CGC CYPRESS FY10 DRYDOCK SPEC
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30 Amendment A00001 .doc | DOC document | |
| Posted Schedule.pdf | ||
| Posted Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC CYPRESS (WLB-210)
225 FOOT B CLASS SEAGOING BUOY TENDER
SPECIFICATION FOR DRYDOCK REPAIRS
Developed By:
James L Ward
Commander (v) Maintenance and Logistics Command, Atlantic 300 E. Main Street, Suite (600) Norfolk, VA 23510-9102
(October 19, 2009 / Rev 1)
USCGC CYPRESS (WLB-210) DRYDOCK AVAILABILITY 2010
TABLE OF CONTENTS
Work Item Title Page
List of Sketches iii
Revisions Record iv
List of Applicable References v
List of Government-furnished Property ix
List of Critical Inspection Items x
Specification Feedback xi
Principal Characteristics xii
General Requirements 1
1 Clean and Inspect Sewage Collection and Holding Tanks 9
2 Clean and Inspect Grey Water Collection and Holding Tanks 12
3 Renew Watertight Door 15
4 Clean and Inspect MDE and SSDG Exhaust Uptakes 17
5 Clean Diesel Generators In-Place 20
6 Inspect and Test Main Breakers 22
7 Repair Supply Ventilation Systems (S1-23-2, S1-14-2) 25
8 Renew Rudder Blade 28
9 Overhaul Bow and Stern Thruster Motors 33
10 Disassemble and Repair Stbd Hydraulic Chain Stopper 35
11 Repair Cargo Hatch 38
12 Repair SORs Hold Hatch 41
Page i (Rev 1)
13 Inspect and Repair Welin-Lambie Boat Davit (Level 2) 44
14 Welin-Lambie Davit - Perform Repairs 46
15 225B WLB Buoy Crane – Operate and Inspect System and Submit Report 49
16 225B WLB Buoy Crane – Renew DCV Block 51
17 Clean Grey Water Piping System 53
18 Clean Sewage Piping System 57
19 Modify Sewage Tank Float Switch Flange (EC 225-C-
109) 61
20 Inspect Various Deck Fittings 63
21 Renew ATON Tie Downs 65
22 Install New Deck Covering Systems 68
23 Preserve Buoy Working Areas 70
24 Preserve Weather Decks 73
25 Routine Drydocking 76
26 Provide Temporary Logistics 79
27 Modify Fuel Oil Purifier Seal Water Discharge And Service Tank Stripping Piping 82
Page ii (Rev 1)
List of Sketches
Work Item Sketch Number Page
This section is not applicable to this package.
Page iii (Rev 1)
Revisions Record
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package.
Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK ITEM# CHANGES MADE
19 OCT 09 1 n/a Changed header of each page to read
“2010” vs “2009”.
NOTE: All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
Page iv (Rev 1)
List of Applicable References
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at time of specification writing and during contract execution. Electronic copies of the latest Editions of MLCA Standard Specifications are available on the Internet and may be accessed at the following Internet Uniform Resource Locator (URL) address:
http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp.
Guidance for obtaining copies of all other documents referenced herein is provided in the solicitation.
Order of precedence. In the event of conflicts between text of this specification and the applicable references specified herein, order of precedence shall be in accordance with MLCA Standard Specification 0000_STD, paragraph 3.2 (Order of precedence), unless otherwise specified by the Contracting Officer (KO). The Contractor shall immediately notify the KO in writing of any perceived conflicts contained herein. Nothing in these documents, however, supersedes applicable laws and regulations, unless a specific exemption has been obtained.
FEDERAL AND MILITARY SPECIFICATIONS AND STANDARDS
DOD-STD-2187, Aug 1987, Chemical Cleaning of Salt Water Piping Systems
OTHER GOVERNMENT DOCUMENTS, DRAWINGS, AND PUBLICATIONS
225A Class Rudder Removal Memorandum, 7 Jan 2009
DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 1001_STD, 2004 Edition, Temporary Hull Accesses
Page v (Rev 1) http://www.uscg.mil/mlclant/vdiv/standard_specifications.asp
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 2350_STD, 2004 Edition, Clean, Inspect, Varnish-Treat, and Test Propulsion Generators and Motors, Ship Service and Emergency Generators in-Place
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 2351_STD, 2004 Edition, Overhaul Main Propulsion Generators And Motors
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 5000_STD, 2004 Edition, Auxiliary Machinery Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 6341_STD, 2004 Edition, Renew Deck Covering Systems
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8634_STD, 2004 Edition, Drydocking
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 8635_STD, 2004 Edition, Provide Temporary Logistics
Code of Federal Regulations (CFR) Title 29, Part 1915, 2005, Occupational Safety and Health Standards for Shipyard Employment
DRAWINGS
Coast Guard Drawing 225 WLB 528-001, Rev H, Plumbing and Interior Deck Drains
Coast Guard Drawing 225 WLB 593-001, Rev G, Sewage and Waste Water System Diagrams
Coast Guard Drawing 225B WLB 167-001, Rev H, Structural Closures
Coast Guard Drawing 225B WLB 259-001, Rev C, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 259-006, Rev C, Combustion Intake & Exhaust A & D Hull Block 970 & 975
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Page vi (Rev 1)
Coast Guard Drawing 225B WLB 512-004, Rev E, HVAC A&D FR 12-30, Hull Block 910
Coast Guard Drawing 225B WLB 512-009, Rev D, HVAC A&D FR 57-75
MN DK & 01 LVL BLK 960
Coast Guard Drawing 225B WLB 512-012, Rev -, HVAC Standard Details and General Instructions
Coast Guard Drawing 225B WLB 549-001, Rev A, Onboard Lubrication Requirements
Coast Guard Drawing 225B WLB 561-003, Rev A, Steering Gear Arrangement
Coast Guard Drawing 225B WLB 562-001, Rev D, Steering Components A&D
Coast Guard Drawing 225B WLB 562-002, Rev C, Rudder - Structure A&D
Coast Guard Drawing 225B WLB 562-003, Rev -, Thordon Lower Rudder Stock Bearing
Coast Guard Drawing 225B WLB 562-004, Rev -, Pintle Bearing
Coast Guard Drawing 225B WLB 573-001, Rev E, Bouy Handling System Arrangement
Coast Guard Drawing 225B WLB 573-009, Rev D, Bi Dir Ch Stopper With Retractable Roller Assembly
Coast Guard Drawing 225B WLB 573-011, Rev -, ATON Tie Downs
Coast Guard Drawing 225B WLB 593-009, Rev B, Sewage Holding Tank.
Coast Guard Drawing 225B WLB 601-002, rev G, Booklet of General Drawings
Coast Guard Drawing 225B WLB 631-001, Rev G, Painting Schedule
Coast Guard Drawing 225B WLB 634-001, Rev F, Deck Covering Schedule
Coast Guard Drawing 225B WLB 635-001, Rev B, Hull Thermal and Acoustic Insulation Schedule
Coast Guard Drawing 225B WLB 801-006, Rev C, Docking Drawing
Page vii (Rev 1)
Coast Guard Drawing 225B WLB 920-001, Rev D, Hull Block 920 Panels
Coast Guard Drawing 225B WLB 930-001, Rev E, Hull Block 930 Panels
NAVSEA Drawing 804-5773932, Rev A, Acoustic & Thermal Insulation for Ducts Installation Details
PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
Coast Guard Technical Publication (TP) 3520, Section 167-B, Manual Cargo Hatch - Model D-WK-837
Coast Guard Technical Publication (TP) 3536A, All Sections, Manufacturers Instruction Book - SWBS Group 324
Coast Guard Technical Publication (TP) 3536B, All Sections, Manufacturers Instruction Book - SWBS Group 324
Coast Guard Technical Publication (TP) 3556, SWBS 568, Feb 1999, Instruction Manual for the Bow and Stern Thruster Units
Coast Guard Technical Publication (TP) 3557, Section 573-C, Jul 2005, Manufacturer's Instruction Book-SWBS Group 568-573, Buoy Crane – Model EB-480-60-40
Coast Guard Technical Publication (TP) 3562, Section 583-C, Aug 1998, Manufacturer's Instruction Book-SWBS Groups 583-589, Twin Pivot Arm Davit - Model TW-PIV5.0A
Coast Guard Technical Publication (TP) 3717, Section 167-A, Hydraulic Cargo Hatch - Model D-WK-837
INDUSTRY STANDARDS
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
Page viii (Rev 1)
List of Government-furnished Property
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
3 N Watertight Door
1-66-2 N/A 1 ea 3500.00
8 No **Lower Rudder Stock brg 3120-21-912-7635 1 5,478 No **Upper Rudder brg 3110-01-466-9924 1 5,002 No **Pental brg 3120-21-912-7634 1 2,610 No Rudder System Seal Kit 5330-01-565-8083 1 1,826 Yes Rudder Blade Assembly
(blade, stock, etc.)
2040-01-507-7034 1 298,000
No **Rudder Stock Blank 2040-01-F98-0204 1 27,328 No Pin, Straight, Headless 5315-01-565-8012 1 725 No Pin, Straight, Headless 5315-01-565-8004 1 695 10 No Repair Kit, HYD Chain
Stopper Rising Sheave
APL 90980420A1
PN: MDL 573009KIT
NSN: 2040-01-483-
1 ea $2465.00
No Bearing, Rulon PN: 01-573-09-11 2 ea $1025.00 No Seal, wiper PN: 01-573-09-13 1 ea $274.05 No Gasket PN: 01-573-09-71 1 ea 15.90 14 N Pin, Sheaves PN: 5125-4611 2 ea. 1272.00 N Pin, Sheaves PN: 5144-4611 6 ea. 724.00 N Plate, Keep PN: 2400-0011 8 ea. 42.00 N Nipple, Grease PN: 889-01049 8 ea. 18.70 N Setscrew, Hex HD PN: 609-10016 16 ea 9.00 N Sheave Assembly (sheave body, ball bearing, etc.)
PN 5014-1401 6 ea 1,967.00
N Sheave Assembly (sheave body, ball bearing, etc.)
PN: 5014-1501 2 ea 1,873.00
16 Y DCV Block PN: n/a 1 ea 12000.00 21 N D-ring tie downs PN: n/a 10 ea 400.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
Page ix (Rev 1)
List of Critical Inspection Items
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see Std Spec 0000_STD, paragraph 3.6.2 (Inspection report particulars)):
Work Item Title
This section is not applicable to this package.
Page x (Rev 1)
Specification Feedback
The intent of this section is to inform all users that a spec feedback mechanism is in place, and is located on the MLCA Naval Engineering Division’s website. Spec feedback is a very important part of our overall continuous improvement process, and is crucial to specification development. It will allow spec writers to capture all specification-related lessons learned, and avoid mistakes or ambiguities in follow-on availabilities.
All feedback will be reviewed, evaluated, and responded to in a timely manner.
If you have access to the CGWeb (Intranet), please use the following link, which will connect you to the MLCA(v) Naval Engineering website, for submitting your feedbacks:
http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/defaul t.cfm
If you do not have access to the CGWeb (Intranet), you may still submit your feedbacks, using the following web link:
http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xi (Rev 1) http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://webapps.mlca.uscg.mil/vdiv/specifications/feedback/default.cfm http://www.uscg.mil/mlclant/vdiv/specfeedback.asp
Page xii (Rev 1)
PC_225 WLB
(07 Jan 2004)
Principal Characteristics
225' WLB Seagoing Buoy Tender
Length Overall 225' 9-7/8"
Depth (main deck at side to baseline) N/A
Maximum Beam 46' 1-3/8”
Height of Highest Projection (above DWL) N/A
Frame Spacing 21” from FR 0 to 12, 22” from FR 12 to 30
24’ from FR 30 to stern
Full Load Draft 13'
Full Load Displacement 2000 long tons
Shore Tie Voltage Requirements 3-Phase 450VAC w/Navy SYM.1160 connector plug IAW 225B WLB 3200-009 Rev A.
PROPELLER / SHAFT
Number of Propellers 1
Number of Blades per Propeller 4
Diameter of Propeller 10'
Pitch controllable
Revolutions per Minute (RPM) 254
Shaft Diameter N/A
00000_DLA_FLT (23 Oct 2008)
General Requirements
1. SCOPE
1.1 Intent. This item describes the general requirements to be followed by the Contractor while conducting this availability.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA) Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Jun 2006, Coatings and Color Manual
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in Std Spec 0000_STD and in this item, as applicable, during the performance of this availability.
NOTICE!
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and also to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Contractor-provided fire watch personnel. The Contractor
shall provide fire watch personnel and equipment.
3.3 Welding and brazing requirements. The Contractor shall
perform all welding and allied processes, and nondestructive inspection (NDI), in accordance with Std Spec 0740_STD.
Page 1 (Rev 1)
3.4 Term substitution - COTR for COR. The Contractor shall be aware that the term "COR" (Contracting Officer's Representative) has been discontinued in favor of "COTR" (Contracting Officer's Technical Representative); consequently, whenever "COR" is encountered in this specification package, including referenced standard specifications and other referenced documents, it shall refer to "COTR", explicitly.
3.5 Small boat storage. When a small boat (Motor Surf Boat
(MSB)/Motor Cargo Boat (MCB)/Rigid Hull Inflatable (RHI) boat) is removed as interference to Contractor-work, the Contractor shall provide a suitable pier side storage cradle, for safely storing said boat.
3.5.1 Cradle design. Ensure that the temporary cradle meets
the following criteria:
1. Structure is templated from the geometry and arrangement of the contact support areas of the existing cradle onboard the vessel, to provide same or more support area as that which is provided by the existing cradle.
2. Arrangement will allow ship's force to perform maintenance on the small boat, without modification of the cradle.
3. Structure is manufactured using the most economical methods and materials available, and is capable of supporting the full weight of the small boat under normal conditions experienced during routine maintenance.
4. Contact surfaces are no harder or rougher than the contact surfaces for existing cradle onboard the vessel.
3.5.2 Boat accessibility. Ensure the storage is located in the vicinity of the vessel, and is unrestricted, to allow for ship's force to complete maintenance during normal working hours for the entire performance period.
3.5.3 Boat protection. Provide full protection that can be
safely and completely secured when the small boat is left unattended (e.g. watertight cover, storage in a warehouse or shop, etc.), in addition to isolating the boat from the elements.
3.5.4 Boat transportation. Transport each small boat to its
storage area within one week of docking the vessel and back to the vessel prior to the end of the performance period.
Page 2 (Rev 1)
4. NOTES
4.1 Access to COMDTINST M10360.3. The COMDTINST M10360.3 may
be accessed at the following URL address:
http://www.uscg.mil/directives/cim.asp
4.2 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in Std Spec 0000_STD to be completed and submitted during preservation of "critical-coated surfaces", are provided at the end of this item.
Page 3 (Rev 1) http://www.uscg.mil/directives/cim.asp
QA-1: QUALITY ASSURANCE INSPECTION FORM - PRESERVATION CHECKLIST
CHECKPOINT 1 - COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with COMDTINST M10360.3, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-based coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating manufacturer(s).
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-12, SP-11, SP-10?).
Verify surface anchor profile (1.5-3.5 mils for abrasive-blasted steel surfaces; 1.0 mil (minimum) for power-tool cleaned surfaces; 1.0-1.5 mils for abrasive-blasted aluminum surfaces); and 1.5 -2.5 for surfaces to be coated w/single coat of inorganic zinc).
Measure soluble salt conductivity (5 measurements per 1000 sqft) - maximum threshold: 70 microsiemens/cm for non-submerged surfaces and 30 microsiemens/cm for submerged surfaces.
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the Coating Manufacturer(s).
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 - STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 - TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer's instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 - FINAL INSPECTION
Verify final system dry film thickness.
Verify system cure for service resumption - U/W Body surfaces: 5-8 hours @ 77 degrees F; Potable water tanks: 7 days @
77 degrees F.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure (minimum 7 days @ 77 degrees F.), to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
CHECKPOINT 10 - RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
Signature of Inspector:______________________________________________________Date:____________
Page 4 (Rev 1)
QA-2. QUALITY ASSURANCE INSPECTION FORM
ENVIRONMENTAL READINGS
(Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat)
DATE TIME
ENTER ACTIVITY
(Surface preparation, primer coat, barrier coat, top coat, etc?)
LOCATION DEW
POINT
SURFACE
TEMP.
% REL.
HUMIDITY
SIGNATURE
OF
INSPECTOR
.Signature of Inspector:__________________________________________________Date:____________
Page 5 (Rev 1)
QA-3 QUALITY ASSURANCE INSPECTION FORM
SURFACE PROFILE LOG
Vessel Name And Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location Of Work (Including Frame Numbers):_____________________________________
Area (Square Feet):_____________
Surface Preparation Method:_____________________________________________________
Abrasive Manufacturer And Size:_________________________________________________
Degreasing Method Used:________________________________________________________
Number Of Hours Surfaces (Steel Only) Left Unpainted:______________________________
Sweep blasting performed to remove flash rusting (steel)? Yes/No:_____________________
Place Surface Profile Replica Tapes In The Spaces Provided Below, To Serve As Permanent QA record.
Maintain separate log for each area/location. When an Area Is Divided Into Separate Sections, Maintain A Separate Log for Each Section.
AVERAGE MILS
(IAW ASTM D4417,
METHOD C)
Place Surface Profile Replica Tape Here
Reading:__________ mils
• Place Surface Profile Replica Tape Here
Date and Time:__________________________________________________
Location of Surface Profile Measurements:___________________________________________________________
Signature of Inspector:____________________________________________________________________________
Page 6 (Rev 1)
QA-4. QUALITY ASSURANCE INSPECTION FORM
SURFACE SOLUBLE SALT CONDUCTIVITY LOG
Vessel Name and Hull Number:__________________________________________________
Work Item Title:_______________________________________________________________
Location of Work (including frame numbers):_______________________________________
Area (square feet):____________
DATE TEST LOCATIONS CONDUCTIVITY
(microsiemens/cm)
Date and Time:_________________________________________
Signature of Inspector:___________________________________
Page 7 (Rev 1)
QA-5. QUALITY ASSURANCE DATA FORM
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC PA-2
(Use one sheet for each sequence)
Vessel Name and Hull Number:__________________________________________________
Work Item Title:______________________________________________________________
Coating Manufacturer:_________________________________________________________
Product Name:________________________________________________________________
Batch Number:________________________________________________________________
Induction Time:_______________________________________________________________
Coating System Sequence (Indicate whether: primer, touch-up primer, barrier coat, 3rd coat?):__________________
DFT
MEASUREMENT
NUMBER
LOCATION OF READINGS MEASURED DFT
Application Method (Airless, Conventional Spray, Rolled):____________________
Average DFT: __________________________________________________________
Date and Time: _________________________________________________________
Signature of Inspector: ___________________________________
Page 8 (Rev 1)
12319_DLA_FLT (10 Sept 2008) 225 WLB (23 Apr 2008)
WORK ITEM 1: Clean and Inspect Sewage Collection and Holding Tanks
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the below designated tank(s):
TYPE OF TANK LOCATION CAPACITY
(gallons)
Sewage Tank 3-83-1-W 1,772 Vacuum Collection Tank 4-81-0-E 500
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General.
3.1.1 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which is a separate work item in this specification package:
• “Routine Drydocking”.
3.2 Cleaning requirements. The Contractor shall do the
following for the designated tank(s) listed in paragraph 1.1:
3.2.1 Operational test – initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
Page 9 (Rev 1)
3.2.2 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations.
3.2.3 Cleaning requirements. Remove manhole cover(s). Clean
the designated structure’s interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the tank coating system.
Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.2.4 Inspection. Visually inspect all interior surfaces;
including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
• Tank level indicator (TLI) and/or float switch condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
3.3 Closing. The Contractor shall ensure that the tanks remain open for approximately 24 hours after completion of the tasks specified above. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and after authorized repairs, if any, reinstall manhole cover(s) with new gasket material conforming to ASTM D1330. The Contractor shall clean and reseal all tank sight glasses, if applicable, prior to reinstallation.
3.4 Operational test – final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.
Page 10 (Rev 1)
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational tests.
Page 11 (Rev 1)
12318_DLA_FLT (10 Sept 2008) 225 WLB (23 Apr 2008)
WORK ITEM 2: Clean and Inspect Grey Water Collection and Holding Tanks
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the below designated tank(s):
TYPE OF TANK LOCATION CAPACITY
(gallons)
Grey Water Tank 4-82-2-W 2,798
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
ASTM International (ASTM) D1330, 2004, Standard Specification for Rubber Sheet Gaskets
3. REQUIREMENTS
3.1 General.
NOTICE!
The Contractor shall coordinate with the COTR and bundle all work that will impact habitability, minimizing the Government’s lodging costs. Provide a schedule of anticipated habitability disruption at the earliest practicable date, ideally at the arrival conference.
3.1.1 Related work items. The Contractor shall accomplish this work item in conjunction with the following, which is a separate work item in this specification package:
• “Routine Drydocking”.
• “Clean and Inspect Sewage Collection and Holding Tanks”.
3.2 Cleaning requirements. The Contractor shall do the
following for the designated tank(s) listed in paragraph 1.1:
Page 12 (Rev 1)
3.2.1 Operational test – initial. Prior to commencement of
work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all designated tank TLIs to demonstrate existing operational condition. Submit a CFR.
3.2.2 Content removal. Remove and dispose of all contents, fluids, and/or residues in accordance with all applicable Federal, state, and local regulations.
3.2.3 Cleaning requirements. Remove manhole cover(s). Clean
the designated structure’s interior surfaces free of all foreign materials, sediment, and sludge. Remove all persistent residues, taking care not to damage the tank coating system.
Remove cleaning media and residues continuously from the tank during the washing process. Remove any residual wash media and wipe up residual moisture with clean lint-free cloths. Collect, contain, and dispose of all wash media, residues, and cleaning materials in accordance with all Federal, state, and local regulations.
3.2.4 Inspection. Visually inspect all interior surfaces;
including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces. Submit a CFR including the following, as applicable:
• Tank structural condition.
• Inaccessible areas.
• Condition of tank coating, including measurements taken, percentage, location, and type of coating failure.
• Tank level indicator (TLI) and/or float switch condition.
• Suction and discharge piping condition.
• Fastener material and condition (correct fastener material is stainless steel).
Page 13 (Rev 1)
3.3 Closing. The Contractor shall ensure that the tanks remain open for approximately 24 hours after completion of the tasks specified above. Notify the COTR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and after authorized repairs, if any, reinstall manhole cover(s) with new gasket material conforming to ASTM D1330. The Contractor shall clean and reseal all tank sight glasses, if applicable, prior to reinstallation.
3.4 Operational test – final. After all authorized work is
complete, in the presence of the Coast Guard Inspector, the Contractor shall thoroughly test and prove the TLIs to be in satisfactory operating condition (see 4.1 (Equipment operation)). Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational
Page 14 (Rev 1)
S_13000_JLW_210(21 September 2009)
WORK ITEM 3: Renew Watertight Door
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew a watertight door.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Watertight Door
1-66-2 N/A 1 ea. 3500.00
2. APPLICABLE DOCUMENTS
Coast Guard Drawing 225B WLB 167-001, Rev H, Structural Closures
3. REQUIREMENTS
3.1 Reference documents. The Contractor shall:
3.1.1 Refer to Coast Guard Drawing 225B WLB 167-001.
3.1.2 Renew watertight door 1-66-2. Perform the following:
• Temporarily remove interferences, as applicable.
• Crop and remove the structural closure. DO NOT DISPOSE.
Turn over to ship’s force for disposal. Install protective coverings, as required, when work on structural closure is suspended for more than an hour to prevent contamination, water, and all other foreign material from entering ship and to act as an AC boundary.
• Install the new designated structural closure assembly.
Re-install all items removed or disturbed as interferences, restoring these items to their original configuration and operating condition.
Page 15 (Rev 1)
• Prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces.
For exterior surfaces use the “Freeboard/Superstructure/Mast (Freeboard/Superstructure, Steel), Option I” coating system. For interior surfaces use either the “Bulkheads (Bulkheads and Overheads, Un-insulated Steel), Option I” coating system or “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam, Option I” coating system as applicable. Match colors to surrounding surfaces.
• Perform a chalk test to demonstrate 100% gasket to knife edge contact when the door is fully dogged. Ensure that initial contact between gasket and knife edge occurs throughout extent of gasket before final securing of dogs, and without use of excessive closing force. If the mark on the gasket is not uniform, adjust as necessary to achieve uniform contact and retest.
• For structural closures that open to the weather, perform a water hose test of all affected boundaries in accordance with Std Spec 0740_STD, Appendix C.
• Ships force will handle all damage control marking
4. NOTES
This section is not applicable to this work item.
Page 16 (Rev 1)
25900W_225(21 September 2009)
WORK ITEM 4: Clean and Inspect MDE and SSDG Exhaust Uptakes
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect both Main Diesel Engine (MDE) and Ship Service Diesel Generator (SSDG) exhaust stacks.
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 1001_STD, 2004 Edition, Temporary Hull Accesses
Code of Federal Regulations (CFR) Title 29, Part 1915, 2005, Occupational Safety and Health Standards for Shipyard Employment
Coast Guard Drawing 225B WLB 259-001, Rev C, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225B WLB 259-005, Rev C, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225B WLB 259-006, Rev C, Combustion Intake & Exhaust A & D Hull Block 970 & 975
3. REQUIREMENTS
3.1 General.
3.1.1 Refer to Coast Guard Drawings 225B WLB 259-001, 225B WLB 259-005, and 225B WLB 259-006.
3.1.2 Staging. The Contractor shall, in accordance with 29 CFR 1915, Subpart E, erect suitable staging or scaffolding within each stack, to facilitate the performance of the work specified herein.
Page 17 (Rev 1)
3.1.3 Protective measures. The Contractor shall furnish and
install suitable covering to seal off and protect all non-affected surfaces/equipment and spaces in the vicinity of the work area against contamination during the performance of work.
Upon completion of work, remove protective material and inspect for the presence of contamination. Clean all equipment and spaces, contaminated due to improper protection, to original condition of cleanliness.
3.1.4 Safety precaution. The Contractor shall rig suitable
safety netting, to protect workers during possible falls, and to protect the Engine Room and machinery from falling tools.
3.1.5 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Exhaust pipe insulation.
• Exhaust pipe expansion joints.
• Expansion joint insulation.
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.3 Temporary access openings. Due to limited access to the
exhaust piping, the Contractor may, with express permission of the COTR (via submission of a CFR), cut access holes in the exhaust piping, above the mufflers, to facilitate removal of debris generated by the cleaning process. Perform all work required to open and close the access openings in accordance with Std Spec 1001_STD.
3.4 Cleaning requirement particulars. The Contractor shall
accomplish the following tasks:
• Disassemble the exhaust piping between diesel engines and mufflers at the flanges for each diesel engine (as necessary), to facilitate cleaning of the exhaust piping sections.
• Using flue brushes or other suitable means, thoroughly clean the interior of each exhaust pipe system, from the top of the stack to the engine exhaust manifold; ensure that all tar and soot deposits, and all other surface contaminants are completely removed.
Page 18 (Rev 1)
• Upon completion of cleaning, remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all generated debris in accordance with all applicable Federal, state, and local regulations.
3.5 Inspection and report. The Contractor shall perform a
visual inspection of the following components; submit a CFR:
• Exhaust stack access hatches, including all associated studs and nuts.
• All cleaned exhaust stack surfaces.
• All exhaust expansion joints.
3.6 Component renewal. The Contractor shall renew all flange
connection gaskets with suitable high temperature, non-asbestos-containing gasket materials, during interference reinstallation.
3.7 Operational test. In the presence of the Coast Guard
Inspector, the Contractor shall thoroughly test and prove the exhaust stack system to be in satisfactory operating condition (see 4.1 (Equipment operation)). Inspect and correct any abnormal back-pressure, noise, lack of tightness, and high temperature generated from the exhaust systems. Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational
Page 19 (Rev 1)
S31100_LNM_SWIT (18 Mar 2008)
WORK ITEM 5: Clean Diesel Generators In-Place
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the below-listed diesel generators – in place:
Generators/Motors
Description & Location
Manufacturer Model number Volts Power Speed rpm
Qty
Thruster Generator
Magnatek 243266-LA 480 VAC 800 KW 1200 1
SSDG Caterpillar 3508 562 KVA 450 KVA 1200/
60 HZ
EDG Caterpillar 3506 450 VAC 285 KW 1800/
60 HZ
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 2350_STD, 2004 Edition, Clean, Inspect, Varnish-Treat, and Test Propulsion Generators and Motors, Ship Service and Emergency Generators in-Place
3. REQUIREMENTS
3.1 Critical Inspection Report. The Contractor shall submit a critical inspection report (CIR) for the inspections listed in the following paragraph(s):
3.2 (Operational test - initial).
Page 20 (Rev 1)
3.2 Operational test - initial. Prior to commencement of work, the Contractor shall witness an operational pre-test (by Coast Guard personnel) of all specified generators, to demonstrate existing operational condition. Meggar all windings to determine insulation resistance prior to cleaning. Submit CIR.
NOTICE!
Leave one generator functional at all times!
3.3 Cleaning and inspection requirements. The Contractor shall clean and inspect the designated generator(s) in accordance with Std Spec 2350_STD.
3.4 Varnish treatment. If a Change Request has been released
and authorized by the KO, the Contractor shall air-dry varnish treat each generator in accordance with Spec 2350_STD, Section 3.4.2.
3.5 Operational test – final. In the presence of the Coast
Guard Inspector, the Contractor shall thoroughly test and prove the Ships Service Diesel Generators and Emergency Diesel Generator to be in satisfactory operating condition, and able to hold full load separately for one hour using ship's load (see
5.1 (Equipment operation)). Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational
Page 21 (Rev 1)
S13000W_616#(26 Dec 2007)
WORK ITEM 6: Inspect and Test Main Breakers
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect and test the following breakers.
BREAKER DESCRIPTION LOCATION
1 4PSA-15 Shore Power #1, 400AMP Main SWBD 2 4PSA-15 Shore Power #2, 400AMP Main SWBD 3 15GA-4P-15 #1 SSDG, 830 AMP Main SWBD 4 25B6-4P-25 #2 SSDG, 830 AMP Main SWBD 5 25-4P-E(1) #1 FWD MACH, 500 AMP Main SWBD 6 25-4P-D(1) # FWD MACH, 250 AMP Main SWBD 7 Bus Tie Bus Tie, 1200 AMP Main SWBD 8 Thruster Gen Thruster Gen, 1600 AMP Thruster SWBD 9 Bow Thruster Bow Thruster, 750 AMP Thruster SWBD 10 Stern Thruster Stern Thruster, 1200 AMP Thruster SWBD 11 1EG-4EP-1E Emergency Gen, 520 AMP EDG SWBD 12 15-4P-1E Emergency Tie, 375 AMP EDG SWBD
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Technical Publication (TP) 3536A, All Sections, Manufacturers Instruction Book - SWBS Group 324
Coast Guard Technical Publication (TP) 3536B, All Sections, Manufacturers Instruction Book - SWBS Group 324
3. REQUIREMENTS
3.1 General. Refer to TP-3536A and TP-3536B. Prior to
disassembly, the Contractor shall record all wiring information, trip setting adjustments, and equipment locations for use at reinstallation. Retain all mounting and connecting hardware for later reuse. Notify the Coast Guard Inspector 48 hours prior to start of disassembly work. Submit CFR.
Page 22 (Rev 1)
3.2 Disassembly. The Contractor shall disconnect and remove
the circuit breakers listed in the Para 1.1. Coordinate the disconnection and removal of the circuit breakers with the Coast Guard Inspector to minimize disruption of power. After removing breakers, prevent personnel contact with energized conductors by installing temporary covers or switchboard/panel board insulation.
3.3 Inspections. The Contractor shall inspect the wire
connectors, screws and plating. Record all evidence of cross threading or binding, wire connector damage, etc. Submit CFR.
3.4 Testing. The contractor shall perform the following tests on all circuit breakers. Repairs required as a result of damage due to testing procedures shall be the responsibility of the Contractor:
• Mechanical Operation
• Insulation Resistance
• Individual Pole Resistance
• Inverse-Time Over current Tripping
• Instantaneous Over current Tripping
• Rated Hold-In Current (Note: Perform this test only on the Circuit Breaker which are tripping under normal load condition. The Coast Guard Inspector will identify the Circuit Breakers).
NOTICE!
Surface burn marks and hairline cracks are acceptable but shall not deteriorate the mold surface or impair physical strength. Cracks are not permitted in wall section between phase and a ground plane when there is a conducting part in contact with the wall section. Cracks shall not exceed 0.75 inch in length, and in no case should be greater than 50 percent of the length of the surface in which the crack appears.
3.4.1 Report The Contractor shall provide report detailing the following for each circuit breaker:
• Circuit Breaker Model and Serial Number
• Circuit Breaker Service
• Circuit Breaker Visual Condition
• Test Voltage / Test Amperes
• Type of Test / Test Method / Test Date / Name of Test Laboratory
Page 23 (Rev 1)
• Result of Testing (state if breaker assembly renewal recommended vice repair)
3.5 Reinstallation. Reinstall all removed breakers and return systems to normal operating condition.
Page 24 (Rev 1)
S_31100_LNM_SWIT (06 Oct 2008)
S_51001_JLW_211#(17 NOV 2008)
WORK ITEM 7: Repair Supply Ventilation Systems (S1-23-2, S1-14-2)
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to repair supply ventilation systems (S1-23-2, S1-14- 2)
1.2 Government-furnished property.
None.
2. APPLICABLE DOCUMENTS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
NAVSEA Drawing 804-5773932, Rev A, Acoustic & Thermal Insulation for Ducts Installation Details
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B WLB 512-009, Rev D, HVAC A&D FR 57-75
MN DK & 01 LVL BLK 960
Coast Guard Drawing 225B WLB 512-012, Rev -, HVAC Standard Details and General Instructions
Coast Guard Drawing 225B WLB 512-001, Rev K, HVAC Diagram
Coast Guard Drawing 225B WLB 512-004, Rev E, HVAC A&D FR 12-30, Hull Block 910
Coast Guard Drawing 225B WLB 512-012, Rev -, HVAC Standard Details and General Instructions
3. REQUIREMENTS
3.1 General.
Page 25 (Rev 1)
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to:
• Shelving.
• Ducting Screens
• Galley food prep tables and other associated equipment.
• Overhead sheathing/panels.
• Electric pre-heaters
3.1.3 Refer to Coast Guard Drawings 225B WLB 512-001, 225B WLB
512-009, 225B WLB 512-012, 225B WLB 512-001, 225B WLB 512-004,
and 225B WLB 512-012.
3.2 Repairs and renewals. The Contractor shall perform the
following:
NOTICE!
Ships force will disconnect all wiring to motors, preheaters and thermostats.
3.2.1 System S1-23-2. Renew ventilation duct work and
associated fasteners and gaskets from the reducer at the supply side of the fan to where the duct enters the ATON Shop (1-21-2- Q), using stainless steel. Renew all associated accessories including screens, dampers and vanes.
3.2.2 System S1-14-2. Renew ventilation duct work and
associated fasteners and gaskets from the reducer at the supply side of the fan to where the duct enters the Armory (1-12-2-M), using stainless steel. Renew all associated accessories including screens, dampers and vanes.
3.2.3 Renew all disturbed duct insulation, as applicable, as
described below:
3.2.3.1 Clean all exposed ducting component surfaces, with a
soft bristle brush and a mild detergent solution, to remove all visible surface contaminants..
3.2.3.2 Install new insulation material over the exposed
ducting surfaces, as shown on NAVSEA Drawing 804-5773932. Paint the newly installed insulation system, in accordance with COMDTINST M10360.3, using the system specified for “Insulation Surfaces, Fiberglass Sheet/Closed Cell PVC Foam” in Appendix B (Cutter and Boat Interior Paint Systems).
Page 26 (Rev 1)
3.3 Touch-up preservation. The Contractor shall prepare and
coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with COMDTINST M10360.3, Appendix A (Cutter and Boat Exterior Painting Systems) and Appendix B (Cutter and Boat Interior Painting Systems), respectively, and as applicable. Abide by all touch-up requirements outlined in paragraph 3.11.9 (Touch-ups and minor coating repairs)) of Std Spec 0000_STD.
3.4 Operational test - final. In the presence of the Coast
Guard Inspector, and prior to re-installing the false overhead, the Contractor shall thoroughly test and prove all new and disturbed equipment to be in satisfactory operating condition.
Submit a CFR.
4. NOTES
4.1 Equipment operation. Coast Guard personnel will operate
all shipboard machinery and equipment during all operational
Page 27 (Rev 1)
WORK ITEM 8: Renew Rudder Blade
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the rudder blade.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
No **Lower Rudder Stock brg 3120-21-912-7635 1 5,478 No **Upper Rudder brg 3110-01-466-9924 1 5,002 No **Pental brg 3120-21-912-7634 1 2,610 No Rudder System Seal Kit 5330-01-565-8083 1 1,826 Yes Rudder Blade Assembly
(blade, stock, etc.)
2040-01-507-7034 1 298,000
No **Rudder Stock Blank 2040-01-F98-0204 1 27,328 No Pin, Straight, Headless 5315-01-565-8012 1 725 No Pin, Straight, Headless 5315-01-565-8004 1 695 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel, Electronic Systems Support Unit (ESU) or local Electronic Support Detachment (ESD).
2. APPLICABLE DOCUMENTS
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0000_STD, 2006 Edition, General Requirements
Coast Guard Maintenance and Logistics Command Atlantic (MLCA), Standard Specification 0740_STD, 2004 Edition, Welding and Allied Processes
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Coast Guard Drawing 225B WLB 561-003, Rev A, Steering Gear Arrangement
Coast Guard Drawing 225B WLB 562-001, Rev D, Steering Components A&D
Page 28 (Rev 1)
Coast Guard Drawing 225B WLB 562-002, Rev C, Rudder - Structure A&D
Coast Guard Drawing 225B WLB 801-006, Rev C, Docking Drawing
Coast Guard Drawing 225B WLB 562-003, Rev -, Thordon Lower Rudder Stock Bearing
Coast Guard Drawing 225B WLB 562-004, Rev -, Pintle Bearing
Coast Guard Drawing 225B WLB 631-001, Rev G, Painting Schedule
225A Class Rudder Removal Memorandum, 7 Jan 2009
3. REQUIREMENTS
3.1 General.
3.1.1 Protective measures. The Contractor shall accomplish the following:
• Provide suitable covering to protect all exposed rudder and vessel components against contamination during the performance of the work specified herein.
• Ensure that rudder stock/shaft surfaces are supported in a minimum of two locations, at all times, until reinstallation.
3.1.2 Interferences. The Contractor shall be aware that
interferences in way of work include, but are not limited to the following:
• Rudder post nut.
• Tiller & steering gear.
• Plate above rudder post.
NOTICE!
Although the Contractor is responsible for determining and performing the best procedure for renewal of the CYPRESS rudder blade, a memorandum titled “225A Class Rudder Removal
Memorandum” that describes a procedure used on a 225 A-Class Cutter is provided, for information only. The Contractor is not required to use this procedure, however, it may assist the
Contractor with the determination of pricing and with determining the optimum procedure for renewing the CYPRESS rudder blade. The Contractor shall use the information in the 225A Class
Rudder Removal Memorandum at his own risk.
Page 29 (Rev 1)
3.1.5 Refer to the 225A Class Rudder Removal Memorandum, for
information only.
3.1.6 Refer to Coast Guard Drawings 225B WLB 561-003, 225B WLB 562-001, 225B WLB 562-002, 225B WLB 801-006, and 225B WLB 562- 003, and 225B WLB 562-004.
3.2 Rudder blade renewal. The Contractor shall renew the rudder blade using Government-furnished property. Renew all disturbed software (e.g. seals, gaskets, o-rings, synthetic rubber sealant, etc.) and fasteners. Use Government-furnished seals, as applicable. Renew the seal plates and seal retainer plate.
Renew all associated grease fittings. While the rudder assembly is disassembled, perform the…