SECTION B

View the file

Other files for this federal contract opportunity

Other files attached to DRYDOCK REPAIRS - USCGC BISCAYNE BAY, newest first.
File Type Posted
AMEND0002BISCAYNEBAY.doc DOC document
AMENDBISCAYNE.pdf PDF
USCGC_BISCAYNE_BAY_FY14-SPECIFICATIONS_.doc DOC document
USCGCBISCAYNEBAY_FY14_SOLICITATION.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC BISCAYNE BAY (WTGB-140) DRYDOCK AVAILABILITY FY2014
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (U/W Body), Inspect$0.00JOB$0.00
D-002Hull Plating (U/W Body), Ultrasonic Testing$0.00JOB$0.00
D-003Appendages (U/W), Leak Test$0.00JOB$0.00
D-004Appendages (U/W) - Internal, Preserve$0.00JOB$0.00
D-005Voids (Non-Accessible), Leak Test$0.00JOB$0.00
D-006Voids (Non-Accessible), Preserve Internal Surfaces$0.00JOB$0.00
D-007Propulsion Shaft Coating Inspect$0.00JOB$0.00
D-008Propulsion Shaft Coating, Renew$0.00JOB$0.00
D-009Propulsion Shafting, Straighten$0.00JOB$0.00
D-010Shaft Seal Assembly, Overhaul$0.00JOB$0.00
D-011Stern Tube Bearing Staves, Renew$0.00JOB$0.00
D-012Propeller, Remove, Inspect, and Reinstall$0.00JOB$0.00
D-013Propeller, Perform Minor Repairs and Reconditioning$0.00JOB$0.00
D-014Main Diesel Engine (MDE) Exhaust Stack Uptakes, Clean$0.00JOB$0.00
D-015Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean$0.00JOB$0.00
D-016Boiler Exhaust Stack Uptakes, Commercial Clean$0.00JOB$0.00
D-017Circuit Breakers (60 Hz), Inspect and Test$0.00JOB$0.00
D-018Fathometer Transducer, Renew$0.00JOB$0.00
D-019Vent Ducts (Engine and Motor Room All), Commercial Cleaning$0.00JOB$0.00
D-020Vent Ducts (Galley and Pantry Room All), Commercial Cleaning$0.00JOB$0.00
D-021Vent Ducts (All Other), Commercial Cleaning$0.00JOB$0.00
D-022Sea Valves and Waster Pieces, Overhaul or Renew$0.00JOB$0.00
D-023Compressed Air Receivers (All), Clean, Inspect, and Hydro$0.00JOB$0.00
D-024Rudder Assembly, Remove, Inspect and Reinstall$0.00JOB$0.00
D-025Rudder Stock Bearings (Upper and Lower), Renew$0.00JOB$0.00
D-026Rudder Stock, Rebuild$0.00JOB$0.00
D-027Anchor Windlass, Level 2 Inspect and Repair$0.00JOB$0.00
D-028Vertical Capstan, Level 2 Inspect and Repair$0.00JOB$0.00
D-029Grey Water Holding Tanks, Clean and Inspect$0.00JOB$0.00
D-030Tanks (Ballast), Preserve “100%”$0.00JOB$0.00
D-031Tanks (Ballast), Preserve “Partial”$0.00JOB$0.00
D-032Decks - Exterior, Preserve (“Non-Skid Broadcast Grit” System)$0.00JOB$0.00
D-033U/W Body, Preserve (100%)$0.00JOB$0.00
D-034U/W Body, Preserve (Partial - Condition A)$0.00JOB$0.00
D-035U/W Body, Preserve (Partial - Condition B)$0.00JOB$0.00
D-036Hull Plating Freeboard, Preserve -“100%”$0.00JOB$0.00
D-037Cathodic Protection / Zinc Anodes, Renew$0.00JOB$0.00
D-038Drydocking - Tender$0.00JOB$0.00
D-039Temporary Services, Provide$0.00JOB$0.00
D-040Sea Trial Performance, Provide Support$0.00JOB$0.00
D-041{Anything Space or Component}, Preserve$0.00JOB$0.00
D-042Fixed Ballast (Lead Ingots), Encapsulate$0.00JOB$0.00
D-043Ballast Tank TLI Striker Plate, Renew$0.00JOB$0.00
D-044MDE Mufflers and Mounts, Renew$0.00JOB$0.00
D-045Water Tight Hatches (Internal DC Deck and Below), Renew$0.00JOB$0.00
D-046Main Mast, Preserve$0.00JOB$0.00
D-047Main Mast Rigging, Inspect$0.00JOB$0.00
O-00AComposite Labor RateHour100
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$500.00JOB$0.00
O-00ZLaydaysDay5
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price of Definite and Optional Items$0.00

&C(11/1/2013) Draft-2 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009)_x000D_ Page &P of &N