Attachment_7_GMP__OCONUS_July_2017.pdf
PDF 837 KB Posted
- Attached to
- OCONUS Generator Maintenance Federal contract opportunity
- Solicitation number
- HSFE40-17-R-0006
About this file
Attachment 7 GMP
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solcitation_Response_Questions_for_HSFE40-17-R-0006.pdf | ||
| Updated_RFP_Instructions_and_Evaluations_Factors.pdf | ||
| Attachment_3_SF_91_Motor_Vehicle_Accident_Report.pdf | ||
| Attachment_4_OCONUS_Inventory_24_July_2017.xlsx | XLSX spreadsheet | |
| Attachment_8_Past_Performance_Questionaire_October_2016.pdf | ||
| Attachment_5_OCONUS_QASP_24_July_2017.pdf | ||
| Attachment_5B_Cust_Complaint__OCONUS_July_2017.pdf | ||
| HOW_TO_FILL_OUT_ATTACHMENT1.docx | DOCX document | |
| Attachment_5A_QA_Monitoring_OCONUS_July_2017.pdf | ||
| Combined_Synopsis_HSFE40-17-R-0006.pdf | ||
| Attachment_6_Auth_for_Repair_OCONUS_v1.3_July_2017.pdf | ||
| Attachment_2_OCONUS_Generator_PWS_24_July_2017_Fleet_Review.pdf | ||
| RFP_Instructions_and_Evaluations_Factors.pdf | ||
| Attachment_1_OCONUS_Pricing_July_2017.xls | XLS spreadsheet | |
| Attachment_9_Wage_Determination_Chart.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SIZE (kW): MANUFACTURER: BARCODE:
DATE OF THIS SERVICE HOUR METER READING (@ Start of Service):
LOCATION OF SERVICE: (Select) RUN UP HOUR METER READING:
STATION OF ORIGIN: (Select)
CURRENT CONDITION: (Select)
LEVEL OF SERVICE: (Select)
ACTION ITEM
SERVICE REQUIRED
**Quarterly tasks are to be completed during Annual & RTS services**
CODE
(OK= No Problem; CS=Corrected to spec; TF=Temporary
Fix; PF=Permanent Fix; NA=Not Applicable; XP=No replacement part available; XF=FEMA Waived Repair;
XX=Uncorrectable damage)
CHECK/CLEAN Battery terminals / battery hold down QUARTERLY
DISCONNECT (Secure) Battery Cable QUARTERLY
TEST Panel Lights QUARTERLY
CHECK / ADD (if needed) Coolant fill level - add recharge if necessary QUARTERLY
INSPECT Coolant Leak QUARTERLY
CHECK Tension on belts QUARTERLY
CHECK Silencer isolator mount QUARTERLY
CHECK/ADJUST Governor QUARTERLY
CHECK/CLEAN Air filter(s) QUARTERLY
INSPECT Loose/worn belts/hoses QUARTERLY
INSPECT Oil Leak QUARTERLY
INSPECT Turbo/chair-air cooler QUARTERLY
CHECK Exhaust components QUARTERLY
CHECK Fuel line quick couplers QUARTERLY
DRAIN Fuel / water separator QUARTERLY
INSPECT Fuel Leak QUARTERLY
INSPECT
All filters marked with date and run hours at replacement
QUARTERLY
INSPECT All gauges/meters QUARTERLY
INSPECT Breaker(s)/lugs QUARTERLY
INSPECT Frayed/Corroded Wiring QUARTERLY
INSPECT Housing - proper FEMA identification QUARTERLY
INSPECT Loose Bolts/linkage/etc. Replace if missing QUARTERLY
LUBE/ADJUST Various linkages QUARTERLY
CHECK Lube oil level QUARTERLY
DRAIN & REPLACE - SEE NOTE Coolant ANNUAL / RTS
DRAIN & REPLACE Lube Oil ANNUAL / RTS
REPLACE Air cleaner element(s) ANNUAL / RTS
REPLACE Fuel filter(s) ANNUAL / RTS
REPLACE Fuel/Water Separator ANNUAL / RTS
REPLACE Oil filter(s) ANNUAL / RTS
ACTION ITEM SERVICE REQUIRED CODE ACTION CODE / VOLTAGE CONFIGURATION
CLEAN Clean out Coolant Strainer ANNUAL Voltage Configuration at time of load test
CLEAN DEF Filter ANNUAL 1-Phase Breaker Functionality
DRAIN / REPLACE DEF Fluid ANNUAL 3-Phase Breaker Functionality
CHANGE During Coolant Change - Bleed EGR Coolant COOLANT CHANGE ONLY Output Voltage Stability
REPLACE Crankcase filter EVERY 1,000 hrs
TEST DEF Fluid Concentration EVERY 90 DAYS Start (Hours)
INSPECT / RE-TORQUE
Power Balance Connections (Re-torque terminal bolts to 75 IN-
LBS)
EVERY 90 DAYS Stop (Hours)
COOLANT PROTECTION (Every 90 days) OUTPUT VOLTAGE READINGS (Every 90 Days) adjust if needed
FREEZE POINT: READINGS: BATTERY STATUS: BATTERY REPLACEMENT DATE: PASS
DEF CONCENTRATION (TIER 4 ONLY) SET POINT: ESTOP STATUS: FAIL
SET POINT:
OVERALL GENERATOR READINESS
FUEL FILTER PRIMARY: SECONDARY: BLOW BY (TIER 4 ONLY)
LUBE OIL PRIMARY: SECONDARY: CRANKCASE (TIER 4 ONLY, EVERY 1,000 HRS)
AIR PRIMARY: SECONDARY: DEF (TIER 4 ONLY
COOLANT PRIMARY: SECONDARY:
ACTION CODE New Coolant
Drain/inspect fuel tank (no fuel present) New Lube Oil (15w40)
NOTES
GOVERNMENT FINAL Q/A INSPECTOR:
SIGNATURE OF CONTRACTOR AND GOVERNMENT REPRESENATIVE
FUEL TANK COOLANT / LUBE OIL
NOTE ALL NEW DAMAGE / REPAIRS/ LOAD TST FAILURES / NO-START
CONTRACTOR FINAL Q/A INSPECTOR:
FILTERS (PART & MFG) TIER 4 FILTERS ONLY
TIER 4 SERVICE REQUIREMENT (Applicable Generators) LOAD TEST DETAILS (PERFORMED & COMPLETED UPON COMPLETION OF ALL OTHER SERVICES)
BATTERY / ESTOP STATUS
Load Bank Tested (90minutes)
LOAD TEST RESULTS (CONDUCTED AT MAX CAPACITY)
GENERATOR MAINTENACE CHECKLIST - (TO BE COMPLETED AS SERVICES ARE RENDERED)
FEMA PWS REQUIRED GENERATOR MAINTENACE CHECKS & SERVICES
IDENTIFICATION
CURRENT MAINTENANCE DATA
PRE-EXISTING DAMAGE:
Per PWS (6.1.1.10) : Annual 2017 (CONUS) ; Annual 2018 (OCONUS)
SEE NOTE Per PWS (6.1.2.2): Annual 2018 (CONUS) ; Annual 2017 (OCONUS)
SEE NOTE above when to change
3 years
2 Years
ATTACHMENT 7: GENERATOR MAINTENANCE PROFILE SHEET (GMP) - JULY 2017
| PREEXISTING DAMAGERow1: |
| SET POINT: |
| PRIMARY: |
| SECONDARY: |
| BLOW BY TIER 4 ONLY: |
| PRIMARY_2: |
| SECONDARY_2: |
| CRANKCASE TIER 4 ONLY EVERY 1000 HRS: |
| PRIMARY_3: |
| DEF TIER 4 ONLY: |
| NOTE ALL NEW DAMAGE REPAIRS LOAD TST FAILURES NOSTART: |
| Service: [] |
| Service Location: [] |
| Condition: [] |
| Date of Service: |
| Station of Origin: [] |
| Check1: |
| 0: [] |
| 1: [] |
| 2: [] |
| 3: [] |
| 4: [] |
| 5: [] |
| 6: [] |
| 7: [] |
| 8: [] |
| 9: [] |
| 10: [] |
| 11: [] |
| 12: [] |
| 13: [] |
| 14: [] |
| 15: [] |
| 16: [] |
| 17: [] |
| 18: [] |
| 19: [] |
| 20: [] |
| 21: [] |
| 22: [] |
| 23: [] |
| Run up Hour Meter: |
| Notes_Text1: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| 6: |
| 7: |
| 8: |
| 9: |
| 10: |
| 11: |
| 12: |
| 13: |
| 14: |
| 15: |
| 16: |
| 17: |
| 0: |
| 18: |
| Notes_Text2: |
| Notes_Text3: |
| Notes_Text4: |
| Notes_Text5: |
| Notes_Text6: |
| Check2: |
| 1: [] |
| 2: [] |
| 3: [] |
| 0: [] |
| 4: [] |
| 5: [] |
| 8: [] |
| 6: [] |
| 7: [] |
| 9: [] |
| Notes1: |
| 0: |
| 1: |
| 2: |
| 3: |
| 4: |
| 5: |
| Check3: |
| 0: [] |
| 1: [] |
| 2: [] |
| 3: [] |
| Check4: |
| 3: [] |
| 1: [] |
| 2: [] |
| FREEZE POINT: |
| Output Voltage: |
| Battery1: [] |
| ESTOP: [] |
| Text4: |
| Voltage Config1: |
| Voltage Config2: |
| Start Hours: |
| Stop Hours: |
| Check Box5: Off |
| Check Box6: Off |
| New Lube Oil 15w40: |
| Generator Readiness: [] |
| Coolant Check: [] |
| Hour Meter @ Start of Service: |
| kW Size: |
| Manufacture: |
| PRIMARY_4: |
| SECONDARY_3: |
| SECONDARY_4: |
| Clear Form: |
| Technican Name: TECHNICIAN NAME: |
| Name: |
File details come from the government source that posted it. Updated .