IBM09B0003 Spec Division 00

View the file

Other files for this federal contract opportunity

Other files attached to RECOVERY - Construction of Hidalgo Loop Levee Ph 1 and Ph 2, newest first.
File Type Posted
II_Dwg09C.pdf PDF
I_Dwg08.pdf PDF
II_Dwg14.pdf PDF
II_Dwg06.pdf PDF
I_Dwg09.pdf PDF
I_Dwg08D.pdf PDF
I_Dwg12.pdf PDF
II_Dwg03.pdf PDF
I_Dwg13.pdf PDF
II_Dwg10E.pdf PDF
II_Dwg10A.pdf PDF
GFMS IBM09B0003-A003.pdf PDF
I_Dwg08B.pdf PDF
I_Dwg08C.pdf PDF
II_Dwg09A.pdf PDF
II_Dwg09B.pdf PDF
II_Dwg09.pdf PDF
II_Dwg09E.pdf PDF
I_Dwg08A.pdf PDF
II_Dwg10H.pdf PDF
I_Dwg01.pdf PDF
II_Dwg01.pdf PDF
II_Dwg09D.pdf PDF
GFMS IBM09B0003-A002.pdf PDF
IBM09B0003-A001.pdf PDF
HPL-PhaseI_drawings.pdf PDF
J-5 SF 24.pdf PDF
HPL-PhaseI_drawings.pdf PDF
J-6 SF 25.pdf PDF
HidalgoProtLeveeI IIGeotech-2006.pdf PDF
J-9 IBWC-105.pdf PDF
J-4 IBWC Form 116.pdf PDF
Div_02.pdf PDF
J-3 IBWC Form 110.pdf PDF
BankerFldwy-SouthLeveeGeotech.pdf PDF
Div_50.pdf PDF
J-8 SF 28.pdf PDF
GFMS IBM09B0003.pdf PDF
J-1 General Decision TX829.pdf PDF
J-10 IBWC Form 108.pdf PDF
HidalgoProtLeveeIIGeotech.pdf PDF
Div_31.pdf PDF
Div_90.pdf PDF
J-7 SF 25A.pdf PDF
Div_01.pdf PDF
Div60.pdf PDF
J-2 IBWC Form 117.pdf PDF
J-11 SF 1413.pdf PDF
HPL-PhaseII_drawings.pdf PDF
Div_35.pdf PDF
Show all 50

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

8-7-2009

TECHNICAL SPECIFICATIONS

LOWER RIO GRANDE FLOOD CONTROL PROJECT

Rehabilitation of Hidalgo Protective Levee (HPL) & Banker Floodway (BF) South Levee

HPL Modified Phase I, From Just East of Northbound Hidalgo-Reynosa International Bridge

To Just West of Southbound Hidalgo Reynosa International Bridge

HPL Modified Phase II, From Approximately 0.8 Mile South of the Common Levee To the Common Levee

BF South Levee, From Hidalgo Protective Levee / Common Levee To Spur 115

Hidalgo County, Texas

Prepared for:

United States Section, International Boundary & Water Commission

Prepared by:

Texas Firm No. 1582

Project Manager: Daniel O. Rios, PE Deputy Project Manager: Sharlotte L. Teague, PE Senior Project Manager: Michael C. Riojas, PE

In Cooperation With:

Raba-Kistner Consultants, Inc.

Contract No. IBM05D0001 Task Order Nos. IBM09T0019, 25 and 29

(This Page Is Intentionally Blank)

Lower Rio Grande Flood Control Project Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

DIVISION 00-

USIBWC Contract No.: IBM09B0003 PROCUREMENT AND CONTRACTING REQUIREMENTS

US INTERNATIONAL BOUNDARY & WATER COMMISSION

GOVERNING TECHNICAL SPECIFICATIONS AND PROVISIONS

DIVISION 00 – PROCUREMENT AND CONTRACTING

REQUIREMENTS

(INTRODUCTORY / AVAILABLE INFORMATION)

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

DIVISION 00-

USIBWC Contract No.: IBM09B0003 PROCUREMENT AND CONTRACTING REQUIREMENTS

This Page Intentionally Blank

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

PROJECT TITLE

USIBWC Contract No.: IBM09B0003 Page 00.01.01 - 1

INTRODUCTORY INFORMATION 00.01.01

The title of this project is as follows:

International Boundary & Water Commission – United States Section

Rehabilitation of Hidalgo Protective Levee (Modified Phase I and II) and Banker Floodway – South Levee, Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.01.01 - 2

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

TABLE OF CONTENTS

USIBWC Contract No.: IBM09B0003 Page 00.01.10 - 1

INTRODUCTORY INFORMATION 00.01.10

GOVERNING SPECIFICATIONS AND PROVISIONS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SPECIFICATION 00 01 01 PROJECT TITLE

SPECIFICATION 00 01 10 TABLE OF CONTENTS

SPECIFICATION 00 01 15 LIST OF CONTRACT DRAWINGS

SPECIFICATION 00 01 20 LIST OF SCHEDULES

SPECIFICATION 00 31 19 EXISTING CONDITION INFORMATION

SPECIFICATION 00 31 21 SURVEY INFORMATION

SPECIFICATION 00 31 24 ENVIRONMENTAL ASSESSMENT INFORMATION

SPECIFICATION 00 31 26 EXISTING HAZARDOUS MATERIAL INFORMATION

SPECIFICATION 00 31 32 GEOTECHNICAL DATA

SPECIFICATION 00 31 43 PERMIT APPLICATION

SPECIFICATION 00 31 50 OTHER PROJECT INFORMATION

DIVISION 01 - GENERAL REQUIREMENTS

SPECIFICATION 01 01 00 IDENTIFICATION OF TECHNICAL SPECIFICATIONS

SPECIFICATION 01 19 00 SCOPE OF WORK

SPECIFICATION 01 27 00 MEASUREMENT AND PAYMENT

SPECIFICATION 01 31 00 PROJECT MANAGEMENT AND COORDINATION

SPECIFICATION 01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION

SPECIFICATION 01 33 00 SUBMITTALS

SPECIFICATION 01 39 00 SAFETY

SPECIFICATION 01 42 00 REFERENCES

SPECIFICATION 01 46 00 QUALITY CONTROL / QUALITY ASSURANCE

SPECIFICATION 01 51 00 TEMPORARY UTILITIES

SPECIFICATION 01 56 00 BARRICADES AND SIGNS

SPECIFICATION 01 57 00 TEMPORARY EROSION, SEDIMENTATION AND

ENVIRONMENTAL CONTROLS

SPECIFICATION 01 59 00 TEMPORARY CONTROLS FOR WORK AREAS / PROJECT-

SPECIFIC LOCATIONS

SPECIFICATION 01 69 00 CONTROL OF MATERIALS

SPECIFICATION 01 70 00 MOBILIZATION

SPECIFICATION 01 71 00 FIELD ENGINEERING

SPECIFICATION 01 77 00 CONTRACT CLOSE-OUT

DIVISION 02 - EXISTING CONDITIONS

SPECIFICATION 02 02 00 EXISTING CONDITIONS & FACILITIES

SPECIFICATION 02 91 00 INSTALL, REMOVE AND/OR RELOCATE FENCE

DIVISIONS 31 / 33 - SITE GRADING

SPECIFICATION 31 04 00 REMOVING CONCRETE

SPECIFICATION 31 11 00 PREPARING RIGHT OF WAY

STANDARD DIVISIONS

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.01.10 - 2

SPECIFICATION 31 12 00 OBLITERATE EXISTING ROAD

SPECIFICATION 31 14 00 REMOVE / STOCKPILE EXISTING MATERIALS

SPECIFICATION 31 81 00 PROOF ROLLING

SPECIFICATION 31 92 00 VEGETATION FOR EROSION CONTROL

SPECIFICATION 33 46 00 PIPE UNDERDRAIN

DIVISION 35 - WATERWAY / MARINE

SPECIFICATION 35 41 00 CONSTRUCTION OF LEVEE

SPECIFICATION 35 42 00 WATERWAY BANK PROTECTION

DIVISION 50 - ROADWAY CONSTRUCTION

SPECIFICATION 50 11 00 ROADWAY EMBANKMENT

SPECIFICATION 50 12 00 ROADWAY EXCAVATION

SPECIFICATION 50 20 00 ROADWAY BASE

SPECIFICATION 50 21 00 PRIME COAT

SPECIFICATION 50 22 00 ASPHALT ANTISTRIPPING AGENTS

SPECIFICATION 50 23 00 EQUIPMENT FOR ASPHALT CONCRETE PAVEMENT

SPECIFICATION 50 24 00 ASPHALT, OILS, AND EMULSIONS

SPECIFICATION 50 25 00 HOT MIX ASPHALT CONCRETE PAVEMENT

SPECIFICATION 50 29 00 CONCRETE CURB AND GUTTER

DIVISION 60 - STRUCTURES

SPECIFICATION 60 02 00 TRENCH EXCAVATION PROTECTION

SPECIFICATION 60 04 00 DRIVING PILING

SPECIFICATION 60 05 00 FOUNDATION TEST LOAD

SPECIFICATION 60 07 00 STEEL PILING

SPECIFICATION 60 10 00 EXCAVATION AND BACKFILL FOR STRUCTURES

SPECIFICATION 60 20 00 CONCRETE STRUCTURES

SPECIFICATION 60 21 00 HYDRAULIC CEMENT

SPECIFICATION 60 27 00 SURFACE FINISHES FOR CONCRETE

SPECIFICATION 60 38 00 CLEAN AND SEAL JOINTS

SPECIFICATION 60 40 00 REINFORCING STEEL

SPECIFICATION 60 41 00 STEEL STRUCTURES

SPECIFICATION 60 42 00 METAL FOR STRUCTURES

SPECIFICATION 60 45 00 GALVANIZING

SPECIFICATION 60 46 00 CLEANING AND PAINTING STEEL

SPECIFICATION 60 47 00 STRUCTURAL BOLTING

SPECIFICATION 60 48 00 STRUCTURAL FIELD WELDING

SPECIFICATION 60 50 00 RAILING

SPECIFICATION 60 64 00 REINFORCED CONCRETE PIPE

SPECIFICATION 60 67 00 SLOPE END – SAFETY END TREATMENT

SPECIFICATION 60 79 00 ABANDON AND PLUG STRUCTURE

SPECIFICATION 60 80 00 FLOOD GATE

SPECIFICATION 60 81 00 POLYVINYL CHLORIDE PIPE

SPECIFICATION 60 96 00 REMOVING EXISTING STRUCTURES

SPECIFICATION 60 98 00 CLEAN EXISTING STRUCTURES

SPECIAL DIVISIONS

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

LIST OF CONTRACT DRAWINGS

USIBWC Contract No.: IBM09B0003 Page 00.01.15 - 1

INTRODUCTORY INFORMATION 00.01.15

The Contract Drawings applicable to this Contract are as follows:

• “United States Section International Boundary and Water Commission, Lower Rio Grande Flood Control Project, American Recovery and Reinvestment Act, Rehabilitation of Hidalgo Protective Levee (Phase I) and Banker Floodway (South Levee).” An index of drawings is identified on the title sheet, and includes the following:

INDEX OF SHEETS-HIDALGO PROTECTIVE LEVEE (PHASE I)

SHEET NO. DESCRIPTION

1 TITLE SHEET

2-2A PROJECT LAYOUT

3 GENERAL NOTES & SPECIFICATION DATA

4 ESTIMATE OF QUANTITIES

04.01 ESTIMATE OF QUANTITIES

5-5A SUMMARY OF QUANTITIES

6, 6A-6B TYPICAL SECTIONS

7-7A ALIGNMENT DATA

8., 8A-8H PLAN & PROFILES

9, 9A-9DD PROPOSED CROSS SECTIONS

10 STRUCTURE DETAILS – CROSS SECTION

11, 11A-11C STANDARDS

• “United States Section International Boundary and Water Commission, Lower Rio Grande Flood Control Project, American Recovery and Reinvestment Act, Rehabilitation of Hidalgo Protective Levee (Phase II).” An index of drawings is identified on the title sheet, and includes the following:

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.01.15 - 2

INDEX OF SHEETS-HIDALGO PROTECTIVE LEVEE (PHASE II)

SHEET NO. DESCRIPTION

1 TITLE SHEET

2 PROJECT LAYOUT

2A-2E SEQUENCE OF WORK AND TRAFFIC CONTROL PLAN

3 GENERAL NOTES & SPECIFICATION DATA

4 ESTIMATE OF QUANTITIES

5 SUMMARY OF QUANTITIES

6 TYPICAL SECTIONS

7 ALIGNMENT DATA

8 - 8A PLAN & PROFILES

9, 9A-9E PROPOSED CROSS SECTIONS

10 STRUCTURE DETAILS – CROSS SECTION

10-10A FLOODWALL PLAN & PROFILE

10AA, 10B, 10C FLOODWALL BORING LOGS

10D-10HH FLOODWALL / FLOODGATE DETAILS

11, 11A-11B RAIL DETAILS

11C CHAIN LINK FENCE RETROFIT

12, 12A-12B EROSION CONTROL STANDARDS

13 TRAFFIC CONTROL DETAILS

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

LIST OF SCHEDULES

USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 1

INTRODUCTORY INFORMATION 00.01.20

1. Schedule of Submittals. For this Project, the requirements for submittals are identified on the Contract Drawings and Technical Specifications (Divisions 00, 01, 02, 31, 33, 50, 60, and 90). For this project, a schedule of submittals includes, but may not be limited to the following: (The Contractor shall refer to each Technical Specification for a full description of applicable submittals and submittal requirements.)

SPECIFICATION

Submittal(s)

00 31 24 Environmental Assessment Information Upon Government Request:

Documentation of certification activities including environmental consultant reports, Contractor documentation regarding certification decisions and contacts, and correspondence with the resource agencies.

01 31 00 Project Management and Coordination Schedule of Work (Reference 01 32 00) 01 32 00 Construction Progress Documentation Progress Schedule (PS) 01 33 00 Submittals Schedule for Submittals (SFS);

Construction Photographs; and, Record Drawings

01 39 00 Safety Accident Prevention Plan;

Material Safety Data Sheets;

OSHA Form 300 (frecordable accidents);

OSHA Citations & Reports and Contractor Written Corrective

Action; and, Excavation Protection System and Plan (if trenching required)

01 46 00 Quality Control / Quality Assurance Contractor Quality Control Plan, Certifications for Testing Personnel

01 56 00 Barricades and Signs Designation of Contractor’s Responsible Person (CRP); Traffic

Control, Barricade and Signing Plans; and, Material Certifications for Traffic Barrier 01 57 00 Temporary Erosion, Sedimentation, And

Environmental Controls Field Environmental Monitor (FEM)

Qualifications; Storm Water Pollution Prevention Plan (SWP3)

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 2

01 59 00 Temporary Controls For Work Areas / Project-Specific Locations

Upon Government Request:

Documentation of certification activities including environmental consultant reports, Contractor documentation regarding certification decisions and contacts, and correspondence with the resource agencies;

Staging and Storage Area Plan

Layout;

Hazardous Waste Material Test

Results;

Hazardous Waste Material

Manifests; and, PSL Stormwater Pollution

Prevention Plan 01 69 00 All other specs requiring materials

Control of Materials Materials Source Identification and Certifications; and, Manufacturer’s Warranties or Guarantees

01 71 00 Field Engineering Field Engineer Resume(s);

Survey Plan;

RPLS Resume(s);

Sample of the Proposed Survey Field

Book(s);

Copy of Actual Field Data and

Calculations; and, Original Field Books

01 77 00 Contract Close-Out Record Drawings; and Final Inspection and Testing Records

02 02 00 Existing Conditions & Facilities Flood Protection Plan;

Videotape of Existing Site Conditions and Noteworthy Events Designated by the COR

31 81 00 Proof Rolling Manufacturer’s Chart for Contact

Areas /Pressures and Loadings 31 92 00 Seeding Seeding Plan

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 3

35 41 00 Construction of Levee Plan of Operations Testing Facilities Testing Results for Classification of

Fill Material Nuclear-Density Operator

Certification Test Results for Construction Designs and Details for Contractor

Repairs Dewatering Controls Excavation or Fill Support Details Moisture Content Adjustment Plan

50 21 00 Prime Oil Equipment / Material Certifications 50 22 00 Asphalt Antistripping Agents Material Certifications 50 23 00 Equipment for Asphalt Concrete Pavement Equipment Certifications 50 24 00 Asphalt, Oils, and Emulsions Material Certifications 50 25 00 Hot Mix Asphalt Concrete Pavement Mix Design 50 60 00 Concrete Pavement Paving and Quality Control Plan

Weather Protection Plan

60 20 00 Concrete Structures Falsework and/or Forming Plans

Transport Plan Construction Methods

60 21 00 Hydraulic Cement Concrete Plant, Admixture Certifications

60 38 00 Clean and Seal Joints Information from the sealant manufacturer showing recommended equipment and installation procedures.

60 40 00 Reinforcing Steel Material Certifications 60 41 00 Steel Structures Welding Shop Drawings

Non Conformance Reports 60 42 00 Metal For Structures Mill Test Reports, Supplemental Test

Documentation, and Certifications 60 46 00 Cleaning and Painting Steel Painting Certifications

Painting Methods Containment Plan

60 48 00 Structural Field Welding Welder Certification or Qualification 60 64 00 Reinforced Concrete Pipe Jacking, Boring Plan (if applicable)

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.01.20 - 4

60 68 00 Sluice Gate Gate and Lift Mechanism Shop Drawings and Submittals

Manufacturer’s Qualifications 60 71 00 Grates and Ladders Mill Test Reports and Certifications 60 80 00 Flood Gate Manufacturer’s Product Data Sheets

Shop Drawings

2. Schedule of Assemblies, Materials, and Estimated Quantities. For this Project, the schedules of assemblies, material specifications and associated estimated quantities are identified on the Contract Drawings and Technical Specifications (Divisions 00, 01, 02, 31, 33, 50, 60, and 90). Estimated quantities for each Bid Item are shown on the Plan Sheet identified as “Estimate of Quantities”.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

EXISTING CONDITION INFORMATION

USIBWC Contract No.: IBM09B0003 Page 00.31.19 - 1

AVAILABLE INFORMATION 00.31.19

The existing condition of the levee has been evaluated by the Government, and is included in a report entitled “Condition Assessment of US International Boundary and Water Commission, Lower Rio Grande Valley Levees, South Texas, October 2003”. The applicable sections of this report are available to the Contractor for the purposes of understanding the existing condition of the levee within the project limits of this Contract. Additionally, geotechnical investigations were performed during the final design of the project, and the associated geotechnical data and reports are identified in 00.31.32 Geotechnical Data herein.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.31.19 - 2

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

SURVEY INFORMATION

USIBWC Contract No.: IBM09B0003 Page 00.31.21 - 1

AVAILABLE INFORMATION 00.31.21

For these Contract Drawings, surveying and data collection was performed as follows:

(1) Light Detection and Ranging (LiDAR) was obtained from the Government and used for preliminary information.

(2) Control was performed in April / May 2009 by RODS Surveying, Inc. who developed and provided the following (at .01-foot accuracy):

(a) Control. The surveyor established points at cross-roads to establish horizontal and vertical control; control sheets were developed for each control point set, signed and sealed by a Texas Registered Professional Land Surveyor (RPLS). The control sheet includes a drawing of the control point with a 3-point tie to existing physical features, description of the control point, X,Y & Z coordinates and the coordinate system. The Contract Drawings include the control information data for all the control points set for the project, signed and sealed by the

RPLS.

(b) Benchmarks. The surveyor established bench marks along project limits; vertical benchmarks were set at 1000-foot intervals at the right of way (ROW) line of the levee reach. A tabulation of the benchmarks is shown within the Contract Drawings.

(3) Supplemental ground surveys were performed by RODS Surveying, Inc.:

(a) Voids. A topographic survey was performed by the surveyors to fill-in the voids of the aerial planimetrics; additionally, the surveyor performed topographic survey on existing structures, including bridges, inlets, culverts and irrigation structures.

(b) ROW Verification. The surveyors recovered and staked ROW points from available ROW maps supplied by the Government. This ROW information is shown on the plan / profile sheets of the Contract Drawings.

(c) Geotechnical Borings Survey. The surveyors obtained x-y-x coordinates for the geotechnical borings along the levee reach spaced at approximately 500-foot spacings.

(d) Utility Survey. The surveyors coordinated with utility notification companies to get utilities marked in the field; the surveyor performed field location of underground utilities as marked by utility companies along the levee reach and intersecting streets. These locations are shown on the plan / profile sheets of the Contract Drawings. NOTE: IT IS THE CONTRACTOR’S

RESPONSIBILITY TO VERIFY LOCATIONS OF ALL EXISTING UTILITIES (SHOWN

AND NOT SHOWN ON THE CONTRACT DRAWINGS) PRIOR TO CONSTRUCTION.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.31.21 - 2

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

ENVIRONMENTAL ASSESSMENT INFORMATION

USIBWC Contract No.: IBM09B0003 Page 00.31.24 - 1

AVAILABLE INFORMATION 00.31.24

ENVIRONMENTAL DOCUMENT INFORMATION

The Project’s environmental assessment entitled “Final Environmental Assessment, Alternatives for Improved Flood Control of the Hidalgo Protective Levee System, September 2005” is available for Contractor review upon request of the Contractor. The project is located adjacent to the Lower Rio Grande Valley National Wildlife Refuge (LRGV NWR), Pate Bend (352, 352A, 354B, & 354C) and Hidalgo Bend (354A, 354II, & 354) Tracts. Additional information is as follows:

1. Establishing and Acquisition Authorities. Various authorities include:

• Fish and Wildlife Act of 1956 [16 U.S.C. 742f(a)(4)], [16 U.S.C. 742f(b)(1)]

• An Act Authorizing the Transfer of Certain Real Property for Wildlife, or other purposes [16

U.S.C. 667b]

• Refuge Recreation Act, as amended [16 U.S.C. 460k-1], [16 U.S.C. 460k-2]

• Migratory Bird Treaty Act [16 USC 703]

• National Wildlife Refuge System Improvement Act of 1997

2. Refuge Purpose(s). As excerpted from the enabling legislation used to authorize the acquisition of the Refuge, the following are the Refuge purposes:

“... for the development, advancement, management, conservation, and protection of fish and wildlife resources...” [16 U.S.C. 742f(a)(4)] “... for the benefit of the United States Fish and Wildlife Service, in performing its activities and services. Such acceptance may be subject to the terms of any restrictive or affirmative covenant, or condition of servitude...” [16 U.S.C. 742f(b)(1)] (Fish and Wildlife Act of 1956)

”... particular value in carrying out the national migratory bird management program.” [16 U.S.C. 667b] (An Act Authorizing the Transfer of Certain Real Property for Wildlife, or other purposes)

”... suitable for: (1) incidental fish and wildlife-oriented recreational development, (2) the protection of natural resources, (3) the conservation of endangered species or threatened species...” [16 U.S.C. 460k- 1] “... the Secretary ... may accept and use ... real ... property. Such acceptance may be accomplished under the terms and conditions of restrictive covenants imposed by donors...” [16 U.S.C. 460k-2] (Refuge Recreation Act [16 U.S.C. 460k-460k-4], as amended)

”... for use as an inviolate sanctuary, or for any other management purpose, for migratory birds.” [16 U.S.C. 715d] (Migratory Bird Treaty Act, 16 USC 703)

3. Refuge Goals. The Lower Rio Grande Valley and Santa Ana National Wildlife Refuges Comprehensive Conservation Plan (CCP) of 1997 satisfies the CCP requirement of the National Wildlife Refuge System Improvement Act of 1997 and identifies the following five goals of the Lower Rio Grande Valley National Wildlife Refuge:

• To restore, enhance and protect biological diversity.

• To protect and obtain additional water rights, improve water management, and protect, restore and enhance wetlands.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

ENVIRONMENTAL ASSESSMENT INFORMATION

USIBWC Contract No.: IBM09B0003 Page 00.31.24 - 2

• To improve water quality and reduce contaminant related fish and wildlife resource losses.

• To protect, maintain and plan for cultural resources.

• To offer compatible wildlife dependent public uses, recreational opportunities, and interpretation and education.

4. National Wildlife Refuge System Mission. “The Mission of the National Wildlife Refuge System is to administer a national network of lands and waters for the conservation, management, and where appropriate, restoration of the fish, wildlife, and plant resources and their habitats within the United States for the benefit of present and future generations of Americans.”

5. Description of Use. It is anticipated that no use of LRGV NWR property will be required for the construction of the Project.

6. Availability of LRGV NWR Resources. It is anticipated that no use of LRGV NWR resources will be required for the construction of the Project.

7. Anticipated Impacts of the Use. It is anticipated that no use of LRGV NWR property will be required for the construction of the Project.

8. Public Review and Comment. It is anticipated that no use of LRGV NWR property or resources will be required for the construction of the Project; therefore, no public review or comment period will be required.

9. Other considerations. The Contractor is required to adhere to the following:

(a) No excavation event should be performed on LRGV NWR property. If during construction it is found that there is a need to perform construction on LRGV NWR property, the Contractor shall not begin construction without obtaining a Special Use Permit from the LRGV NWR or without the notification of the activity to the Refuge Manager; all federally mandated consultations and the procurement of permits will be completed by the Government, including, but not limited to, those required by the U.S. Army Corps of Engineers and the Texas State Historic Preservation Office.

(b) Vegetated areas will be clearly marked by an environmental monitor and work activities will avoid these areas.

(c) Proper training will be given to machine operators to reduce the risk of accidental mortality to less mobile terrestrial wildlife.

(d) While work is being conducted, vehicles and equipment will be monitored continuously to insure that fuels, oils and fluids do not leak or are spilled onto the ground. In the event of a spill or leak, the Refuge Manager will be immediately notified, all work activities will be suspended until the spillage or leakage is stopped and appropriate clean-up measures are employed to capture contaminants and remove contaminated soils.

(e) All other stipulations and/or rules from “General Conditions and Operating Procedures While on the Lower Rio Grande Valley National Wildlife Refuge” will be strictly adhered to.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

EXISTING HAZARDOUS MATERIAL INFORMATION

USIBWC Contract No.: IBM09B0003 Page 00.31.26 - 1

AVAILABLE INFORMATION 00.31.26

There is no available information regarding hazardous materials within / adjacent to the Project limits and/or right of way.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.31.26 - 2

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

GEOTECHNICAL DATA

USIBWC Contract No.: IBM09B0003 Page 00.31.32 - 1

AVAILABLE INFORMATION 00.31.32

Geotechnical investigations for this project included the following:

(1) “Geotechnical Engineering Study for Proposed Rehabilitation Improvements – Phase I Hidalgo Protective Levee System Lower Rio Grande Flood Control Project, US Section of the International Boundary and Water Commission (USIBWC), Hidalgo, Hidalgo County, Texas,” February 16, 2006 and supplemented June 22, 2007 and July 19, 2007,” Raba-Kistner Consultants, Inc.

(2) “Geotechnical Engineering Report, South Banker Floodway Levee (Common Levee Extension)

Improvement Project, Common Levee to Spur 115, Hidalgo County, Texas,” August 6, 2009, – Phase I Hidalgo Protective Levee System Lower Rio Grande Flood Control Project, US Section of the International Boundary and Water Commission (USIBWC), Hidalgo, Hidalgo County, Texas,” February 16, 2006 and supplemented June 22, 2007 and July 19, 2007,” L&G Engineering Laboratory, LLC.

(3) Hidalgo Protective Levee – Phase II Final Geotechnical Investigations and Assessment Technical

Report, July 31 2008 summarized and included the following reports:

• “Geotechnical Engineering Study for Proposed Rehabilitation Improvements – Phase II (April 9, 2008),” Raba-Kistner Consultants, Inc.

• “Supplemental Recommendations to Geotechnical Engineering Study, Seepage Cutoff Wall and Drainage Blanket Recommendations, April 13 & 16, 2008,” Raba-Kistner Consultants, Inc.

• “Supplemental Recommendations to Geotechnical Engineering Study, Intake Channel Crossing Recommendations, April 11 and 25, 2008,” Raba-Kistner Consultants, Inc.

The Contractor may request a copy of the report from the Government.

The data and report are not intended as a representation or warranty of continuity of conditions between soil borings nor of groundwater levels at dates and times other than date and time when measured. The Government will not be responsible for interpretations or conclusions drawn there from by the Contractor. Data are solely made available for the convenience of Contractor. Additional test borings and other exploratory operations may be made by Contractor subsequent to award of the Contract at no additional cost to the Government.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.31.32 - 2

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

PERMIT APPLICATION

USIBWC Contract No.: IBM09B0003 Page 00.31.43 - 1

AVAILABLE INFORMATION 00.31.43

No information is available regarding required permit applications. The Contractor will be required to research the need for any required permits. For the Work under this Contract, the Contractor shall be responsible for coordinating and obtaining all permits required by Federal, state, and local entities, unless otherwise specified within the Contract Provisions and these technical specifications.

Rehabilitation of Hidalgo Protective Levee (Modified Phases I and II) and Banker Floodway South Levee

USIBWC Contract No.: IBM09B0003 Page 00.31.43 - 2