Attachment_1_SOS_Section_B.xls
XLS spreadsheet 38 KB Posted
- Attached to
- CGC JUNIPER DRY DOCK Federal contract opportunity
- Solicitation number
- HSCG85-17-Q-P45837
About this file
Attachment 1 SOS Section B
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 225-WLB_506_1_1_-_L.PDF | ||
| Amendment_A0002_CGC_JUNIPER_DRY_DOCK.pdf | ||
| Amendment_A00001_CGC_JUNIPER_DD.pdf | ||
| Attachment_5_Request_for_Clarification.docx | DOCX document | |
| Attachment_3_Past_Performance_Questionnaire_JUNIPER.doc | DOC document | |
| Attachment_2_JUNIPER_(WLB_225A)_DD_JCC_17R0.doc | DOC document | |
| Attachment_4_Ombudsman.docx | DOCX document | |
| Solicitation_CGC_JUNIPER_DD_FY17_LSC.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC JUNIPER (WLB-225A) DRYDOCK AVAILABILITY FY2017 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Inspect | JOB | 1 | $0.00 | |
| D-002 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-003 | Appendages (U/W), Leak Test | JOB | 1 | $0.00 | |
| D-004 | Propulsion Shaft Fairwaters and Rope Guards, Inspect | JOB | 1 | $0.00 | |
| O-005 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $0.00 | |
| D-006 | Chain Locker(s), Clean and Inspect, and Preserve "100%" | JOB | 1 | $0.00 | |
| D-007 | Voids (Non-Accessible), Leak Test | JOB | 1 | $0.00 | |
| O-008 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | $0.00 | |
| D-009 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | |
| D-010 | Tanks (Ballast), Clean and Inspect | JOB | 1 | $0.00 | |
| D-011 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | $0.00 | |
| D-012 | Propulsion Shaft Seals, Mechanical Overhaul And Inflatable Renewal | JOB | 1 | $0.00 | |
| O-013 | Propulsion Shaft Seals (Bulkhead), Overhaul | JOB | 1 | $0.00 | |
| O-014 | Propulsion Tail Shaft Sleeve, Skim Cut | JOB | 1 | $0.00 | |
| D-015 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | $0.00 | |
| D-016 | Controllable Pitch Propeller, System Maintenance | JOB | 1 | $0.00 | |
| D-017 | Controllable Pitch Propeller Hub, General Maintenance, Perform | JOB | 1 | $0.00 | |
| D-018 | Fathometer Transducer, General Maintenance | JOB | 1 | $0.00 | |
| D-019 | Fwd Scan Sonar Transducer, General Maintenance, Perform | JOB | 1 | $0.00 | |
| D-020 | Sea Valves and Waster Pieces, Overhaul or Renew | JOB | 1 | $0.00 | |
| D-021 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | $0.00 | |
| D-022 | Sea Strainers - Simplex (All Sizes), Clean and Inspect | JOB | 1 | $0.00 | |
| D-023 | Sea Bay, Clean and Inspect | JOB | 1 | $0.00 | |
| O-024 | Sea Bay, Preserve 100% | JOB | 1 | $0.00 | |
| O-025 | Rudder(s), Preserve (“100%”) | JOB | 1 | $0.00 | |
| O-026 | Rudder and Rudder Stock, Remove and Inspect | JOB | 1 | $0.00 | |
| D-027 | Thruster Units (Bow And Stern), Overhaul | JOB | 1 | $0.00 | |
| D-028 | Anchor Windlass, Inspect and Service | JOB | 1 | $0.00 | |
| D-029 | Warping Capstan, Inspect and Service | JOB | 1 | $0.00 | |
| D-030 | Single Point Davit, Inspect and Service | JOB | 1 | $0.00 | |
| D-031 | Twin Pivot Arm Davit, Inspect and Service | JOB | 1 | $0.00 | |
| D-032 | Buoy Crane, Inspect And Service | JOB | 1 | $0.00 | |
| O-033 | Tanks (Ballast), Preserve “100%” | JOB | 1 | $0.00 | |
| O-034 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| O-035 | U/W Body, Preserve (Partial - Condition A) | JOB | 1 | $0.00 | |
| O-036 | U/W Body, Preserve (Partial - Condition B) | JOB | 1 | $0.00 | |
| O-037 | U/W Body, Preserve (Partial - Condition C) | JOB | 1 | $0.00 | |
| O-038 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | $0.00 | |
| D-039 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| D-040 | Impressed Current Cathodic Protection System, Inspect and Maintain | JOB | 1 | $0.00 | |
| O-041 | Impressed Current Cathodic Protection System Anodes, Renew | JOB | 1 | $0.00 | |
| O-042 | Impressed Current Cathodic Protection System Reference Cells, Renew | JOB | 1 | $0.00 | |
| O-043 | Impressed Current Cathodic Protection System Dielectric Shield, Repair | JOB | 1 | $0.00 | |
| O-044 | Impressed Current Cathodic Protection System Dielectric Shield (Capastic Fairing), Renew | JOB | 1 | $0.00 | |
| D-045 | Drydock | JOB | 1 | $0.00 | |
| D-046 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-047 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-048 | Bilges, Machinery Space, Preserve "Partial" | JOB | 1 | $0.00 | |
| D-049 | Main Mast, Preserve, 100% | JOB | 1 | $0.00 | |
| D-050 | Bilges, Machinery Space, Preserve "100%" | JOB | 1 | $0.00 | |
| D-051 | Main Diesel Engine Mounts, Upgrade | JOB | 1 | $0.00 | |
| D-052 | LUBE OIL ISOLATION VALVE, INSTALLATION | JOB | 1 | $0.00 | |
| D-053 | Stack Lighting, Install | JOB | 1 | $0.00 | |
| D-054 | Sewage Tank Vent Overboard Piping, Renew | JOB | 1 | ||
| D-055 | Water Quality Package Auxiliary Seawater (ASW) Piping, Renew | JOB | 1 | ||
| D-056 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 1690 | ||
| D-00B | GFP Report | NSP | EA | ||
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items | $0.00 |
&C(1/10/2017)
Rev-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | ||||||||||||||||||||||||
| Assumed G&A Factor | 15% | ||||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | ||||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData | |
| 62 | Baltimore, MD | ||||||||||||||||||||||||
| 52 | Biloxi, MS | ||||||||||||||||||||||||
| 56 | Boston, MA | ||||||||||||||||||||||||
| 50 | Charleston, SC | ||||||||||||||||||||||||
| 60 | Corpus Christi, TX | ||||||||||||||||||||||||
| 51 | Hampton Roads | ||||||||||||||||||||||||
| 64 | Honolulu, HI | ||||||||||||||||||||||||
| 55 | Houston, TX | ||||||||||||||||||||||||
| 56 | Los Angeles, CA | ||||||||||||||||||||||||
| 55 | Median Rate | ||||||||||||||||||||||||
| 49 | Miami | ||||||||||||||||||||||||
| 50 | Narragansett Bay, RI | ||||||||||||||||||||||||
| 55 | New London, CN | ||||||||||||||||||||||||
| 45 | New Orleans | ||||||||||||||||||||||||
| 62 | NYNY | ||||||||||||||||||||||||
| 49 | Panama City, FL | ||||||||||||||||||||||||
| 60 | Philadelphia, PA | ||||||||||||||||||||||||
| 51 | Portland, ME | ||||||||||||||||||||||||
| 57 | Portland, OR | ||||||||||||||||||||||||
| 55 | San Diego, CA | ||||||||||||||||||||||||
| 67 | San Francisco, CA | ||||||||||||||||||||||||
| 55 | Santa Barbara, CA | ||||||||||||||||||||||||
| 55 | SE North Carolina | ||||||||||||||||||||||||
| 65 | Seattle, WA | ||||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | ||||||||||||||||||||||||
| 60 | Wilmington, DE | ||||||||||||||||||||||||
| D-054 | Sewage Piping, Renew | JOB | 1 | ||||||||||||||||||||||
| D-055 | ASW Piping, Renew | JOB | 1 |
&C(09/28/2009)_x000D_ Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .