OAK_(WLB_225B)_DS_Specification_JAD_13R0.doc
DOC document 608 KB Posted
- Attached to
- USCGC OAK DOCKSIDE REPAIRS Federal contract opportunity
- Solicitation number
- HSCG85-14-Q-P45386
About this file
CGC Oak DS Specification
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_4_SF30.docx | DOCX document | |
| OAK_(WLB_225B)_DS_JAD_13R1.docx | DOCX document | |
| Amendment_3_SF30.docx | DOCX document | |
| Amendment_2_SF30.docx | DOCX document | |
| Amendment_1_SF30.docx | DOCX document | |
| SOLCITATION_FOR_CGC_OAK_DS.docx | DOCX document | |
| SOLCITATION_FOR_CGC_OAK_DS.docx | DOCX document | |
| GOVERNMENT_PROPERTY_REPORT_SF_1149 1 .docx | DOCX document | |
| Past_Performance_Questionnaire 1 .docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC OAK (WLB 211)
225 FOOT "B CLASS" SEAGOING BUOY TENDER
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2013
Developed By: Jarrod A. Deir (Rev-0, 18 November 2013)
TABLE OF CONTENTS
iiiRevisions Record ivConsolidated List of References viiConsolidated List of Government-furnished Property viiiConsolidated List of Critical Inspection Items ixPrincipal Characteristics
1General Requirements
10WORK ITEM 1: Both Ship Service Diesel Generators, Clean & Inspect
13WORK ITEM 2: Circuit Breakers (60 Hz), Inspect and Test
17WORK ITEM 3: Commissary Hoist, Level 2 Inspect and Repair
19WORK ITEM 4: Anchor Chain(s) and Ground Tackle, Inspect and Repair
25WORK ITEM 5: Warping Capstan, Level 2 Inspect and Repair
28WORK ITEM 6: Single Point Davit - Slewing Arm, Level 2 Inspect and Repair
32WORK ITEM 7: Potable Water Pneumatic Tanks, Clean and Inspect
35WORK ITEM 8: Anchor Chain and Ground Tackle, Preserve (OPTION)
39WORK ITEM 9: Anchor(s), Preserve (OPTION)
41WORK ITEM 10: Thruster Generator Clean & Inspect
44WORK ITEM 11: Ventilation Systems, Overhaul
47WORK ITEM 12: Reverse Osmosis Desalination Plant, Renew
51WORK ITEM 13: Miscellaneous Tanks Vent Piping, Renew
Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
| DATE |
| REV# |
| WORK ITEM# |
| CHANGES MADE |
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Consolidated List of References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.
All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:
· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm
· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp
· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:
· American Welding Society (AWS): http://www.awspubs.com/index.php
· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/
· NFPA: http://www.nfpa.org
· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 589-201
Coast Guard Drawing 225 WLB 589-2-1
Coast Guard Drawing 225 WLB 589-2-2
Coast Guard Drawing 225B WLB 320-1, Rev L, Electrical One - Line Diagram
Coast Guard Drawing 225B WLB 532-002, Rev D, Potable Water Sys Dia
Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement
Coast Guard Drawing 225B-WLB 512-1, Rev K, HVAC Diagram
Coast Guard Drawing 225B-WLB 512-2, Rev C, Ventilation Schedule
Coast Guard Drawing 225B-WLB 512-4, Rev D, HVAC a&D FR 12-30, Hull Block 910
Coast Guard Drawing 225B-WLB 512-8, Rev -, HVAC a & D FR 92 Thru FR 910 1st Plat & Mn Dk Hull Block 950
Coast Guard Drawing 225B-WLB 201-2, Rev C, Access Removal Routes
Coast Guard Drawing 225B-WLB 505-1, Rev -, General Requirements for Piping Systems
Coast Guard Drawing 225B-WLB 506-1, Rev -, Overflows, Air Escapes & Sndg Tubes Diagram
Coast Guard Drawing 225B-WLB 506-5 , Rev D, Vent & St System A/D, FR 48-66 Block 930
Coast Guard Drawing 225B-WLB 506-7, Rev D, Ovfl, AE & St Sys A/D Mn Dk & Above Block 960A, 970
Coast Guard Drawing 225B-WLB 507-1, Rev C, Operating Instructions & Label Plates, Piping Systems
Coast Guard Drawing 225-WLB_180_2, E, FOUNDATIONS HULL BLOCK 910
Coast Guard Drawing 225-WLB_601_2, H, BOOKLET OF GENERAL DRAWINGS
NAVSEA Dwg 803-1385866, Rev E, Penetrations; Bulkhead and Deck
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3534A, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2
Coast Guard Technical Publication (TP) 3534B, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2
Coast Guard Technical Publication (TP) 3537B, Manufacturer's Instruction Book – SWBS Group(s) 310
Coast Guard Technical Publication (TP) 3550, MANUFACTURER'S INSTRUCTION BOOK-SWBS GROUP(S) 521-531
Coast Guard Technical Publication (TP) 3556, Manufacturer's Instruction Book – SWBS Group(s) 568
Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-475
Coast Guard Technical Publication (TP) 3562, Feb 2009, Manufacturer’s Instruction Book, Matot Model 100 -SWBS Group(s) 583-589
Coast Guard Technical Publication (TP) 3562, Feb 209, Manufacturer's Instruction Book SWBS Groups 583-589, Section A, Davit, RHIB P/S – Model RAD30-15.5
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2012, General Requirements
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0450, 2012, Electrical Power for Contractor’s Tools & Equipment
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3100, 2012, Inspect, Test and Recondition AC Synchronous Machines In-Place
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, 2012, Auxiliary Machinery Systems
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5100, 2012, Clean Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2012, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 8636, 2012, Temporary Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American Society of Mechanical Engineers (ASME) B16.25, 2012, Buttwelding Ends
American Society of Mechanical Engineers (ASME) B16.5, 2013, Pipe Flanges & Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch Standard
American Society of Mechanical Engineers (ASME) B16.9, 2012, Factory-Made Wrought Buttwelding Fittings
ASTM International (ASTM) A106, 2011, Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service
ASTM International (ASTM) A181, 2013, Standard Specification for Carbon Steel Forgings, For General-Purpose Piping
ASTM International (ASTM) A234, 2011, Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters
Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and Weldless
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-DTL-23549, Feb 2007, Grease, General Purpose
National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning
Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker
Consolidated List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
| WORK ITEM |
| MTI |
| ITEM DESCRIPTION |
| NSN/PN |
| QTY |
| ESTIMATED COST |
($/Unit)
| 6 |
| N |
| Swing Brake Seal Kit |
| PN: YMD-6644 (Eskridge, Inc) |
| 2 ea |
| 1,875.00 |
| 6 |
| N |
| Swing Brake Disc & Bearing Kit |
| NSN 3010-01-464-1040 |
| 2 ea. |
| 178.00 |
| 6 |
| N |
| Counterbalance Valve |
| PN: YMD-3763 (Eskridge, Inc) |
| 1 ea. |
| 700.00 |
| 6 |
| N |
| Shuttle Valve |
| PN: YMD-1288 (Eskridge, Inc) |
| 1 ea. |
| 35.00 |
| 12 |
| Y |
| Reverse Osmosis Unit |
| Village Marine Type PW 2/2000 R/O Unit |
| 1 ea. |
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter
Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
| Work Item |
| Title |
| 2 |
| Circuit Breakers (60 Hz), Inspect and Test |
| 4 |
| Anchor Chain(s) and Ground Tackle, Inspect and Repair |
| 5 |
| Warping Capstan, Level 2 Inspect and Repair |
| 6 |
| Single Point Davit - Slewing Arm, Level 2 Inspect and Repair |
| 12 |
| Reverse Osmosis Desalination Plant, Renew |
PC_225B_WLB_1109
Principal Characteristics
225' WLB (B-CLASS)
Physical Characteristics
| Length Overall |
| 225' 0" |
| Length between Perpendiculars |
| 206' 0" |
| Maximum Beam |
| 46' |
| Designed Draft |
| 13' 0" |
| Full Load Displacement |
| 1905.6 Long Tons SW |
| Light Ship Displacement |
| 1500.7 Long Tons SW |
| Minimum Operating Displacement |
| 1869.2 Long Tons SW |
| Mast Height (Above 12' Waterline) |
| 67' 5" |
| Anchor |
| Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain |
Hull Characteristics
| Bilge Keels (Port & Starboard) |
| Frames 42-79 |
Frame Spacing
| FR 0 to 12 |
| 21" |
| FR 12 to 30 |
| 22" |
| FR 30 to 102 |
| 24" |
Machinery Characteristics
| Main Propulsion |
| Diesel Reduction |
| Diesel Engines |
| Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM |
| Number of Propellers |
| 1 |
| Number of Blades |
| 4 |
| Diameter |
| 10' |
| Pitch |
| Controllable |
| RPM |
| 254 |
| Ship's Service Diesel Generators |
| Two Caterpillar 3508 TA, 450 kW |
| Emergency Diesel Generator |
| One Caterpillar 3406 DITA, 280 kW |
| Shore Tie |
| Two 450 VAC, 400 Amp, 3-wire |
| Shaft Bearing, Forward |
| Cooper Bearing 01-BCP-1400-EX-TL |
| Shaft Bearing, Aft |
| Water Lubricated Cutless Bearing |
Tank CAPACITIES
| Diesel Oil |
| 76,498 gal |
| Fresh Water Capacity |
| 8056 gal |
| Hydraulic Oil Capacity |
| 2785 gal |
| Lube Oil Storage |
| 764 gal |
| Grey Water Tank |
| 2700 gal |
| Sewage Holding Tank |
| 1700 gal |
00000_PWB_0312_FLT
REC_0000_FLT_ Commercial Project @ CG Facility (0212) General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
2. REFERENCES
Coast Guard Drawings
None.
Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Other References
ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel
Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting
Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure
The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency
Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
· Provide fire watch personnel and fire extinguishers for the duration of the availability period, beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with SFLC Std Spec 6310, Chapter 11 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130
3.5 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazardous wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.
3.5.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.
3.5.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.
3.5.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COR in writing 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.4 The Contractor shall be aware of the following:
3.5.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.
3.5.4.2 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with local and state regulations.
3.5.4.3 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.
3.6 SFLC Standard Specification Approved Changes. The Contractor shall be aware that the following are approved changes to published SFLC 2012 Edition Standard Specifications and supersede published content:
3.6.1 SFLC Std Spec 8634, Drydocking, Appendix A, page A5, paragraph A2.7.1.3 Side Blocks. Remove formula value shown as g – Acceleration of gravity – 32.3 Ft/sec2, and replace with formula value g - Acceleration of gravity - 32.174 ft/sec2.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).
Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
| DATE & TIME |
| ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…) |
| LOCATION (Frame & Deck, relation to equipment, etc.) |
| TEMPERATURE |
| % REL. HUMID-ITY |
| DEW PT. |
| SURFACE |
| AMBIENT |
| ΔT |
| DP - Surface |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (Frame References) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils Place Surface Profile Replica Tape Here
Reading:__________ mils
Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
| SURFACE PREPARATION METHOD |
| PROFILE ACHIEVED (mils) |
| Min |
| Max |
| Mean |
SSPC-SP-10/NACE No. 2
SSPC-SP-12/NACE No. 5
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
Abrasive Manufacturer and Sieve Size: _________________________________
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Reading: |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| _____ mils |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Location of Work (incl. frame #’s) |
| Area (sqft) |
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15
| DATE |
| TEST LOCATIONS |
| CONDUCTIVITY |
(microsiemens/cm)
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
| Vessel Name |
| Hull # |
| Work Item # |
| Work Item Title |
| Coating Mfg |
| Product Name |
| Batch # |
| Induction Time |
| Coating System Sequence (Primer/Touchup/3rd Coat, etc.) |
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| AVERAGE VALUE |
*BASE METAL READING (BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
Location (Frame Reference): ___________________
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| SPOT |
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| Overall Avg. DFT |
| ADJUSTMENTS |
| Avg. BMR |
| Deviation |
| Before Adjustments |
| After Adjustments |
Avg.
| Application Method (Airless, Conventional Spray, Rolled) |
| Average DFT |
| Name of QP-1/NACE Inspector |
| Signature |
| Cert. # |
| Date / Time |
31120_WJW_0610_FLT
REC_31120_FLT_225’ WLB
B Class(1111)
WORK ITEM 1: Both Ship Service Diesel Generators, Clean & Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect, recondition, and test in place the windings of each Ship Service Diesel Generator.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 225B-WLB 201-2, Rev C, Access Removal Routes Coast Guard Publications
Coast Guard Technical Publication (TP) 3537B, Manufacturer's Instruction Book – SWBS Group(s) 310 Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0450, 2012, Electrical Power for Contractor’s Tools & Equipment
Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3100, 2012, Inspect, Test and Recondition AC Synchronous Machines In-Place
Other References
None.
3. REQUIREMENTS
3.1 General. Inspect, recondition, and test in place the windings of No. 1 and No. 2 Ship Service Diesel Generators in accordance with SFLC Std Spec 3100. Generator data is shown in Table 1 below.
3.2 Optional work. Perform the optional work sections of SFLC Std Spec 3100 as follows:
3.2.1 Bearing wear. Do not measure and record bearing wear.
3.2.2 Collector rings. Do not measure and record collector ring wear and concentricity.
3.2.3 Rotor extraction. Do not remove the rotor for cleaning within the compartment and reinstall it afterwards.
3.2.4 Installed prime mover. During drying operations, the installed prime mover (e.g., engine or barring gear) may not be used to spin the rotor while circulating current through the field windings.
Table 1 – Generator Data
| Quantity |
| Characteristics |
| Manufacturer |
| Location |
| 2 |
| 450 kW, 450 VAC, 60 Hz, 3 phase, 1200 RPM, 0.8 power factor |
| Caterpillar |
| Engine Room |
3.3 Utility services. The use of Coast Guard utility services, both afloat and ashore, for performance of this work item is restricted as follows:
3.3.1 Electrical power. Electrical power for temporary tools and equipment used to accomplish this work item shall comply with SFLC Std Spec 0450. When no other power source options are practicable, such loads may be energized from a temporary generator located afloat or ashore in accordance with Appendix E of SFLC Std Spec 0450.
3.3.1.1 Dockside equipment. Power solely for dockside tools and equipment may be taken from the dockside electrical power distribution system in accordance with Appendix A (preferred) of SFLC Std Spec 0450 or from the shipboard electrical power distribution system in accordance with Appendix D of SFLC Std Spec 0450.
3.3.1.2 Shipboard equipment. Power solely for shipboard tools and equipment may be taken from the ship service electrical distribution system in accordance with Appendix B (preferred) of SFLC Std Spec 0450 or from the dockside electrical power distribution system in accordance with Appendix C of SFLC Std Spec 0450. All tools must be inspected by CG personnel prior to use with shipboard distribution system.
3.3.2 Potable water. Hot and cold potable water may be obtained from shipboard systems. Cold potable water may be obtained from dockside connections.
3.3.3 Compressed air. Compressed air for tools and generator hand cleaning may not be taken from the ship service air system. Air that is to be blown into a generator shall be filtered for particulate, water, and oil prior to discharge.
3.4 External heating. External heat must be applied following cleaning to dry out the windings. The heater power rating will vary with the amount of equipment to be dried, degree of enclosure, and amount of ventilation. The estimate in Table 2 below assumes that no heat is lost by radiation or by forced or natural convection; consequently, the input power rating should be increased by a few kilowatts to compensate for heat losses.
3.4.1 Limit heat input so that winding temperatures do not increase more than «dTdt»°F per hour.
3.4.2 Do not exceed a winding temperature of 167°F.
Table 2 – External Heating Data
| Machine Weight (lbs) |
| Heater Power |
| Heatup Rate (°F/h) |
| Temperature Rise (°F) |
| Duration (h) |
| (kW) |
| (BTU/h) |
| 5,651 |
| 3.9 |
| 13,306 |
| 20 |
| 107 |
| 5.4 |
4. NOTES
4.1 Conditional performance. This work item is performed only when warranted by the condition of the generator windings. The mere presence of dust is not sufficient justification to perform this work item.
4.1.1 Note that there is some risk that solutions used during the cleaning process may penetrate through microscopic cracks in the varnish, carrying contaminants deeper into the windings through capillary action. Once so embedded, such contamination cannot be removed and insulation resistance could actually be degraded such that a costly and time consuming rewind would be necessary.
4.1.2 Cleaning is normally only warranted when the windings have been wetted by sea water or insulation resistance trends suggest that the machine will fall below the minimum acceptable insulation resistance for operation before the next depot level availability.
4.2 Shop cleaning. This generator is (rotor only) removable from the vessel without making a hull cut. See CG Drawing 225B-WLB 201-2 for rigging path to weather including any bolted (BERP) or welded (WERP) equipment removal plates that must be removed. For machines that can be removed from the vessel through existing accesses or openings created by other work items, it is generally quicker and more cost effective to offload the affected generator from the vessel and perform the work ashore in a generator repair shop. Such tasking should be performed under “Ship Service Diesel Generator Overhaul” and not this work item.
32123_JSP_0309_225B
WORK ITEM 2: Circuit Breakers (60 Hz), Inspect and Test
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and test circuit breakers (60 Hz) located on the Switchboards.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 225B WLB 320-1, Rev L, Electrical One - Line Diagram
Coast Guard Publications
Coast Guard Technical Publication (TP) 3534A, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2
Coast Guard Technical Publication (TP) 3534B, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2
Other References
National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker
3. REQUIREMENTS
3.1 General. The Contractor shall provide skilled technicians, portable instrument standards and all necessary equipment to inspect and test circuit breakers designated in the work item. The Contractor may remove the Circuit Breakers from the vessel to a shoreside test facility. If this is done the Contractor shall exercise extreme care in transporting and reinstalling the circuit breakers to original operating condition on Switchboard.
3.1.1 Prior to any wiring disconnection and removal of circuit breakers, the Contractor shall record all wiring information, trip setting adjustments, and equipment locations necessary for use in later reinstallation. Retain all mounting and connecting hardware for later reuse. Submit a CFR.
3.1.2 Disconnect and remove the circuit breakers listed in the Table 1,2&3. Coordinate the disconnection and removal of the circuit breakers with the COR to minimize disruption of power. Temporarily cover or insulate switchboard or panel board openings created by the removal of circuit breakers to prevent personnel contact with energized conductors.
3.1.3 The Contractor shall notify the COR 48 Hours prior to start work on this item.
3.2 Inspection requirement. The Contractor shall inspect all circuit breaker wire connectors, screws and plating and submit a CFR.
3.2.1 Surface burn marks and hairline cracks are acceptable but shall not deteriorate the mold surface or impair physical strength. Cracks are not permitted in wall section between phase and a ground plane when there is a conducting part in contact with the wall section. Cracks shall not exceed 0.75 inch in length, and in no case should be greater than 50 percent of the length of the surface in which the crack appears. Submit a CFR.
3.3 Circuit breaker testing. The contractor shall test circuit breakers listed in the Table 1, 2 &3 in accordance with the National Electrical Manufacturers Association (NEMA) AB 4 or UL 489 Molded Case Circuit Breakers. The test shall include, at a minimum:
· Mechanical Operation
· Insulation Resistance
· Individual Pole Resistance
· Inverse-Time Over current Tripping
· Instantaneous Over current Tripping
· Rated Hold-In Current (Note: Perform this test only on the circuit breakers which are tripping under normal load condition. The COR will identify the circuit breakers).
3.3.1 CIR. The Contractor shall submit a CIR for the testing listed in the following paragraph(s):
· 3.3 (Circuit breaker testing).
3.4 Circuit breaker data sheet. The contractor shall provide data sheet of each circuit breaker testing with the following information:
· Circuit Breaker Model and Serial Number
· Circuit Breaker Service
· Circuit Breaker Visual Condition
· Test Voltage/Test Amperes
· Type of Test/Test Method/Test Date/Name of Test Laboratory
· Result of Testing
3.5 Contractor’s option for circuits breaker renewal. The Contractor may elect to renew circuit breakers in lieu of testing (due to high cost of labor for testing or non available near by testing facilities) at no additional cost to the government. Ensure that all circuit breakers shall be UL 489 Certified.
TABLE 1 – circuit breaker list (EMERGENCy SWITCHBOARD)
| quantity |
| DESCRIPTION |
| siemens Part NO |
| service |
| location |
| 1 |
| 800AF, 800 AMP,450 VAC,3 Phase |
| RLAS8EAFXB6D-47 |
| S/S Switchboard/Emergency Switchboard Bus Tie |
| Emergency Switchboard |
| 1 |
| 800AF,800 AT, 450 VAC,3 Phase |
| RLAS8EAFXBA06D-544 |
| Emergency Generator |
| Emergency Switchboard |
| 1 |
| 125AF, 125AT, 450 VAC,3 Phase |
| ED63M1255 |
| MMR Vital Panel (P25) |
| Emergency Switchboard |
| 1 |
| 125AF, 125AT, 450 VAC,3 Phase |
| FD63M080 |
| Port Boat Davit |
| Emergency Switchboard |
| 2 |
| 250AF,250 AMP,450 VAC,3 Phase |
| FXD63M250 |
| MMR Vital Panel (P30) & CP |
| Emergency Switchboard |
| 2 |
| 250AF,200 AMP,450 VAC,3 Phase |
| FXD63M200 |
| Fire Pump No.1 & 2, |
| Emergency Switchboard |
| 2 |
| 125AF, 420 IT, 450 VAC,3 Phase |
| ED63A050 |
| Steering gear No.1& 2 HPU, |
| Emergency Switchboard |
TABLE 2 – circuit breaker list (THRUSTER switchboard)
| quantity |
| DESCRIPTION |
| siemens Part NO |
| service |
| location |
| 1 |
| 2000AF, 1600AT |
| SBA2016 |
| Thruster Generator |
| Thruster Switchboard |
| 1 |
| 1200AF,900AT |
| SBA2012 |
| Stern Thruster |
| Thruster Switchboard |
| 1 |
| 800AF,750AT |
| SBA0808 |
| Bow Thruster |
| Thruster Switchboard |
TABLE 3– circuit breaker LIST (MAIN switchboard)
| quantity |
| DESCRIPTION |
| siemens Part NO |
| service |
| location |
| 1 |
| 1600AF,1200AMP,450 VAC, 3 Phase |
| RLAS1EAHXBA06D-U7 |
| S/S Generator No. 1 |
| Main Switchboard |
| 1 |
| 1600AF,1200AMP,450 VAC, 3 Phase |
| RLAS1EAHXBA06D-KU7 |
| S/S Generator No. 2 |
| Main Switchboard |
| 2 |
| 800AF,400AMP,450 VAC, 3 Phase |
| RLAS8EAEXBA06D-U7 |
| Shore Power No. 1 & 2 |
| Main Switchboard |
| 1 |
| 1600AF,1200AMP,450 VAC,3 Phase |
| RLAS1EAHXBA06D-U7 |
| Bus Tie |
| Main Switchboard |
| 2 |
| 800AF,800AMP,450 VAC,3 Phase |
| RLAS8EAGXBA06D |
| FWD Deck M/C No. 1 & 2 |
| Main Switchboard |
| 1 |
| 400AF,400AMP,450 VAC,3 Phase |
| JXD63M400 |
| S/S Switchboard /Emergency Switchboard Bus Tie |
| Main Switchboard |
| 2 |
| 225AF,225AMP,450 VAC,3 Phase |
| FXD63M225 |
| Aux Power Panel (P36) & SORS HPU |
| Main Switchboard |
| 5 |
| 225AF, 200AMP,450 VAC,3 Phase |
| FXD63M200 |
| Power Panels (P3,P24,P26), Fire Pump No.1 & 2 |
| Main Switchboard |
| 2 |
| 125AF,125AMP,450VAC,3 Phase |
| ED63M125 |
| Power Panel (P25) & Vent Power Panel(P12) |
| Main Switchboard |
| 2 |
| 125AF,100AMP,450 VAC,3 Phase |
| ED63M100 |
| Misc Power Panel, Heater Panels (P1, P4, P22), Aux Power Panel |
| Main Switchboard |
| 5 |
| 250AF,150AMP,450 VAC,3 Phase |
| FXD63M150 |
| Heater Panel (P2 on 120V Panel), Aux Power Panel (P37), MMR Aux Panel(P26) 250AF, 100AT, 450VAC, 3P, Domestic Service Power Panel(P11) |
| Main Switchboard |
| 1 |
| 250AF,250AMP,450 VAC,3 Phase |
| FXD63M250 |
| AMR Vital Panel (P30) |
| Main Switchboard |
| 2 |
| 250AF,100AMP,450 VAC,3 Phase |
| FXD63B100 |
| NO.1 & 2 ATF Deck & RHIB Davit |
| Main Switchboard |
| 2 |
| AFIT, VAC, 3 Phase |
| EMD63125 |
| Steering Pumps 1&2 |
| Main Switchboard |
3.6 Circuit breaker reinstallation. After all testing is complete, reinstall circuit breakers using previously recorded wiring information to its original operating condition and Coast Guard TP 3534.
3.7 Operational test-post repairs. After completion of the work, the Contractor shall witness an operational test (by Coast Guard personnel) of all circuit breakers to prove satisfactory operating condition. Submit a CFR.
3.7.1 Operate each Circuit Breaker “ON” and “OFF” several times to exercise the circuit breaker and ensure that mechanical linkages are free.
3.7.2 Direction of Rotation Test – Perform a direction of rotation test on each new and disturbed three-phase motor circuit.
4. NOTES
This section is not applicable to this work item.
57201_JLW_0409_FLT
REC_57200_FLT_225’ WLB ‘B’ Class (ALL) [tender] (0609) WORK ITEM 3: Commissary Hoist, Level 2 Inspect and Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform various repairs and depot-level maintenance to the commissary hoist system.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 225 WLB 589-2-1
Coast Guard Drawing 225 WLB 589-2-2
Coast Guard Drawing 225 WLB 589-201 Coast Guard Publications
Coast Guard Technical Publication (TP) 3562, Feb 2009, Manufacturer’s Instruction Book, Matot Model 100 -SWBS Group(s) 583-589 Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machinery Systems
Other References
None.
3. REQUIREMENTS
3.1 Special requirements for various components. If a repair task specified in paragraph 3.3 below, or any related subsequent repairs associated with this work item, requires work to be performed on one or more of the special component types listed in the first column of Table 1 below, the Contractor shall perform all work on those components in accordance with the corresponding Appendix and paragraph of SFLC Std Spec 5000 listed in the second column of Table 1 below.
TABLE 1 – Components with special requirements
| Component |
| Appendix & Paragraph |
| Fluids |
| C20.1 |
| Hose assemblies |
| C20.2 |
| Piping and tubing |
| C20.3 |
| Valves and manifolds |
| C20.4 |
| Gages |
| C20.5 |
| Gas charged accumulators |
| C20.6 |
| Heat exchangers and fluid coolers |
| C20.7 |
| Systems |
| C20.8 |
| Fastener assemblies |
| D20.1 |
| Wire rope assemblies |
| D20.2 |
| Brakes and clutches |
| D20.3 |
| Open gearing and gear reducers |
| D20.4 |
3.2 Repairs or other maintenance. The Contractor shall perform the following in accordance TP 3562 SFLC Std Spec 5000_STD. Refer to paragraph 3.2 of SFLC Std Spec 5000 for definitions of task types in quotes (e.g. “Service and Inspect”):
3.3. Perform Various Maintenance Tasks and Pre-Identified Repair Tasks. The Contractor shall perform the tasks below. Submit CFR(s) to document all inspections, to recommend additional repairs, and to document completed maintenance and repair tasks.
3.3.1 Routine maintenance tasks.
· “Service and Inspect” the Commissary Hoist in accordance with SFLC Std Spec 5000. Submit CFR.
· “Filter” the system hydraulic fluid in accordance with paragraph C2.1 of SFLC Std Spec 5000.
· “Sample and test” the system hydraulic fluid in accordance with paragraph C2.1 of SFLC Std Spec 5000.
· Set and tag in place the system valve(s) as designated by the COR in accordance with paragraph C2.4.4 of SFLC Std Spec 5000.
4. NOTES
This section is not applicable to this work item.
58101_0212_FLT
REC_58110_FLT_225' WLB ('B' Class: Hulls 201-205) (1211) WORK ITEM 4: Anchor Chain(s) and Ground Tackle, Inspect and Repair
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspection and repairs the anchor chain assemblies (port and starboard), including associated ground tackle.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement Coast Guard Publications
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures
Other References
Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and Weldless
MIL-DTL-23549, Feb 2007, Grease, General Purpose
MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
· 3.2.3 (Inspections).
3.1.2 Technical Representative.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
· Port and starboard anchors.
3.2 Required work particulars. The Contractor shall use the chain description (see 4.1 (Component characteristics)) and Coast Guard Drawing 225B WLB 581-001 for guidance, for accomplishing the tasks specified below for each anchor chain assembly.
3.2.1 Removal. Disconnect and remove the anchor chain assembly and transport from the vessel to a suitable location, to facilitate the performance of the tasks specified herein.
NOTE
The use of Coast Guard equipment (e.g. anchor windlass) for off-loading and on-loading of anchors and anchor chain is authorized. Coast Guard personnel will operate all Government equipment.
3.2.2 Pre-inspection surface preparation. Prepare all shots of chain to a “Commercial Blast” standard, in accordance with SSPC-SP 6.
3.2.3 Inspections. ,Perform the following inspections (Submit CIR):
3.2.3.1 Visual inspection. Visually inspect the following:
· All swivels, outboard swivel shots, cats paw, pelican hook and shackles.
· Entire length of Shot 1, Shot 2, Shot n-1, and Shot n.
NOTES
1. For the purpose of reference in this item, the shots will be referred to by numbers. Mark each shot with a removable tag. Moving inboard from the anchor, the shots will be referred to as follows: ANCHOR, Shot 1, Shot 2, Shot 3...Shot n-2, Shot n-1, Shot n, and BITTER END. These shot numbers are designated in order as existing prior to work, and will not change - although the shot order itself will change.
2. Number n in the paragraph above is equal to the number of shots per chain.
3.2.3.2 Measurements. Determine the suitability for continued service of the anchor chain assembly, by checking wire diameter dimension and six-link dimension ,using information provided in Table I (Dimensions for Condemning Anchor Chain) as guidance, as applicable; submit a CFR.
TABLE I. DIMENSIONS FOR CONDEMNING ANCHOR CHAIN
SIZE OF CHAIN
(inches)
90 PERCENT OF
LINK DIAMETER(1)
(inches)
SIX-LINK
DIMENSION(2)
(inches)
| 1 |
| 0.90 |
| 26-3/4 |
| 1-1/8 |
| 1.013 |
| 30-1/16 |
| 1-1/4 |
| 1.125 |
| 33-7/16 |
| 1-3/8 |
| 1.238 |
| 36-3/4 |
| 1-1/2 |
| 1.35 |
| 40-1/8 |
| 1-5/8 |
| 1.463 |
| 43-7/16 |
| 1-3/4 |
| 1.575 |
| 46-13/16 |
| 1-7/8 |
| 1.688 |
| 50-1/8 |
| 2 |
| 1.80 |
| 53-1/2 |
| 2-1/8 |
| 1.913 |
| 56-13/16 |
1. Use a micrometer, caliper or GO/NO-GO gage* to check wire diameter dimension. Gage is to be made by Contractor/repair facility in accordance with the dimensions shown in Table 1 above. Check the diameters at right angles to the link. When measuring with a micrometer or caliper take one-half the sum of the two diameters as representing the line diameter.
2. Take six-link measurements with a load applied to the chain in order to take all slack out of the chain. Use a bar gauge to check the six-link dimension. When the gauge will not fit over six links, the chain has been stretched beyond allowable limit. Measure six links for the entire length of each shot, measuring from every third link.
*When using a GO/NO-GO gage, a failed check is to be verified by measuring with a micrometer or caliper. Measure the diameter at right angles and take one-half the sum of the two diameters as representing the link diameter. Take measurements on clean, bare metal.
3.2.4 Reassembly.
3.2.4.1 Reassemble detachable links, swivels and shackles; and repack with molybdenum disulfide grease (MIL-DTL-23549).
3.2.4.2 Change the relative position of the shots, as designated by the Coast Guard Inspector, to distribute the wear on the chain, ensuring that shot shall be rotated end for end upon reinstallation, as follows: ANCHOR, Shot 3... Shot n-2, Shot n-1, Shot n, Shot 1, Shot 2, BITTER END.
NOTE
Detachable link components are not interchangeable.
3.2.4.3 Renew all detachable taper pin and link assemblies and associated link plugs.
3.2.4.4 Renew shackle at bitter end of chain.
3.2.5 Chain renewal. If a Change Request has been authorized and released, renew designated section of chain with material conforming to MIL-C-24633.
3.2.6 Chain coating. Using the coating system specified for “Anchor/Anchor Chain” in SFLC Std Spec 6310, Appendix A, (Cutters and Boats Exterior Painting Systems), do the following:
3.2.6.1 Coat the following shots:
Shot n-1 Black (17038).
Shot n
Black (17038).
Shot 1
Yellow (13538)
Shot 2
Red (11105).
3.2.6.2 Coat and wire (CRES wire) all detachable links (red, white, and blue), adjacent chain links, shackles, and swivels in accordance with Attached Figure “Painting and Markings On Mooring Chain”, using the , and SFLC Std Spec 6310. Remove all existing CRES wire prior to the installation of new markings.
3.2.7 Chain restowing. When directed by the Coast Guard Inspector, reassemble the anchor and anchor chain; restow the anchor chain in its chain locker, free for running, with the anchor properly hawsed and secured with the chain stopper set. Ensure that (1) the bitter ends of the chain are securely fastened in the chain locker with new bitter end shackles, conforming to Fed Spec RR-C-271, Type IV-A, Class 3, Grade A; (2) the ground tackle is kept ready for use, (3) nothing interferes with a readiness to veer or slip the anchors, (4) the detachable links located just inboard of the riding stopper and the detachable link tool set are readily accessible for use in slipping the anchor chains in an emergency, and (5) the anchor has a crown buoy attached, with sufficient length of rope to facilitate indicate the depths of water in which moored. In addition, do the following:
· Lead the bitter ends down and through the deck bolts in the chain locker and secure to the chain locker pad eye.
· Back out the chains to ensure the chain stopper is set properly.
3.3 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the anchor chain assembly to prove satisfactory operating condition, by releasing the chain stoppers and lower both anchors under power to the drydock floor (or waterline, as applicable),…