BERTHOLF_MR4_CARPETS_DECK_RENEWAL_REV4.pdf

PDF 135 KB Posted

Attached to
USCGC BERTHOLF CARPET& DECK SYSTEM RENEWAL Federal contract opportunity
Solicitation number
HSCG85-10-R-P30LL2
Issued by
Department of Homeland Security US Coast Guard

View the file

Other files for this federal contract opportunity

Other files attached to USCGC BERTHOLF CARPET& DECK SYSTEM RENEWAL, newest first.
File Type Posted
AMEND 0001 TO SOL.doc DOC document
750-WMSL_100_1_1 —
750-WMSL_100_1_2 —

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL REQUIREMENTS: GENERAL REQUIREMENTS - DOCKSIDE

HOMEPORT

GR_00000_JMS_0308_FLEET

1 INTENT

This document invokes general requirements applicable to ship repair contracts for work performed at a cutter’s home port pier. The items discussed in the General Requirements are an amplification of, or are in addition to, the specific items of the Specification. Other sections of the contract establish requirements for work on Coast Guard cutters. The General Requirements are a part of the contract and, as such, compliance is a contractual requirement. The Contractor is responsible for understanding and complying with all requirements established in the Specifications.

Government Furnished Property: NONE

2 REFERENCES

Coast Guard Drawings: NONE

Applicable Documents:

COMDTINST M6260.16A, Asbestos Exposure Control Manual, Ch-1 COMDTINST 6260.21, Hazard Communications For Work Place Materials COMDTINST 9077.1, Equipment Tag-Out Procedure, Revision C COMDTINST M16478.1, Hazardous Waste Management Manual COMDTINST M16478.2, Procurement, Handling and Disposal of Polychlorinated Biphenyls COMDTINST M10360.3, Coatings and Colors Manual, Revision C Federal Standard FED-STD-595B(1), Rev B, Not 1; Color Used in Government Procurement MIL-A-22262, Rev B, Amd 2; Abrasive Blasting Media Ship Hull Blast Cleaning MIL-DTL-5624, Rev U; Turbine Fuel, Aviation, Grades Jp-4 and Jp-5 MIL-PRF-16884, Rev L; Fuel, Naval Distillate MIL-STD-1625, Rev C, Chg Not 1; Safety Certification Program for Drydocking Facilities and

Shipbuilding Ways for U.S. Navy Ships MLCPAC Standard Specification 997, 3/29/2004; DrydockingMLCPAC Standard Specification 074, Welding and Allied Processes, 3/21/2003 MLCPAC Standard Specification 085.1, General Requirements for Drawing Preparation, 3/1/2000 National Fire Protection Association NFPA 51 Standard for the Design and Installation of Oxygen-

Fuel Gas Systems for Welding, Cutting, and Allied Processes Naval Ships’ Technical Manual, Chapter 074, Volume 1, Chg 5, Welding and Allied Processes Rev 4

(Aug 99) Naval Ships’ Technical Manual, Chapter 074, Volume 3, Gas Free Engineering (Apr 98) Nondestructive Testing Handbook, American Society for Non-Destructive Testing, Volume 1, Section

7 USC §136 to 136(y), Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA) 15 USC §2601 to 2692, Toxic Substance Control Act (TSCA) 33 USC §1251 to 1387, Federal Water Pollution Control Act 33 USC §1342, National Pollutant Discharge Elimination System 33 USC §2701 to 2761, Oil Pollution Control Act of 1990 42 USC §4851 to 4852, Residential Lead-Based Paint Hazard Reduction Act 42 USC §4901 to 4918, Noise Control Act (NCA) 42 USC §6901 to 6991(i), Resource Conservation and Recovery Act (RCRA)

42 USC §7401 to 7671(q), Clean Air Act 42 USC §9601 to 9675, Comprehensive Environmental Response, Compensation, and Liability Act

(CERCLA)

16 CFR §1303, Ban of Lead-Containing Paint and Certain Consumer Products Bearing Lead-

Containing Paint 29 CFR §1910, Occupational Safety and Health Standards 29 CFR §1926, Safety and Health Regulations for Construction 29 CFR §1915, Occupational Health and Safety Standards for Shipyard Employment 33 CFR §154, Facilities Transferring Oil or Hazardous Materials in Bulk 40 CFR §61, National Emission Standards for Hazardous Air Pollutants 40 CFR §112, Oil Pollution Prevention 40 CFR §204, Noise Emission Standards for Construction Equipment 40 CFR §261, Identification and Listing of Hazardous Waste 40 CFR §262, Standards Applicable to Generators of Hazardous Waste 40 CFR §263, Standards Applicable to Transporters of Hazardous Waste 40 CFR §279, Used Oil Management Standards 40 CFR §300, National Oil and Hazardous Substances Pollution Contingency Plan 40 CFR §761, Polychlorinated Biphenyls (PCB) Manufacturing, Processing, Distribution in

Commerce, and Use Prohibitions 49 CFR §100-199, Hazardous Materials Transportation, Handling, and Storage Regulations California Code of Regulations, Title 22, Division 4, Environmental Health and 4.5, Environmental

Health Standards For The Management Of Hazardous Waste California Code of Regulations, Title 23, Waters California Health and Safety Code, Divisions 20, Miscellaneous Health And Safety Provisions, 26, Air

Resources, 37, Regulation Of Environmental Protection, 103, Disease Prevention And Health Promotion, 104, Environmental Health.

Chapter 173-303, Washington Administrative Code Chapter 340, Oregon Administrative Rules Title 18, Alaska Administrative Code Title 11, Hawaii Administrative Code

3 ADMINISTRATION

3.1 DEFINITIONS

3.1.1 Unless otherwise stated, the phrase as shown, as indicated, as detailed, or words of similar import refer to the contractual documents including drawings referenced in the specification.

3.1.2 The phrase as directed, as required, as permitted, approved, acceptance, or words of similar import refer to the direction, requirements, permission, approval, or acceptance by the Contracting Officer or a properly designated Contracting Officer’s Technical Representative (COTR).

3.1.3 Remove/Reinstall – To remove the original item and then later install the same original item back in its place after performing specified work on it.

3.1.4 Renew or renewal - To remove the original item and to install a new item in new condition, identical or of like size, material and quality to that removed (i.e. “Renew-in-Kind”).

3.1.5 Replace – To remove the original item and to install in its place a different item as described in the specification.

3.1.6 Restore – To bring back to the former, original or normal condition before alteration or removal.

3.1.7 Underwater body includes the external hull, all appendages, and sea chests from the keel up to and including the upper edge of the boot-top area.

3.1.8 The Contracting Officer’s Technical Representative (COTR) is the person delegated by the Contracting Officer as the on-scene representative for matters concerning performance of work. This includes technical correctness, timeliness, and quality of the Contractor’s work. Normally the Commanding Officer of the vessel is designated as the COTR.

3.1.9 The Coast Guard Inspector is the COTR or the individual designated by the COTR to perform Coast Guard Inspector duties.

3.1.10 Condition Found Report (CFR) – See paragraph 3.8 below.

3.1.11 Vessel – Either a Coast Guard cutter (sixty-five feet or greater) or a Coast Guard boat (less than sixty-five feet.)

3.2 REFERENCES

3.2.1 All references shall be of the issue and/or revision indicated in the consolidated list of references. It is incumbent on the Contractor to maintain current MLCPAC Standard Specifications. In many instances, the references will be available for review locally aboard the vessel or at the cognizant Naval Engineering Support Unit (NESU). U. S. Government issued Standardization Documents can be found at:

http://stinet.dtic.mil/str/dodiss4_fields.html.

3.2.2 Detail and dimensioned drawings for precision equipment are generally accurate and will give sufficient information for estimating. However, allowance for changes in dimensions should be taken into consideration due to changes of equipment and to the structure and arrangement of the vessel. Actual installations shall conform to the specifications. When it is required that drawings or sketches be prepared, the Contractor shall meet the requirements of MLCPAC Standard Specification 085.1.

3.2.3 All referenced drawings and each piece or page of data that is marked with a Limited Rights Legend is a part of this specification and shall not be used for any purpose other than that contemplated by the specifications or item of work. The Contractor is prohibited from further use, release, or disclosure of this information.

3.2.4 Unless otherwise noted within this specification, hierarchy, priority, or order of precedence of requirements shall be as follows:

Specification Definite Item or Optional Item Specification General Requirements Coast Guard Drawings Coast Guard Technical Manuals Commercial Drawings Commercial Technical Manuals Coast Guard Standards and Instructions Military and Navy Standards, Specifications, and Technical Manuals Commercial or Industrial Standards Commercial practices

3.2.5 Drawing discrepancies found in performance of work associated with this specification which may adversely affect work in this or future specifications shall be reported using “DRAWING DEFICIENCY ACTION FORM.”

This drawing feedback form, designed to be used by Contractor and Coast Guard personnel alike, may be downloaded from the Procurement section of the following Coast Guard web site:

http://www.uscg.mil/mlcpac/mlcp/Eng%20Support/mlcpv/files/procurement/Drawing_Deficiency_Action_Form_ed itable.pdf. The form shall be downloaded, duplicated and completed, as necessary, to inform MLCP(vs) technical personnel of drawing & configuration problems, as well as, suggested recommendations which may correct them.

3.2.6 Electronic "redlines" are preferred by the CG, but are not required. Electronic “redlines” may be submitted by using AutoDesk Design Review http://www.autodesk.com/designreview to create markups of .dwf files. If .dwg files are provided, the Contractor may submit "redlines" by adding a layer named "REDLINE" to the provided file, and entering all suggested changes on that layer. If .tif files are provided, the Contractor may submit "redlines" by using any suitable picture editing software to produce multi-color .tif files, using red for all annotations.

3.3 ARRIVAL CONFERENCE

3.3.1 Within two days of the commencement of this work, and usually prior to the start of work, the Contracting Officer or the Contracting Officer’s designated representative will meet with the Contractor at either the Contractor’s conference facilities near the vessel or aboard the vessel (location to be at the sole discretion of the

COTR).

3.3.2 Normally this conference will be attended by the COTR, designated Coast Guard Inspectors, representatives of the cognizant MLCPAC Naval Engineering Support Unit (NESU) and MLCPAC Support Branch (vr). For availabilities at Coast Guard facilities, the facility Hazardous Waste Coordinator will be invited to attend.

3.4 CONTRACTOR’S SUBMITTALS

3.4.1 The Contractor shall provide the following at the arrival conference:

Subcontractor List Technical Representatives List Marine Chemist & “Competent Persons” List Welders’ Qualification List List of Qualified Sil-Brazers Material Safety Data Sheets List of Key Personnel List of Emergency Phone Numbers Contractor’s Inspection And Quality Control System Contractor’s Property Administration System for GFE Certificate of Insurance Sample Copy of the Condition Found Report Contractor’s Fire Emergency Response Plan Contractor’s Oil Spill Response Plan Environmental Submittals (See Section 6) Contractor Security Requirements

3.5 VESSEL’S SUBMITTALS

3.5.1 The vessel will provide the following at the arrival conference:

List of Key Personnel List of Emergency Phone Numbers List of designated Coast Guard Inspectors

3.6 WORKING HOURS

3.6.1 Except for items specifically authorized by COTR, Contractor work shall normally be accomplished between the hours of 7:00 a.m. to 8:00p.m. Monday through Friday, except Federal Holidays.

3.6.2 If the Contractor desires to accomplish work outside of normal working hours, request shall be made to the COTR at least 24 hours in advance. Approval will be the sole discretion of the Contracting Officer or the COTR.

3.7 REPORTS/READINGS/AS FOUND CONDITIONS

3.7.1 All readings and inspections are to be taken within twenty-four hours after the machinery or system is opened. The Contractor shall notify the COTR of the time and location of inspections requiring Coast Guard verification 24 hours prior to such inspections, unless such inspections need to be conducted more than 50 road miles from the primary place of contact performance, in which case 3 working days notice is required, in order to make travel arrangements for the Coast Guard inspectors. Measurements and readings shall be taken with calibrated measurement and test instrumentation. All reports of readings, operational tests and inspections required by the specifications shall be submitted to the COTR in writing, using a “Condition Found Report (CFR)”, within twenty-four hours after the readings and/or inspections are made. Promptness in taking and reporting readings is particularly important for underbody work items such as shaft bearing or rudder bearing clearances. Often during the progress of a work item, conditions are discovered by the Contractor which are considered abnormal for reasons of safety, expected reliability, health, or habitability. These conditions must be brought to the attention of the Coast Guard using a CFR. Details provided by the Contractor in a CFR are important because the CFR may result in a contract change. To speed the contract change process, the Contractor should include in the CFR the following details as a minimum:

3.7.1.1 A sequential number.

3.7.1.2 The contract item which the “CFR” relates to (i.e. D-XX).

3.7.1.3 A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials, and dimensions as appropriate.

3.7.1.4 A proposed or recommended repair to correct the defective condition, including but not limited to frame numbers, part numbers, materials, and dimensions as appropriate.

3.7.1.5 Indicate whether the report requires Coast Guard action or if it is provided “for info” only. If action is required, indicate the time and date when the Coast Guard response is required in order to complete the action within the specified contract performance period. If the action cannot be completed within the specified contract period, so state.

3.7.1.6 A space on the form for the Coast Guard designated representative to make comments.

3.7.1.7 All CFRs shall be signed, dated and submitted by the Contractor’s Ship Superintendent. Price proposals for work requests, quick chits, and other change orders shall include, at a minimum, the following information:

1) The work request or quick chit the proposal is in reference to.

2) A labor hour breakdown broken out by task and subdivided by trade, including any requests for overtime.

3) A summary of travel costs, broken out by line item or type of cost.

4) A summary of material and other miscellaneous costs.

5) A summary of sub-contractor costs.

6) Profit or G&A added to any of the above.

7) The final price proposal.

A sample form is available from the Coast Guard upon request

3.8 GOVERNMENT FURNISHED MATERIAL/EQUIPMENT

3.8.1 The Contractor shall furnish all equipment, staging, materials, fittings, tools, etc., necessary for proper completion of each item of work unless the specifications indicate the Coast Guard will provide GFM/GFE.

3.9 SANITARY FACILITIES

3.9.1 Sanitary facilities for Contractor personnel will be provided on the pier; ship facilities are not for contractor use.

3.9.2 If at any time during the performance of the contract, Contractor work will place vessel sanitary facilities out of service, the Contractor shall provide temporary replacement facilities. The minimum replacement facility for up to 18 crew members displaced shall be hot and cold running water with a minimum of 2 showers, 2 sinks, 2 toilets, and 1 urinal located no further than two hundred feet from the vessel’s gangway. Facility shall be equipped with electrical lighting and power outlets (110 VAC with ground fault circuit interrupters, GFCI’s) for powering of electrical appliances (e.g., blow dryers). If more crew members are displaced, the replacement facilities shall be increased in direct proportion to this ratio. If the crew contains members of both sexes, suitable separate facilities shall be provided for men and women in proportion to their numbers in the crew. The Contractor shall maintain the facilities in a clean and sanitary condition at all times.

3.10 SMOKING AND TOBACCO PRODUCTS

3.10.1 Smoking and use of tobacco products aboard the Vessel or in Vessel office space is prohibited. Exceptions may be permitted if in strict compliance with Vessel rules and regulations (which may include designated smoking time/area).

3.11 CONTRACTOR SERVICES

3.11.1 The Contractor shall provide all services required by the Contractor for the completion of work. These services include but are not limited to electrical power, compressed air, steam, crane services, garbage and refuse, phones, office space, and portable toilet facilities. These services are for the Contractor’s use only. Regarding crane services, several Coast Guard facilities have weight restrictions at some piers or berths. Notify the COTR seven days in advance of desired lift to coordinate lift, crane size, rigger locations, etc.

4 WORK CONTROL

4.1 TAG-OUT PROCEDURES

4.1.1 To prevent injury to personnel and/or damage to ship systems equipment tag-outs must be properly conducted. Ship’s force will work closely with the Contractor to ensure tag-outs are done in a thorough and efficient manner as outlined below and in more detail in COMDTINST 9077.1, Equipment Tag-out Procedure.

4.1.2 Tag-Out Establishment

4.1.2.1 Prior to start of work on this Item, notify the Coast Guard Inspector in writing of equipment, systems, circuits, components, piping, and valves that require isolation so that tag-outs can be accomplished as required by COMDTINST 9077.1, Equipment Tag-out Procedure.

4.1.2.2 Ship’s Force personnel will position equipment and install tags when tag-out of equipment, systems, circuits, components, piping, or valves as required.

4.1.2.3 The Ship’s Authorizing Officer (normally the Engineer of the Watch) and the Repair Activity (Contractor’s) Representative shall each verify that the tag-out is sufficient to prevent operation of equipment, systems, circuits, components, piping, or valves from all stations that could exercise control. Tags shall also be hung as required by COMDTINST 9077.1, Equipment Tag-out Procedure, paragraph 1.d to control the status of non-permanent jumpers, locking devices, seals, blank flanges, relief valve gags, or similar safety devices.

4.1.2.4 A Contractor’s representative shall also verify that each tag is attached to the proper component and that it is in the condition required by the tag-out record sheet. This verification shall be made by witnessing the actions of the Ship’s Force member posting or checking the tags and observing devices such as valve position indicators, operating handles, etc.

4.1.2.5 A Contractor’s designated representative shall sign and identify his company on each ship’s tag-out record sheet and tag prepared to support the Contractor’s work.

4.1.3 Tag-Out Clearance

4.1.3.1 To facilitate prompt removal of tags, the Contractor shall notify the Coast Guard Inspector immediately when the Contractor’s work is complete and the affected system, piping, or circuit is ready for activation.

4.1.3.2 Tags shall be cleared and removed in accordance with COMDTINST 9077.1, Equipment Tag-out Procedure, before the equipment is operationally tested or operated.

4.1.3.3 The Ship’s Authorizing Officer and the Repair Activity (Contractor’s) Representative shall each verify that the work necessary to clear a tag-out has been completed prior to authorizing removal of the tags. Both parties shall concur to clearing the tag-out by signing the ship’s tag-out record sheet.

4.1.3.4 Ship’s Force personnel will remove the tags so authorized for clearance.

4.2 SAFETY REQUIREMENTS

4.2.1 The Contractor shall comply with and ensure compliance to the following for operations which may affect Government personnel or property: 29 CFR Part 1915, “Occupational Safety and Health Standards for Shipyard Employment”, 29 CFR Part 1910, “Occupational Safety and Health Standards”, and 29 CFR Part 1926 “Safety and Health Requirements for Construction”.

4.2.2 The following are deficiencies commonly encountered on safety inspections and are therefore emphasized here:

4.2.2.1 Anti-backflash control valves are required on all welding rigs (NFPA 51).

4.2.2.2 Scaffolds and/or lifelines are required when working above five feet. 29 CFR 1910 and 1915 cover this in detail. The following are commonly encountered problem areas:

4.2.2.2.1 Scaffolds require standard 42” high rails & midrails and 4” toeboards.

4.2.2.2.2 Planking must be scaffold-grade and completely cover the area between the railings and the ship.

4.2.2.3 Lifelines, body harnesses and lanyards are required wherever standard rails are not feasible. Lines must be kept taut, never allowing a fall of greater than six feet.

4.2.2.4 Lifelines must be attached above the worker.

4.2.3 Gear and equipment for rigging and lifting shall be in good working condition and operated according to the regulations set forth in 29 CFR 1915.111-116 and 29 CFR 1910.184. Proper safety precautions shall be practiced in the use of tag lines, mousing of hooks, and moving loads. In addition to the above requirements, all cranes used for work on the vessel or for handling GFM/GFE shall have a current weight handling certification in accordance with local, state and federal laws.

4.2.4 Tools and related equipment are addressed in 29 CFR 1915 Subpart H. Of particular concern is the use of ground fault circuit interrupters (GFCI) with power tools and the use of double insulated power tools. All shore supplied power circuits shall be protected by GFCI’S and have a grounding circuit back to shore. In addition, all power tools shall be approved by Underwriters’ Laboratories, or by other testing laboratories approved by the Contracting Officer and either be double insulated or have a grounded circuit.

4.2.5 Personnel protective equipment must be maintained and used in accordance with 29 CFR 1915.151-160.

4.2.5.1 Where personnel exposures can not be maintained below the PEL using appropriate engineering controls, the Contractor shall provide all Contractor personnel with appropriate respiratory protective equipment or other protective equipment specified by the manufacture or where the Contractor/Contractor’s industrial hygienist has determined that exposures could exceed the PEL. The Contractor shall also ensure personnel are properly protected from sensitizing agents/conditions reported by the manufacturer in the Material Safety Data Sheets. These operations include, but are not limited to spray painting and grinding. Selection of respiratory protective equipment should be based on sound industrial hygiene sampling data for the material being worked. Airline hose masks or Self Contained Breathing Apparatus (SCBA) shall be provided to all personnel conducting abrasive blasting or confined space operations, unless an industrial hygienist has determined that exposures can be maintained below the PEL. In addition, respiratory protection for all work which could be immediately dangerous to life and health must consist of either an SCBA or a airline hose mask with an escape bottle as a designed component of the mask assembly.

4.2.5.2 Air line respirators shall be fitted with a pressure regulating valve, a filter which will remove oil, water, and rust particles, and a carbon monoxide alarm. The air intake shall be from a source free from all contaminants, such as the exhaust from internal combustion engines, and air must meet Grade D.

4.2.5.3 Safety harnesses shall be equipped with lifelines which are secured with a minimum of slack when in use.

Lifelines must not permit a drop of greater than six feet or contact with any lower level.

4.2.6 Confined space entry requires initial gas free certification by a Marine Chemist in accordance with 29 CFR 1915. The Contractor shall be responsible for monitoring and maintaining the “safe” condition during the entire time work is being performed. Monitoring shall be conducted by a NFPA certified Marine Chemist or a Competent Person. As a minimum, test/certification shall be made before each work shift or daily, whichever is more frequent, and duly recorded on all required certificates.

4.2.7 The Contractor shall provide to the vessel Material Safety Data Sheets for all hazardous materials used under this contract (including petroleum products), at least two working days prior to its use, if not previously submitted per paragraph 3.4.1. These include, but are not limited to, paints, solvents, cleaners, and abrasive blasting grits.

4.2.8 The Contractor shall ensure paints, solvents, etc., used in, on or around the vessel are used in a manner which prevents personnel exposure to concentrations of vapors exceeding Permissible Exposure Limits (PELs), or Threshold Limit Values (TLVs) for chemicals for which PELs are not listed in OSHA standards.

4.2.9 Each fuel and gas system supplied from shore shall be arranged to be secured by a valve located off the ship and marked to show its purpose. When not in use, fuel and gas hose valves shall be secured at the manifolds and the hoses pulled back to the open deck. Unused manifold valves shall be capped.

4.2.10 The Contractor shall control abrasive blast grit sufficiently to prevent exposure to personnel at or greater than Permissible Exposure Limits (as defined by OSHA). Ensure abrasive blast grit does not contain free silica.

4.2.11 Diving operations must be accomplished in accordance with the requirements of 29 CFR 1910.401 to 440 including appendices. No person may fill more than one assignment if it an emergency response or other incident may require complete dedication to one of the tasks.

4.3 QUALITY CONTROL

4.3.1 The Contractor shall implement the quality control (QC) program submitted in paragraph 3.4.1. Quality assurance is the sole responsibility of the Contractor. The COTR may delegate inspection responsibilities to members of the vessel’s crew. The designated inspectors monitor the progress of work done by the Contractor. If, during the performance of work the Coast Guard Inspectors witness work that fails to meet the specifications, work that is otherwise unsatisfactory, or conditions which may lead to an unsatisfactory end product, the inspectors will alert the COTR who will advise the Contractor informally of the deficiency. If the deficient work is not corrected within a reasonable period of time (as approved by the COTR), the COTR will officially alert the Contractor via a Contract Deficiency Report. The COTR will initiate the report (a sample report may be found at http://www.uscg.mil/mlcpac/mlcp/Eng%20Support/mlcpv/files/platform_support/Arrival_Agenda_Pkg_Form.doc) and submit it to the Contracting Officer with copies to the cognizant NESU and MLCPAC(vr). The Contracting Officer will forward the original to the Contractor.

4.4 INTERFERENCES

4.4.1 The prices offered shall include the cost of performing all the necessary removal, relocation, and/or reinstallation of ship’s structure, materials, and equipment in connection with the work. The fact that an interference is not shown on a plan or specifically identified in the specification item is not justification for a contract change. A physical check of each job aboard the vessel prior to bidding is strongly encouraged.

4.4.2 Removal and Reinstallation of Interferences. The Contractor shall remove and reinstall all interferences and obstructions necessary to complete the required work without regard to whether interferences are indicated under specification work items. This may include the removal of machinery, piping, ducts, wiring, insulation, structure and anything else which interferes with the proper accomplishment of a work item. Prior to being disturbed or removed and in the presence of the Coast Guard Inspector, the Contractor shall operationally test each interference reporting by Condition Found Report any existing operational defects or deficiencies. While awaiting reinstallation and restoration, the Contractor shall maintain and protect interferences. When determined to be in the best interest of the Coast Guard & the Contractor and upon Coast Guard approval, interferences may be modified or altered and returned to essentially the same configuration and condition. They are then to be retested in the presence of the Coast Guard Inspector to verify proper operation. Otherwise, upon completion of required work, the Contractor shall restore interferences to their original configuration and condition, and in the presence of the Coast Guard Inspector retest for proper operation.

4.5 EXTERIOR/COMPARTMENT PRESERVATION/PROTECTION

4.5.1 To prevent damage arising from the performance of the contracted work, it shall be the responsibility of the Contractor to provide adequate protection to the vessel or any government property in areas where the work under items of these specifications is to be accomplished. Any damage resulting from the Contractor’s failure to adequately protect the vessel or government property shall be repaired by the Contractor at no charge to the government.

4.5.2 Compartment Cleaning and Finishing – When the Contractor enters a compartment for the accomplishment of work, the Contractor is to notify the Coast Guard Inspector and jointly inspect the compartment prior to starting the work. All areas in way of the Contractor’s work, whether or not directly repaired or altered, are to be restored to as clean and ship shape condition on completion of the work as when work was started. For example, the decks leading to work areas are to be cleaned and, if required due to unusual wear by the Contractor’s crew, the work sections are to be either refinished or renewed so that they match the original condition of the decks.

4.5.3 Protective Coverings – All machinery, equipment, deck covering, insulation, and open vent terminals exposed to dust or drifting particles resulting from work under this contract shall be adequately protected. Methods of protection include, but are not limited to fire-retardant blanket (if required due to sparks or slag), canvas, or plastic coverings. All open vent intakes shall be completely covered with air intake screens fitted with 20 pores per inch polyester or polyurethane foam filtering material and shall be maintained by the Contractor to prevent excessive air restriction and/or damage to ventilation motors. Any damage resulting from failure by the Contractor to provide adequate coverings shall be repaired at the Contractor’s expense. It shall be the responsibility of the Contractor to provide adequate protection to all deck covering in areas where the work under items of these specifications is being accomplished and on all main access routes to these areas. Acceptable protective covering will be either heavy cardboard, masonite (fiberboard), or plywood installed in sufficient quantities to adequately protect existing deck covering. Any protective coverings which are damaged during the course of work shall be immediately repaired or renewed by the Contractor.

4.5.4 Glass – All glass (port lights, windows, etc.) adjacent to areas interior and exterior where abrasive blasting, burning, or welding is required or accomplished shall be covered to prevent scarring and damage.

4.5.5 Ragged Edges – Care is to be taken to smooth off all ragged edges or burned off edges by grinding or filing to leave a smooth surface. Removal of fixtures, equipment, plating, piping, and fittings shall be made clean to the root and finished off. Where pipes, cables, and fittings are removed, the hole shall be blanked off flush with welded plates of like material and thickness.

4.5.6 Bracket and Supports – All pipes, cables, duct work, installed furniture, and equipment shall be bracketed, supported, and/or secured so as to carry the weight, prevent excessive vibration, and withstand inertia forces resulting from rolling and pitching.

4.5.7 Dirt/Debris/Trash – At the end of the work day, the Contractor shall remove all dirt, debris, trash, grinding dust and excess material from the vessel in areas and access to areas where work is being accomplished. The standard for this daily clean up is that the decks will be broom/vacuum clean, no liquids will be left standing on decks, and items which will not be further used for the work will be removed from the vessel. The goals behind this requirement are to remove fire hazards, to improve access within the vessel for routine and emergency movement of personnel, and to preserve the material condition of the vessel.

4.5.8 Painting

4.5.8.1 All burned or scarred areas, new structure, or plating resulting from any work performed by the Contractor shall be cleaned and repainted in accordance with this specification, the Coatings and Color Manual (Commandant Instruction M10360.3), or vessel paint schedule in that order of priority. The Coast Guard Inspector will inspect surface preparation prior to painting to assure conformance with specifications and COMDTINST M10360.3.

Prime bare metal to prevent rusting. Re-preparation due to rust bloom shall be the responsibility of the Contractor at no charge to the Government.

NOTE: Local VOC restrictions may reduce number of paint system options permitted by the Coatings and Color Manual (Commandant Instruction M10360.3). Ensure VOC limits of painting systems used comply with local (where work is performed) requirements.

4.5.8.2 All steel and aluminum installed under this contract shall, prior to installation, be free of mill scale and corrosion. Except where otherwise specified, all steel shall be properly primed with one liberal coat of high build epoxy primer in accordance with the Coast Guard Coatings and Color Manual (COMDTINST M10360.3).

NOTE: Apply all coatings in strict compliance with manufacturer’s application instructions.

4.5.8.3 Where new paint is to be merged into the existing paint system, feather into the surrounding paint. Apply paint to surfaces only if they are dry and free of sand, dust, grease, or any foreign material. Apply paint only if surface is five or more degrees F. above the dew point.

4.5.8.4 Paint must have an age less than the manufacturer’s recommended shelf life. The Contractor shall supply certified laboratory reports showing product, batch number, and date of manufacture for each batch of paint to the designated Coast Guard Inspector.

4.5.8.5 Store paint for at least 48 hours prior to painting so it is maintained between 65 and 85 degrees F. Issue paint from storage so that it is applied before the paint temperature drops below 50 degrees F. Do not apply paint if the paint temperature is below 50 degrees. When ambient temperature drops below 50 degrees F. or wet weather is encountered, the Contractor shall ascertain whether the paint manufacturer recommends any substitutions of paint, alteration of paint formulas, or modified application instructions. Any substitution of paint is subject to approval of COTR. Adhere to all of the manufacturer’s recommendations.

4.5.8.6 All paints shall meet the environmental standards for the locale at which they are applied. This includes, but may not be limited to, meeting volatile organic compound (VOC) limits for coating systems.

4.5.8.7 Quality assurance inspections are required for all painting done in accordance with individual work items, and are to be recorded the Paint Log. The Paint Log will be filled out by the Contractor, verified by the Coast

Guard Inspector and retained by the vessel for hull history. The forms may be downloaded from the Procurement section of the following Coast Guard web site:

http://www.uscg.mil/mlcpac/mlcp/Eng%20Support/mlcpv/index.htm.

4.5.9 Fluid Containers & Piping. The Contractor is responsible for containment, clean up, and disposal of any fluid spilled during course of their efforts (e.g., includes spills resulting from mishandling, disassembly & piping removal).

4.6 MAINTENANCE OF WATERTIGHT INTEGRITY

4.6.1 Upon completion of any work on a water or oil tight boundary (including hull), perform an “air hose test” (also known as liquid film bubble emission leak test) along entire length of affected boundary. This test shall be in addition to any NDT which may be specified. Apply a solution consisting of equal parts of liquid soap or detergent and glycerin, and 4.5 parts water, to one side of affected boundary, while applying air pressure or a jet of dry air to opposite side of affected boundary. For tanks and voids, pressurize compartment to 2 psi. For watertight compartments which are not tanks or voids, direct a jet of dry air on affected boundary. In all cases the nozzle shall be as close as possible to item under test and the stream directed against all compartment boundaries, plate connections, closures, fittings and boundary penetrations in the manner most likely to reveal leaks. The nozzle diameter shall be 3/8 inch minimum and the pressure at the nozzle shall be 90 psi minimum. Closely inspect low pressure (solution) side of affected boundary in presence of the Coast Guard Inspector. Defects/discrepancies will appear as small bubbles in soap solution. Correct defects/discrepancies and retest. Repeat until a satisfactory bubble emission test is obtained.

4.7 SCRAP/SALVAGE

4.7.1 The COTR shall determine which existing materials removed or disconnected are of scrap/salvage value to the Government. Though not indicated or specified for reuse in the new work, those materials shall remain the property of the Coast Guard. The material shall be placed on the deck of the vessel or Government truck, or packed/palletized and shipped by the Contractor (funded by the Coast Guard) as directed by the COTR. Material not identified by the COTR for retention shall be designated as scrap. The Contractor shall store scrap at no additional cost to the Government and dispose of the scrap upon completion of the contract. The Contractor shall submit a proposal, supported by an invoice from a scrap dealer, to credit the Government for the value of the scrap.

4.8 LABEL PLATES/TAGS

4.8.1 The Contractor shall provide label plates for all new and/or redesignated access fittings, compartments, electrical and electronic equipment and fittings, ventilation blowers and systems, valves, and any other equipment and/or fittings requiring them as indicated on installation drawings. The Contractor shall also provide label plates where they would normally be required as indicated on similar listings in the ship’s label plate list. In the absence of guidance regarding the inscriptions, the plates shall be engraved with the inscriptions provided by the COTR.

4.9 ABRASIVE BLAST & PAINT OVERSPRAY

4.9.1 The Contractor shall ensure that all abrasive blast material, paint particle/waste, and paint overspray is managed in accordance with all applicable federal, state and local environmental/personal exposure requirements and is contained in the work area, and not allowed to enter the atmosphere or water. This prevention may include, as necessary, the use of vacuum-blasting techniques, the construction of temporary shelters, and covering all openings, open areas, and other possible exits, including, but not limited to, scuppers, railings, freeing ports, ladders, and doorways. The Contractor shall install protective covering on all vessel carpeting and tile when major grit blasting (as determined by the COTR) is to be performed during the contract.

4.9.2 Blast material used shall meet the environmental profile specified in Paragraph 3.4.12 (Hazardous Waste Minimization) of Mil-A-22262(SH).

4.10 DISASSEMBLY & INSPECTION ACTIONS

4.10.1 Any additional work resulting from required disassembly and inspection actions is typically disruptive and may cause availability schedule delays. To minimize adverse impact of such work, all required disassembly and inspection actions shall be accomplished before 25% of availability contract period has elapsed. Production schedule submitted to Coast Guard shall clearly show & schedule all disassembly & inspection actions.

5 ACCESS TO VESSEL

5.1 WORK BY SHIP’S FORCE

5.1.1 The Coast Guard reserves the right for the vessel crew to perform routine maintenance or ship’s work and to check all clearances and readings taken on equipment by the Contractor throughout the contract period. The vessel’s crew work will not interfere with the Contractor in the execution of the contract. The vessel will refer to the Contractor’s Production Control submittals in planning such work to prevent interferences.

5.2 SECURITY/CONTROLLED ACCESS

5.2.1 All classified visit requests shall be approved by the Commanding Officer only when the request is received through official correspondence and pertains to U.S. Military, Civil Service Employees or official U.S. Government contractors. The Contractor shall notify the Commanding Officer of the vessel, in writing, of the names of the Contractor personnel who will be performing work in controlled access compartments. The Contractor shall ensure its employees do not enter controlled access compartments without prior authorization. The Contractor will also ensure their employees do not bring Portable Electronic Devices (PDEs) into these spaces without prior written notification to the command AND approval/authorization by the Commanding Officer. The Commanding Officer will prevent access to controlled compartments (i.e. Classified Work Spaces) by individuals with no operational requirement for access and no security clearance. If access is required by non-cleared Contractors, the ship will sanitized the compartment, if possible, to allow contractor personnel to enter and complete their work. If a Contractor is employing Foreign Nationals, they must be vetted by the CG Counterintelligence Service (CGCIS/COMDT CG-2-CI) prior to being allowed access to the ship. Their visitor information must be submitted to COMDT (CG-ACO-I) 30 days prior to the desired visit date. Final approval of any visit is the prerogative of the Commanding Officer.

5.3 TECHNICAL REPRESENTATIVES

5.3.1 Refer to the “Access To Vessels” clause contained in Section H of this contract.

6 ENVIRONMENTAL

6.1 DEFINITIONS

6.1.1 Solid Waste: Rubbish, debris, sanitary waste, and other discarded solid materials resulting from industrial, commercial, and agricultural operations, and from community activities.

6.1.2 Rubbish: A variety of combustible and noncombustible wastes such as paper, boxes, glass, crockery, metal, lumber, cans, and bones.

6.1.3 Debris: Includes combustible and noncombustible wastes, such as ashes, waste materials that result from construction or maintenance and repair work, leaves, and tree trimmings.

6.1.4 Chemical Wastes: Includes salts, acids, alkalis, herbicides, pesticides, and organic chemicals.

6.1.5 Sanitary Wastes:

6.1.5.1 Sewage: Wastes characterized as domestic sanitary sewage.

6.1.5.2 Garbage: Refuse and scraps resulting from preparation, cooking, dispensing, and consumption of food.

6.1.6 Asbestos and Asbestos Materials: Asbestos means actinolite, amosite, antophyllite, chrysotile, crocidolite, and tremolite. Asbestos material means asbestos or any material containing asbestos such as asbestos waste, scrap, debris bags, containers, equipment, and asbestos-contaminated clothing consigned for disposal. Friable asbestos material means any material that contains more than one percent asbestos by weight and that can be crumbled, pulverized, or reduced to powder, when dry, by hand pressure.

6.1.7 Oily Waste: Includes petroleum products and bituminous materials.

6.1.8 PCB (Polychlorinated Biphenyls): Toxic and non-biodegradable materials used extensively under trade names, such as Pyranol or Askarel, as insulating cooling fluids in capacitors and transformers.

6.1.9 Hazardous Material (HM): Chemicals defined by OSHA 29 CFR 1915.1200 or under the U.S. Department of Transportation (DOT) regulations (Title 49 CFR Parts 100 through 199) which are determined by the Secretary of Transportation to present risks to safety, health, and property during transportation. The DOT regulations include requirements for shipping papers, package marking, labeling, transport vehicle placarding, and training of personnel handling hazardous materials.

6.1.10 Hazardous Substance: Substances defined under the Clean Water Act and CERCLA as chemicals which are harmful to aquatic life or the environment and are regulated, if spilled or otherwise released to the environment.

The EPA has designated “reportable quantities” for each hazardous substance under CERCLA. If an amount equal to or greater than the reportable quantity of a hazardous substance is released to the environment, that spill must be reported.

6.1.11 Hazardous Waste (HW): Substances which are hazardous and have been discarded are regulated as hazardous waste under RCRA or State Health and Safety Codes and their implementing regulations. A waste is hazardous if it meets certain levels of reactivity, ignitability, corrosivity, or toxicity, or is otherwise listed as a hazardous waste in Title 40 CFR Part 261 or in the respective State Health and Safety Code or Code of Regulations.

NOTE: In addition to the usual Title 40 CFR Part 261 Hazardous Wastes, California manages Waste Oil and Zinc in certain concentrations as Hazardous Waste. Debris from zinc paint removal may be regulated. See the California Code of Regulations, Title 22 , section 66261.24

6.1.12 Paint Containing Lead: Paint or other similar surface coating material containing detectable levels of lead or lead compounds. The definition for Paint Containing Lead is the same as that for lead-based paint. Definitions for lead-based paint found in other documents, do not apply to work under this contract.

6.1.13 Post-consumer Material: A material or finished product that has served its intended use and has been diverted or recovered from waste destined for disposal, having completed its life as a consumer item. Post-consumer material is a part of the broader category of “recovered material.”

6.1.14 Recovered Material: Waste materials and byproducts which have been recovered or diverted from solid waste including post-consumer material, but such term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.

6.2 APPLICABLE REGULATIONS

6.2.1 The statutes and regulations listed in the References section of these General Requirements form a part of this specification to the extent referenced. The publications are referred to in the text by the basic designation only.

6.3 TEST RESULTS

6.3.1 Submit all test results taken as required by Section 6 of the General Requirements to the Contracting Officer or COTR.

6.4 PERMITS & CERTIFICATES

6.4.1 Submit copies of all permits and certificates required for performance of this contract at the arrival conference.

6.5 HAZARDOUS MATERIAL IDENTIFICATION

6.5.1 Submit Material Safety Data Sheets (MSDS) for any materials defined as hazardous under the most current revision of 29 CFR 1910.1200. One copy of each MSDS shall be submitted to the Contracting Officer’s Representative no later than the delivery date of the product. Two copies shall be submitted to the Contracting Officer.

6.6 KNOWN HAZARDS

6.6.1 (See note in paragraphs 6.9.1.6 and 6.9.1.7 for required contract proposal hazard assumptions.):

6.7 SUBMITTALS

6.7.1 Environmental Management Plan: The Contractor shall have a written compliance program (the plan) outlining how the Contractor handles hazardous materials, petroleum products, hazardous substances, and hazardous waste. The plan shall comply with all local, state, and federal laws and regulations when handling hazardous materials and hazardous or other wastes. For work involving the hazards of lead, the compliance program shall be in accordance with 29 CFR 1915.1025. The program shall include, but is not limited to, the following elements as appropriate: a general storage site plan, methods used to analyze whether generated material (blasting debris, paint waste, etc.) is hazardous, any hazardous waste licenses and permits, air district permits, spill response plans (see paras. 27.14 and 27.15), any permits required by the National Pollutant Discharge Elimination System, 33 U.S.C. 1342, air district permits, noise control plan, identification of hazardous waste and material. The Coast Guard has the right to require removal from the contract any subcontractor whose performance fails to comply with these and any other environmental laws and regulations or who fails to provide appropriate evidence of compliance with them. NOTE: a general format outline of an acceptable Environmental Management Plan can be found on our internet site:

http://www.uscg.mil/mlcpac/mlcp/Eng%20Support/mlcpv/files/procurement/ENVIRONMENTAL_MANAGEMEN T_PLAN.doc.

6.7.2 Asbestos Documentation <if required>

6.7.3 Job Specific Statements of Procedures <if required>

6.8 STRICT COMPLIANCE WITH REGULATIONS AND STATUTES

6.8.1 Provide and maintain environmental protection during the life of the Contract to control pollution or to correct conditions that develop during performance of the contract. Comply with all Federal, State, and local laws and regulations pertaining to water, air, and noise pollution.

6.9 CONTROL & DISPOSAL OF WASTES

6.9.1 With the exception of materials specifically indicated or specified to be salvaged for reuse, and turned over to the Government, all non-hazardous wastes and demolished materials become the Contractor’s property and shall be removed from the job site daily. Shipboard, store hazardous waste in corrosion resistant containers labeled to identify type of waste and date filled.

6.9.1.1 Hazardous Waste Disposal (for work performed at a Coast Guard facility): Any hazardous waste generated by work under this contract is the responsibility of the Contractor and shall be labeled and packaged in 49 CFR approved containers and in accordance with all other applicable Federal, state, and local laws and regulations.

Along with the Government, the Contractor is contractually considered the co-generator of any hazardous waste.

The Government shall make available its facility’s EPA generator ID number for manifesting of hazardous waste.

The Contractor shall identify, arrange and be responsible for the turnover of any hazardous waste,…