification decisions and contacts, and correspondence with the resource agencies;
Staging and Storage Area Plan
Layout;
Hazardous Waste Material Test
Results;
Hazardous Waste Material
Manifests; and, PSL Stormwater Pollution
Prevention Plan 01 69 00 All other specs requiring materials
Control of Materials Materials Source Identification and Certifications; and, Manufacturer’s Warranties or Guarantees
01 71 00 Field Engineering Field Engineer Resume(s);
Survey Plan;
RPLS Resume(s);
Sample of the Proposed Survey Field
Book(s);
Copy of Actual Field Data and
Calculations; and, Original Field Books
01 77 00 Contract Close-Out Record Drawings; and Final Inspection and Testing Records
02 02 00 Existing Conditions & Facilities Flood Protection Plan;
Videotape of Existing Site Conditions and Noteworthy Events Designated by the COR
31 81 00 Proof Rolling Manufacturer’s Chart for Contact
Areas /Pressures and Loadings 31 92 00 Seeding Seeding Plan
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 3
35 41 00 Construction of Levee Plan of Operations Testing Facilities Testing Results for Classification of
Fill Material Nuclear-Density Operator
Certification Test Results for Construction Designs and Details for Contractor
Repairs Dewatering Controls Excavation or Fill Support Details Moisture Content Adjustment Plan
50 21 00 Prime Oil Equipment / Material Certifications 50 22 00 Asphalt Antistripping Agents Material Certifications 50 23 00 Equipment for Asphalt Concrete Pavement Equipment Certifications 50 24 00 Asphalt, Oils, and Emulsions Material Certifications 50 25 00 Hot Mix Asphalt Concrete Pavement Mix Design 50 60 00 Concrete Pavement Paving and Quality Control Plan
Weather Protection Plan
60 20 00 Concrete Structures Falsework and/or Forming Plans
Transport Plan Construction Methods
60 21 00 Hydraulic Cement Concrete Plant, Admixture Certifications
60 38 00 Clean and Seal Joints Information from the sealant manufacturer showing recommended equipment and installation procedures.
60 40 00 Reinforcing Steel Material Certifications 60 41 00 Steel Structures Welding Shop Drawings
Non Conformance Reports 60 42 00 Metal For Structures Mill Test Reports, Supplemental Test
Documentation, and Certifications 60 46 00 Cleaning and Painting Steel Painting Certifications
Painting Methods Containment Plan
60 48 00 Structural Field Welding Welder Certification or Qualification 60 64 00 Reinforced Concrete Pipe Jacking, Boring Plan (if applicable)
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 4
60 68 00 Sluice Gate Gate and Lift Mechanism Shop Drawings and Submittals
Manufacturer’s Qualifications 60 71 00 Grates and Ladders Mill Test Reports and Certifications 60 80 00 Flood Gate Manufacturer’s Product Data Sheets
Shop Drawings
2. Schedule of Assemblies, Materials, and Estimated Quantities. For this Project, the schedules of assemblies, material specifications and associated estimated quantities are identified on the Contract Drawings and Technical Specifications (Divisions 00, 01, 02, 31, 33, 50, 60, and 90). Estimated quantities for each Bid Item are shown on the Plan Sheet identified as “Estimate of Quantities”.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
EXISTING CONDITION INFORMATION
USIBWC Contract No.: IBM09B0003 Page 00.31.19 - 1
AVAILABLE INFORMATION 00.31.19
The existing condition of the levee has been evaluated by the Government, and is included in a report entitled “Condition Assessment of US International Boundary and Water Commission, Lower Rio Grande Valley Levees, South Texas, October 2003”. The applicable sections of this report are available to the Contractor for the purposes of understanding the existing condition of the levee within the project limits of this Contract. Additionally, geotechnical investigations were performed during the final design of the project, and the associated geotechnical data and reports are identified in 00.31.32 Geotechnical Data herein.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.31.19 - 2
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
SURVEY INFORMATION
USIBWC Contract No.: IBM09B0003 Page 00.31.21 - 1
AVAILABLE INFORMATION 00.31.21
For these Contract Drawings, surveying and data collection was performed as follows:
(1) Light Detection and Ranging (LiDAR) was obtained from the Government and used for preliminary information.
(2) Control was performed in April / May 2009 by RODS Surveying, Inc. who developed and provided the following (at .01-foot accuracy):
(a) Control. The surveyor established points at cross-roads to establish horizontal and vertical control; control sheets were developed for each control point set, signed and sealed by a Texas Registered Professional Land Surveyor (RPLS). The control sheet includes a drawing of the control point with a 3-point tie to existing physical features, description of the control point, X,Y & Z coordinates and the coordinate system. The Contract Drawings include the control information data for all the control points set for the project, signed and sealed by the
RPLS.
(b) Benchmarks. The surveyor established bench marks along project limits; vertical benchmarks were set at 1000-foot intervals at the right of way (ROW) line of the levee reach. A tabulation of the benchmarks is shown within the Contract Drawings.
(3) Supplemental ground surveys were performed by RODS Surveying, Inc.:
(a) Voids. A topographic survey was performed by the surveyors to fill-in the voids of the aerial planimetrics; additionally, the surveyor performed topographic survey on existing structures, including bridges, inlets, culverts and irrigation structures.
(b) ROW Verification. The surveyors recovered and staked ROW points from available ROW maps supplied by the Government. This ROW information is shown on the plan / profile sheets of the Contract Drawings.
(c) Geotechnical Borings Survey. The surveyors obtained x-y-x coordinates for the geotechnical borings along the levee reach spaced at approximately 500-foot spacings.
(d) Utility Survey. The surveyors coordinated with utility notification companies to get utilities marked in the field; the surveyor performed field location of underground utilities as marked by utility companies along the levee reach and intersecting streets. These locations are shown on the plan / profile sheets of the Contract Drawings. NOTE: IT IS THE CONTRACTOR’S
RESPONSIBILITY TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES (SHOWN
AND NOT SHOWN ON THE CONTRACT DRAWINGS) PRIOR TO CONSTRUCTION.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.31.21 - 2
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
ENVIRONMENTAL ASSESSMENT INFORMATION
USIBWC Contract No.: IBM09B0003 Page 00.31.24 - 1
AVAILABLE INFORMATION 00.31.24
ENVIRONMENTAL DOCUMENT INFORMATION
The Project’s environmental assessment entitled “Final Environmental Assessment, Alternatives for Improved Flood Control of the Hidalgo Protective Levee System, September 2005” is available for Contractor review upon request of the Contractor. The project is located adjacent to the Lower Rio Grande Valley National Wildlife Refuge (LRGV NWR), Pate Bend (352, 352A, 354B, & 354C) and Hidalgo Bend (354A, 354II, & 354) Tracts. Additional information is as follows:
1. Establishing and Acquisition Authorities. Various authorities include:
• Fish and Wildlife Act of 1956 [16 U.S.C. 742f(a)(4)], [16 U.S.C. 742f(b)(1)]
• An Act Authorizing the Transfer of Certain Real Property for Wildlife, or other purposes [16
U.S.C. 667b]
• Refuge Recreation Act, as amended [16 U.S.C. 460k-1], [16 U.S.C. 460k-2]
• Migratory Bird Treaty Act [16 USC 703]
• National Wildlife Refuge System Improvement Act of 1997
2. Refuge Purpose(s). As excerpted from the enabling legislation used to authorize the acquisition of the Refuge, the following are the Refuge purposes:
“... for the development, advancement, management, conservation, and protection of fish and wildlife resources...” [16 U.S.C. 742f(a)(4)] “... for the benefit of the United States Fish and Wildlife Service, in performing its activities and services. Such acceptance may be subject to the terms of any restrictive or affirmative covenant, or condition of servitude...” [16 U.S.C. 742f(b)(1)] (Fish and Wildlife Act of 1956)
”... particular value in carrying out the national migratory bird management program.” [16 U.S.C. 667b] (An Act Authorizing the Transfer of Certain Real Property for Wildlife, or other purposes)
”... suitable for: (1) incidental fish and wildlife-oriented recreational development, (2) the protection of natural resources, (3) the conservation of endangered species or threatened species...” [16 U.S.C. 460k- 1] “... the Secretary ... may accept and use ... real ... property. Such acceptance may be accomplished under the terms and conditions of restrictive covenants imposed by donors...” [16 U.S.C. 460k-2] (Refuge Recreation Act [16 U.S.C. 460k-460k-4], as amended)
”... for use as an inviolate sanctuary, or for any other management purpose, for migratory birds.” [16 U.S.C. 715d] (Migratory Bird Treaty Act, 16 USC 703)
3. Refuge Goals. The Lower Rio Grande Valley and Santa Ana National Wildlife Refuges Comprehensive Conservation Plan (CCP) of 1997 satisfies the CCP requirement of the National Wildlife Refuge System Improvement Act of 1997 and identifies the following five goals of the Lower Rio Grande Valley National Wildlife Refuge:
• To restore, enhance and protect biological diversity.
• To protect and obtain additional water rights, improve water management, and protect, restore and enhance wetlands.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
ENVIRONMENTAL ASSESSMENT INFORMATION
USIBWC Contract No.: IBM09B0003 Page 00.31.24 - 2
• To improve water quality and reduce contaminant related fish and wildlife resource losses.
• To protect, maintain and plan for cultural resources.
• To offer compatible wildlife dependent public uses, recreational opportunities, and interpretation and education.
4. National Wildlife Refuge System Mission. “The Mission of the National Wildlife Refuge System is to administer a national network of lands and waters for the conservation, management, and where appropriate, restoration of the fish, wildlife, and plant resources and their habitats within the United States for the benefit of present and future generations of Americans.”
5. Description of Use. It is anticipated that no use of LRGV NWR property will be required for the construction of the Project.
6. Availability of LRGV NWR Resources. It is anticipated that no use of LRGV NWR resources will be required for the construction of the Project.
7. Anticipated Impacts of the Use. It is anticipated that no use of LRGV NWR property will be required for the construction of the Project.
8. Public Review and Comment. It is anticipated that no use of LRGV NWR property or resources will be required for the construction of the Project; therefore, no public review or comment period will be required.
9. Other considerations. The Contractor is required to adhere to the following:
(a) No excavation event should be performed on LRGV NWR property. If during construction it is found that there is a need to perform construction on LRGV NWR property, the Contractor shall not begin construction without obtaining a Special Use Permit from the LRGV NWR or without the notification of the activity to the Refuge Manager; all federally mandated consultations and the procurement of permits will be completed by the Government, including, but not limited to, those required by the U.S. Army Corps of Engineers and the Texas State Historic Preservation Office.
(b) Vegetated areas will be clearly marked by an environmental monitor and work activities will avoid these areas.
(c) Proper training will be given to machine operators to reduce the risk of accidental mortality to less mobile terrestrial wildlife.
(d) While work is being conducted, vehicles and equipment will be monitored continuously to insure that fuels, oils and fluids do not leak or are spilled onto the ground. In the event of a spill or leak, the Refuge Manager will be immediately notified, all work activities will be suspended until the spillage or leakage is stopped and appropriate clean-up measures are employed to capture contaminants and remove contaminated soils.
(e) All other stipulations and/or rules from “General Conditions and Operating Procedures While on the Lower Rio Grande Valley National Wildlife Refuge” will be strictly adhered to.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
EXISTING HAZARDOUS MATERIAL INFORMATION
USIBWC Contract No.: IBM09B0003 Page 00.31.26 - 1
AVAILABLE INFORMATION 00.31.26
There is no available information regarding hazardous materials within / adjacent to the Project limits and/or right of way.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.31.26 - 2
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
GEOTECHNICAL DATA
USIBWC Contract No.: IBM09B0003 Page 00.31.32 - 1
AVAILABLE INFORMATION 00.31.32
Geotechnical investigations for this project included the following:
(1) “Geotechnical Engineering Study for Proposed Rehabilitation Improvements – Phase I Hidalgo Protective Levee System Lower Rio Grande Flood Control Project, US Section of the International Boundary and Water Commission (USIBWC), Hidalgo, Hidalgo County, Texas,” February 16, 2006 and supplemented June 22, 2007 and July 19, 2007,” Raba-Kistner Consultants, Inc.
(2) “Geotechnical Engineering Report, South Banker Floodway Levee (Common Levee Extension)
Improvement Project, Common Levee to Spur 115, Hidalgo County, Texas,” August 6, 2009, – Phase I Hidalgo Protective Levee System Lower Rio Grande Flood Control Project, US Section of the International Boundary and Water Commission (USIBWC), Hidalgo, Hidalgo County, Texas,” February 16, 2006 and supplemented June 22, 2007 and July 19, 2007,” L&G Engineering Laboratory, LLC.
(3) Hidalgo Protective Levee – Phase II Final Geotechnical Investigations and Assessment Technical
Report, July 31 2008 summarized and included the following reports:
• “Geotechnical Engineering Study for Proposed Rehabilitation Improvements – Phase II (April 9, 2008),” Raba-Kistner Consultants, Inc.
• “Supplemental Recommendations to Geotechnical Engineering Study, Seepage Cutoff Wall and Drainage Blanket Recommendations, April 13 & 16, 2008,” Raba-Kistner Consultants, Inc.
• “Supplemental Recommendations to Geotechnical Engineering Study, Intake Channel Crossing Recommendations, April 11 and 25, 2008,” Raba-Kistner Consultants, Inc.
The Contractor may request a copy of the report from the Government.
The data and report are not intended as a representation or warranty of continuity of conditions between soil borings nor of groundwater levels at dates and times other than date and time when measured. The Government will not be responsible for interpretations or conclusions drawn there from by the Contractor. Data are solely made available for the convenience of Contractor. Additional test borings and other exploratory operations may be made by Contractor subsequent to award of the Contract at no additional cost to the Government.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.31.32 - 2
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
PERMIT APPLICATION
USIBWC Contract No.: IBM09B0003 Page 00.31.43 - 1
AVAILABLE INFORMATION 00.31.43
No information is available regarding required permit applications. The Contractor will be required to research the need for any required permits. For the Work under this Contract, the Contractor shall be responsible for coordinating and obtaining all permits required by Federal, state, and local entities, unless otherwise specified within the Contract Provisions and these technical specifications.
Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee
USIBWC Contract No.: IBM09B0003 Page 00.31.43 - 2