QUALITY ASSURANCE SURVEILLANCE PLAN
FOR
FEMA REGION 10 FRC MAINTENANCE SERVICES
1.
INTRODUCTION
This Quality Assurance Surveillance Plan has been developed to evaluate Contractor performance while implementing the Performance Work Statement (PWS). It is designed to provide an effective surveillance method for monitoring and evaluating the Contractor’s performance for the requirements listed in the PWS.
The Contractor, and not the Government, is responsible for management and quality control actions to meet the terms of the contract. The role of the Government is quality assurance to ensure contract standards are achieved. In this contract, the quality control program is the driver for service quality. The Contractor is required to develop a comprehensive program of inspections and monitoring actions. The major step to ensuring a “self-correcting” contract is to ensure that the quality control program approved after contract award provides the measures needed to lead the Contractor to success. Once the quality control program is approved, careful application of the process and standards presented in the remainder of this document will ensure a quality program.
2.
OBJECTIVE
This plan provides a quality surveillance strategy maintenance services to be performed at the Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA)/ Region 10 Federal Regional Center (FRC), located at Bothell, Washington. The primary intent of the plan is to provide a basis for the Contracting Officer’s Technical Representative (COTR) evaluation of performance quality. Oversight of Contractor performance will assure quality performance. The plan will also afford the COTR and Contracting Officer a productive mechanism to preclude major deficiencies in performance, provide input for annual contractor past performance evaluations, and make the determination for exercising of contract options.
3.
PERFORMANCE INDICATORS (MEASURES). Surveillance of contractor performance will be performed by the appointed COTR and the Contracting Officer based on the surveillance methodologies identified in the Performance Requirements Summary (PRS). The following primary task areas of the contract will be the basis from which all surveillance will originate:
3.1 Existing Deficiency Inspection/Initial Deficiency List
3.2 Start-up Phase/Transition Period
3.3 General and Administrative Requirements
3.4 Building Operating Plan
3.5 Monthly Progress Reports
3.6 Reference Library
3.7 Service Requests
3.8 Tours
3.9 Disruptive or Hazardous Tools
3.10 Disruption to Utilities, Lighting, or Space Conditioning
3.11 Plumbing and Restrooms
3.12 Maintenance Program
3.13 Water Treatment
3.14 Oil Analysis and Oil Changes
3.15 Lamps and Ballasts
3.16 Architectural and Structural Systems Maintenance
3.17 Repairs
3.18 Safety and Environmental Management
3.19 Fire Protection and Life Safety Equipment and Systems
3.20 Standard Systems
3.21 Exterior
3.22 Snow and Ice Removal
3.23 Grounds Maintenance
3.24 Recycling
4.
EVALUATION METHODS
The COTR efforts will primarily be based on verification and monitoring of the Contractor’s performance. The Government will use a variety of surveillance methodology and techniques to validate the contractor’s compliance. The COTR, assisted by other Government representatives, will perform evaluations based on each of the indicators stated in section 3 of this plan. The below listed methods of surveillance shall be used in the administration of this QASP.
5.
PERFORMANCE REQUIREMENT SUMMARY
5.1 Lists the specific section in the PWS that the government will evaluate. The absence of any contract requirement from the PRS shall not detract from its enforceability or limit the rights or remedies of the government under any other provision of the contract.
5.2 Lists the service to be performed.
5.3 Lists the standard of performance for each specific service.
5.4 Lists the surveillance methods the government will use to evaluate the contractors performance in meeting the requirements of the contract.
6.
SURVEILLANCE METHODS
6.1 The Government’s quality assurance procedures are based in part on attribute sampling of the recurring critical products of the contract using the concepts of MIL STD 105E sampling procedures and ANSI/ASQC Z1.4 sampling procedures and tables for inspection by attributes.
6.2 The Random Sampling method will be used for recurring service output items (daily, weekly, monthly, quarterly, semiannually, annually or as required) as determined necessary to assure a sufficient evaluation of contractor performance.
6.3 The 100% Inspection Method will be used for those tasks that occur infrequently and cannot be random sampled because the sample size for a small lot may exceed the lot size. Also, the tasks may have a stringent performance requirement where safety or health may be a concern.
6.4 Periodic surveillance. Sometimes called sampling, consists of the evaluation of tasks selected on other than 100 percent or random sample basis. It is appropriate for tasks that occur infrequently and where 100 percent inspection is neither required nor practicable. A predetermined plan for inspecting part of the work is established using subjective judgment and analysis of agency resources to decide what work to inspect and how frequently to inspect it. There will be periodic surveillance of output items as determined necessary to assure sufficient evaluation of contractor’s performance.
6.5 Customer complaints/Input. This is not a primary method, but it is a valuable supplement to more systematic methods.
FEMA CENTER FOR DOMESTIC PREPAREDNESS (CDP) COURSE DEVELOPMENT AND DELIVERY SERVICES
PERFORMANCE REQUIREMENTS SUMMARY (PRS)
| Performance Area (PA) |
| Required Services |
| Performance Standard/ Acceptable Quality Levels (AQL) |
| Monitoring Method |
Incentives/
Disincentives for Meeting/ Not Meeting AQL
| Existing Deficiency Inspection/Initial Deficiency List. |
| A thorough and systematic |
initial inspection and inventory of all equipment and systems and the performance of an annual inventory to verify and update the inventory.
| A complete and accurate deficiency list and inventory must be completed and submitted within the initial timeframe and an annual inventory must be scheduled and conducted to verify and update inventory. |
| 100% Inspection |
| 1, 2, 3 |
| Start-up Phase/Transition Period. |
| The Contractor must provide all start up services necessary to provide seamless operation of all building systems. |
| Submission and review of all required building documentation without failures in providing service to our customers. |
| 100% Inspection |
| 1, 2, 3 |
| General and Administrative Requirements. |
| Minimum staffing and Ability to Contact Communicate with COR - Contractor must staff and provide communication methods to ensure services are adequately provided to the tenant. |
| Quality and quantity of staffing and methods of communication ensure adequate response to all contract requirements. |
| Random Inspection |
| 1, 2, 3 |
| General and Administrative Requirements. |
| Onsite records - All records required by the contract must be accurate and available for inspection. |
| Records must be organized, up to date, and reflect actual conditions. |
| Random Inspection |
| 1, 2, 3 |
| Building Operating Plan (BOP). |
| BOP must detail all aspects of the contractor’s performance of the contract and building equipment and system information. |
| BOP must be submitted and address all items. . Control systems must be operated to provide maximum efficiency as measured by energy consumption per gross sq. ft. while providing tenant comfort. |
| Random Inspection |
| 1, 2, 3 |
| Monthly Progress Reports. |
| Reports of Contractor progress and activities must be provided monthly. |
| All reports must be thorough, accurate and submitted on time as required by the contract. |
| 100% Inspection |
| 1, 2, 3 |
| Reference library. |
| Information in the form of a reference library must be provided by the Contractor. |
| All required documents are to be included in the reference library and must be complete and up to date. |
| 100% Inspection |
| 1, 2, 3 |
| Service Requests. |
| Service requests must be received, tracked, and responded to in accordance with contract requirements. |
| All routine, emergency, and urgent service requests are responded to as required by the contract and repairs are completed within specified timeframes. |
| Random Inspection |
| 1, 2, 3 |
| Tours |
| Tours must be conducted and documented in accordance with contract requirements. |
| All tours must be conducted and documented as required and will reflect actual conditions. Adjustments will be made as needed. Logs and check sheets must be adequate to track operating hours and equipment performance history. |
| Random Inspection |
| 1, 2, 3 |
| Disruptive or hazardous tool use. |
| Tenants must not be unnecessarily disrupted during repairs or procedures. |
| All disruptive tool use during normal working hours must be approved by the COR. |
| 100% Inspection |
| 1, 2, 3 |
| Disruption to utilities, lighting and space conditioning. |
| Tenants must not be unnecessarily disrupted during repairs or procedures. |
| The COR must approve in advance any work that will disrupt lighting, utilities, and space |
| 100% Inspection |
| 1, 2, 3 |
| Plumbing and restroom maintenance. |
| Plumbing and drain systems must be maintained and in good working order. |
| All drain systems must be clear and kept functional at all times. |
| Random Inspection |
| 1, 2, 3 |
Maintenance program.
Equipment must be maintained to the minimum standard established in the contract and developed by the Contractor.
Minimally the contractor must perform maintenance in accordance with the manufacturer’s recommended standards for all equipment requiring a preventive maintenance procedure. The Contractor must be required to use the specified NFPA Codes and Standards in this document to perform inspections, testing, and preventive maintenance of fire protection and life safety systems and equipment. In addition, the Contractor shall be required to follow the specific testing and inspection frequencies and methods specified in such NFPA Codes and Standards. The Contractor must record such inspection, testing, and services.
| Random Inspection |
| 1, 2, 3 |
| Water treatment. |
| The Contractor must provide for an effective water treatment program including equipment, monitoring, reporting, etc. |
| The Contractor must perform water treatment, monitoring, and testing in accordance with the contract requirements. |
| Random Inspection |
| 1, 2, 3 |
| Oil analysis and oil changes. |
| Oil analysis and oil changes must be documented. |
| The Contractor must perform initial and periodic oil analysis and oil changes in accordance with the contract provisions. |
| Random Inspection |
| 1, 2, 3 |
| Lamp and ballasts. |
| Quality, energy- efficient replacement lamps and ballasts must be used by the Contractor. |
| The Contractor must perform lamp and ballast replacements in accordance with the contract provisions |
| Random Inspection |
| 1, 2, 3 |
| Architectural and structural systems maintenance. |
| Interior and exterior building architectural and structural systems must be maintained in good repair. |
| The Contractor must conduct inspections, repairs, replacements, |
and touch up painting and patching to match existing finishes as required by contract provisions.
| Random Inspection |
| 1, 2, 3 |
| Architectural and structural systems maintenance. |
| Interior signage and directories - Signage must be up to date and in good repair. |
| Signage must be updated and repaired as required. |
| Random Inspection |
| 1, 2, 3 |
| Architectural and structural systems maintenance. |
| Finishes maintenance - All finishes must appear neat and have an esthetically appealing appearance. |
| The Contractor must maintain and touch up building finishes in a professional manner. |
| Random Inspection |
| 1, 2, 3 |
| Repairs. |
| All repairs must be performed in a timely professional manner, using quality parts and materials. |
| The Contractor must perform repairs in accordance with the provisions of the contract including timeliness of response, invoicing, thresholds, replacement part quality standards, and warranty provisions. |
| Random Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Scheduling and record keeping. |
| All required safety and environmental tests, certifications, permits and other procedures |
required in this document must be scheduled, and documented. In addition, the Contractor must maintain copies of all such tests, certifications, permits and other required records.
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Refrigerant control and certification. |
| The Contractor must control refrigerants and maintain records in accordance with EPA, and appropriate Air Quality Management District standards. The Contractor must take immediate action to contain refrigerant leaks and must report any leaks to the COR. |
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Underground storage tanks management. |
| The Contractor is responsible for complying with all Federal, State, and local requirements for the periodic inspection, monitoring, permitting, certification and maintenance of underground storage tanks. |
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Hazardous waste management. |
| The Contractor must be cognizant of, and comply with, all Federal, State, and local laws and regulations related to the disposal (landfill, sewer discharge, etc.) of hazardous waste and materials used or contract or discharged by the building, and must comply with all such requirements, to include record keeping requirements. |
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Electrical safety. |
| The contractor must comply with NFPA 70E when working on or around electrical equipment or systems. The Contractor must ensure that areas restricted to qualified |
personnel are secured and properly labeled.
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Lock out/tag out program. |
| The Contractor must develop a lockout/tag out program in accordance with 29 CFR 1910. The program must include all anticipated energy sources, including but not limited to electricity, steam, pressurized fluids, and mechanical energy. |
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Confined spaces management. |
| The Contractor must identify and label all confined spaces in accordance with OSHA requirements. |
The Contractor must develop a confined space entry permit system for all permit- required confined spaces within
60 calendar days of commencement of the contract.
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Asbestos management. |
| The Contractor shall be expected to occasionally perform Class III and Class IV asbestos work as defined in 29 CFR |
1910.26.1101. The Contractor must be prepared to deal with asbestos on a small scale, short duration basis to effect emergency repairs and to clean up small spills. The Contractor must protect building tenants, visitors, and employees from asbestos exposure. The Contractor must comply with applicable National Institute of Building Sciences (NIBS) and OSHA standards.
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Hazardous materials reporting. |
| The Contractor must make material safety data sheets (MSDSs) available to their employees in accordance with 29 CFR |
1910.1200.
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Backflow prevention devices . |
| Backflow prevention devices used on water- based fire suppression systems must be inspected, and maintained according to NFPA 25. |
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Potable water systems maintenance. |
| The Contractor must comply with the Safe Drinking Water Act, PL |
99-339, as amended, and the EPA Safe Drinking Water regulations (40
CFR 141.43, sections A and D), that address the quantity of lead allowable in new installations or repairs to existing drinking water systems and/or plumbing. Potable water systems which are repaired, modified, serviced, or breeched in any way must be disinfected and flushed prior to returning the system to service.
| 100% Inspection |
| 1, 2, 3 |
| Safety and environmental management. |
| Labeling |
| The Contractor must label equipment, storage areas and workspaces in accordance with OSHA standards immediately after commencement of the contract if such labels are not already in place. |
| 100% Inspection |
| 1, 2, 3 |
| Fire Protection and Life Safety Equipment and Systems. |
| Fire alarm system management. |
(NOTE: Annual maintenance, service and testing will be performed by licensed and certified personnel contracted by FEMA. All repairs to the fire alarm system, water based suppression system, and fire extinguishers with be conducted through the appropriate contracted vendor by FEMA.)
The Contractor is responsible for meeting the inspection, testing frequencies, and testing methods outlined in NFPA 72. Documentation of the above mentioned inspection, and testing results must be recorded on the applicable Inspection and
Testing Form from
NFPA 72.
All fire alarm testing, with the exception of interconnected building functions, must be performed after normal working hours unless approved in advance by the COR.
Testing of the interconnected building functions, including, but not limited to, air handler shutdown, damper control, elevator recall, egress door unlocking, etc., must be performed during hours the interconnected equipment is active.
The testing of the fire alarm system shall not be considered complete without the testing of interconnected equipment.
The Contractor must provide a fire watch in areas left unprotected until the fire alarm system is completely restored to service. In no case shall the fire alarm systems be left in a disabled condition without notifying the COR.
The Contractor must ensure that the fire alarm system is maintained operable at all times except while being tested or repaired. It is essential that the Contractor carefully schedule with the building manager all non emergency shutdowns of the fire alarm system and that back up protection be provided by the Contractor (arrangement of additional personnel stationed at the fire alarm system control panel) any time the fire alarm system is out of service for more than 4 hours. In addition, regardless of the duration of the shutdown, the affected portion of the system must be tested to ensure that the protection has been restored.
| 100% Inspection |
| 1, 2, 3 |
| Fire Protection and Life Safety Equipment and Systems. |
| Fire alarm system central station monitoring. |
| The Contractor must maintain a UL-listed central station monitoring service for fire alarm system monitoring. |
During any period in which there is no central station monitoring, the Contractor must maintain a fire watch in accordance with GSA guidelines.
| 100% Inspection |
| 1, 2, 3 |
| Fire Protection and Life Safety Equipment and Systems. |
| Water-based fire suppression system inspection. |
| The Contractor is responsible for meeting the inspection methods outlined in NFPA 25. Documentation of the inspection results must be recorded. |
All water-based fire suppression system testing must be performed after normal working hours unless approved otherwise by the COR. The Contractor must provide a fire watch in areas left unprotected until the water-based fire suppression system is completely restored to service. In no case must any water based fire suppression system be left in a disabled condition without notifying the COR.
It is essential that the Contractor carefully schedule with the building manager and COR all non emergency shutdowns of the sprinkler system and that back up protection be provided by the Contractor any time the sprinkler system is out of service for more than 4 hours.
| 100% Inspection |
| 1, 2, 3 |
| Fire Protection and Life Safety Equipment and Systems. |
| Portable fire extinguishers inspections. |
| The Contractor must perform inspections in accordance with the current edition of NFPA 10. |
The Contractor is responsible for meeting the inspection methods, and documentation requirements outlined in NFPA 10.
| 100% Inspection |
| 1, 2, 3 |
| Fire Protection and Life Safety Equipment and Systems. |
| Non-water based fire extinguishing systems inspections. |
| The Contractor must perform inspections in accordance with the current edition of the applicable NFPA standards (e.g., NFPA 12, 12A, 17, 17A, 96, 2001, etc.). |
The Contractor is responsible for meeting the inspection methods, and documentation requirements outlined in the applicable NFPA standards (e.g., NFPA 12, 12A, 17, 17A, 96, 2001, etc.).
| 100% Inspection |
| 1, 2, 3 |
| Fire Protection and Life Safety Equipment and Systems. |
| Emergency and standby power systems management. |
| The Contractor must perform inspections, tests, and maintenance in accordance with the current edition of the applicable NFPA standards (e.g., NFPA110 and 111). |
The Contractor is responsible for meeting the inspection, maintenance, testing frequencies, testing methods, and documentation requirements outlined in the applicable NFPA standards (e.g.,NFPA 110 and 111)
| 100% Inspection |
| 1, 2, 3 |
| Fire Protection and Life Safety Equipment and Systems. |
| Emergency lighting and exit signage management. |
| The Contractor must perform inspections, |
tests, and maintenance or repairs in accordance with the current edition of NFPA 101.
The Contractor is responsible for meeting the inspection, maintenance, testing frequencies, testing methods, and documentation requirements outlined in NFPA 101.
| 100% Inspection |
| 1, 2, 3 |
Standard services
Bare Floors maintenance - (lobbies, corridors, restrooms, etc.)
Floors, base moldings and grout shall be clean and free of debris, including but not limited to, (dirt, water streaks, mop marks, string, gum, tar and other foreign matter). The floors shall maintain their natural luster and not have a dull appearance.
| Random Inspection |
| 1, 2, 3 |
Standard services
ADP Floors maintenance
Damp mopping shall be the only method of wet cleaning for floors in Automated Data Processing (ADP) space.
| Random Inspection |
| 1, 2, 3 |
Standard services
Loading Dock Floors maintenance
Spill residue and clean- up materials shall be disposed of in accordance with the Environmental Protection Agency (EPA), and State and local regulatory agency requirements.
| Random Inspection |
| 1, 2, 3 |
Standard services
| Carpeted Floors maintenance |
| Free of visible dirt, dust, and other debris. |
No spots, smears, crusted material, or spills.
No fuzzing caused by harsh rubbing or brushing of carpet.
| Random Inspection |
| 1, 2, 3 |
Standard services
| Carpet Cleaning/extraction |
| Build-up, spills, or crusted material is to be removed along with spots and smears. Cleaned areas of carpets and rugs shall be reasonably blended |
with surrounding carpets
| Random Inspection |
| 1, 2, 3 |
Standard services
| Mats and Runners maintenance |
| Mats and runners shall be free of removable spots, soiled traffic patterns, dirt, debris, gum and crusted material. There shall be no areas of deterioration or fuzzing as a result of harsh brushing or scrubbing. |
| Random Inspection |
| 1, 2, 3 |
Standard services
| Restrooms, Shower Rooms, and Locker Rooms maintenance |
| Areas shall be cleaned with a disinfectant cleaner. Fixtures shall maintain a high level of luster and be free of dust, mold, mildew, streaks, and |
encrustation. Partitions, doors, vents, sills, and walls shall be free of dust, dirt, bodily fluids, and waste and graffiti.
Restrooms shall be free of discarded material and trash shall be emptied to prevent the containers from overflowing.
| 100% Inspection |
| 1, 2, 3 |
Standard services
| Fixtures maintenance |
| Fixtures and surfaces (washbasins, urinals, modesty panels, toilets, shower stalls etc.) shall be clean with no dust, spots, soil substances, discoloration, rust, mold, build-up, or excess Custodial services |
moisture.
| Random Inspection |
| 1, 2, 3 |
Standard services
Surfaces maintenance - Metal, Brass, and Woodwork
Surfaces (including corners, crevices, moldings, ledges, hand rails, grills, doors, door knobs, door frames, kick plates, etc.) shall be free of dust, streaks, spots, hand marks, oil, smudges, dirt, soil substances, rust, encrustation, and streaks.
| Random Inspection |
| 1, 2, 3 |
Standard services
| Glass Surfaces maintenance |
| All glass, clear partitions, mirror surfaces, bookcases, and other glass (within approximately 70 inches of the floor) shall be clean and free of dirt, dust, streaks, smudges, watermarks, spots and grime, and shall not be cloudy. |
There shall be no water spots on the glass or adjacent fixtures and furniture.
| Random Inspection |
| 1, 2, 3 |
| Standard services |
| Walls maintenance |
| Free of smudges, marks, dirt, and spots with no discoloration. |
| Random Inspection |
| 1, 2, 3 |
| Standard services |
| High Surfaces maintenance |
| Surfaces above 70 inches and 96 inches shall be cleaned free of dirt, dust, and cobwebs. Where glass is present, |
both sides shall be clean and free of streaks. This does not include removal of vents, tiles, or fixtures.
| Random Inspection |
| 1, 2, 3 |
| Standard services |
| Trash, Wastebaskets, and Ash Receptacles maintenance |
| Trash containers shall be emptied and kept clean, odor-free and |
free of dirt, dust, debris, residue, and spilled material. Plastic liners for all trash, debris containers shall not be torn, worn, or contain residue. All ash receptacles shall be free of dust, ashes, odors, tar, streaks, and tobacco residue.
| 100% Inspection |
| 1, 2, 3 |
| Standard services |
| Elevators, and Stairways maintenance |
| Door tracks shall be clean and free of dirt, debris, built up grime, dust, smudges, and |
other extraneous matter. Surfaces shall be clean and free of finger marks, smudges, and spills. Carpets and floors shall be free of removable spots, dirt, and debris. Floors requiring a finish shall be maintained at a high luster.
Stairways, escalators, entrances, landings, railings, risers, ledges, grills, doors, radiators, and surrounding areas shall be free of dirt, dust, litter, and debris.
| Random Inspection |
| 1, 2, 3 |
| Standard services |
| Plate Glass maintenance - (all glass - glass over and in exterior and vestibule doors, all plate glass around entrances, lobbies vestibules, and spandrel) |
| Shall be clean and free of dirt, grime, streaks and moisture, and shall not be cloudy. |
| Random Inspection |
| 1, 2, 3 |
| Standard services |
| Window Washing |
| Windows shall be clean (minimum is annually) and free of dirt, grime, streaks and moisture, and shall not be cloudy. Window sashes, sills, woodwork, and other surroundings of interior glass shall be wiped |
free of drippings and other watermarks.
| Random Inspection |
| 1, 2, 3 |
| Standard services |
| Policing (All building areas both interior and exterior |
| All trash, and other discarded material shall be removed. |
| Random Inspection |
| 1, 2, 3 |
| Standard services |
| Break room / concessions maintenance |
| Public areas shall be clean, sanitized, free of spillages, food crumbs, spots, smudges, marks, and soil |
| 100% Inspection |
| 1, 2, 3 |
| Standard services |
| Fitness Area maintenance |
| Areas such as the fitness area shall be cleaned with disinfectant. |
All vinyl surfaces of exercise equipment and exercise mats shall be free of dust, dirt, spots, streaks, and smudges.
All metal (door frames and handles, fixtures, equipment) and glazed surfaces (including partitions), shall be free of smears, finger marks, and streaks and shall maintain a uniform luster.
| Random Inspection |
| 1, 2, 3 |
| Exterior |
| Canopies maintenance |
| Shall be clean and free of dirt, dust, cobwebs, nests, bird excrement, trash, and debris. |
| Random Inspection |
| 1, 2, 3 |
| Exterior |
| Hard Surface Areas maintenance (sidewalks, brick areas, hard surfaces, parking areas, garages, docks, etc.) |
| Shall be clean and free of dirt, debris, gum, litter, gravel, weeds, oil, and grease. No residual dirt shall remain after |
the removal of the debris.
| Random Inspection |
| 1, 2, 3 |
| Exterior |
| Exterior Surfaces maintenance (signs, vending machines, tables, etc.) |
| Shall be clean, with no dirt, dust, residue, streaks, spots, soil substances, discoloration, or rust. |
| Random Inspection |
| 1, 2, 3 |
| Snow and Ice removal |
| Snow and Ice Removal |
| Shall be free of snow and ice which may cause slip hazard. |
| 100% Inspection |
| 1, 2, 3 |
| Grounds Maintenance |
| Grounds Maintenance |
| Maintain all plants, trees, shrubs, ground cover, and lawns in a manner that prolongs life and sustains a healthy appearance and free from pests. |
Entrances and Exits shall not be wet from watering, during the arrival and departure of occupants and visitors.
| Random Inspection |
| 1, 2, 3 |
| Recycling |
| Recycling |
| Paper shall be transported from recycling bins to storage containers in designated area. |
| Random Inspection |
| 1, 2, 3 |
Incentive/Disincentives for Meeting/Not Meeting AQL
1. Positive or negative performance will be documented in the contractor performance assessment reporting system/database.
2. Non compliance to contract standards will be corrected at no cost to the government.
3. The contractor may receive informal or formal acknowledgement for exceptional performance in the form of certificates or letters.
Notification. The contractor shall respond in writing to the Contracting Officer, to all notifications of failure to meet acceptable quality levels within 5 days of issuance by the Contracting Officer. The contractor’s response shall include the corrective action taken to rectify the problem and the proposed measure to preclude the recurrence of the problem.