OAK_(WLB_225B)_DS_Specification_JAD_13R0.doc

DOC document 608 KB Posted

Attached to
USCGC OAK DOCKSIDE REPAIRS Federal contract opportunity
Solicitation number
HSCG85-14-Q-P45386
Issued by
Department of Homeland Security US Coast Guard

About this file

CGC Oak DS Specification

View the file

Other files for this federal contract opportunity

Other files attached to USCGC OAK DOCKSIDE REPAIRS, newest first.
File Type Posted
Amendment_4_SF30.docx DOCX document
OAK_(WLB_225B)_DS_JAD_13R1.docx DOCX document
Amendment_3_SF30.docx DOCX document
Amendment_2_SF30.docx DOCX document
Amendment_1_SF30.docx DOCX document
SOLCITATION_FOR_CGC_OAK_DS.docx DOCX document
SOLCITATION_FOR_CGC_OAK_DS.docx DOCX document
GOVERNMENT_PROPERTY_REPORT_SF_1149 1 .docx DOCX document
Past_Performance_Questionnaire 1 .docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USCGC OAK (WLB 211)

225 FOOT "B CLASS" SEAGOING BUOY TENDER

SPECIFICATION FOR DOCKSIDE REPAIRS

FY2013

Developed By: Jarrod A. Deir (Rev-0, 18 November 2013)

TABLE OF CONTENTS

iiiRevisions Record ivConsolidated List of References viiConsolidated List of Government-furnished Property viiiConsolidated List of Critical Inspection Items ixPrincipal Characteristics

1General Requirements

10WORK ITEM 1: Both Ship Service Diesel Generators, Clean & Inspect

13WORK ITEM 2: Circuit Breakers (60 Hz), Inspect and Test

17WORK ITEM 3: Commissary Hoist, Level 2 Inspect and Repair

19WORK ITEM 4: Anchor Chain(s) and Ground Tackle, Inspect and Repair

25WORK ITEM 5: Warping Capstan, Level 2 Inspect and Repair

28WORK ITEM 6: Single Point Davit - Slewing Arm, Level 2 Inspect and Repair

32WORK ITEM 7: Potable Water Pneumatic Tanks, Clean and Inspect

35WORK ITEM 8: Anchor Chain and Ground Tackle, Preserve (OPTION)

39WORK ITEM 9: Anchor(s), Preserve (OPTION)

41WORK ITEM 10: Thruster Generator Clean & Inspect

44WORK ITEM 11: Ventilation Systems, Overhaul

47WORK ITEM 12: Reverse Osmosis Desalination Plant, Renew

51WORK ITEM 13: Miscellaneous Tanks Vent Piping, Renew

Revisions Record This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.

DATE
REV#
WORK ITEM#
CHANGES MADE

NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.

Consolidated List of References

The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution.

All Coast Guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – as follows:

· MIL/DOD/CID Specifications: http://www.assistdocs.com/search/search_basic.cfm

· Commandant Instruction Manuals: http://www.uscg.mil/directives/default.asp

· Public Laws, Code of Federal Regulations, U.S Codes, and other Federal Government laws:: www.gpoaccess.gov The Government is aware of the following internet web links where contractors may procure commercial specifications:

· American Welding Society (AWS): http://www.awspubs.com/index.php

· ANSI, ASTM, IEEEE, NFPA, ASME, SAE Standards: http://www.techstreet.com/

· NFPA: http://www.nfpa.org

· SSPC Standards and pictorial guides: http://shopping.netsuite.com/sspcmarketplace

COAST GUARD DRAWINGS

Coast Guard Drawing 225 WLB 589-201

Coast Guard Drawing 225 WLB 589-2-1

Coast Guard Drawing 225 WLB 589-2-2

Coast Guard Drawing 225B WLB 320-1, Rev L, Electrical One - Line Diagram

Coast Guard Drawing 225B WLB 532-002, Rev D, Potable Water Sys Dia

Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement

Coast Guard Drawing 225B-WLB 512-1, Rev K, HVAC Diagram

Coast Guard Drawing 225B-WLB 512-2, Rev C, Ventilation Schedule

Coast Guard Drawing 225B-WLB 512-4, Rev D, HVAC a&D FR 12-30, Hull Block 910

Coast Guard Drawing 225B-WLB 512-8, Rev -, HVAC a & D FR 92 Thru FR 910 1st Plat & Mn Dk Hull Block 950

Coast Guard Drawing 225B-WLB 201-2, Rev C, Access Removal Routes

Coast Guard Drawing 225B-WLB 505-1, Rev -, General Requirements for Piping Systems

Coast Guard Drawing 225B-WLB 506-1, Rev -, Overflows, Air Escapes & Sndg Tubes Diagram

Coast Guard Drawing 225B-WLB 506-5 , Rev D, Vent & St System A/D, FR 48-66 Block 930

Coast Guard Drawing 225B-WLB 506-7, Rev D, Ovfl, AE & St Sys A/D Mn Dk & Above Block 960A, 970

Coast Guard Drawing 225B-WLB 507-1, Rev C, Operating Instructions & Label Plates, Piping Systems

Coast Guard Drawing 225-WLB_180_2, E, FOUNDATIONS HULL BLOCK 910

Coast Guard Drawing 225-WLB_601_2, H, BOOKLET OF GENERAL DRAWINGS

NAVSEA Dwg 803-1385866, Rev E, Penetrations; Bulkhead and Deck

COAST GUARD PUBLICATIONS

Coast Guard Technical Publication (TP) 3534A, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2

Coast Guard Technical Publication (TP) 3534B, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2

Coast Guard Technical Publication (TP) 3537B, Manufacturer's Instruction Book – SWBS Group(s) 310

Coast Guard Technical Publication (TP) 3550, MANUFACTURER'S INSTRUCTION BOOK-SWBS GROUP(S) 521-531

Coast Guard Technical Publication (TP) 3556, Manufacturer's Instruction Book – SWBS Group(s) 568

Coast Guard Technical Publication (TP) 3559, Section 582B, Apr 2009, Aft Capstan, 21” - Model BMD-475

Coast Guard Technical Publication (TP) 3562, Feb 2009, Manufacturer’s Instruction Book, Matot Model 100 -SWBS Group(s) 583-589

Coast Guard Technical Publication (TP) 3562, Feb 209, Manufacturer's Instruction Book SWBS Groups 583-589, Section A, Davit, RHIB P/S – Model RAD30-15.5

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0000, 2012, General Requirements

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0450, 2012, Electrical Power for Contractor’s Tools & Equipment

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0740, 2012, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3100, 2012, Inspect, Test and Recondition AC Synchronous Machines In-Place

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5000, 2012, Auxiliary Machinery Systems

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 5100, 2012, Clean Shipboard Ventilation Systems

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 6310, 2012, Requirements for Preservation of Ship Structures

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 8636, 2012, Temporary Hull Accesses

OTHER REFERENCES

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities

American Society of Mechanical Engineers (ASME) B16.25, 2012, Buttwelding Ends

American Society of Mechanical Engineers (ASME) B16.5, 2013, Pipe Flanges & Flanged Fittings: NPS 1/2 Through NPS 24 Metric/Inch Standard

American Society of Mechanical Engineers (ASME) B16.9, 2012, Factory-Made Wrought Buttwelding Fittings

ASTM International (ASTM) A106, 2011, Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service

ASTM International (ASTM) A181, 2013, Standard Specification for Carbon Steel Forgings, For General-Purpose Piping

ASTM International (ASTM) A234, 2011, Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service

ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel

Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters

Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency

Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation

Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting

Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and Weldless

Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement

MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded

MIL-DTL-23549, Feb 2007, Grease, General Purpose

National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning

The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning

Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker

Consolidated List of Government-furnished Property

The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.

WORK ITEM
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST

($/Unit)

6
N
Swing Brake Seal Kit
PN: YMD-6644 (Eskridge, Inc)
2 ea
1,875.00
6
N
Swing Brake Disc & Bearing Kit
NSN 3010-01-464-1040
2 ea.
178.00
6
N
Counterbalance Valve
PN: YMD-3763 (Eskridge, Inc)
1 ea.
700.00
6
N
Shuttle Valve
PN: YMD-1288 (Eskridge, Inc)
1 ea.
35.00
12
Y
Reverse Osmosis Unit
Village Marine Type PW 2/2000 R/O Unit
1 ea.

*Government-loaned property, which shall be returned to the vessel upon completion of the availability.

**New or refurbished equipment that the Government may provide for installation in place of existing equipment.

***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter

Consolidated List of Critical Inspection Items The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):

Work Item
Title
2
Circuit Breakers (60 Hz), Inspect and Test
4
Anchor Chain(s) and Ground Tackle, Inspect and Repair
5
Warping Capstan, Level 2 Inspect and Repair
6
Single Point Davit - Slewing Arm, Level 2 Inspect and Repair
12
Reverse Osmosis Desalination Plant, Renew

PC_225B_WLB_1109

Principal Characteristics

225' WLB (B-CLASS)

Physical Characteristics

Length Overall
225' 0"
Length between Perpendiculars
206' 0"
Maximum Beam
46'
Designed Draft
13' 0"
Full Load Displacement
1905.6 Long Tons SW
Light Ship Displacement
1500.7 Long Tons SW
Minimum Operating Displacement
1869.2 Long Tons SW
Mast Height (Above 12' Waterline)
67' 5"
Anchor
Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-3/8 die lock chain

Hull Characteristics

Bilge Keels (Port & Starboard)
Frames 42-79

Frame Spacing

FR 0 to 12
21"
FR 12 to 30
22"
FR 30 to 102
24"

Machinery Characteristics

Main Propulsion
Diesel Reduction
Diesel Engines
Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of Propellers
1
Number of Blades
4
Diameter
10'
Pitch
Controllable
RPM
254
Ship's Service Diesel Generators
Two Caterpillar 3508 TA, 450 kW
Emergency Diesel Generator
One Caterpillar 3406 DITA, 280 kW
Shore Tie
Two 450 VAC, 400 Amp, 3-wire
Shaft Bearing, Forward
Cooper Bearing 01-BCP-1400-EX-TL
Shaft Bearing, Aft
Water Lubricated Cutless Bearing

Tank CAPACITIES

Diesel Oil
76,498 gal
Fresh Water Capacity
8056 gal
Hydraulic Oil Capacity
2785 gal
Lube Oil Storage
764 gal
Grey Water Tank
2700 gal
Sewage Holding Tank
1700 gal

00000_PWB_0312_FLT

REC_0000_FLT_ Commercial Project @ CG Facility (0212) General Requirements

1. SCOPE

1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.

2. REFERENCES

Coast Guard Drawings

None.

Coast Guard Publications

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2012, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2012, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures

Other References

ASTM International (ASTM) D4417, 2003, Standard Test Methods for Field Measurement of Surface Profile of Blast Cleaned Steel

Commercial Item Description (CID) A-A-59316, Nov 2003, Abrasive Materials for Blasting

Federal Standard (FED-STD) 595, 2008, Colors Used In Government Procurement

MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning

NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), May 1997, Requirements for Fabrication, Welding, and Inspection of Submarine Structure

The Society for Protective Coatings (SSPC) VIS 1, 2004, Guide and Reference Photographs for Steel Surfaces Prepared by Dry Abrasive Blast Cleaning Code of Federal Regulations (CFR) Title 33 CFR, 2008, Navigation and Navigable Waters Code of Federal Regulations (CFR) Title 40, Chapter I, 2008, Environmental Protection Agency

Code of Federal Regulations (CFR) Title 49, Chapter I, 2008, Pipeline and Hazardous Materials Safety Administration, Department Of Transportation

3. REQUIREMENTS

3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.

NOTE

The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.

3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:

· Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.

· Provide fire watch personnel and fire extinguishers for the duration of the availability period, beyond noted Coast Guard fire watch support.

3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.

3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).

3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with SFLC Std Spec 6310, Chapter 11 (Cutter and Boat Colors Exterior and Interior).

NOTE

Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes are strictly prohibited.

3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.

NOTE

NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding Weldox 900 shall be considered the same as those for welding HY-130

3.5 HW disposal. The Contractor shall be responsible for all hazardous wastes generated by work under this contract. Label and package all hazardous wastes in 49 CFR-approved containers, and in accordance with all other applicable Federal, state, and local laws and regulations. In addition, comply with applicable parts of 40 CFR 262, applicable to handling of hazardous wastes.

3.5.1 Along with the Government, the Contractor shall be contractually considered the co-generator of all hazardous wastes; be aware that the Government will make available its facility’s EPA Generator Identification (ID) Number for manifesting of hazardous wastes.

3.5.2 The Contractor shall identify, arrange, and be responsible for the turnover of all hazardous wastes, within the confines of the Coast Guard shore facility, to the facility’s HM/HW Coordinator. Notify the ship’s HW Coordinator prior to any transfers of HW from ship to shore.

3.5.3 The Contractor shall prepare a manifest of hazardous waste to be reviewed and signed by the HM/HW Coordinator. Contact the HM/HW Coordinator for turnover of any hazardous waste; in addition, notify the COR in writing 24 hours prior to any waste removals, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).

3.5.4 The Contractor shall be aware of the following:

3.5.4.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast Guard facility without COR or KO-approval.

3.5.4.2 Local environmental regulations at the Government facilities may be more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with local and state regulations.

3.5.4.3 Coast Guard facilities do not have Facilities Response Plans (see 33 CFR 154 Subpart F). It is the Contractor’s responsibility to furnish the Facility Response Plan (FRP) when required for over-the-water liquids transfers to and from vessels. This requirement is applicable to transfers to/from vessels with an oil/fuel capacity of 250 barrels or more.

3.6 SFLC Standard Specification Approved Changes. The Contractor shall be aware that the following are approved changes to published SFLC 2012 Edition Standard Specifications and supersede published content:

3.6.1 SFLC Std Spec 8634, Drydocking, Appendix A, page A5, paragraph A2.7.1.3 Side Blocks. Remove formula value shown as g – Acceleration of gravity – 32.3 Ft/sec2, and replace with formula value g - Acceleration of gravity - 32.174 ft/sec2.

4. NOTES

4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 0000 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.

QA-1 - QUALITY ASSURANCE INSPECTION FORM

(PRESERVATION CHECKLIST)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

CHECKPOINT 1 – COATING SYSTEM COMPLIANCE

Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.

CHECKPOINT 2 - PAINT STORAGE

Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.

CHECKPOINT 3 - AMBIENT CONDITIONS

Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).

Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).

Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.

CHECKPOINT 4 - PRE-SURFACE PREPARATION

Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.

Verify equipment setup, blast media, and surface preparation methods match designated test coupon.

CHECKPOINT 5 - SURFACE PREPARATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10…).

Verify surface anchor profile using ASTM D4417-Methods B or C against COMDTINST M10360.3. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.

Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).

CHECKPOINT 6 - PRIMER COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Verify proper mixing and stand-in (induction) times.

Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.

Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).

Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.

Brush out all runs, sags, drips, and puddles.

Perform visual inspection for holidays and other defects.

CHECKPOINT 7 – STRIPE COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).

CHECKPOINT 8 – TOP COAT APPLICATION

Verify environmental conditions (see CHECKPOINT 3).

Ensure overcoating window is as per manufacturer’s instructions.

Verify proper mixing and stand-in (induction) times, as applicable.

Verify wet film thickness at random, to prevent under or over application.

Brush out all runs, sags, drips, and puddles.

CHECKPOINT 9 – FINAL INSPECTION

Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.

Ensure that system cure is in accordance with manufacturer's recommendation for intended service.

Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.

For immersion coatings (including tank U/W body), record date and time of the following events:

Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____

CHECKPOINT 10 – RECORD KEEPING

Complete, sign, and submit all provided QA Inspection Forms.

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-2 - QUALITY ASSURANCE INSPECTION FORM

(ENVIRONMENTAL READINGS)

Vessel Name
Hull #
Work Item #
Work Item Title

Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.

DATE & TIME
ACTIVITY (Surface preparation, primer coat, barrier coat, top coat, etc…)
LOCATION (Frame & Deck, relation to equipment, etc.)
TEMPERATURE
% REL. HUMID-ITY
DEW PT.
SURFACE
AMBIENT
ΔT

| DP - Surface |

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3a - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (Frame References)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils Place Surface Profile Replica Tape Here

Reading:__________ mils

Mean Mil Reading (IAW ASTM D4417-Method C) for above 15 readings: ______________

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-3b - QUALITY ASSURANCE INSPECTION FORM

(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)
SURFACE PREPARATION METHOD
PROFILE ACHIEVED (mils)
Min
Max
Mean

SSPC-SP-10/NACE No. 2

SSPC-SP-12/NACE No. 5

SSPC-SP-3

SSPC-SP-11

SSPC-SP-11 (inaccessible area)

Brush-blasting (non-metallic substrate)

Abrasive Manufacturer and Sieve Size: _________________________________

Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.

Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Reading:
_____ mils
_____ mils
_____ mils
_____ mils
_____ mils

Mean Mil Reading (IAW ASTM D4417-Method B) for above 10 readings (by column):

_____ mils
_____ mils
_____ mils
_____ mils
_____ mils
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-4 - QUALITY ASSURANCE INSPECTION FORM

(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)

Vessel Name
Hull #
Work Item #
Work Item Title
Location of Work (incl. frame #’s)
Area (sqft)

SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15

DATE
TEST LOCATIONS
CONDUCTIVITY

(microsiemens/cm)

Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

QA-5 - QUALITY ASSURANCE DATA FORM

(COATING THICKNESS)

(Use one sheet for each sequence)

Vessel Name
Hull #
Work Item #
Work Item Title
Coating Mfg
Product Name
Batch #
Induction Time
Coating System Sequence (Primer/Touchup/3rd Coat, etc.)

Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2

SPOT
1
2
3
4
5
AVERAGE VALUE

*BASE METAL READING (BMR)

*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.

Location (Frame Reference): ___________________

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

SPOT
1
2
3
4
5
Overall Avg. DFT
ADJUSTMENTS
Avg. BMR
Deviation
Before Adjustments
After Adjustments

Avg.

Application Method (Airless, Conventional Spray, Rolled)
Average DFT
Name of QP-1/NACE Inspector
Signature
Cert. #
Date / Time

31120_WJW_0610_FLT

REC_31120_FLT_225’ WLB

B Class(1111)

WORK ITEM 1: Both Ship Service Diesel Generators, Clean & Inspect

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect, recondition, and test in place the windings of each Ship Service Diesel Generator.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 225B-WLB 201-2, Rev C, Access Removal Routes Coast Guard Publications

Coast Guard Technical Publication (TP) 3537B, Manufacturer's Instruction Book – SWBS Group(s) 310 Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 0450, 2012, Electrical Power for Contractor’s Tools & Equipment

Surface Forces Logistics Center Standard Specification (SFLC Std Spec) 3100, 2012, Inspect, Test and Recondition AC Synchronous Machines In-Place

Other References

None.

3. REQUIREMENTS

3.1 General. Inspect, recondition, and test in place the windings of No. 1 and No. 2 Ship Service Diesel Generators in accordance with SFLC Std Spec 3100. Generator data is shown in Table 1 below.

3.2 Optional work. Perform the optional work sections of SFLC Std Spec 3100 as follows:

3.2.1 Bearing wear. Do not measure and record bearing wear.

3.2.2 Collector rings. Do not measure and record collector ring wear and concentricity.

3.2.3 Rotor extraction. Do not remove the rotor for cleaning within the compartment and reinstall it afterwards.

3.2.4 Installed prime mover. During drying operations, the installed prime mover (e.g., engine or barring gear) may not be used to spin the rotor while circulating current through the field windings.

Table 1 – Generator Data

Quantity
Characteristics
Manufacturer
Location
2
450 kW, 450 VAC, 60 Hz, 3 phase, 1200 RPM, 0.8 power factor
Caterpillar
Engine Room

3.3 Utility services. The use of Coast Guard utility services, both afloat and ashore, for performance of this work item is restricted as follows:

3.3.1 Electrical power. Electrical power for temporary tools and equipment used to accomplish this work item shall comply with SFLC Std Spec 0450. When no other power source options are practicable, such loads may be energized from a temporary generator located afloat or ashore in accordance with Appendix E of SFLC Std Spec 0450.

3.3.1.1 Dockside equipment. Power solely for dockside tools and equipment may be taken from the dockside electrical power distribution system in accordance with Appendix A (preferred) of SFLC Std Spec 0450 or from the shipboard electrical power distribution system in accordance with Appendix D of SFLC Std Spec 0450.

3.3.1.2 Shipboard equipment. Power solely for shipboard tools and equipment may be taken from the ship service electrical distribution system in accordance with Appendix B (preferred) of SFLC Std Spec 0450 or from the dockside electrical power distribution system in accordance with Appendix C of SFLC Std Spec 0450. All tools must be inspected by CG personnel prior to use with shipboard distribution system.

3.3.2 Potable water. Hot and cold potable water may be obtained from shipboard systems. Cold potable water may be obtained from dockside connections.

3.3.3 Compressed air. Compressed air for tools and generator hand cleaning may not be taken from the ship service air system. Air that is to be blown into a generator shall be filtered for particulate, water, and oil prior to discharge.

3.4 External heating. External heat must be applied following cleaning to dry out the windings. The heater power rating will vary with the amount of equipment to be dried, degree of enclosure, and amount of ventilation. The estimate in Table 2 below assumes that no heat is lost by radiation or by forced or natural convection; consequently, the input power rating should be increased by a few kilowatts to compensate for heat losses.

3.4.1 Limit heat input so that winding temperatures do not increase more than «dTdt»°F per hour.

3.4.2 Do not exceed a winding temperature of 167°F.

Table 2 – External Heating Data

Machine Weight (lbs)
Heater Power
Heatup Rate (°F/h)
Temperature Rise (°F)
Duration (h)
(kW)
(BTU/h)
5,651
3.9
13,306
20
107
5.4

4. NOTES

4.1 Conditional performance. This work item is performed only when warranted by the condition of the generator windings. The mere presence of dust is not sufficient justification to perform this work item.

4.1.1 Note that there is some risk that solutions used during the cleaning process may penetrate through microscopic cracks in the varnish, carrying contaminants deeper into the windings through capillary action. Once so embedded, such contamination cannot be removed and insulation resistance could actually be degraded such that a costly and time consuming rewind would be necessary.

4.1.2 Cleaning is normally only warranted when the windings have been wetted by sea water or insulation resistance trends suggest that the machine will fall below the minimum acceptable insulation resistance for operation before the next depot level availability.

4.2 Shop cleaning. This generator is (rotor only) removable from the vessel without making a hull cut. See CG Drawing 225B-WLB 201-2 for rigging path to weather including any bolted (BERP) or welded (WERP) equipment removal plates that must be removed. For machines that can be removed from the vessel through existing accesses or openings created by other work items, it is generally quicker and more cost effective to offload the affected generator from the vessel and perform the work ashore in a generator repair shop. Such tasking should be performed under “Ship Service Diesel Generator Overhaul” and not this work item.

32123_JSP_0309_225B

WORK ITEM 2: Circuit Breakers (60 Hz), Inspect and Test

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to inspect and test circuit breakers (60 Hz) located on the Switchboards.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 225B WLB 320-1, Rev L, Electrical One - Line Diagram

Coast Guard Publications

Coast Guard Technical Publication (TP) 3534A, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2

Coast Guard Technical Publication (TP) 3534B, 07-JAN-97, Switchboards, Ship Service and Emergency Diesel Generator - Model D2

Other References

National Electrical Manufacturers Association (NEMA) Stds, Pub. No. AB4, 2003, Guidelines for Inspection and Preventive Maintenance of Molded Case Circuit Breakers Used in Commercial and Industrial Applications Underwriters Laboratories Inc. (UL) 489, May 2002, Molded Case Circuit Breaker

3. REQUIREMENTS

3.1 General. The Contractor shall provide skilled technicians, portable instrument standards and all necessary equipment to inspect and test circuit breakers designated in the work item. The Contractor may remove the Circuit Breakers from the vessel to a shoreside test facility. If this is done the Contractor shall exercise extreme care in transporting and reinstalling the circuit breakers to original operating condition on Switchboard.

3.1.1 Prior to any wiring disconnection and removal of circuit breakers, the Contractor shall record all wiring information, trip setting adjustments, and equipment locations necessary for use in later reinstallation. Retain all mounting and connecting hardware for later reuse. Submit a CFR.

3.1.2 Disconnect and remove the circuit breakers listed in the Table 1,2&3. Coordinate the disconnection and removal of the circuit breakers with the COR to minimize disruption of power. Temporarily cover or insulate switchboard or panel board openings created by the removal of circuit breakers to prevent personnel contact with energized conductors.

3.1.3 The Contractor shall notify the COR 48 Hours prior to start work on this item.

3.2 Inspection requirement. The Contractor shall inspect all circuit breaker wire connectors, screws and plating and submit a CFR.

3.2.1 Surface burn marks and hairline cracks are acceptable but shall not deteriorate the mold surface or impair physical strength. Cracks are not permitted in wall section between phase and a ground plane when there is a conducting part in contact with the wall section. Cracks shall not exceed 0.75 inch in length, and in no case should be greater than 50 percent of the length of the surface in which the crack appears. Submit a CFR.

3.3 Circuit breaker testing. The contractor shall test circuit breakers listed in the Table 1, 2 &3 in accordance with the National Electrical Manufacturers Association (NEMA) AB 4 or UL 489 Molded Case Circuit Breakers. The test shall include, at a minimum:

· Mechanical Operation

· Insulation Resistance

· Individual Pole Resistance

· Inverse-Time Over current Tripping

· Instantaneous Over current Tripping

· Rated Hold-In Current (Note: Perform this test only on the circuit breakers which are tripping under normal load condition. The COR will identify the circuit breakers).

3.3.1 CIR. The Contractor shall submit a CIR for the testing listed in the following paragraph(s):

· 3.3 (Circuit breaker testing).

3.4 Circuit breaker data sheet. The contractor shall provide data sheet of each circuit breaker testing with the following information:

· Circuit Breaker Model and Serial Number

· Circuit Breaker Service

· Circuit Breaker Visual Condition

· Test Voltage/Test Amperes

· Type of Test/Test Method/Test Date/Name of Test Laboratory

· Result of Testing

3.5 Contractor’s option for circuits breaker renewal. The Contractor may elect to renew circuit breakers in lieu of testing (due to high cost of labor for testing or non available near by testing facilities) at no additional cost to the government. Ensure that all circuit breakers shall be UL 489 Certified.

TABLE 1 – circuit breaker list (EMERGENCy SWITCHBOARD)

quantity
DESCRIPTION
siemens Part NO
service
location
1
800AF, 800 AMP,450 VAC,3 Phase
RLAS8EAFXB6D-47
S/S Switchboard/Emergency Switchboard Bus Tie
Emergency Switchboard
1
800AF,800 AT, 450 VAC,3 Phase
RLAS8EAFXBA06D-544
Emergency Generator
Emergency Switchboard
1
125AF, 125AT, 450 VAC,3 Phase
ED63M1255
MMR Vital Panel (P25)
Emergency Switchboard
1
125AF, 125AT, 450 VAC,3 Phase
FD63M080
Port Boat Davit
Emergency Switchboard
2
250AF,250 AMP,450 VAC,3 Phase
FXD63M250
MMR Vital Panel (P30) & CP
Emergency Switchboard
2
250AF,200 AMP,450 VAC,3 Phase
FXD63M200
Fire Pump No.1 & 2,
Emergency Switchboard
2
125AF, 420 IT, 450 VAC,3 Phase
ED63A050
Steering gear No.1& 2 HPU,
Emergency Switchboard

TABLE 2 – circuit breaker list (THRUSTER switchboard)

quantity
DESCRIPTION
siemens Part NO
service
location
1
2000AF, 1600AT
SBA2016
Thruster Generator
Thruster Switchboard
1
1200AF,900AT
SBA2012
Stern Thruster
Thruster Switchboard
1
800AF,750AT
SBA0808
Bow Thruster
Thruster Switchboard

TABLE 3– circuit breaker LIST (MAIN switchboard)

quantity
DESCRIPTION
siemens Part NO
service
location
1
1600AF,1200AMP,450 VAC, 3 Phase
RLAS1EAHXBA06D-U7
S/S Generator No. 1
Main Switchboard
1
1600AF,1200AMP,450 VAC, 3 Phase
RLAS1EAHXBA06D-KU7
S/S Generator No. 2
Main Switchboard
2
800AF,400AMP,450 VAC, 3 Phase
RLAS8EAEXBA06D-U7
Shore Power No. 1 & 2
Main Switchboard
1
1600AF,1200AMP,450 VAC,3 Phase
RLAS1EAHXBA06D-U7
Bus Tie
Main Switchboard
2
800AF,800AMP,450 VAC,3 Phase
RLAS8EAGXBA06D
FWD Deck M/C No. 1 & 2
Main Switchboard
1
400AF,400AMP,450 VAC,3 Phase
JXD63M400
S/S Switchboard /Emergency Switchboard Bus Tie
Main Switchboard
2
225AF,225AMP,450 VAC,3 Phase
FXD63M225
Aux Power Panel (P36) & SORS HPU
Main Switchboard
5
225AF, 200AMP,450 VAC,3 Phase
FXD63M200
Power Panels (P3,P24,P26), Fire Pump No.1 & 2
Main Switchboard
2
125AF,125AMP,450VAC,3 Phase
ED63M125
Power Panel (P25) & Vent Power Panel(P12)
Main Switchboard
2
125AF,100AMP,450 VAC,3 Phase
ED63M100
Misc Power Panel, Heater Panels (P1, P4, P22), Aux Power Panel
Main Switchboard
5
250AF,150AMP,450 VAC,3 Phase
FXD63M150
Heater Panel (P2 on 120V Panel), Aux Power Panel (P37), MMR Aux Panel(P26) 250AF, 100AT, 450VAC, 3P, Domestic Service Power Panel(P11)
Main Switchboard
1
250AF,250AMP,450 VAC,3 Phase
FXD63M250
AMR Vital Panel (P30)
Main Switchboard
2
250AF,100AMP,450 VAC,3 Phase
FXD63B100
NO.1 & 2 ATF Deck & RHIB Davit
Main Switchboard
2
AFIT, VAC, 3 Phase
EMD63125
Steering Pumps 1&2
Main Switchboard

3.6 Circuit breaker reinstallation. After all testing is complete, reinstall circuit breakers using previously recorded wiring information to its original operating condition and Coast Guard TP 3534.

3.7 Operational test-post repairs. After completion of the work, the Contractor shall witness an operational test (by Coast Guard personnel) of all circuit breakers to prove satisfactory operating condition. Submit a CFR.

3.7.1 Operate each Circuit Breaker “ON” and “OFF” several times to exercise the circuit breaker and ensure that mechanical linkages are free.

3.7.2 Direction of Rotation Test – Perform a direction of rotation test on each new and disturbed three-phase motor circuit.

4. NOTES

This section is not applicable to this work item.

57201_JLW_0409_FLT

REC_57200_FLT_225’ WLB ‘B’ Class (ALL) [tender] (0609) WORK ITEM 3: Commissary Hoist, Level 2 Inspect and Repair

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform various repairs and depot-level maintenance to the commissary hoist system.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 225 WLB 589-2-1

Coast Guard Drawing 225 WLB 589-2-2

Coast Guard Drawing 225 WLB 589-201 Coast Guard Publications

Coast Guard Technical Publication (TP) 3562, Feb 2009, Manufacturer’s Instruction Book, Matot Model 100 -SWBS Group(s) 583-589 Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2012, Auxiliary Machinery Systems

Other References

None.

3. REQUIREMENTS

3.1 Special requirements for various components. If a repair task specified in paragraph 3.3 below, or any related subsequent repairs associated with this work item, requires work to be performed on one or more of the special component types listed in the first column of Table 1 below, the Contractor shall perform all work on those components in accordance with the corresponding Appendix and paragraph of SFLC Std Spec 5000 listed in the second column of Table 1 below.

TABLE 1 – Components with special requirements

Component
Appendix & Paragraph
Fluids
C20.1
Hose assemblies
C20.2
Piping and tubing
C20.3
Valves and manifolds
C20.4
Gages
C20.5
Gas charged accumulators
C20.6
Heat exchangers and fluid coolers
C20.7
Systems
C20.8
Fastener assemblies
D20.1
Wire rope assemblies
D20.2
Brakes and clutches
D20.3
Open gearing and gear reducers
D20.4

3.2 Repairs or other maintenance. The Contractor shall perform the following in accordance TP 3562 SFLC Std Spec 5000_STD. Refer to paragraph 3.2 of SFLC Std Spec 5000 for definitions of task types in quotes (e.g. “Service and Inspect”):

3.3. Perform Various Maintenance Tasks and Pre-Identified Repair Tasks. The Contractor shall perform the tasks below. Submit CFR(s) to document all inspections, to recommend additional repairs, and to document completed maintenance and repair tasks.

3.3.1 Routine maintenance tasks.

· “Service and Inspect” the Commissary Hoist in accordance with SFLC Std Spec 5000. Submit CFR.

· “Filter” the system hydraulic fluid in accordance with paragraph C2.1 of SFLC Std Spec 5000.

· “Sample and test” the system hydraulic fluid in accordance with paragraph C2.1 of SFLC Std Spec 5000.

· Set and tag in place the system valve(s) as designated by the COR in accordance with paragraph C2.4.4 of SFLC Std Spec 5000.

4. NOTES

This section is not applicable to this work item.

58101_0212_FLT

REC_58110_FLT_225' WLB ('B' Class: Hulls 201-205) (1211) WORK ITEM 4: Anchor Chain(s) and Ground Tackle, Inspect and Repair

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to perform inspection and repairs the anchor chain assemblies (port and starboard), including associated ground tackle.

1.2 Government-furnished property.

None.

2. REFERENCES

Coast Guard Drawings

Coast Guard Drawing 225B WLB 581-001 Rev C, Anchor Handling System Arrangement Coast Guard Publications

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2012, Requirements for Preservation of Ship Structures

Other References

Federal Specification (Fed Spec) RR-C-271, Nov 1995, Chain and Attachments, Welded and Weldless

MIL-DTL-23549, Feb 2007, Grease, General Purpose

MIL-C-24633, Apr 1998, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded

The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 1 (SSPC-SP 1), 2004, Solvent Cleaning

3. REQUIREMENTS

3.1 General.

3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):

· 3.2.3 (Inspections).

3.1.2 Technical Representative.

Not applicable.

3.1.3 Protective measures. The Contractor shall furnish and install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:

· Port and starboard anchors.

3.2 Required work particulars. The Contractor shall use the chain description (see 4.1 (Component characteristics)) and Coast Guard Drawing 225B WLB 581-001 for guidance, for accomplishing the tasks specified below for each anchor chain assembly.

3.2.1 Removal. Disconnect and remove the anchor chain assembly and transport from the vessel to a suitable location, to facilitate the performance of the tasks specified herein.

NOTE

The use of Coast Guard equipment (e.g. anchor windlass) for off-loading and on-loading of anchors and anchor chain is authorized. Coast Guard personnel will operate all Government equipment.

3.2.2 Pre-inspection surface preparation. Prepare all shots of chain to a “Commercial Blast” standard, in accordance with SSPC-SP 6.

3.2.3 Inspections. ,Perform the following inspections (Submit CIR):

3.2.3.1 Visual inspection. Visually inspect the following:

· All swivels, outboard swivel shots, cats paw, pelican hook and shackles.

· Entire length of Shot 1, Shot 2, Shot n-1, and Shot n.

NOTES

1. For the purpose of reference in this item, the shots will be referred to by numbers. Mark each shot with a removable tag. Moving inboard from the anchor, the shots will be referred to as follows: ANCHOR, Shot 1, Shot 2, Shot 3...Shot n-2, Shot n-1, Shot n, and BITTER END. These shot numbers are designated in order as existing prior to work, and will not change - although the shot order itself will change.

2. Number n in the paragraph above is equal to the number of shots per chain.

3.2.3.2 Measurements. Determine the suitability for continued service of the anchor chain assembly, by checking wire diameter dimension and six-link dimension ,using information provided in Table I (Dimensions for Condemning Anchor Chain) as guidance, as applicable; submit a CFR.

TABLE I. DIMENSIONS FOR CONDEMNING ANCHOR CHAIN

SIZE OF CHAIN

(inches)

90 PERCENT OF

LINK DIAMETER(1)

(inches)

SIX-LINK

DIMENSION(2)

(inches)

1
0.90
26-3/4
1-1/8
1.013
30-1/16
1-1/4
1.125
33-7/16
1-3/8
1.238
36-3/4
1-1/2
1.35
40-1/8
1-5/8
1.463
43-7/16
1-3/4
1.575
46-13/16
1-7/8
1.688
50-1/8
2
1.80
53-1/2
2-1/8
1.913
56-13/16

1. Use a micrometer, caliper or GO/NO-GO gage* to check wire diameter dimension. Gage is to be made by Contractor/repair facility in accordance with the dimensions shown in Table 1 above. Check the diameters at right angles to the link. When measuring with a micrometer or caliper take one-half the sum of the two diameters as representing the line diameter.

2. Take six-link measurements with a load applied to the chain in order to take all slack out of the chain. Use a bar gauge to check the six-link dimension. When the gauge will not fit over six links, the chain has been stretched beyond allowable limit. Measure six links for the entire length of each shot, measuring from every third link.

*When using a GO/NO-GO gage, a failed check is to be verified by measuring with a micrometer or caliper. Measure the diameter at right angles and take one-half the sum of the two diameters as representing the link diameter. Take measurements on clean, bare metal.

3.2.4 Reassembly.

3.2.4.1 Reassemble detachable links, swivels and shackles; and repack with molybdenum disulfide grease (MIL-DTL-23549).

3.2.4.2 Change the relative position of the shots, as designated by the Coast Guard Inspector, to distribute the wear on the chain, ensuring that shot shall be rotated end for end upon reinstallation, as follows: ANCHOR, Shot 3... Shot n-2, Shot n-1, Shot n, Shot 1, Shot 2, BITTER END.

NOTE

Detachable link components are not interchangeable.

3.2.4.3 Renew all detachable taper pin and link assemblies and associated link plugs.

3.2.4.4 Renew shackle at bitter end of chain.

3.2.5 Chain renewal. If a Change Request has been authorized and released, renew designated section of chain with material conforming to MIL-C-24633.

3.2.6 Chain coating. Using the coating system specified for “Anchor/Anchor Chain” in SFLC Std Spec 6310, Appendix A, (Cutters and Boats Exterior Painting Systems), do the following:

3.2.6.1 Coat the following shots:

Shot n-1 Black (17038).

Shot n

Black (17038).

Shot 1

Yellow (13538)

Shot 2

Red (11105).

3.2.6.2 Coat and wire (CRES wire) all detachable links (red, white, and blue), adjacent chain links, shackles, and swivels in accordance with Attached Figure “Painting and Markings On Mooring Chain”, using the , and SFLC Std Spec 6310. Remove all existing CRES wire prior to the installation of new markings.

3.2.7 Chain restowing. When directed by the Coast Guard Inspector, reassemble the anchor and anchor chain; restow the anchor chain in its chain locker, free for running, with the anchor properly hawsed and secured with the chain stopper set. Ensure that (1) the bitter ends of the chain are securely fastened in the chain locker with new bitter end shackles, conforming to Fed Spec RR-C-271, Type IV-A, Class 3, Grade A; (2) the ground tackle is kept ready for use, (3) nothing interferes with a readiness to veer or slip the anchors, (4) the detachable links located just inboard of the riding stopper and the detachable link tool set are readily accessible for use in slipping the anchor chains in an emergency, and (5) the anchor has a crown buoy attached, with sufficient length of rope to facilitate indicate the depths of water in which moored. In addition, do the following:

· Lead the bitter ends down and through the deck bolts in the chain locker and secure to the chain locker pad eye.

· Back out the chains to ensure the chain stopper is set properly.

3.3 Operational test – post repairs. After completion of work, the Contractor shall witness an operational test (by Coast Guard personnel) of the anchor chain assembly to prove satisfactory operating condition, by releasing the chain stoppers and lower both anchors under power to the drydock floor (or waterline, as applicable),…

This is the start of the file's text. The full file is on GovTribe.